CN214417309U - Watering cooling device for non-ferrous metal calendering process - Google Patents

Watering cooling device for non-ferrous metal calendering process Download PDF

Info

Publication number
CN214417309U
CN214417309U CN202023187670.9U CN202023187670U CN214417309U CN 214417309 U CN214417309 U CN 214417309U CN 202023187670 U CN202023187670 U CN 202023187670U CN 214417309 U CN214417309 U CN 214417309U
Authority
CN
China
Prior art keywords
water
lifting support
water tank
cooling device
ferrous metal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202023187670.9U
Other languages
Chinese (zh)
Inventor
刘畅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenyang Aohang Technology Co ltd
Original Assignee
Shenyang Aohang Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenyang Aohang Technology Co ltd filed Critical Shenyang Aohang Technology Co ltd
Priority to CN202023187670.9U priority Critical patent/CN214417309U/en
Application granted granted Critical
Publication of CN214417309U publication Critical patent/CN214417309U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Details Or Accessories Of Spraying Plant Or Apparatus (AREA)

Abstract

The utility model belongs to the technical field of metal processing, specifically be a non ferrous metal calendering technology watering cooling device, it includes: base, lifting support pole, horizontal telescopic link, water diversion box, water tank and water collecting plate, base top left side sets up the lifting support pole, lifting support pole left side wall is provided with first pipe clamp, the lifting support pole top sets up horizontal telescopic link, horizontal telescopic link top is provided with the second pipe clamp, the water diversion box is connected on horizontal telescopic link right side, can adjust the horizontal and vertical operating position of shower nozzle, satisfies not unidimensional calendering device and sprinkle the cooling, simultaneously, can filter and purify the water resource of retrieving, avoids in the dust and the impurity bring into the water tank of water recycling with calendering device surface, when spraying the cooling, can avoid dust and impurity to follow rivers and spray the calendering device surface once more to can avoid spun water smoke to be intermittent, improve the stability of spraying.

Description

Watering cooling device for non-ferrous metal calendering process
Technical Field
The utility model relates to a metal processing technology field specifically is a non ferrous metal calendering technology watering cooling device.
Background
Non-ferrous metals: the non-ferrous metals in the narrow sense are also called non-ferrous metals, and are the general names of all metals except iron, manganese and chromium. Non-ferrous metals in the broad sense also include non-ferrous alloys. In the cooling process of the traditional non-ferrous metal rolling process, certain amount of water is generally filled in a barrel, and then the water is added into the non-ferrous metal rolling process.
Present non ferrous metal calendering technology watering cooling device is when using, can't adjust the horizontal and vertical operating position of shower nozzle, can not satisfy not unidimensional calendering device and sprinkle water cooling, the device structure is complicated, inconvenient post repair and maintenance, simultaneously, the water of retrieving is with in the dust and the impurity on calendering device surface area income water tank, at the in-process that sprays the cooling, the dust follows rivers with impurity and sprays calendering device surface once more, adhere to the calendering device surface of high temperature easily, the influence is to the machining effect of non ferrous metal.
SUMMERY OF THE UTILITY MODEL
This section is for the purpose of summarizing some aspects of embodiments of the invention and to briefly introduce some preferred embodiments. Some simplifications or omissions may be made in this section and in the abstract of the specification and the title of the application to avoid obscuring the purpose of this section, the abstract of the specification and the title of the application, and such simplifications or omissions are not intended to limit the scope of the invention.
The utility model discloses in view of above-mentioned and/or the problem that exists among the current non ferrous metal calendering technology watering cooling device, provided the utility model.
Therefore, the utility model aims at providing a non ferrous metal calendering technology watering cooling device, can adjust the horizontal and vertical operating position of shower nozzle, satisfy not unidimensional calendering device and carry out the watering cooling, device simple structure makes things convenient for later stage repair and maintenance, simultaneously, can carry out filtration purification to the water resource of retrieving, in the dust and the impurity that avoid the water of retrieving to roll the device surface brought into the water tank, when spraying the refrigerated, can avoid dust and impurity to follow rivers and spray the calendering device surface once more.
For solving the technical problem, according to the utility model discloses an aspect, the utility model provides a following technical scheme:
a watering cooling device for a non-ferrous metal rolling process comprises: base, lift bracing piece, horizontal telescopic link, water diversion box, water tank and water collection board, base top left side sets up the lift bracing piece, lift bracing piece left side wall is provided with first pipe clamp, the lift bracing piece top sets up horizontal telescopic link, horizontal telescopic link top is provided with the second pipe clamp, the water diversion box is connected on horizontal telescopic link right side, the water diversion bottom of the case portion is provided with a plurality of atomizer, base top left side sets up the water tank, water tank left side wall is provided with the water pump, the water pump bottom is connected with the drinking-water pipe with the water tank intercommunication, the water pump top is connected with the water delivery hose, the water delivery hose passes first pipe clamp and second pipe clamp and is connected with the water diversion top, lift bracing piece right side wall sets up the water collection board, the water collection board bottom is provided with the fill that falls into water, the inner chamber that falls into water is provided with the filter screen.
As a non ferrous metal calendering technology watering cooling device's an preferred scheme, wherein: the base bottom left and right sides all is provided with the gyro wheel, the gyro wheel adopts the universal wheel.
As a non ferrous metal calendering technology watering cooling device's an preferred scheme, wherein: the top of the water tank is provided with an opening, and the water falling hopper is positioned right above the water tank.
As a non ferrous metal calendering technology watering cooling device's an preferred scheme, wherein: the plurality of atomizing spray heads are uniformly distributed at the bottom of the water distribution box.
As a non ferrous metal calendering technology watering cooling device's an preferred scheme, wherein: the filter screen is filled with an active carbon layer.
Compared with the prior art: the utility model discloses can adjust the horizontal and vertical operating position of shower nozzle, satisfy not unidimensional calendering device and carry out the watering cooling, device simple structure, make things convenient for later stage repair and maintenance, simultaneously, can carry out filtration purification to the water resource of retrieving, in the dust and the impurity on the water of avoiding retrieving to carry into the water tank with calendering device surface, when spraying the refrigerated, can avoid dust and impurity to follow rivers and spray calendering device surface once more to can avoid spun water smoke intermittent and intermittent, improve the stability of spraying.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the present invention will be described in detail with reference to the accompanying drawings and detailed embodiments, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without inventive labor. Wherein:
FIG. 1 is a schematic structural view of the present invention;
fig. 2 is a schematic view of the structure of the drain funnel of the present invention.
In the figure: 100 bases, 110 rollers, 200 lifting support rods, 210 first pipe clamps, 300 transverse telescopic rods, 310 second pipe clamps, 400 water distribution boxes, 410 atomizing nozzles, 500 water tanks, 510 water pumps, 520 water pumping pipes, 530 water delivery hoses, 600 water collection plates, 610 water falling buckets and 620 filter screens.
Detailed Description
In order to make the above objects, features and advantages of the present invention more comprehensible, embodiments of the present invention are described in detail below with reference to the accompanying drawings.
In the following description, numerous specific details are set forth in order to provide a thorough understanding of the present invention, but the present invention may be implemented in other ways than those specifically described herein, and one skilled in the art may similarly generalize the present invention without departing from the spirit of the present invention, and therefore the present invention is not limited to the specific embodiments disclosed below.
Next, the present invention will be described in detail with reference to the schematic drawings, and in the detailed description of the embodiments of the present invention, for convenience of explanation, the sectional view showing the device structure will not be enlarged partially according to the general scale, and the schematic drawings are only examples, and should not limit the scope of the present invention. In addition, the three-dimensional dimensions of length, width and depth should be included in the actual fabrication.
In order to make the objects, technical solutions and advantages of the present invention clearer, embodiments of the present invention will be described in further detail below with reference to the accompanying drawings.
The utility model provides a non ferrous metal calendering technology watering cooling device, can adjust the horizontal and vertical operating position of shower nozzle, satisfy not unidimensional calendering device and carry out the watering cooling, device simple structure makes things convenient for later stage repair and maintenance, simultaneously, can filter the purification to the water resource of retrieving, in avoiding the water of retrieving to bring into the water tank with the dust and the impurity on calendering device surface, when spraying the refrigerated, can avoid dust and impurity to follow rivers and spray calendering device surface once more, please refer to figure 1 and figure 2, include: the water collecting device comprises a base 100, a lifting support rod 200, a transverse telescopic rod 300, a water distribution box 400, a water tank 500 and a water collecting plate 600;
referring to fig. 1 again, a lifting support rod 200 is disposed on the left side of the top of the base 100, a first pipe clamp 210 is mounted on the left side wall of the lifting support rod 200, the lifting support rod 200 adopts a hydraulic cylinder for driving the atomizer 410 to move up and down and adjusting the working height of the atomizer 410, and the first pipe clamp 210 is used for mounting a water hose 530.
Referring to fig. 1 again, the top of the lifting support rod 200 is provided with a transverse telescopic rod 300, the top of the transverse telescopic rod 300 is provided with a second pipe clamp 310, the transverse telescopic rod 300 adopts a hydraulic cylinder, the transverse telescopic rod 300 is used for driving the atomizer 410 to move left and right to adjust the transverse working position of the atomizer 410, and the second pipe clamp 310 is used for installing a water hose 530.
Referring to fig. 1 again, the water distribution box 400 is installed on the right side of the transverse telescopic rod 300, the atomizing nozzle 410 is installed at the bottom of the water distribution box 400, and water is stored in the water distribution box 400, so that water mist sprayed by the atomizing nozzle 410 is prevented from being interrupted and interrupted due to bubbles existing in the water delivery hose 530 during water delivery, and the spraying stability is improved.
Referring to fig. 1 again, the water tank 500 is installed on the left side of the top of the base 100, the water pump 510 is installed on the left side wall of the water tank 500, the water pumping pipe 520 communicated with the water tank 500 is connected to the bottom of the water pump 510, the water delivery hose 530 is connected to the top of the water distribution tank 400 through the first pipe clamp 210 and the second pipe clamp 310, the water pump 510 pumps water in the water tank 500 through the water pumping pipe 520, and water is delivered into the water distribution tank 400 through the water delivery hose 530.
Referring to fig. 1 and 2 again, the water collecting plate 600 is disposed on the right side wall of the lifting support rod 200, the water falling hopper 610 is disposed at the bottom of the water collecting plate 600, the filter screen 620 is disposed in the inner cavity of the water falling hopper 610, water falling from the rolling device after spraying and cooling falls onto the water collecting plate 600 for collection, and falls into the water tank 500 for recovery after being filtered by the filter screen 620, so that dust and impurities on the surface of the rolling device are prevented from being brought into the water tank 500 by the water flow, the water with the dust and impurities is prevented from being sprayed onto the surface of the rolling device by the atomizing nozzle 410, and the water collecting plate 600 itself can play a role in shielding, thereby preventing external impurities from falling into the water tank 500.
When concrete use, the lift bracing piece 200 adopts the pneumatic cylinder, be used for driving atomizer 410 and reciprocate, utilize horizontal telescopic link 300 to drive atomizer 410 and remove about, adjust the horizontal operating position of atomizer 410, water pump 510 takes out the water in water tank 500 through drinking-water pipe 520, in defeated water knockout drum 400 with water through water delivery hose 530, the inside retaining that carries out of knockout drum 400, utilize atomizer 410 to spout water, cool off and wash calendering device surface, the water that drops on the calendering device after the spray cooling falls onto water-collecting plate 600 and collects, it retrieves to fall into water tank 500 after filtering through filter screen 620, avoid rivers to bring into water tank 500 with the dust and the impurity on calendering device surface, prevent that atomizer 410 will have the water of dust and impurity to spout on calendering device surface.
The left side and the right side of the bottom of the base 100 are provided with rollers 110, and the rollers 110 are universal wheels, so that the device is convenient to move and use.
The top of the water tank 500 is open, and the falling water bucket 610 is located right above the water tank 500, so that water falling from the falling water bucket 610 can enter the water tank 500 to be collected.
The plurality of atomizing spray heads 410 are uniformly distributed at the bottom of the water distribution box 400, and uniformly spray and cool the calendaring device.
The filter screen 620 is filled with an activated carbon layer, so that the adsorption effect on dust and impurities is improved.
While the invention has been described above with reference to an embodiment, various modifications may be made and equivalents may be substituted for elements thereof without departing from the scope of the invention. In particular, as long as there is no structural conflict, the various features of the disclosed embodiments of the present invention can be used in any combination with each other, and the non-exhaustive description of these combinations in this specification is merely for the sake of brevity and resource conservation. Therefore, it is intended that the invention not be limited to the particular embodiments disclosed, but that the invention will include all embodiments falling within the scope of the appended claims.

Claims (5)

1. The utility model provides a non ferrous metal calendering technology watering cooling device which characterized in that includes: the water distribution device comprises a base (100), a lifting support rod (200), a transverse telescopic rod (300), a water distribution box (400), a water tank (500) and a water collection plate (600), wherein the lifting support rod (200) is arranged on the left side of the top of the base (100), a first pipe clamp (210) is arranged on the left side wall of the lifting support rod (200), the transverse telescopic rod (300) is arranged on the top of the lifting support rod (200), a second pipe clamp (310) is arranged on the top of the transverse telescopic rod (300), the water distribution box (400) is connected to the right side of the transverse telescopic rod (300), a plurality of atomizing spray heads (410) are arranged at the bottom of the water distribution box (400), the water tank (500) is arranged on the left side of the top of the base (100), a water pump (510) is arranged on the left side wall of the water tank (500), a water pumping pipe (520) communicated with the water tank (500) is connected to the bottom of the water pump (510), a water delivery hose (530) is connected to the top of the water pump (510), the water delivery hose (530) passes through first pipe clamp (210) and second pipe clamp (310) and is connected with water diversion box (400) top, lifting support pole (200) right side wall sets up water-collecting sheet (600), water-collecting sheet (600) bottom is provided with the fill of falling into water (610), the fill of falling into water (610) inner chamber is provided with filter screen (620).
2. The watering cooling device for the non-ferrous metal rolling process according to claim 1, wherein the rollers (110) are arranged on the left side and the right side of the bottom of the base (100), and the rollers (110) adopt universal wheels.
3. A non-ferrous metal rolling process sprinkling cooling device as claimed in claim 1, wherein the water tank (500) is open at the top, and the water falling hopper (610) is positioned right above the water tank (500).
4. The watering cooling device for the nonferrous metal rolling process according to claim 1, wherein a plurality of the atomizing nozzles (410) are uniformly distributed at the bottom of the water diversion box (400).
5. A non-ferrous metal calendering process watering cooling device as set forth in claim 1, characterized in that the inside of said screen (620) is filled with activated carbon layer.
CN202023187670.9U 2020-12-26 2020-12-26 Watering cooling device for non-ferrous metal calendering process Expired - Fee Related CN214417309U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202023187670.9U CN214417309U (en) 2020-12-26 2020-12-26 Watering cooling device for non-ferrous metal calendering process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202023187670.9U CN214417309U (en) 2020-12-26 2020-12-26 Watering cooling device for non-ferrous metal calendering process

Publications (1)

Publication Number Publication Date
CN214417309U true CN214417309U (en) 2021-10-19

Family

ID=78052812

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202023187670.9U Expired - Fee Related CN214417309U (en) 2020-12-26 2020-12-26 Watering cooling device for non-ferrous metal calendering process

Country Status (1)

Country Link
CN (1) CN214417309U (en)

Similar Documents

Publication Publication Date Title
CN111014604A (en) Continuous casting machine
CN214417309U (en) Watering cooling device for non-ferrous metal calendering process
CN214715381U (en) Highway engineering construction dust device
CN113387414A (en) Building site machineshop car self-cleaning spray set
CN202155090U (en) Filter tower
CN206844034U (en) A kind of civil engineering depositing dust spray system
CN208555193U (en) A kind of bearing roller cleaning device
CN217217550U (en) Planting tank for greening
CN215745513U (en) Cooling system of rolling mill
CN202315617U (en) Exhaust gas sprinkling tower of melting furnace
CN211836525U (en) Rain sewage recycling device for construction
CN212813320U (en) Sprinkling irrigation equipment for farming
CN209257249U (en) A kind of diamond wire side of cuing open machine
CN211113457U (en) Hydraulic engineering side slope protector
CN219050755U (en) Circulating dust removing device for profile powder spraying line
CN209985147U (en) Building site raise dust treatment facility
CN201665575U (en) Filter-material intercept device and aeration biofilter with filter-material intercept device
CN216574423U (en) Sand washing device for hardware die casting
CN221673773U (en) Purification and dust removal device for construction site
CN112982256B (en) Dust collecting equipment is used in highway engineering construction
CN211689245U (en) Anti-blocking structure for continuous acid pickling acid liquid injection beam
CN216467699U (en) Dustproof cleaning tank
CN220918570U (en) Waste gas treatment tower
CN216585139U (en) Mounting structure of outer storage yard spray pipe and rotary joint
CN113648758B (en) Air purification washing device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20211019