CN214424038U - Constructional column pouring device is built in room - Google Patents

Constructional column pouring device is built in room Download PDF

Info

Publication number
CN214424038U
CN214424038U CN202120301659.6U CN202120301659U CN214424038U CN 214424038 U CN214424038 U CN 214424038U CN 202120301659 U CN202120301659 U CN 202120301659U CN 214424038 U CN214424038 U CN 214424038U
Authority
CN
China
Prior art keywords
template
pouring
closing plate
plate
plugging
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202120301659.6U
Other languages
Chinese (zh)
Inventor
曹丽丽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian Ronghong Construction Co ltd
Original Assignee
Fujian Ronghong Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujian Ronghong Construction Co ltd filed Critical Fujian Ronghong Construction Co ltd
Priority to CN202120301659.6U priority Critical patent/CN214424038U/en
Application granted granted Critical
Publication of CN214424038U publication Critical patent/CN214424038U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The application discloses constructional column pouring device is built in room relates to a constructional column is built in room, has reduced staff's work burden, and it is including being used for fixing first template and the second template in the relative both sides of wall body, the mouth of pouring that is the rectangle structure is seted up to first template upper end, first template is located the feeder hopper that the department of pouring is provided with the slope, sliding connection has the closing plate that is used for sealing the mouth of pouring on the first template, the length direction that the closing plate can follow first template slides from top to bottom, be equipped with on the first template when the closing plate cunning is opened to the mouth of pouring completely for carry out fixed knot to first template and construct. This application reduces effectual reduction staff's intensity of labour.

Description

Constructional column pouring device is built in room
Technical Field
The application relates to a constructional column is built in room, especially relates to a constructional column pouring device is built in room.
Background
At present, in order to enhance the integrity and stability of a building, reinforced concrete constructional columns are arranged in the wall body of a multi-layer brick-concrete structure building and are connected with ring beams of all layers to form a space frame capable of resisting bending and shearing, and the space frame is an effective measure for preventing a house from collapsing.
As shown in fig. 1, a pouring template 1 of a constructional column in the related art includes two templates 1 oppositely arranged on two sides of a wall body, a split bolt 3 for fixing the two templates 1 is arranged between the two templates 1, a pouring opening 4 is formed in the top of each template 1, a funnel 2 for pouring concrete is arranged at the position, located at the pouring opening 4, of each template 1, and the funnel 2 is in a dustpan shape with a large top and a small bottom.
With respect to the related art among the above, the inventors consider that the following drawbacks exist: after the constructional column is poured, concrete which exceeds the constructional column and a wall body can be formed in the funnel 2 in a hardening mode, after the formwork 1 and the funnel 2 are disassembled, protruding concrete needs to be chiseled and leveled manually, and the labor burden of workers is increased.
SUMMERY OF THE UTILITY MODEL
In order to reduce staff's work burden, this application provides a constructional column pouring device is built in room.
The application provides a constructional column pouring device is built in room adopts following technical scheme:
the utility model provides a device is pour to constructional column is built in room, is including being used for fixing first template and the second template in the relative both sides of wall body, the mouth of pouring that is the rectangle structure is seted up to first template upper end, first template is located the feeder hopper that the department of pouring was provided with the slope, sliding connection has the closing plate that is used for sealing the mouth of pouring on the first template, the length direction that the closing plate can follow first template slides from top to bottom, be equipped with between first template and the closing plate when the closing plate cunning is opened to the mouth of pouring completely for carry out fixed knot structure fixed to first template.
By adopting the technical scheme, after the pouring of the concrete is completed, the sealing plate can be slid to the position for plugging the pouring opening, so that the caking of the concrete at the pouring opening is reduced, the step of chiseling the concrete can be reduced in the later-stage form removal, and the labor intensity of workers is reduced.
Optionally, the two sides of the first formwork, which are located at the pouring opening, are provided with T-shaped blocks extending along the length direction of the first formwork, and one side of the closing plate, which is close to the first formwork, is provided with a T-shaped groove connected to the T-shaped blocks in a sliding manner.
Through adopting above-mentioned technical scheme, the setting of T type groove and T type piece can make the closing plate slide from top to bottom along the length direction of first template.
Optionally, a plugging mechanism for completely plugging the pouring opening by extending into the pouring opening is movably connected to the closing plate.
Through adopting above-mentioned technical scheme, the setting of shutoff mechanism, concrete caking that reduction that can be further is in pouring mouthful department.
Optionally, the blocking mechanism includes a blocking plate adapted to the size of the pouring opening, and a mounting groove for slidably connecting the blocking plate is formed in one side of the blocking plate facing the first template; and a driving piece is arranged on the sealing plate and used for driving the plugging plate to stretch into the pouring opening to enable the plugging plate and the inner side wall of the first template to be in the same plane position when the sealing plate moves to the mounting groove and is in the opposite position to the pouring opening.
Through adopting above-mentioned technical scheme, when the closure plate seals and pours the mouth, push the jam plate through the driving piece and be in the coplanar position to the inboard of jam plate inboard and first template, can effectual reduction concrete in pouring the mouth remain.
Optionally, the driving member is an adjusting bolt, a threaded hole communicated with the mounting groove and used for screwing the adjusting bolt is formed in one side of the sealing plate, which is far away from the first template, and one end of the adjusting bolt, which extends into the mounting groove, is rotatably connected with the sealing plate; and a limiting block for abutting the head of the adjusting bolt is arranged on the edge of the outer side of the closing plate close to the threaded hole in a protruding mode when the blocking plate moves to be in the same plane with the inner side of the first template.
Through adopting above-mentioned technical scheme, through adjusting bolt's setting, can make things convenient for the staff to adjust the flexible volume of jam plate, simultaneously, the setting of stopper can make things convenient for the staff to judge, and whether jam plate inboard is in the coplanar position with the inboard of first template.
Optionally, the fixing structure is a limiting groove formed above the pouring opening of the first template and used for clamping the blocking plate.
Through adopting above-mentioned technical scheme, when carrying out pouring of concrete, can remove the closure plate to the top of pouring the mouth to push the jam plate in the spacing groove through adjusting bolt, can realize the fixed of closure plate.
Optionally, the discharge gate has been seted up to the bottom of feeder hopper, and discharge gate department is connected with downwardly extending's discharging pipe, the tip of discharging pipe is provided with the shutoff piece that is used for shutoff discharging pipe.
Through adopting above-mentioned technical scheme, discharging pipe and the setting of jam piece can make things convenient for the staff to carry out recycle with unnecessary concrete in the feeder hopper, practices thrift the cost.
Optionally, the plugging piece is a plugging cover screwed with the pipe orifice of the discharge pipe for plugging the discharge pipe.
Through adopting above-mentioned technical scheme, adopt the shutoff lid as the shutoff piece of discharging pipe, have convenient operation's advantage.
In summary, the present application includes at least one of the following benefits:
1. the labor intensity of workers can be effectively reduced;
2. discharging pipe and shutoff lid's setting can make things convenient for the staff to carry out recycle with unnecessary concrete in the feeder hopper, practices thrift the cost.
Drawings
FIG. 1 is a schematic diagram of a prior art configuration;
FIG. 2 is a schematic view of the overall structure of the present embodiment;
FIG. 3 is an exploded view of the T-block of the present embodiment;
FIG. 4 is a schematic structural view of the closing plate of the present embodiment;
FIG. 5 is a schematic view illustrating a state that the plugging plate plugs the pouring opening according to the embodiment;
fig. 6 is a schematic diagram showing the plugging state of the plugging plate and the limiting groove according to the embodiment.
Description of reference numerals: 1. a template; 2. a funnel; 3. oppositely pulling the bolts; 4. pouring a mouth; 5. a first template; 6. a second template; 7. a feed hopper; 8. a closing plate; 9. a T-shaped block; 10. a T-shaped groove; 11. adjusting the bolt; 12. a bearing; 13. mounting grooves; 14. a blocking plate; 15. a threaded hole; 16. a limiting block; 17. a limiting groove; 18. a discharge port; 19. a discharge pipe; 20. and (6) sealing and blocking the cover.
Detailed Description
The present application is described in further detail below with reference to the attached drawings.
The embodiment of the application discloses constructional column pours device is built in room. Referring to fig. 2 and 3, the pouring device comprises a first formwork 5 and a second formwork 6 which are fixed on two opposite sides of the wall, and the first formwork 5 and the second formwork 6 are oppositely tensioned and tightly abutted on the wall through a plurality of oppositely-pulled bolts 3. The first template 5, the second template 6 and the wall body enclose a pouring space for forming the constructional column.
Referring to fig. 2 and 3, a pouring opening 4 communicated with the pouring space is formed in the upper end of the first template 5, and the pouring opening 4 is of a rectangular structure. The first template 5 is fixedly provided with an inclined feed hopper 7 at the pouring opening 4. Concrete can be fed into the pouring opening 4 through the feed hopper 7 to pour the constructional column.
Referring to fig. 3, a closing plate 8 for closing the pouring opening 4 is slidably connected to the first formwork 5, the closing plate 8 can slide up and down along the height direction of the first formwork 5, and when the sliding lower end of the closing plate 8 abuts against the feed hopper 7, the pouring opening 4 is blocked by the closing plate 8.
Further, referring to fig. 3 and 4, T-shaped blocks 9 extending along the length direction of the first formwork 5 are protruded from both sides of the first formwork 5 located at the pouring opening 4, and a T-shaped groove 10 connected to the T-shaped blocks 9 in a sliding manner is formed in the direction of the closing plate 8 facing the first formwork 5. The closing plate 8 can slide up and down along the length direction of the first template 5 through the matching of the T-shaped groove 10 and the T-shaped block 9.
Referring to fig. 4 and 5, a blocking mechanism for blocking the pouring port 4 is movably connected to the closing plate 8 in order to further block the pouring port 4. The plugging mechanism can completely plug the pouring opening 4.
Referring to fig. 4 and 5, the plugging mechanism comprises a plugging plate 14 arranged in the closing plate 8, and the size and the shape of the plugging plate 14 are the same as those of the pouring opening 4. One side of the closing plate 8 close to the first template 5 is provided with a mounting groove 13 for mounting the plugging plate 14, and the closing plate 8 is further provided with a driving part for driving the plugging plate 14 to extend out of the mounting groove 13. When the lower end of the closing plate 8 abuts against the feed hopper 7, the plugging plate 14 is opposite to the pouring opening 4, and the driving piece can push the plugging plate 14 into the pouring opening 4 at the moment, so that one side of the plugging plate 14 and the inner side of the first template 5 are in the same vertical plane, and concrete cannot be hardened at the pouring opening 4.
Referring to fig. 5, the driving member is an adjusting bolt 11, a threaded hole 15 communicated with the mounting groove 13 for the adjusting bolt 11 to be screwed is formed in the middle of one side of the closing plate 8, which is far away from the first template 5, a bearing 12 is embedded or welded on one side of the blocking plate 14, which is close to the threaded hole 15, and one end of the adjusting bolt 11, which extends into the mounting groove 13, is fixedly connected with an inner ring of the bearing 12, so that the adjusting bolt 11 and the closing plate 8 are rotatably connected.
Referring to fig. 3 and 5, a limiting block 16 protrudes from the edge of the outer side of the closing plate 8 close to the threaded hole 15, and when the adjusting bolt 11 rotates to abut against the limiting block 16, one side of the blocking plate 14 departing from the adjusting bolt 11 and the inner side of the first template 5 are located at the same plane, so that a worker can conveniently determine the position relation between the blocking plate 14 and the closing plate 8.
Referring to fig. 5 and 6, in order to facilitate concrete pouring by workers, a limiting groove 17 for the plugging plate 14 to be clamped is formed in the upper portion of the first formwork 5, which is located at the pouring opening 4. When the blocking plate 14 moves to the position just opposite to the limiting groove 17, the blocking plate 14 is pushed to enter the limiting groove 17 through the adjusting bolt 11, and then the fixed state for fixing the closing plate 8 can be formed. The blocking plate 14 and the limiting groove 17 are matched and fixed, so that a fixing structure for fixing the closing plate 8 can be formed.
Referring to fig. 5 and 6, in order to facilitate recycling of the excess concrete, a discharge hole 18 is formed in the bottom of the feed hopper 7, a discharge pipe 19 extending downward is connected to the discharge hole 18, a plugging member for plugging the discharge pipe 19 is disposed at an end of the discharge pipe 19, and the plugging member is a plugging cover 20 screwed to a pipe orifice of the discharge pipe 19. When concrete is poured, the discharge pipe 19 is sealed by the sealing cap 20, and when excess material is recovered, the sealing cap 20 is unscrewed for discharging.
The implementation principle of this application embodiment a constructional column pouring device is built in room is:
when the concrete placement of completion constructional column, slide closing plate 8 to the position of lower extreme butt in feeder hopper 7, then rotate adjusting bolt 11 to the position of butt in stopper 16 for the inboard parallel and level of inboard and the first template 5 of jam plate 14 can accomplish the shutoff of pouring mouth 4, when making the later stage form removal, pour mouth 4 department and be difficult to leave the concrete of sclerosis, reduce the step of later stage pick chisel, reduced staff's work burden.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (8)

1. The utility model provides a device is pour to constructional column is built in room, is used for fixing first template (5) and second template (6) in the wall body both sides relatively, its characterized in that: first template (5) upper end is seted up and is pouring mouth (4) of rectangle structure, first template (5) are located pouring mouth (4) and locate to be provided with feeder hopper (7) of slope, sliding connection has closing plate (8) that are used for sealing pouring mouth (4) on first template (5), closing plate (8) can be followed the length direction of first template (5) and slide from top to bottom, be equipped with between first template (5) and closing plate (8) and slide to pouring mouth (4) when opening completely when closing plate (8) for carry out fixed knot structure to first template (5).
2. The building construction column pouring device according to claim 1, wherein: the first formwork (5) is located the both sides of pouring the mouth (4) and all is provided with along T type piece (9) that first formwork (5) length direction extends, one side that closing plate (8) is close to first formwork (5) is equipped with T type groove (10) of sliding connection on T type piece (9).
3. The building construction column pouring device of claim 2, wherein: and a plugging mechanism which is used for extending into the pouring opening (4) to completely plug the pouring opening (4) is movably connected in the closing plate (8).
4. The building construction column pouring device according to claim 3, wherein: the blocking mechanism comprises a blocking plate (14) matched with the pouring opening (4) in size, and one side, facing the first template (5), of the closing plate (8) is provided with a mounting groove (13) for the sliding connection of the blocking plate (14); and a driving piece which is used for driving the plugging plate (14) to extend into the pouring opening (4) to enable the plugging plate (14) and the inner side wall of the first template (5) to be in the same plane position when the closing plate (8) moves to the relative position of the installation groove (13) and the pouring opening (4) is arranged on the closing plate (8).
5. The building construction column pouring device of claim 4, wherein: the driving piece is an adjusting bolt (11), one side, far away from the first template (5), of the sealing plate (8) is provided with a threaded hole (15) communicated with the mounting groove (13) and used for the adjusting bolt (11) to be in threaded connection, and one end, extending into the mounting groove (13), of the adjusting bolt (11) is rotatably connected with the sealing plate (8); the edge of the outer side of the closing plate (8) close to the threaded hole (15) is provided with a limiting block (16) which is used for abutting against the head of the adjusting bolt (11) when the blocking plate (14) moves to be in the same plane with the inner side of the first template (5).
6. The building construction column pouring device of claim 5, wherein: the fixing structure is a limiting groove (17) which is formed above the pouring opening (4) of the first template (5) and is used for clamping the blocking plate (14).
7. The building construction column pouring device according to claim 1, wherein: discharge gate (18) have been seted up to the bottom of feeder hopper (7), and discharge gate (18) department is connected with downwardly extending's discharging pipe (19), the tip of discharging pipe (19) is provided with the shutoff piece that is used for shutoff discharging pipe (19).
8. The building construction column pouring device of claim 7, wherein: the plugging piece is a plugging cover (20) which is screwed with the pipe orifice of the discharge pipe (19) and is used for plugging the discharge pipe (19).
CN202120301659.6U 2021-02-03 2021-02-03 Constructional column pouring device is built in room Expired - Fee Related CN214424038U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120301659.6U CN214424038U (en) 2021-02-03 2021-02-03 Constructional column pouring device is built in room

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120301659.6U CN214424038U (en) 2021-02-03 2021-02-03 Constructional column pouring device is built in room

Publications (1)

Publication Number Publication Date
CN214424038U true CN214424038U (en) 2021-10-19

Family

ID=78070128

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120301659.6U Expired - Fee Related CN214424038U (en) 2021-02-03 2021-02-03 Constructional column pouring device is built in room

Country Status (1)

Country Link
CN (1) CN214424038U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115162716A (en) * 2022-07-26 2022-10-11 中国建筑第五工程局有限公司 Primary pouring method for secondary structure of building
CN115419191A (en) * 2022-09-22 2022-12-02 北京建工新型建材科技股份有限公司 Prefabricated hollow superposed shear wall cavity pouring node grout blocking and formwork erecting integrated tool and using method thereof

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115162716A (en) * 2022-07-26 2022-10-11 中国建筑第五工程局有限公司 Primary pouring method for secondary structure of building
CN115162716B (en) * 2022-07-26 2023-10-03 中国建筑第五工程局有限公司 One-time pouring method for secondary structure of building
CN115419191A (en) * 2022-09-22 2022-12-02 北京建工新型建材科技股份有限公司 Prefabricated hollow superposed shear wall cavity pouring node grout blocking and formwork erecting integrated tool and using method thereof
CN115419191B (en) * 2022-09-22 2024-05-24 北京建工新型建材科技股份有限公司 Prefabricated hollow superimposed shear wall cavity pouring node slurry blocking and formwork supporting integrated tool and application method thereof

Similar Documents

Publication Publication Date Title
CN214424038U (en) Constructional column pouring device is built in room
CN113047612B (en) Fabricated building constructional column and construction method thereof
CN214364933U (en) Constructional column pouring device is built in room
CN210599002U (en) Plugging device for lining trolley
CN111236636A (en) Wall constructional column pouring and shaping device and method
CN108222656B (en) The construction method of Prefabricated enclosure wall
CN103590599A (en) Self-compaction mode locking device and using method
CN210421182U (en) Basement roof post-cast strip seals structure in advance
CN205822780U (en) Floor setting-out hole is reserved and blocks mould
CN217680512U (en) Tool type constructional column pouring opening device
CN214245387U (en) Anticollision wall template convenient to dismantle
CN211850831U (en) Wall body constructional column pours setting device
CN205577403U (en) Template end cap instrument is pour to shear force wall waist rail concrete
CN210195773U (en) Steel mould trolley grouting device for rock wall grouting
CN106481082A (en) A kind of improvement casting method of constructional column
CN1064722A (en) At the bottom of a kind of expansion/footpath castinplace pile forming method and stake tool thereof
CN207934439U (en) Wall column root stuff up a crack optimizes device in a kind of aluminum alloy mould plate
CN218952829U (en) Convenient secondary structure pouring device in construction site
CN111663771A (en) Construction column dustpan mouth exempts from to pick chisel device
CN213597537U (en) Turnover cover plate for blocking aluminum template material conveying opening
CN108331333A (en) Wall column root stuff up a crack optimization device and its construction in a kind of aluminum alloy mould plate
CN220353393U (en) Movable horn mouth structure for pouring constructional column
CN206385661U (en) Engineering sleeve pipe pre-embedding for building blocks fixing device
CN220365316U (en) Discharge hopper device suitable for sandwich structure concrete placement
CN206428831U (en) Foam concrete wall pours a mouthful automatic close sealing device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20211019

CF01 Termination of patent right due to non-payment of annual fee