CN214426008U - Be used for preventing waste incinerator grate coking structure - Google Patents

Be used for preventing waste incinerator grate coking structure Download PDF

Info

Publication number
CN214426008U
CN214426008U CN202120331798.3U CN202120331798U CN214426008U CN 214426008 U CN214426008 U CN 214426008U CN 202120331798 U CN202120331798 U CN 202120331798U CN 214426008 U CN214426008 U CN 214426008U
Authority
CN
China
Prior art keywords
wall
grate
coking
furnace body
side wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120331798.3U
Other languages
Chinese (zh)
Inventor
曹晓东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202120331798.3U priority Critical patent/CN214426008U/en
Application granted granted Critical
Publication of CN214426008U publication Critical patent/CN214426008U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Incineration Of Waste (AREA)

Abstract

The utility model relates to an energy field specifically indicates a be used for preventing waste incinerator row stove coking structure, including the grate furnace body, the grate furnace body includes back wall, left side wall and right side wall are equipped with supplementary combustion-supporting respectively, the back wall is located and encircles the department behind the wall and has laid first burnt hole and broken the encircleing and help the flow ware along the horizontal direction, it is located to encircle behind the back wall first burnt hole top correspondence is equipped with first adherence tuber pipe, left side wall is located supplementary combustion-supporting upper left side and is equipped with the second and beats the burnt hole, the second is beaten burnt hole top and is equipped with second adherence tuber pipe.

Description

Be used for preventing waste incinerator grate coking structure
Technical Field
The utility model relates to an energy field specifically indicates a be used for preventing waste incinerator grate coking structure.
Background
The operating period is prolonged by attempting to slow down the coking of the boiler by methods of controlling the temperature and the oxygen of the boiler, adjusting secondary air, controlling a material layer and the like, but the effect is not obvious, and the coking phenomenon of the boiler is more and more serious. After the boiler is seriously coked, the smoke gas flow area can be reduced, the garbage movement is influenced, the boiler is forced to be shut down, the coking condition of the boiler is checked, generally, the two side walls with the same elevation above a rear arch is formed, the included angle between the rear arch and the side walls is particularly serious, the rear arch and a large amount of coking of the two side walls are gradually connected into a whole, the danger of coke cleaning during the shutdown is large, the cleaning difficulty is large, the maintenance time of the boiler is influenced, large coke blocks are easy to damage a fire grate in the cleaning and dropping process, the boiler is forced to be shut down due to coking, the annual operation hours of the boiler are reduced, the shutdown times are increased, the maintenance workload is increased, the garbage incineration amount is reduced, the garbage can be blown out when the garbage amount is large, the environment is seriously polluted, and the inestimable result is brought.
SUMMERY OF THE UTILITY MODEL
The to-be-solved technical problem of the utility model is to overcome the defect of above-mentioned technique, provide a be used for preventing waste incinerator grate coking structure.
For solving the technical problem, the utility model provides a technical scheme is a be used for preventing waste incinerator grate coking structure, including the grate furnace body, the grate furnace body includes back wall, left side wall and right side wall are equipped with supplementary combustion-supporting respectively, the back wall is located to encircle the department behind the wall and has laid first burnt hole and broken the arch and help the flow ware along the horizontal direction, it is located to encircle behind the back wall first burnt hole top correspondence is equipped with first adherence tuber pipe, the left side wall is located supplementary combustion-supporting upper left side and is equipped with the second and beat the burnt hole, the second is beaten burnt hole top and is equipped with the second and adheres to the wall tuber pipe.
As an improvement, the aperture of the first coking hole adopts a gradually expanding structure from the outside of the furnace body to the inside of the furnace body.
As an improvement, the first wall-attached air pipe is connected with the secondary air pipe.
As an improvement, the second wall-attached air pipe is connected with a secondary air pipe.
Compared with the prior art, the utility model the advantage lie in: before the boiler is technically improved by a coke cleaning hole, the boiler generally runs for about 3 months, the boiler is forced to be shut down for maintenance due to serious coking, 1 boiler needs to be started and stopped 4 times per year, the diesel oil consumption amount of each start-up is about 13 tons, each ton of diesel oil is about 6000.00 yuan according to the market price, about 52 tons of diesel oil are needed for 1 boiler to start up 4 times in 1 year, the fuel oil cost is about 31.2 ten thousand, and 62.4 ten thousand yuan is needed for 2 boilers to start up in one year; after the technical improvement of the coke cleaning hole of the boiler, the coke cleaning work is carried out on the boiler for 1 to 2 times every week, the operation time of the boiler is prolonged from about 3 months to about 6 months, the number of times of starting and stopping the boiler in one year is reduced from 4 times to 2 times, the oil consumption of starting the 2 furnaces is reduced from about 52 tons to about 26 tons, the oil consumption of fuel oil is reduced from about 62.4 ten thousand yuan to about 31.2 ten thousand yuan, and after the technical improvement of the coke cleaning hole, the oil consumption and the cost of starting the 2 furnaces in one year are equivalent to the oil consumption and the cost of 1 furnace before the technical improvement of the coke cleaning hole. Greatly reduces the furnace starting cost, ensures the timely treatment of the garbage, and has considerable economic and social benefits.
Drawings
FIG. 1 is a schematic view of the left side wall of a waste incinerator grate;
FIG. 2 is a schematic view of the right side wall of a grate of a garbage incinerator;
fig. 3 is a schematic view of the rear wall of the waste incineration furnace.
As shown in the figure: 1. the grate furnace comprises a grate furnace body, 101, a rear wall, 102, a left side wall, 103, a right side wall, 2, an auxiliary burner, 3, a first coking hole, 4, a second coking hole, 5, a first wall-attached air pipe, 6, a second wall-attached air pipe, 7 and an arch-breaking flow aid.
Detailed Description
The structure for preventing the grate coking of the garbage incinerator of the present invention will be described in detail with reference to the accompanying drawings.
With reference to fig. 1-3, a structure for preventing a waste incinerator grate from coking includes a grate body 1, the grate body 1 includes a rear wall 101, a left side wall 102 and a right side wall 103, the left side wall 102 and the right side wall 103 are respectively provided with an auxiliary combustion supporter 2, the rear wall 101 is located at the rear arch of the wall and is provided with a first coking hole 3 and an arch-breaking flow-aid 7 along the horizontal direction, the rear arch of the rear wall 101 is located above the first coking hole 3 and is correspondingly provided with a first wall-attached air pipe 5, the wall of the left side wall 102 is located above the auxiliary combustion supporter 2 and is provided with a second coking hole 4, and a second wall-attached air pipe 6 is arranged above the second coking hole 4.
As a preferred embodiment of the embodiment, the aperture of the first coking hole 3 adopts a gradually expanding structure from the outside of the furnace body to the inside of the furnace body.
As a preferred embodiment of this embodiment, the first adherent air duct 5 is connected with a secondary air duct.
As a preferred embodiment of this embodiment, the second adherent air duct 6 is connected with a secondary air duct.
The utility model discloses when concrete implementation, the back wall is located and encircles behind the wall department and lay first burnt hole and the broken ware that helps the flow of arching along the horizontal direction, the back wall is encircleed behind the wall and is located first burnt hole top correspondence is equipped with first adherence tuber pipe, the left side wall is located supplementary combustion-supporting ware upper left side and is equipped with the second and makes burnt hole, the second is made burnt hole top and is equipped with the second adherence tuber pipe.
The present invention and the embodiments thereof have been described above, but the description is not limited thereto, and the embodiment shown in the drawings is only one of the embodiments of the present invention, and the actual structure is not limited thereto. In summary, those skilled in the art should understand that they should not be limited to the embodiments described above, and that they can design the similar structure and embodiments without departing from the spirit of the invention.

Claims (4)

1. The utility model provides a be used for preventing waste incinerator grate coking structure, includes grate furnace body (1), grate furnace body (1) is including back wall (101), left side wall (102) and right side wall (103) are equipped with supplementary combustion-supporting ware (2) respectively, its characterized in that: rear wall (101) are located behind the wall and encircle department and have laid first burnt hole (3) and broken a class and help flow ware (7) along the horizontal direction, rear wall (101) wall is followed to encircle and is located first burnt hole (3) top correspondence is equipped with first adherence tuber pipe (5), left side wall (102) wall is located supplementary combustion-supporting ware (2) upper left side and is equipped with second and beats burnt hole (4), second is beaten burnt hole (4) top and is equipped with second adherence tuber pipe (6).
2. The structure for preventing coking in a grate of a garbage incinerator according to claim 1, characterized in that: the aperture of the first coking hole (3) adopts a gradually expanding structure from the outside of the furnace body to the inside of the furnace body.
3. The structure for preventing coking in a grate of a garbage incinerator according to claim 1, characterized in that: the first wall-attached air pipe (5) is connected with the secondary air pipe.
4. The structure for preventing coking in a grate of a garbage incinerator according to claim 1, characterized in that: and the second wall-attached air pipe (6) is connected with the secondary air pipe.
CN202120331798.3U 2021-02-05 2021-02-05 Be used for preventing waste incinerator grate coking structure Active CN214426008U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120331798.3U CN214426008U (en) 2021-02-05 2021-02-05 Be used for preventing waste incinerator grate coking structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120331798.3U CN214426008U (en) 2021-02-05 2021-02-05 Be used for preventing waste incinerator grate coking structure

Publications (1)

Publication Number Publication Date
CN214426008U true CN214426008U (en) 2021-10-19

Family

ID=78070711

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120331798.3U Active CN214426008U (en) 2021-02-05 2021-02-05 Be used for preventing waste incinerator grate coking structure

Country Status (1)

Country Link
CN (1) CN214426008U (en)

Similar Documents

Publication Publication Date Title
CN216131907U (en) Biomass fuel burning corner tube type steam boiler
CN106224974A (en) Waste incineration processing system
CN106352343A (en) Gasifying incinerator applicable to household garbage with high heat value
CN105698184A (en) Combustion system capable of inhibiting generation of unburned objects during garbage combustion process
CN214426008U (en) Be used for preventing waste incinerator grate coking structure
CN205619343U (en) High -efficient clean burning furnace that burns
CN201487967U (en) Flashback type garbage pyrolysis gasification incinerator
CN201925910U (en) Chain-grate type coal-burning boiler
CN105698183A (en) Combustion furnace for treating garbage
CN105698182A (en) Combustion system for treating garbage
CN209484613U (en) A kind of combustion-supporting burner hearth in surface
CN212108357U (en) Biomass boiler
CN209622815U (en) A kind of fire grate segment and the garbage incinerator grates based on the fire grate segment
CN210891620U (en) Hood grate on biomass boiler
CN203336814U (en) Horizontal hot water boiler
CN111720815A (en) Integrated biomass gasification low-nitrogen and oxygen-poor combustion boiler
CN205535840U (en) A burn burning furnace for refuse disposal
CN202647841U (en) Boiler
CN206768041U (en) A kind of energy-saving biomass solid fuel gas producer device
CN205535839U (en) A system of burning for refuse disposal
CN105588114A (en) Vertical type semi-gasification biomass burning boiler
CN2639716Y (en) Back burn gas furnace for reforming boiler
CN201652323U (en) Synchronous combustion chain furnace with function of full coal layer inflammation
CN201748477U (en) Downwardly-arranged type transverse combustion biomass gasifying boiler
JP2017020712A (en) Method for processing residue and ash at combustion furnace and method for countermeasure against clinker

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant