CN214404221U CN202120486454.XU CN202120486454U CN214404221U CN 214404221 U CN214404221 U CN 214404221U CN 202120486454 U CN202120486454 U CN 202120486454U CN 214404221 U CN214404221 U CN 214404221U
Authority
CN
China
Prior art keywords
engineering equipment
connecting piece
stand
connection
double
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120486454.XU
Other languages
Chinese (zh)
Inventor
黄军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Yimin Construction Machinery Co ltd
Original Assignee
Nanjing Yimin Construction Machinery Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Yimin Construction Machinery Co ltd filed Critical Nanjing Yimin Construction Machinery Co ltd
Priority to CN202120486454.XU priority Critical patent/CN214404221U/en
Application granted granted Critical
Publication of CN214404221U publication Critical patent/CN214404221U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Connection Of Plates (AREA)

Abstract

The utility model discloses a quick connect structure is used in engineering equipment fixing relates to engineering equipment fixing technical field, for solving to lack the connecting piece between the current engineering equipment, leads to connecting inconvenient problem. First connecting piece is installed to the one end of first engineering equipment connecting portion, the second connecting piece is installed to the one end of second engineering equipment connecting portion, first connecting piece includes first stand, the one end of first stand is provided with first double-screw bolt, the second connecting piece includes the second stand, the one end of second stand is provided with the second double-screw bolt, the externally mounted of second double-screw bolt has the connection swivel nut, the inboard of connecting the swivel nut is provided with the internal thread, and connects the swivel nut and the equal threaded connection of first double-screw bolt and second double-screw bolt, the other end of first stand is provided with spacing bolt, and spacing bolt is provided with four, the inside of second stand is provided with spacing slot, and spacing slot is provided with four.

Description

Quick connection structure for engineering equipment installation
Technical Field
The utility model relates to an engineering equipment fixing technical field specifically is a quick connect structure is used in engineering equipment fixing.
Background
Engineering equipment refers to electromechanical equipment, metallic structural equipment, instrumentation and other similar equipment and devices that form or are intended to form part of permanent projects, including: the equipment in the capital construction project (newly built or expanded) and the equipment in the enterprise technical transformation, and the current national standards are divided into mechanical equipment, electrical equipment, standing equipment and non-standard equipment. The mechanical equipment generally refers to cutting, forging, casting, conveying, fans, pumps, compressor equipment and the like, the standing equipment comprises reaction equipment, heat exchange equipment, separation equipment, filtering, drying equipment and the like, the engineering equipment is various in types and large in quantity, and a plurality of engineering equipment is often required to be combined for use.
However, the existing engineering equipment is lack of connecting pieces, so that the connection is inconvenient, the existing requirements are not met, and a quick connecting structure for installing the engineering equipment is provided.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a quick connect structure is used in engineering equipment installation to solve and lack the connecting piece between the current engineering equipment that proposes in the above-mentioned background art, lead to connecting inconvenient problem.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides an engineering equipment quick connect structure for installation, includes first engineering equipment connecting portion and second engineering equipment connecting portion, first connecting piece is installed to the one end of first engineering equipment connecting portion, the second connecting piece is installed to the one end of second engineering equipment connecting portion, first connecting piece includes first stand, the one end of first stand is provided with first double-screw bolt, the second connecting piece includes the second stand, the one end of second stand is provided with the second double-screw bolt, the externally mounted of second double-screw bolt has the connection swivel nut, the inboard of connecting the swivel nut is provided with the internal thread, and connects the swivel nut and the equal threaded connection of first double-screw bolt and second double-screw bolt.
Preferably, the other end of first stand is provided with spacing bolt, and spacing bolt is provided with four, the inside of second stand is provided with spacing slot, and spacing slot is provided with four, and spacing slot and the cooperation of spacing bolt axle sleeve.
Preferably, first mounting panel is installed to the one end of first connecting piece, the second mounting panel is installed to the one end of second connecting piece, the upper end of second mounting panel and first mounting panel all is provided with the mounting hole, first engineering equipment connecting portion pass through screw connection with first connecting piece, second engineering equipment connecting portion pass through screw connection with the second connecting piece, and first connecting piece and first mounting panel welded connection, and second connecting piece and second mounting panel welded connection.
Preferably, one end of the second stud is provided with a connecting column, and one end of the connecting column is provided with a flexible adjusting column.
Preferably, a plurality of anti-skidding threads are arranged on the outer side of the connecting threaded sleeve.
Preferably, the first upright column and the first stud are arranged into an integrally formed structure, and the second upright column and the second stud are arranged into an integrally formed structure.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the utility model discloses earlier fix first engineering equipment connecting portion and first connecting piece through the screw, it is fixed with second engineering equipment connecting portion and second connecting piece, insert corresponding spacing slot inside respectively with spacing bolt again, rotate at last and connect the swivel nut, adjust the position of connecting the swivel nut, make and connect the swivel nut respectively with first double-screw bolt and second double-screw bolt threaded connection, can accomplish being connected between first connecting piece and the second connecting piece, be connected between first engineering equipment connecting portion and the second engineering equipment connecting portion promptly, the connected mode is simple and convenient.
2. The utility model discloses apply to and adjust the certain external force of post in the flexibility, can change the direction of flexible regulation post, change the hookup location and the direction of connection of second connecting piece promptly, improved the flexibility in second connecting piece and the first connecting piece connection process, make the connected mode between second connecting piece and the first connecting piece be applicable to multiple connected environment.
Drawings
Fig. 1 is a working schematic diagram of a quick connection structure for engineering equipment installation according to the present invention;
fig. 2 is a schematic structural view of a first connecting member according to the present invention;
fig. 3 is a schematic structural diagram of a second connecting member according to the present invention.
In the figure: 1. a first construction equipment connection section; 2. a second construction equipment connection section; 3. a first connecting member; 4. a first upright post; 5. a first stud; 6. a second upright post; 7. a second stud; 8. connecting a threaded sleeve; 9. an internal thread; 10. a limiting bolt; 11. limiting slots; 12. a first mounting plate; 13. a second mounting plate; 14. mounting holes; 15. connecting columns; 16. a flexible adjustment post; 17. anti-skid lines; 18. a second connecting member.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1-3, the present invention provides an embodiment: a quick connection structure for mounting engineering equipment comprises a first engineering equipment connection part 1 and a second engineering equipment connection part 2, wherein one end of the first engineering equipment connection part 1 is provided with a first connection piece 3, one end of the second engineering equipment connection part 2 is provided with a second connection piece 18, the first connection piece 3 comprises a first upright post 4, one end of the first upright post 4 is provided with a first stud 5, the second connection piece 18 comprises a second upright post 6, one end of the second upright post 6 is provided with a second stud 7, the outside of the second stud 7 is provided with a connection threaded sleeve 8, the inner side of the connection threaded sleeve 8 is provided with an internal thread 9, the connection threaded sleeve 8 is in threaded connection with the first stud 5 and the second stud 7, the first connection piece 3 and the first engineering equipment connection part 1 are fixed through screws, the second connection piece 18 and the second engineering equipment connection part 2 are fixed, and after the fixation is completed, four limit bolts 10 of the first connecting piece 3 are respectively embedded into limit slots 11 of the second connecting piece 18 and are in one-to-one correspondence with each other, then the connecting threaded sleeves 8 are rotated, the positions of the connecting threaded sleeves 8 are changed, the connecting threaded sleeves 8 are respectively in threaded connection with the first studs 5 and the second studs 7, the connection between the first connecting piece 3 and the second connecting piece 18 is completed through the connecting threaded sleeves 8, namely, the connection between the first engineering equipment connecting part 1 and the second engineering equipment connecting part 2 is completed, the connecting mode is simple and quick, and the mounting and dismounting are convenient.
Further, the other end of first stand 4 is provided with spacing bolt 10, and spacing bolt 10 is provided with four, and the inside of second stand 6 is provided with spacing slot 11, and spacing slot 11 is provided with four, and spacing slot 11 and the cooperation of spacing bolt 10 axle sleeve play spacing effect, convenience when improving joint strength and connecting.
Further, first mounting panel 12 is installed to the one end of first connecting piece 3, second mounting panel 13 is installed to the one end of second connecting piece 18, the upper end of second mounting panel 13 and first mounting panel 12 all is provided with mounting hole 14, first engineering equipment connecting portion 1 passes through screw connection with first connecting piece 3, second engineering equipment connecting portion 2 passes through screw connection with second connecting piece 18, and first connecting piece 3 and first mounting panel 12 welded connection, and second connecting piece 18 and second mounting panel 13 welded connection, can be fixed first connecting piece 3 and first engineering equipment connecting portion 1 fast through the screw, with second connecting piece 18 and second engineering equipment connecting portion 2 fast fixed.
Furthermore, one end of the second stud 7 is provided with a connecting column 15, one end of the connecting column 15 is provided with a flexible adjusting column 16, certain external force applied to the flexible adjusting column 16 can change the direction of the flexible adjusting column 16, namely, the connecting position and the connecting direction of the second connecting piece 18 are changed, the flexibility of the second connecting piece 18 and the first connecting piece 3 in the connecting process is improved, and the connecting mode between the second connecting piece 18 and the first connecting piece 3 is suitable for various connecting environments.
Further, the outer side of the connecting threaded sleeve 8 is provided with a plurality of anti-skidding threads 17, so that slipping when the connecting threaded sleeve 8 rotates is avoided.
Furthermore, the first upright post 4 and the first stud 5 are arranged into an integrally formed structure, and the second upright post 6 and the second stud 7 are arranged into an integrally formed structure, so that the structural strength of the integral connecting structure is improved.
The working principle is as follows: when in use, the first connecting piece 3 and the first engineering equipment connecting part 1 are fixed through screws, the second connecting piece 18 and the second engineering equipment connecting part 2 are fixed, after the fixing is finished, the four limit bolts 10 of the first connecting piece 3 are respectively embedded into the limit slots 11 of the second connecting piece 18 and are in one-to-one correspondence, then the connecting screw sleeve 8 is rotated, the position of the connecting screw sleeve 8 is changed, the connecting screw sleeve 8 is respectively in threaded connection with the first stud 5 and the second stud 7, at the moment, the connection between the first connecting piece 3 and the second connecting piece 18 is finished through the connecting screw sleeve 8, namely, the connection between the first engineering equipment connecting part 1 and the second engineering equipment connecting part 2 is finished, the connection mode is simple and quick, the assembly and disassembly are convenient, certain external force is applied to the flexible adjusting column 16, the direction of the flexible adjusting column 16 can be changed, namely, the connection position and the connection direction of the second connecting piece 18 are changed, the flexibility of the second connecting piece 18 and the first connecting piece 3 in the connecting process is improved, so that the connecting mode between the second connecting piece 18 and the first connecting piece 3 is suitable for various connecting environments.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.

Claims (6)

1. The utility model provides a quick connect structure is used in engineering equipment installation, includes first engineering equipment connecting portion (1) and second engineering equipment connecting portion (2), its characterized in that: first connecting piece (3) are installed to the one end of first engineering equipment connecting portion (1), second connecting piece (18) are installed to the one end of second engineering equipment connecting portion (2), first connecting piece (3) include first stand (4), the one end of first stand (4) is provided with first double-screw bolt (5), second connecting piece (18) include second stand (6), the one end of second stand (6) is provided with second double-screw bolt (7), the externally mounted of second double-screw bolt (7) has connection swivel nut (8), the inboard of connecting swivel nut (8) is provided with internal thread (9), and connects swivel nut (8) and the equal threaded connection of first double-screw bolt (5) and second double-screw bolt (7).
2. The quick connecting structure for the installation of engineering equipment according to claim 1, wherein: the other end of first stand (4) is provided with spacing bolt (10), and just spacing bolt (10) are provided with four, the inside of second stand (6) is provided with spacing slot (11), and just spacing slot (11) are provided with four, and just spacing slot (11) and spacing bolt (10) axle sleeve cooperation.
3. The quick connecting structure for the installation of engineering equipment according to claim 1, wherein: first mounting panel (12) are installed to the one end of first connecting piece (3), second mounting panel (13) are installed to the one end of second connecting piece (18), the upper end of second mounting panel (13) and first mounting panel (12) all is provided with mounting hole (14), first engineering equipment connecting portion (1) pass through the screw connection with first connecting piece (3), second engineering equipment connecting portion (2) pass through the screw connection with second connecting piece (18), and first connecting piece (3) and first mounting panel (12) welded connection, and second connecting piece (18) and second mounting panel (13) welded connection.
4. The quick connecting structure for the installation of engineering equipment according to claim 1, wherein: one end of the second stud (7) is provided with a connecting column (15), and one end of the connecting column (15) is provided with a flexible adjusting column (16).
5. The quick connecting structure for the installation of engineering equipment according to claim 1, wherein: the outer side of the connecting threaded sleeve (8) is provided with a plurality of anti-skidding threads (17).
6. The quick connecting structure for the installation of engineering equipment according to claim 1, wherein: the first upright post (4) and the first stud (5) are arranged into an integrally formed structure, and the second upright post (6) and the second stud (7) are arranged into an integrally formed structure.
CN202120486454.XU 2021-03-08 2021-03-08 Quick connection structure for engineering equipment installation Active CN214404221U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120486454.XU CN214404221U (en) 2021-03-08 2021-03-08 Quick connection structure for engineering equipment installation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120486454.XU CN214404221U (en) 2021-03-08 2021-03-08 Quick connection structure for engineering equipment installation

Publications (1)

Publication Number Publication Date
CN214404221U true CN214404221U (en) 2021-10-15

Family

ID=78028390

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120486454.XU Active CN214404221U (en) 2021-03-08 2021-03-08 Quick connection structure for engineering equipment installation

Country Status (1)

Country Link
CN (1) CN214404221U (en)

Similar Documents

Publication Publication Date Title
CN203703549U (en) Mounting device for equipment
CN214404221U (en) Quick connection structure for engineering equipment installation
CN105927642A (en) Foundation expanding nut assembly
CN210361090U (en) GIS bellows assembly fixture
CN204835419U (en) Illumination bus duct gallows
CN205194994U (en) Fixed electric connector of riveting nut installation
CN210431117U (en) Simple motor base based on adjustable motor tensioning structure
CN201257670Y (en) Split type arm-lock base
CN207053112U (en) A kind of rotation for crane span structure is curved logical
CN212509148U (en) Stud convenient for mounting and dismounting parts
CN214899345U (en) Device for replacing porous static contact of high-voltage cabinet
CN205864131U (en) A kind of attachment structure
CN219335723U (en) Adjusting structure of stripping device
CN220110290U (en) Safety belt hook for building construction
CN221372172U (en) Anchor device for landslide prevention and control
CN213775936U (en) Split type wall-hung frame
CN202979513U (en) Rapid panel plugging device
CN220613886U (en) Boom nut tightening device
CN212665978U (en) Universal tool for disassembling hexagon bolts
CN216138837U (en) Bearing mounting tool with base
CN216265782U (en) Column bearing installation tool
CN211210162U (en) Mounting seat of metal cabinet body
CN221502397U (en) Groove type embedded part device for curtain wall
CN219825963U (en) Novel hidden aluminium grille mounting clamp
CN207705263U (en) Lead-acid accumulator mounting bracket cassette connection structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant