CN214423197U - Operation platform that construction was used - Google Patents

Operation platform that construction was used Download PDF

Info

Publication number
CN214423197U
CN214423197U CN202120328739.0U CN202120328739U CN214423197U CN 214423197 U CN214423197 U CN 214423197U CN 202120328739 U CN202120328739 U CN 202120328739U CN 214423197 U CN214423197 U CN 214423197U
Authority
CN
China
Prior art keywords
plate body
construction
connecting portion
pier stud
work platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120328739.0U
Other languages
Chinese (zh)
Inventor
孙圣强
曲永健
张金峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Linyi Municipal Group Co Ltd
Original Assignee
Linyi Municipal Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Linyi Municipal Group Co Ltd filed Critical Linyi Municipal Group Co Ltd
Priority to CN202120328739.0U priority Critical patent/CN214423197U/en
Application granted granted Critical
Publication of CN214423197U publication Critical patent/CN214423197U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses an operation platform for building construction, which comprises a first plate body and a second plate body which are arranged on independent pier studs; the first plate body and the second plate body are both provided with supporting pieces, the supporting pieces are provided with pull rods, and two ends of each pull rod are connected with two adjacent supporting pieces, so that the device is convenient for workers to carry out construction operation on independent pier columns; in addition, the first plate body and the second plate body are connected together in a combined mode, so that the device is convenient to assemble on site, and the device does not occupy too much space during transportation; install on independent pier stud in order to guarantee that two plate bodys are stable, first plate body with all be equipped with connecting portion on the second plate body, pass connecting portion through the bolt and be connected with pier stud outlying steel form, and then make fixing that the device can be stable on the pier stud, both guaranteed this construction work platform's stable connection, play the protection to constructor's safety again, consequently the utility model discloses be worth promoting and using.

Description

Operation platform that construction was used
Technical Field
The utility model relates to a construction auxiliary assembly technical field specifically is an operation platform that construction used.
Background
The construction of the bridge upright posts belongs to high-altitude operation, and a special scaffold construction operation platform must be erected before pouring the upright post concrete to ensure the construction safety. Because the operation platform has short service cycle and high turnover speed, and needs to spend large manpower and material resources when building the platform, the cost is high, so that half of construction units do not build a special operation platform when the upright column concrete is cast, constructors directly ride on the template or use the simple hanging basket of the reinforcing steel bars to hang externally on the template to carry out the upright column concrete casting construction, and the construction method has large potential safety hazard and violates the safety construction requirement.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide an operation platform that construction used to solve the problem that proposes among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: an operation platform for building construction comprises a first plate body and a second plate body which are arranged on independent pier columns; the first plate body and the second plate body are both provided with supporting pieces, and two adjacent supporting pieces are connected through a pull rod; the first plate body is provided with a positioning hole, and the second plate body is provided with a positioning pin; the positioning pin is inserted into the positioning hole, so that the first plate body and the second plate body are assembled; the first plate body with the middle part of second plate body all is equipped with the supporting part, through the supporting part is connected with pier stud outlying steel form, realizes operation platform's establishment.
As the utility model discloses a preferred technical scheme: the first plate body and the second plate body are butted to form a notch for completely exposing the end part of the pier stud.
As the utility model discloses a preferred technical scheme: and the supporting part is also provided with a round hole for inserting the bolt conveniently.
As the utility model discloses a preferred technical scheme: the first plate body with all be equipped with connecting portion on the second plate body, just be equipped with the through-hole on the connecting portion, pass through the bolt the through-hole with behind the support piece will support piece fixes on the connecting portion.
As the utility model discloses a preferred technical scheme: the first plate body with the second plate body is kept away from the one end of connecting portion still is equipped with the slot, through connecting portion on the first plate body with slot connection on the second plate body realizes piling up of first plate body and second plate body.
As the utility model discloses a preferred technical scheme: the pull rod is provided with a limiting ring and a nut, and one surface of the limiting ring is attached to the support piece through the threaded fit of the nut and the pull rod.
As the utility model discloses a preferred technical scheme: the first plate body with all be equipped with the holding tank on the second plate body.
Adopt above-mentioned technical scheme, the beneficial effects of the utility model are that: 1. the two ends of the pull rod are connected with the two adjacent supporting pieces, so that the device is convenient for workers to carry out construction operation on the independent pier stud; in addition, the first plate body and the second plate body are connected together in a combined mode, so that the device is convenient to assemble on site, and the device does not occupy too much space during transportation;
in order to guarantee that two plate bodies are stably installed on independent pier stud, the first plate body with all be equipped with connecting portion on the second plate body, pass connecting portion through the bolt and be connected with pier stud outlying steel form, and then make fixing that the device can be stable on the pier stud, both guaranteed this construction work platform's stable connection, play the protection to constructor's safety again.
Drawings
FIG. 1 is a schematic view of the main structure of the present invention;
FIG. 2 is an enlarged view of a portion of FIG. 1 at A;
fig. 3 is a schematic view of the present invention stacked together;
fig. 4 is a schematic view of the main structure of the second plate of the present invention.
In the figure: 1. a first plate body; 2. a second plate body; 3. a support member; 4. a nut; 5. a pull rod; 6. a limiting ring; 7. positioning holes; 8. positioning pins; 9. a support portion; 10. a slot; 11. a connecting portion; 12. a through hole; 13. a circular hole; 14. a notch; 15. and (6) accommodating the tank.
Detailed Description
Reference will now be made in detail to embodiments of the present invention, examples of which are illustrated in the accompanying drawings, wherein like reference numerals refer to the same or similar elements or elements having the same or similar function throughout. The embodiments described below with reference to the drawings are exemplary and intended to be used for explaining the present invention, and should not be construed as limiting the present invention. In the description of the present invention, it should be understood that the terms "upper", "lower", "front", "upper surface", etc. indicate the orientation or positional relationship based on the orientation or positional relationship shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element referred to must have a specific orientation, be constructed in a specific orientation, and be operated, and thus should not be construed as limiting the present invention. In the present invention, unless otherwise expressly stated or limited, the terms "mounted," "connected," and "fixed" are to be construed broadly and may, for example, be fixedly connected, detachably connected, or integrally formed; can be mechanically connected, electrically connected or can communicate with each other; either directly or indirectly through intervening media, either internally or in any other relationship. The specific meaning of the above terms in the present invention can be understood according to specific situations by those skilled in the art.
Referring to fig. 1-4, the present invention provides an embodiment: an operation platform for building construction comprises a first plate body 1 and a second plate body 2 which are arranged on independent pier columns; the first plate body 1 and the second plate body 2 are both provided with supporting pieces 3, and two adjacent supporting pieces 3 are connected through a pull rod 5; through the technical scheme, the supporting piece 3 is matched with the pull rod 5 to form a fence, so that a user is protected;
as the first plate body 1 is provided with the positioning hole 7, and the second plate body 2 is provided with the positioning pin 8; the positioning pin 8 is inserted into the positioning hole 7, so that the first plate body 1 and the second plate body 2 are assembled; the two plate bodies are convenient to assemble and align at the assembling positions, and the two plate bodies are more firmly butted;
the middle parts of the first plate body 1 and the second plate body 2 are respectively provided with a supporting part 9, and the supporting parts 9 are connected with a steel formwork on the periphery of the pier stud to realize the establishment of the operation platform. Through the scheme, the device can be stably fixed on the pier stud, the stable connection of the construction operation platform is guaranteed, and the safety of constructors is protected.
In order to facilitate the construction of constructors to the pier stud tip, first plate body 1 with be formed with the notch 14 that is used for exposing the pier stud tip completely behind the butt joint of second plate body 2 for the device can be better be connected with the steel form, improves construction platform's security performance, does not influence the construction operation of the tip of pier stud yet simultaneously.
Because still be equipped with the round hole 13 that the bolt of being convenient for alternates on the supporting part 9, both the installation of two plate bodies and steel form of being convenient for is convenient for again to pull down from the steel form.
In order to facilitate the assembly of the support member 3 and the two plate bodies, the first plate body 1 and the second plate body 2 are both provided with a connecting portion 11, the connecting portion 11 is provided with a through hole 12, and a bolt penetrates through the through hole 12 and the support member 3 and then fixes the support member 3 on the connecting portion 11.
Through the technical scheme, because the mode of adopting the assembly to connect between two plate bodies, and adopt bolted connection between support piece 3 and two plate bodies, consequently after the construction, the whole volume of the device can obtain very big reduction, and then be convenient for accomodate, transport and deposit of the device.
Further, first plate body 1 with second plate body 2 keeps away from the one end of connecting portion 11 still is equipped with slot 10, through connecting portion 11 on first plate body 1 with slot 10 on the second plate body 2 is connected, realizes piling up of first plate body 1 and second plate body 2, after two plate body piles up, the interior bottom surface of connecting portion 11 terminal surface and slot 10 contradicts for form a space that is used for depositing support piece 3 and pull rod 5 between two plate bodies, consequently be convenient for depositing of support piece 3 and pull rod 5 again.
In addition, due to the arrangement of the slots 10, after the first plate body 1 and the second plate body 2 are assembled, the stability of the two plate bodies can be further enhanced through connecting pieces, for example, iron wires are connected with the slots 10 on the two plate bodies.
Because be equipped with spacing ring 6 and nut 4 on the pull rod 5, through nut 4 and pull rod 5's screw-thread fit, so that the laminating of one side of spacing ring 6 is in on the support piece 3, consequently make pull rod 5's easy dismounting, simultaneously after spacing ring 6 and the laminating of support piece 3, can carry out auxiliary stay again to support piece 3, even have external force application when guaranteeing construction safety, the device also can not be easy emergence deformation.
In addition, in order to accommodate the small parts, the accommodating grooves 15 are formed in the first plate body 1 and the second plate body 2, the small parts such as the screw caps 4 and the bolts are intensively accommodated and treated by the accommodating grooves 15, the small parts are prevented from being lost, and the time spent in searching the small parts can be reduced. Besides, a cover can be arranged on the accommodating groove 15, so that the small parts can be further prevented from being lost.
The device can be repeatedly used, so that the material is saved, and the integral movement of the device is facilitated. Namely, after one of the pier stud construction, through the loop wheel machine with the whole handling of the device to another pier stud on, solved the problem that the work platform is established again and is consumed time and power. Meanwhile, after the device is processed and formed at one time, the device is not easy to deform and damage, and the quality of safe production and construction is effectively guaranteed.
The embodiments of the present invention have been described in detail with reference to the accompanying drawings, but the present invention is not limited to the described embodiments. It will be apparent to those skilled in the art that various changes, modifications, substitutions and alterations can be made in the embodiments without departing from the principles and spirit of the invention, and the scope of the invention is to be accorded the full scope of the claims.

Claims (7)

1. The utility model provides an operation platform that construction used which characterized in that: comprises a first plate body (1) and a second plate body (2) which are arranged on independent pier studs;
the first plate body (1) and the second plate body (2) are both provided with supporting pieces (3), and two adjacent supporting pieces (3) are connected through a pull rod (5);
the first plate body (1) is provided with a positioning hole (7), and the second plate body (2) is provided with a positioning pin (8);
the positioning pin (8) is inserted into the positioning hole (7), so that the first plate body (1) and the second plate body (2) are assembled;
the first plate body (1) with the middle part of second plate body (2) all is equipped with supporting part (9), through supporting part (9) are connected with pier stud outlying steel form, realize operation platform's establishment.
2. A work platform for construction according to claim 1, wherein: the first plate body (1) and the second plate body (2) are butted to form a notch (14) for completely exposing the end part of the pier stud.
3. A work platform for construction according to claim 2, wherein: and a round hole (13) which is convenient for the insertion of the bolt is also arranged on the supporting part (9).
4. A work platform for use in construction work according to claim 1, 2 or 3, wherein: first plate body (1) with all be equipped with connecting portion (11) on second plate body (2), just be equipped with through-hole (12) on connecting portion (11), pass through the bolt through-hole (12) with will behind support piece (3) are fixed on connecting portion (11).
5. A work platform for construction according to claim 4, wherein: the first plate body (1) and the second plate body (2) are kept away from one end of the connecting portion (11) is further provided with a slot (10), and the first plate body (1) and the second plate body (2) are stacked through connection of the connecting portion (11) on the first plate body (1) and the slot (10) on the second plate body (2).
6. A work platform for use in construction work according to claim 1, 2 or 3, wherein: be equipped with spacing ring (6) and nut (4) on pull rod (5), through the screw-thread fit of nut (4) and pull rod (5) so that the laminating of one side of spacing ring (6) is in on support piece (3).
7. A work platform for construction according to claim 6, wherein: the first plate body (1) and the second plate body (2) are both provided with accommodating grooves (15).
CN202120328739.0U 2021-02-04 2021-02-04 Operation platform that construction was used Active CN214423197U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120328739.0U CN214423197U (en) 2021-02-04 2021-02-04 Operation platform that construction was used

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120328739.0U CN214423197U (en) 2021-02-04 2021-02-04 Operation platform that construction was used

Publications (1)

Publication Number Publication Date
CN214423197U true CN214423197U (en) 2021-10-19

Family

ID=78070606

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120328739.0U Active CN214423197U (en) 2021-02-04 2021-02-04 Operation platform that construction was used

Country Status (1)

Country Link
CN (1) CN214423197U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114215334A (en) * 2021-11-24 2022-03-22 中建八局第二建设有限公司 Adjustable quick detachable formula construction operation platform

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114215334A (en) * 2021-11-24 2022-03-22 中建八局第二建设有限公司 Adjustable quick detachable formula construction operation platform

Similar Documents

Publication Publication Date Title
CN214423197U (en) Operation platform that construction was used
CN213268319U (en) Support-free assembled frame structure system
CN109518950B (en) Support-free tool-based template system applied to assembled cast-in-place section and use method thereof
CN216766203U (en) Assembled beam column with bracing structure
CN216841016U (en) Oil gas field ground engineering construction safety protection isolating device
CN216157091U (en) Quick-release quick-assembly scaffold
CN214785949U (en) Quick-assembly early-disassembly ear-shaped connecting piece for primary and secondary keels on board
CN211500011U (en) Stay wire construction hole clamp for four-angle steel combined iron tower
CN214834737U (en) Plug-in type board primary and secondary keel fast-assembling early-dismantling ear-shaped connecting piece
CN213979431U (en) Prefabricated assembled shear force wall
CN108396764B (en) Wire pole prefabricated foundation seat and wire pole assembly
CN111535349B (en) Prefabricated building reinforced concrete bearing platform foundation
CN214658259U (en) Engineering stand column structure with high bearing capacity
CN218466727U (en) Steel frame structure for steel structure building
CN214783989U (en) Engineering construction is used for narrow space underground structure
CN210032628U (en) Supporting beam structure for building construction
CN212270922U (en) Combined type reinforcing structure based on building pile foundation
CN219344017U (en) Template support frame
CN215291822U (en) Building enclosure
CN104948004A (en) Revolving wall for on-site safety management
CN213359494U (en) Assembled steel construction support frame
CN216921449U (en) Pile hole protecting sleeve
CN211421599U (en) Quick connection structure of steel core concrete column
CN216664516U (en) Steel structure foundation bolt pre-embedded positioning plate
CN212900092U (en) Assembled push pipe back

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant