CN214403665U - Pour and fill barricade and meet a device - Google Patents

Pour and fill barricade and meet a device Download PDF

Info

Publication number
CN214403665U
CN214403665U CN202120442753.3U CN202120442753U CN214403665U CN 214403665 U CN214403665 U CN 214403665U CN 202120442753 U CN202120442753 U CN 202120442753U CN 214403665 U CN214403665 U CN 214403665U
Authority
CN
China
Prior art keywords
mounting groove
plate
fixedly mounted
side wall
mounting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120442753.3U
Other languages
Chinese (zh)
Inventor
陈金平
徐刚
程战明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tongling Nonferrous Metals Group Co Ltd
Original Assignee
Tongling Nonferrous Metals Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tongling Nonferrous Metals Group Co Ltd filed Critical Tongling Nonferrous Metals Group Co Ltd
Priority to CN202120442753.3U priority Critical patent/CN214403665U/en
Application granted granted Critical
Publication of CN214403665U publication Critical patent/CN214403665U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model discloses a pouring and filling retaining wall top-contacting device, which belongs to the technical field of mining and comprises a baffle plate, wherein the top of the baffle plate is provided with a first mounting groove and a second mounting groove, the number of the first mounting groove and the second mounting groove is two, a first supporting rod is fixedly mounted on the inner side wall of the first mounting groove, a second supporting rod is fixedly mounted on the inner side wall of the second mounting groove, a third mounting groove is internally provided with a protective plate, one side of the protective plate is provided with a fourth mounting groove, a moving plate can be ejected outwards along with the increase of concrete at the top-contacting part, a first fixed ring is internally provided with a friction pad, the friction pad can increase the friction force between the connecting rod and the first fixed ring, the action of the force is mutual, so that when the moving plate is ejected out by the concrete, the moving plate can extrude the concrete through the friction force between the connecting rod and the first fixed ring, thereby avoiding the condition that gaps exist in the pouring of incomplete concrete, the pouring quality of a user is greatly improved.

Description

Pour and fill barricade and meet a device
Technical Field
The utility model relates to a connect a device specifically is a pour and fill barricade and connect a device belongs to mining technical field.
Background
And equipment and electric energy do not need to be added for filling and roof-contacting, but in order to cause the condition that filling materials flow automatically along the slope, a plurality of mining roadways are needed, and the roof-contacting quality is not high enough. The pressurizing roof-contacting is mainly used for the upward access and the downward access filling mining method.
However, the existing retaining wall top connecting device for pouring and filling is easy to cause the condition of incomplete pouring when in use, thereby easily causing gaps in concrete, and further greatly reducing the top connecting quality.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a pour and fill barricade and meet a set top device just for solving above-mentioned problem, can avoid appearing pouring the condition that has the clearance in the incomplete concrete, great improvement user's the quality of pouring.
The utility model realizes the above purpose by the following technical proposal, a pouring and filling retaining wall top connecting device comprises a baffle plate, the top of the baffle plate is provided with a first mounting groove and a second mounting groove, the number of the first mounting groove and the second mounting groove is two, a first supporting rod is fixedly mounted on the inner side wall of the first mounting groove, a second supporting rod is fixedly mounted on the inner side wall of the second mounting groove, one side of the baffle plate is provided with a third mounting groove, a guard plate is arranged in the third mounting groove, one side of the guard plate is provided with a fourth mounting groove, a connecting plate is fixedly mounted on the inner side wall of the fourth mounting groove, the bottom of the connecting plate is provided with a fifth mounting groove, a handle is fixedly mounted on the inner side wall of the fifth mounting groove, a mounting hole is arranged on the baffle plate, a second rotating shaft is rotatably mounted on the inner side wall of the mounting hole, and a fixed plate is fixedly mounted at one end of the second rotating shaft, one side of the fixed plate is provided with a mounting groove six, an anti-slip pad is fixedly mounted on the inner side wall of the mounting groove six, and the baffle is provided with a water through hole.
Preferably, in order to facilitate the limiting of the connecting rod and the embedded pipe, the top fixed mounting of the first supporting rod is provided with a first fixing ring, and the top fixed mounting of the second supporting rod is provided with a second fixing ring.
Preferably, in order to facilitate the installation of the movable plate, a connecting rod is arranged in the first fixing ring in a penetrating manner, and the movable plate is fixedly installed at one end of the connecting rod.
Preferably, in order to install the embedded pipe, the moving plate is provided with a through hole, and the embedded pipe is fixedly installed on the inner side wall of the through hole.
Preferably, in order to facilitate the existence of a gap in the filled concrete, one end of the embedded pipe is arranged in the second fixing ring in a penetrating manner, and a friction pad is arranged in the first fixing ring.
Preferably, in order to be convenient for carry on spacingly to the friction pad, gu fixed ring is provided with the screw hole on one, wear to be equipped with the threaded rod in the screw hole, a rotation axis fixed mounting is passed through to the one end of threaded rod on the friction pad.
The utility model has the advantages that:
1. the movable plate can be ejected outwards by the concrete along with the increase of the concrete at the top, the first fixing ring is internally provided with the friction pad, the friction pad can increase the friction force between the connecting rod and the first fixing ring, and the action of the forces is mutual, so that when the movable plate is ejected out by the concrete, the movable plate can extrude the concrete through the friction force between the connecting rod and the first fixing ring, the condition that a gap exists in the concrete without complete pouring can be avoided, and the pouring quality of a user is greatly improved.
2. Two pairs of fixed plates of user's accessible axis of rotation rotate, and then can make fixed plate and guard plate separation to can make the limbers in the baffle spill, user's accessible limbers is in the utility model discloses the during operation carries out the water spray protection to the barricade, great improvement user's work efficiency.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention.
Fig. 2 is a sectional view of the moving plate of the present invention.
Fig. 3 is a cross-sectional view of the first fixing ring of the present invention.
Fig. 4 is a cross-sectional view of the baffle of the present invention.
In the figure: 1. the device comprises a baffle plate, 2, first support rods, 3, second support rods, 4, a protection plate, 5, a connecting plate, 6, a handle, 7, second rotating shafts, 8, a fixing plate, 9, an anti-slip pad, 10, first fixing rings, 11, second fixing rings, 12, a connecting rod, 13, a moving plate, 14, a pre-buried pipe, 15, a friction pad, 16, a threaded rod, 17 and a water through hole.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, a pouring filling retaining wall top connecting device comprises a baffle 1, the top of the baffle 1 is provided with a first mounting groove and a second mounting groove, the number of the first mounting groove and the second mounting groove is two, a first supporting rod 2 is fixedly mounted on the inner side wall of the first mounting groove, a second supporting rod 3 is fixedly mounted on the inner side wall of the second mounting groove, one side of the baffle 1 is provided with a third mounting groove, a third protective plate 4 is arranged in the third mounting groove, one side of the fourth protective plate 4 is provided with a fourth mounting groove, a connecting plate 5 is fixedly mounted on the inner side wall of the fourth mounting groove, the bottom of the connecting plate 5 is provided with a fifth mounting groove, a handle 6 is fixedly mounted on the inner side wall of the fifth mounting groove, the baffle 1 is provided with a mounting hole, a second rotating shaft 7 is rotatably mounted on the inner side wall of the mounting hole, a fixing plate 8 is fixedly mounted with a fixing plate 8, one side of the fixing plate 8 is provided with a sixth mounting groove, and an anti-slip pad 9 is fixedly mounted on the inner side wall of the mounting groove six, and a water through hole 17 is formed in the baffle plate 1.
As a technical optimization scheme of the utility model, the top fixed mounting of bracing piece one 2 has solid fixed ring one 10, and the top fixed mounting of bracing piece two 3 has solid fixed ring two 11, and the quantity of solid fixed ring one 10 and solid fixed ring two 11 is two.
As the utility model discloses a connecting rod 12 is worn to be equipped with in solid fixed ring 10 to technical optimization scheme, and the one end fixed mounting of connecting rod 12 has movable plate 13, when butt joint top department waters, along with the increase of top department concrete, the concrete can be with movable plate 13 outside ejecting.
As the utility model discloses a technical optimization scheme is provided with the through-hole on the movable plate 13, fixed mounting has pre-buried pipe 14 on the inside wall of through-hole, the user can with external equipment of pouring with the utility model discloses an on pre-buried pipe 14 is connected to and then water in butt joint top department.
As a technical optimization scheme of the utility model, the one end of buried pipe 14 is worn to establish in solid fixed ring two 11, is provided with friction pad 15 in solid fixed ring 10, and friction pad 15 can increase the frictional force between connecting rod 12 and solid fixed ring 10.
As the utility model discloses a technical optimization scheme is provided with the screw hole on solid fixed ring 10, wears to be equipped with threaded rod 16 in the screw hole, and a rotation axis fixed mounting is passed through on friction pad 15 to the one end of threaded rod 16, and the user's accessible rotates threaded rod 16 and makes threaded rod 16 drive friction pad 15 remove, and then can adjust the frictional force between connecting rod 12 and solid fixed ring 10.
When the utility model is used, a user can firstly check whether each component in the utility model is perfect, the user can place the embedded pipe 14 at a position 10cm below the wall top, the roof is filled at the same level, the horizontal construction and the filling of the drilling hole at the upper middle section are avoided, a filling pipeline is laid to connect the roof, then the external pouring equipment can be connected with the embedded pipe 14 on the utility model, the roof is poured, the movable plate 13 can be ejected outwards by the concrete along with the increase of the concrete at the roof, a friction pad 15 is arranged in the fixed ring one 10, the friction force between the connecting rod 12 and the fixed ring one 10 can be increased by the friction pad 15, the action of the force is mutual, so that when the movable plate 13 is ejected out by the concrete, the movable plate 13 can extrude the concrete through the friction force between the connecting rod 12 and the fixed ring one 10, the condition that the gap is not existed in the pouring concrete is avoided, great improvement the user pour the quality, two 7 of user's accessible axis of rotation rotate fixed plate 8 simultaneously, and then can make fixed plate 8 and guard plate 4 separation to can make the limbers 17 in the baffle 1 spill, user's accessible limbers 17 is in the utility model discloses the during operation carries out the protection of spraying water to the barricade, great improvement user's work efficiency.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Furthermore, it should be understood that although the present description refers to embodiments, not every embodiment may contain only a single embodiment, and such description is for clarity only, and those skilled in the art should integrate the description, and the embodiments may be combined as appropriate to form other embodiments understood by those skilled in the art.

Claims (6)

1. The utility model provides a pour and fill barricade and meet a set, includes baffle (1), its characterized in that: the top of the baffle (1) is provided with a first mounting groove and a second mounting groove, the first mounting groove and the second mounting groove are respectively two in number, a first supporting rod (2) is fixedly mounted on the inner side wall of the first mounting groove, a second supporting rod (3) is fixedly mounted on the inner side wall of the second mounting groove, a third mounting groove is arranged on one side of the baffle (1), a protection plate (4) is arranged in the third mounting groove, a fourth mounting groove is arranged on one side of the protection plate (4), a connecting plate (5) is fixedly mounted on the inner side wall of the fourth mounting groove, a fifth mounting groove is arranged at the bottom of the connecting plate (5), a handle (6) is fixedly mounted on the inner side wall of the fifth mounting groove, a mounting hole is formed in the baffle (1), a second rotating shaft (7) is rotatably mounted on the inner side wall of the mounting hole, and a fixing plate (8) is fixedly mounted at one end of the second rotating shaft (7), one side of fixed plate (8) is provided with mounting groove six, fixed mounting has slipmat (9) on the inside wall of mounting groove six, be provided with limbers (17) on baffle (1).
2. The cast-in-place filled retaining wall abutting device according to claim 1, wherein: the top fixed mounting of bracing piece one (2) has solid fixed ring one (10), the top fixed mounting of bracing piece two (3) has solid fixed ring two (11).
3. The cast-in-place filled retaining wall abutting device according to claim 2, wherein: a connecting rod (12) penetrates through the first fixing ring (10), and a moving plate (13) is fixedly mounted at one end of the connecting rod (12).
4. The cast-in-place filled retaining wall abutting device according to claim 3, wherein: the movable plate (13) is provided with a through hole, and a pre-buried pipe (14) is fixedly installed on the inner side wall of the through hole.
5. The cast-in-place filled retaining wall abutting device according to claim 4, wherein: one end of the embedded pipe (14) penetrates through the second fixing ring (11), and a friction pad (15) is arranged in the first fixing ring (10).
6. The cast-in-place filled retaining wall abutting device according to claim 5, wherein: the friction pad is characterized in that a threaded hole is formed in the first fixing ring (10), a threaded rod (16) penetrates through the threaded hole, and one end of the threaded rod (16) is fixedly installed on the friction pad (15) through a first rotating shaft.
CN202120442753.3U 2021-03-02 2021-03-02 Pour and fill barricade and meet a device Active CN214403665U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120442753.3U CN214403665U (en) 2021-03-02 2021-03-02 Pour and fill barricade and meet a device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120442753.3U CN214403665U (en) 2021-03-02 2021-03-02 Pour and fill barricade and meet a device

Publications (1)

Publication Number Publication Date
CN214403665U true CN214403665U (en) 2021-10-15

Family

ID=78027050

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120442753.3U Active CN214403665U (en) 2021-03-02 2021-03-02 Pour and fill barricade and meet a device

Country Status (1)

Country Link
CN (1) CN214403665U (en)

Similar Documents

Publication Publication Date Title
CN111455789B (en) Municipal infrastructure construction engineering well lid pavement construction technology
CN204012118U (en) A kind of earth rod with vertically-guided function is installed power set
CN214403665U (en) Pour and fill barricade and meet a device
CN212154858U (en) A cup joint formula underground conveyor for tailing lotion fills
CN211849493U (en) Civil engineering foundation pit supporting device
CN211648195U (en) Supporting device for railway tunnel construction
CN210421171U (en) A inspection shaft for municipal administration sewage collection pipe network
CN205875779U (en) Prestressed carbon fiber plate stiff end steel base with turn to device
CN109301787B (en) Outdoor abrupt slope cable channel sectional type combination apron
CN211006657U (en) Auxiliary cable descending device suitable for prestressed anchor cable in high and steep complex terrain
CN203271622U (en) Clamping device for all-casing drilling rig
CN211523088U (en) Hydraulic engineering is with unrestrained device that disappears
CN210134807U (en) Drilling tool cleaning device
CN104226183B (en) A kind of central shaft rotating equipment bearing
CN217105120U (en) Building foundation pit supporting structure
CN209873770U (en) Assembled foundation treatment device of soft soil foundation
CN111456806A (en) A cup joint formula underground conveyor for tailing lotion fills
CN202300297U (en) Fixing base for blowout preventer group
CN205775902U (en) A kind of friction energy dissipation device
CN217810958U (en) Cut-off wall construction platform structure
CN218059809U (en) Road surface tamping device
CN212926050U (en) Hydraulic engineering is with supplementary installation device of pile foundation
CN114250774B (en) Device for dismantling pile foundation near existing high-speed rail station house and construction method
CN211690257U (en) Tower type water conservancy trash remover
CN214883945U (en) Slip casting self-balancing load box

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant