CN214423359U - Small-size pile driver is used in building engineering construction - Google Patents
Small-size pile driver is used in building engineering construction Download PDFInfo
- Publication number
- CN214423359U CN214423359U CN202023094529.4U CN202023094529U CN214423359U CN 214423359 U CN214423359 U CN 214423359U CN 202023094529 U CN202023094529 U CN 202023094529U CN 214423359 U CN214423359 U CN 214423359U
- Authority
- CN
- China
- Prior art keywords
- fixedly connected
- bottom plate
- construction
- small
- water tank
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000010276 construction Methods 0.000 title claims abstract description 24
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 44
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 9
- 239000010959 steel Substances 0.000 claims abstract description 9
- 230000005540 biological transmission Effects 0.000 claims abstract description 4
- 230000000149 penetrating effect Effects 0.000 claims description 7
- 239000007787 solid Substances 0.000 claims description 7
- 238000005507 spraying Methods 0.000 claims description 6
- 238000009435 building construction Methods 0.000 abstract description 2
- 238000000034 method Methods 0.000 description 17
- 239000007921 spray Substances 0.000 description 8
- 230000033001 locomotion Effects 0.000 description 6
- 230000004075 alteration Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007423 decrease Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000001125 extrusion Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- 239000002023 wood Substances 0.000 description 1
Images
Landscapes
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
Abstract
The utility model discloses a small-sized pile driving device for building engineering construction, which comprises a bottom plate, wherein universal wheels are fixedly connected with the front surface and the back surface of the two sides of the bottom plate, a toothed plate is fixedly connected with the top of the bottom plate, a winch is fixedly connected with the right side of the top of the bottom plate, a steel wire is connected with the output end of the winch in a transmission manner, a supporting arm is fixedly connected with the top of the bottom plate, a water tank is fixedly connected with the top of the supporting arm, a piston is slidably connected with the inside of the water tank, a connecting rod is fixedly connected with the bottom of the piston, a chute long block is fixedly connected with the top of the bottom plate, a sliding block B is slidably connected with the left side of the chute long block through a chute, a transverse rod is fixedly connected with the left side of the sliding block B, the top of the transverse rod is connected with the bottom of the connecting rod, a hammer head is fixedly connected with the left side of the transverse rod, and the small-sized pile driving device for building construction, the efficiency of pile driving is increased, and the time of pile driving is reduced.
Description
Technical Field
The utility model relates to a building pile technical field specifically is a small-size pile driving device is used in building engineering construction.
Background
Piling is an indispensable step in the construction process, and piling refers to and drives the pile into the ground end and increases the firmness of building, and traditional pile driver for construction is dry hard because of the ground in the in-process of piling, and the in-process efficiency of piling is low, so the small-size pile driver that increases pile efficiency for construction is now urgently needed.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a building engineering construction is with small-size pile device to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: a small-sized pile driving device for construction engineering comprises a base plate, wherein a toothed plate is fixedly connected to the top of the base plate, a winch is fixedly connected to the right side of the top of the base plate, a steel wire is connected to the output end of the winch in a transmission manner, a supporting arm is fixedly connected to the top of the base plate, a water tank is fixedly connected to the top of the supporting arm, a piston is slidably connected to the inside of the water tank, a connecting rod is fixedly connected to the bottom of the piston, a chute long block is fixedly connected to the top of the base plate, a sliding block B is slidably connected to the left side of the chute long block through a chute, a cross rod is fixedly connected to the left side of the sliding block B, the top of the cross rod is connected to the bottom of the connecting rod, a hammer is fixedly connected to the left side of the cross rod, one end, away from the winch, of the steel wire is connected to the top of the hammer through a pulley block, and a sliding block A is slidably connected to the left side of the chute long block, slider A's left side fixedly connected with violently connects the pole, the left side fixedly connected with fixing bearing A that violently connects the pole, fixing bearing A's inside through connection has solid fixed ring, conical gear A has been cup jointed to solid fixed ring's outside, conical gear A's outside meshing is connected with conical gear B, conical gear B's right side is rotated and is connected with the dwang, the right side fixedly connected with gear of dwang, the outside of gear meshes with the front of pinion rack mutually.
Preferably, the front and the back of the two sides of the bottom plate are fixedly connected with universal wheels.
Preferably, a spray pipe is communicated with the left side of the water tank, and a spray block is connected in the spray pipe in a penetrating manner.
Preferably, a water inlet is formed in the top of the water tank, and a wooden plug is connected inside the water inlet in a penetrating mode.
Preferably, the fixed bearing B is sleeved outside the rotating rod, and the top of the fixed bearing B is connected with the bottom of the transverse connecting rod.
Preferably, the right side of the bottom plate is fixedly connected with a push-pull handle.
Compared with the prior art, the beneficial effects of the utility model are that:
1. this small-size pile driver for construction, the water of water tank inside receives the extrusion and spouts the ground of piling through the spray pipe, and the ground of being piled is moistened by water and becomes wet soft, and the ground of piling is made wet soft with the water of water tank inside automatic sprinkling of in-process of piling ground messenger ground of piling, increases the efficiency of piling.
2. This small-size pile driver device for construction, the in-process of solid fixed ring motion drives solid fixed ring rotatory at the in-process that descends through conical gear A cooperation conical gear B, dwang and gear, and the in-process of pile makes solid fixed ring area stake automatically and carries out the spiral decline for the efficiency of bottom of the ground is squeezed into to the stake, increases pile efficiency, reduces the time of pile.
Drawings
FIG. 1 is a front anatomical diagram of the structure of the present invention;
FIG. 2 is an enlarged schematic view of the structure A of the present invention;
fig. 3 is a front schematic view of the long block of the sliding chute of the present invention.
In the figure: the device comprises a base plate 1, a winch 2, a steel wire 3, a supporting arm 4, a water tank 5, a piston 6, a connecting rod 7, a hammer 8, a chute long block 9, a sliding block A10, a sliding block B11, a cross rod 12, a transverse connecting rod 13, a fixing ring 14, a bevel gear A15, a bevel gear B16, a rotating rod 17, a gear 18 and a toothed plate 19.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, the present invention provides a technical solution: a small-sized pile driving device for construction engineering construction comprises a base plate 1, a push-pull handle is fixedly connected to the right side of the base plate 1, universal wheels are fixedly connected to the front and the back of the two sides of the bottom of the base plate 1 respectively, the universal wheels facilitate the movement of the base plate 1, a toothed plate 19 is fixedly connected to the top of the base plate 1, a winch 2 is fixedly connected to the right side of the top of the base plate 1, the type of the winch 2 is JM3T, a steel wire 3 is connected to the output end of the winch 2 in a transmission manner, a supporting arm 4 is fixedly connected to the top of the base plate 1, a water tank 5 is fixedly connected to the top of the supporting arm 4, a water inlet is formed in the top of the water tank 5, a wooden plug is connected to the inside of the water inlet in a penetrating manner, a water spray pipe is communicated to the left side of the water tank 5, a spray block is connected to the inside of the water spray pipe in a penetrating manner, a piston 6 is connected to the inside of the water tank 5 in a sliding manner, a connecting rod 7 is fixedly connected to the bottom of the piston 6, a long sliding groove block 9 is fixedly connected to the top of the base plate 1, the left side of the chute long block 9 is connected with a sliding block B11 in a sliding manner through a chute, the left side of the sliding block B11 is fixedly connected with a cross rod 12, the top of the cross rod 12 is connected with the bottom of a connecting rod 7, the left side of the cross rod 12 is fixedly connected with a hammer 8, one end, far away from the winch 2, of a steel wire 3 is connected with the top of the hammer 8 through a pulley block, the left side of the chute long block 9 is connected with a sliding block A10 in a sliding manner, the left side of the sliding block A10 is fixedly connected with a transverse connecting rod 13, the left side of the transverse connecting rod 13 is fixedly connected with a fixed bearing A, a fixed ring 14 is connected inside the fixed bearing A in a penetrating manner, the left side of the fixed ring 14 is provided with a fixed rod, the inside of the fixed ring 14 is connected with a wood pile in a penetrating manner, the outside of the fixed ring 14 is sleeved with a bevel gear A15, and the outside of the bevel gear A15 is connected with a bevel gear B16 in a meshing manner, the right side of the bevel gear B16 is rotatably connected with a rotating rod 17, the outside of the rotating rod 17 is sleeved with a fixed bearing B, the top of the fixed bearing B is connected with the bottom of a transverse connecting rod 13, the right side of the rotating rod 17 is fixedly connected with a gear 18, the outside of the gear 18 is meshed with the front face of a toothed plate 19, water in a water tank 5 is extruded and sprayed to the ground for piling through a water spray pipe, the ground for piling is moistened and becomes wet and soft, the water in the water tank 5 is automatically sprayed to the ground for piling during the piling process to enable the ground to become wet and soft, the piling efficiency is increased, the small-sized piling device for building construction drives the fixed ring 14 to rotate in the descending process through the bevel gear A15 matched with the bevel gear B16, the rotating rod 17 and the gear 18 during the movement of the fixed ring 14, the fixed ring 14 is automatically driven to spirally descend in the descending process, the efficiency of the stake into the ground bottom is accelerated, the piling efficiency is increased, and the piling time is reduced.
The working principle is as follows: the method comprises the steps of placing a wooden pile in a fixing ring 14, fixing the wooden pile in the fixing ring 14 through a fixing rod and a fixing groove, starting a winch 2, driving a hammer head 8 to pile the wooden pile through a steel wire 3 by the winch 2, driving a connecting rod 7 to move through a cross rod 12 in the movement process of the hammer head 8, driving a piston 6 to be matched with a water tank 5 to extrude water in the water tank 5 in the movement process of the connecting rod 7, spraying the water in the water tank 5 to the ground of the pile through a water spraying pipe in an extruding mode, moistening the ground of the pile by water to be wet and soft, automatically spraying the water in the water tank 5 to the ground of the pile in the pile driving process to enable the ground to be wet and soft, increasing the pile driving efficiency, driving the fixing ring 14 to rotate in the descending process through a conical gear A15 matched with a conical gear B16, a rotating rod 17 and a gear 18 in the movement process of the fixing ring 14, and automatically enabling the fixing ring 14 to carry the wooden pile to spirally descend in the pile driving process, the efficiency of the stake into the ground bottom is accelerated, the piling efficiency is increased, and the piling time is reduced.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (6)
1. The utility model provides a small-size pile driver is used in building engineering construction, includes bottom plate (1), its characterized in that: the top of the bottom plate (1) is fixedly connected with a toothed plate (19), the right side of the top of the bottom plate (1) is fixedly connected with a winch (2), the output end of the winch (2) is connected with a steel wire (3) in a transmission manner, the top of the bottom plate (1) is fixedly connected with a supporting arm (4), the top of the supporting arm (4) is fixedly connected with a water tank (5), the inside of the water tank (5) is connected with a piston (6) in a sliding manner, the bottom of the piston (6) is fixedly connected with a connecting rod (7), the top of the bottom plate (1) is fixedly connected with a sliding chute long block (9), the left side of the sliding chute long block (9) is connected with a sliding block B (11) in a sliding manner through a sliding chute, the left side of the sliding block B (11) is fixedly connected with a cross rod (12), the top of the cross rod (12) is connected with the bottom of the connecting rod (7), and the left side of the cross rod (12) is fixedly connected with a hammer head (8), the one end that hoist engine (2) were kept away from in steel wire (3) is connected with the top of tup (8) through the assembly pulley, the left side sliding connection of spout long block (9) has slider A (10), the left side fixedly connected with of slider A (10) violently connects pole (13), the left side fixedly connected with fixing bearing A of violently connecting pole (13), fixing bearing A's inside through connection has solid fixed ring (14), conical gear A (15) have been cup jointed to the outside of solid fixed ring (14), the outside meshing of conical gear A (15) is connected with conical gear B (16), the right side rotation of conical gear B (16) is connected with dwang (17), the right side fixedly connected with gear (18) of dwang (17), the outside of gear (18) meshes with the front of pinion rack (19) mutually.
2. A small-sized piling device for construction of construction engineering according to claim 1, wherein: the front and the back of the two sides of the bottom plate (1) are fixedly connected with universal wheels.
3. A small-sized piling device for construction of construction engineering according to claim 1, wherein: the left side of the water tank (5) is communicated with a water spraying pipe, and a spraying block penetrates through the interior of the water spraying pipe.
4. A small-sized piling device for construction of construction engineering according to claim 1, wherein: the top of the water tank (5) is provided with a water inlet, and a wooden plug is connected inside the water inlet in a penetrating manner.
5. A small-sized piling device for construction of construction engineering according to claim 1, wherein: the outside of dwang (17) has cup jointed fixing bearing B, and fixing bearing B's top is connected with the bottom that connects horizontal pole (13).
6. A small-sized piling device for construction of construction engineering according to claim 1, wherein: the right side of the bottom plate (1) is fixedly connected with a push-pull handle.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202023094529.4U CN214423359U (en) | 2020-12-21 | 2020-12-21 | Small-size pile driver is used in building engineering construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202023094529.4U CN214423359U (en) | 2020-12-21 | 2020-12-21 | Small-size pile driver is used in building engineering construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN214423359U true CN214423359U (en) | 2021-10-19 |
Family
ID=78052221
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202023094529.4U Active CN214423359U (en) | 2020-12-21 | 2020-12-21 | Small-size pile driver is used in building engineering construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN214423359U (en) |
-
2020
- 2020-12-21 CN CN202023094529.4U patent/CN214423359U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108824770B (en) | Wall painting equipment with extrusion and injection functions for building construction | |
CN112567924B (en) | Seed soaking and germination accelerating device capable of self-cleaning shrivelled floating seeds for biological breeding | |
CN214301925U (en) | Be applied to desilting grabbing device of ecological river course | |
CN112340294A (en) | Garbage transfer complete equipment | |
CN214423359U (en) | Small-size pile driver is used in building engineering construction | |
CN110667795A (en) | Spiral capturing, lifting and salvaging type water surface garbage cleaning ship | |
CN110397249B (en) | Integral type wall whitewashes equipment | |
CN112628064A (en) | Hydroelectric generation device capable of discharging sundries in river | |
CN209736174U (en) | Surface cleaning mechanism of engineering plastic gear | |
CN112122232A (en) | Aluminum alloy recycling and cleaning equipment | |
CN217933293U (en) | Powder coating device for producing flexible mineral insulation fireproof cable | |
CN213278122U (en) | Novel automatic zinc cream adding machine | |
CN214995692U (en) | Wall spraying device for building engineering | |
CN215352695U (en) | House building construction dust collector | |
CN213078890U (en) | Paint spraying apparatus is used in protecting wire net production of circular knitting machine | |
CN213114758U (en) | Dredging device for hydraulic engineering | |
CN210121579U (en) | Gate belt cleaning device for hydraulic engineering | |
CN111744707A (en) | Paint spraying device and method for exposed steel structure of building | |
CN217591979U (en) | Spicy fish tail automatic production line | |
CN109203167A (en) | A kind of Furniture manufacturing equipment with sawdust clearing function | |
CN209277580U (en) | A kind of automatic wall shoveling machine | |
CN211864348U (en) | Dust removal device for concrete mixing plant | |
CN217470919U (en) | Efficient water-saving irrigation device for landscaping nursery stocks | |
CN213648735U (en) | Waterproof roll material area bonding device | |
CN218289026U (en) | Putty powder production is with sealed finished product storage jar |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
EE01 | Entry into force of recordation of patent licensing contract |
Assignee: Chenzhou humon Construction Engineering Co.,Ltd. Assignor: Hunan Liuyang Guandu Construction Engineering Co.,Ltd. Contract record no.: X2023980047796 Denomination of utility model: A Small Pile Driving Device for Construction Projects Granted publication date: 20211019 License type: Common License Record date: 20231122 |
|
EE01 | Entry into force of recordation of patent licensing contract |