CN214402704U - Tool type wall connecting piece structure and steel pipe scaffold structure - Google Patents

Tool type wall connecting piece structure and steel pipe scaffold structure Download PDF

Info

Publication number
CN214402704U
CN214402704U CN202023090704.2U CN202023090704U CN214402704U CN 214402704 U CN214402704 U CN 214402704U CN 202023090704 U CN202023090704 U CN 202023090704U CN 214402704 U CN214402704 U CN 214402704U
Authority
CN
China
Prior art keywords
nut
embedded
steel pipe
steel plate
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202023090704.2U
Other languages
Chinese (zh)
Inventor
赵胤铭
段小强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC5 Group Corp Ltd
Original Assignee
China MCC5 Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC5 Group Corp Ltd filed Critical China MCC5 Group Corp Ltd
Priority to CN202023090704.2U priority Critical patent/CN214402704U/en
Application granted granted Critical
Publication of CN214402704U publication Critical patent/CN214402704U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Mutual Connection Of Rods And Tubes (AREA)

Abstract

The utility model relates to a construction field need set up the problem that the hole influences the construction progress at the structure wall body when aiming at solving the scaffold frame construction among the prior art, provides instrument formula even wall spare structure and steel pipe scaffold structure. The tool type wall connecting piece structure comprises an embedded component, a connecting piece and a connecting piece, wherein the embedded component comprises an embedded sleeve and an embedded nut fixedly arranged in the embedded sleeve; the embedded sleeve is provided with an expanded hole which is formed by expanding outwards along the radial direction, and the embedded nut is arranged in the expanded hole; the horizontal connecting pipe fitting comprises a connecting steel pipe for connecting the vertical steel pipe of the scaffold and a connecting part fixedly connected to one end of the connecting steel pipe, the connecting part comprises a steel plate welded to one end of the connecting steel pipe, and a connecting nut is connected to the steel plate; and one end of the connecting screw penetrates into the embedded sleeve and is in threaded connection with the embedded nut, and the other end of the connecting screw is in threaded connection with the connecting nut. The beneficial effects of the utility model are that need not to stay the hole when building by laying bricks or stones the wall body, one shot forming does not influence the time limit for a project.

Description

Tool type wall connecting piece structure and steel pipe scaffold structure
Technical Field
The utility model relates to a construction field particularly, relates to instrument formula is wall spare structure and steel pipe scaffold structure even.
Background
When the construction such as building outer wall structure, often need set up scaffold structure. In the prior art, when a scaffold structure is arranged, holes are often required to be formed in a structural wall body for realizing the connection between the scaffold and a structural main body. The holes need to be modified after the scaffold is subsequently dismantled, and the overall construction progress is influenced.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing an instrument formula is wall spare structure even to need set up the problem that the hole influences the construction progress at the structure wall body when solving the scaffold frame construction among the prior art.
The embodiment of the utility model is realized like this:
a tool-style wall connecting structure, comprising:
the embedded component comprises an embedded sleeve embedded in a reinforced concrete structure and an embedded nut fixedly arranged in the embedded sleeve; the embedded sleeve is provided with an expanded hole which is formed by expanding outwards along the radial direction, and the embedded nut is arranged in the expanded hole;
the horizontal connecting pipe fitting comprises a connecting steel pipe for connecting a scaffold vertical steel pipe and a connecting part fixedly connected to one end of the connecting steel pipe, wherein the connecting part comprises a steel plate welded to one end of the connecting steel pipe, and a connecting nut is connected to the steel plate; and
and one end of the connecting screw rod penetrates into the embedded sleeve and is in threaded connection with the embedded nut, and the other end of the connecting screw rod is in threaded connection with the connecting nut.
The tool type wall connecting piece structure in the scheme is characterized in that a hole is not required to be reserved when a wall body is built, the wall body is formed at one time, the construction period is not influenced, a large number of hole repairing in the later period is avoided, the steel pipe is not cut in the later period, and the leakage risk is greatly reduced; and the structure also has the beneficial effect that the wall connecting piece can be recycled. The tool type wall connecting piece in the scheme has the advantages of simple structure manufacturing, quickness and high efficiency in installation, convenience and quickness in use, low cost, flexibility in application, convenience in turnover and convenience in construction; the structure is small in size, can be processed on site except for embedded parts, has small influence on subsequent construction, is good in forming effect, can improve construction quality, is good in popularization and can accelerate construction progress.
In addition, in this scheme, embedded nut sets up in enlarging the hole, avoids deviating from of embedded nut, and makes embedded nut and embedded sleeve keep a body structure.
In one embodiment:
the embedded nut is an M10 nut, and the connecting screw rod is formed by respectively processing 50mm end part threads at two ends of a round steel with the diameter of 10 mm; the diameter of the embedded sleeve is 11 mm.
In one embodiment:
one surface of the steel plate, which is positioned on the inner side of the connecting steel pipe, is welded with the connecting nut; one end of the connecting screw rod, which is close to the steel plate, is in threaded connection with a locking nut, the locking nut is positioned on the outer side of the steel plate and can tightly lock the steel plate between the locking nut and the connecting nut.
In one embodiment:
the central axis of the connecting nut coincides with the central axis of the connecting steel pipe.
In one embodiment:
the steel plate and the connecting steel pipe are welded and connected into a whole.
The utility model also provides a steel pipe scaffold structure, which comprises an inner row of vertical steel pipes, an outer row of vertical steel pipes and the tool type wall connecting piece structure; the inner row and the outer row of the vertical steel pipes are respectively connected with the connecting steel pipes through scaffold fasteners.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings referred to in the embodiments will be briefly described below, it should be understood that the following drawings only illustrate some embodiments of the present invention, and therefore should not be considered as limiting the scope, and for those skilled in the art, other related drawings may be obtained from these drawings without inventive effort.
Fig. 1 shows a schematic diagram of a steel pipe scaffold structure in an embodiment of the present invention;
fig. 2 shows a structural connection diagram of the embedded bushing, the embedded nut, the enlarged hole, and the connecting steel pipe in the embodiment of the present invention.
Icon: the steel pipe scaffold comprises a steel pipe scaffold structure 10, a vertical steel pipe 11, a tool type wall connecting piece structure 12, scaffold fasteners 13, embedded components 14, horizontal connecting pipe fittings 15, connecting screws 16, embedded sleeves 17, embedded nuts 18, enlarged holes 19, connecting steel pipes 20, connecting portions 21, steel plates 22, connecting nuts 23, locking nuts 24 and a reinforced concrete structure 50.
Detailed Description
In order to make the objects, technical solutions and advantages of the embodiments of the present invention clearer, the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are some, but not all, embodiments of the present invention. The components of embodiments of the present invention, as generally described and illustrated in the figures herein, may be arranged and designed in a wide variety of different configurations.
Thus, the following detailed description of the embodiments of the present invention, presented in the accompanying drawings, is not intended to limit the scope of the invention, as claimed, but is merely representative of selected embodiments of the invention. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Examples
Referring to fig. 1, the utility model also provides a steel pipe scaffold structure 10, it includes two rows of inside and outside vertical steel pipes 11 and instrument formula even wall spare structure 12. The inner and outer rows of vertical steel pipes 11 are connected to the connecting steel pipes 20 of the tool type wall connecting piece structure 12 through scaffold fasteners 13, respectively (the specific arrangement of the connecting steel pipes 20 will be described later).
With continued reference to fig. 1, in the present embodiment, the tool type wall connecting structure 12 includes an embedded member 14, a horizontal connecting pipe 15 and a connecting screw 16.
Referring to fig. 1 and fig. 2 in a matching manner, the embedded member 14 includes an embedded sleeve 17 embedded in the reinforced concrete structure 50 and an embedded nut 18 fixedly arranged in the embedded sleeve 17; the embedded sleeve 17 has an enlarged hole 19 formed by expanding outward in the radial direction, and the embedded nut 18 is disposed in the enlarged hole 19.
The horizontal connecting pipe fitting 15 comprises a connecting steel pipe 20 used for connecting the scaffold vertical steel pipe 11 and a connecting part 21 fixedly connected to one end of the connecting steel pipe 20, and the connecting part 21 comprises a steel plate 22 welded to one end of the connecting steel pipe 20 and a connecting nut 23 connected to the steel plate 22.
One end of the connecting screw 16 penetrates into the embedded sleeve 17 and is in threaded connection with the embedded nut 18, and the other end of the connecting screw is in threaded connection with the connecting nut 23.
The tool type wall connecting piece structure 12 in the scheme is used, a hole does not need to be reserved when a wall body is built, one-step forming is achieved, the construction period is not affected, a large number of hole repairing in the later period is avoided, steel pipe cutting in the later period is avoided, and the leakage risk is greatly reduced; and the structure also has the beneficial effect that the wall connecting piece can be recycled. The tool type wall connecting piece structure 12 in the scheme is simple to manufacture, quick and efficient to install, convenient and quick to use, low in cost, flexible to apply, convenient to turnover and convenient to construct; the structure is small in size, can be processed on site except for embedded parts, has small influence on subsequent construction, is good in forming effect, can improve construction quality, is good in popularization and can accelerate construction progress.
In addition, in this scheme, the embedded nut 18 is arranged in the enlarged hole 19, so that the embedded nut 18 is prevented from being separated, and the embedded nut 18 and the embedded sleeve 17 are kept in an integrated structure.
In the embodiment, the embedded nut 18 is an M10 nut, and the connecting screw 16 is a round steel with the diameter of 10mm, and the two ends of the round steel are respectively provided with 50mm end threads; the diameter of the embedded sleeve 17 is 11 mm.
In this embodiment, a connection nut 23 is welded to one surface of the steel plate 22 located inside the connection steel pipe 20; a lock nut 24 is threadedly coupled to an end of the coupling screw 16 adjacent to the steel plate 22, and the lock nut 24 is located outside the steel plate 22 and can tightly lock the steel plate 22 between the lock nut 24 and the coupling nut 23. When in use, the connecting screw 16 is screwed into the connecting nut 23, and then the locking nut 24 is screwed to press the steel plate 22. In this embodiment, the central axis of the coupling nut 23 coincides with the central axis of the coupling steel pipe 20. The steel plate 22 and the connecting steel pipe 20 are welded and connected into a whole.
The above is only a preferred embodiment of the present invention, and is not intended to limit the present invention, and various modifications and changes will occur to those skilled in the art. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (6)

1. The utility model provides a wall spare structure is even to instrument formula which characterized in that includes:
the embedded component comprises an embedded sleeve embedded in a reinforced concrete structure and an embedded nut fixedly arranged in the embedded sleeve; the embedded sleeve is provided with an expanded hole which is formed by expanding outwards along the radial direction, and the embedded nut is arranged in the expanded hole;
the horizontal connecting pipe fitting comprises a connecting steel pipe for connecting a scaffold vertical steel pipe and a connecting part fixedly connected to one end of the connecting steel pipe, wherein the connecting part comprises a steel plate welded to one end of the connecting steel pipe, and a connecting nut is connected to the steel plate; and
and one end of the connecting screw rod penetrates into the embedded sleeve and is in threaded connection with the embedded nut, and the other end of the connecting screw rod is in threaded connection with the connecting nut.
2. The tool type wall connecting member structure according to claim 1, wherein:
the embedded nut is an M10 nut, and the connecting screw rod is formed by respectively processing 50mm end part threads at two ends of a round steel with the diameter of 10 mm; the diameter of the embedded sleeve is 11 mm.
3. The tool type wall connecting member structure according to claim 1, wherein:
one surface of the steel plate, which is positioned on the inner side of the connecting steel pipe, is welded with the connecting nut; one end of the connecting screw rod, which is close to the steel plate, is in threaded connection with a locking nut, the locking nut is positioned on the outer side of the steel plate and can tightly lock the steel plate between the locking nut and the connecting nut.
4. The tool type wall connecting member structure according to claim 1, wherein:
the central axis of the connecting nut coincides with the central axis of the connecting steel pipe.
5. The tool type wall connecting member structure according to claim 1, wherein:
the steel plate and the connecting steel pipe are welded and connected into a whole.
6. The utility model provides a steel pipe scaffold structure which characterized in that:
the tool type wall connecting piece structure comprises an inner row of vertical steel pipes, an outer row of vertical steel pipes and the tool type wall connecting piece structure as claimed in any one of claims 1 to 5;
the inner row and the outer row of the vertical steel pipes are respectively connected with the connecting steel pipes through scaffold fasteners.
CN202023090704.2U 2020-12-21 2020-12-21 Tool type wall connecting piece structure and steel pipe scaffold structure Active CN214402704U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202023090704.2U CN214402704U (en) 2020-12-21 2020-12-21 Tool type wall connecting piece structure and steel pipe scaffold structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202023090704.2U CN214402704U (en) 2020-12-21 2020-12-21 Tool type wall connecting piece structure and steel pipe scaffold structure

Publications (1)

Publication Number Publication Date
CN214402704U true CN214402704U (en) 2021-10-15

Family

ID=78039566

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202023090704.2U Active CN214402704U (en) 2020-12-21 2020-12-21 Tool type wall connecting piece structure and steel pipe scaffold structure

Country Status (1)

Country Link
CN (1) CN214402704U (en)

Similar Documents

Publication Publication Date Title
CN212642120U (en) Concrete anti-ridge template device
CN214402704U (en) Tool type wall connecting piece structure and steel pipe scaffold structure
CN209195907U (en) Unilateral bolt
CN204531185U (en) A kind of adjustable reinforcing bar straight thread connector
CN210342642U (en) Scaffold wall connecting piece and scaffold
CN218375201U (en) Frame post and wall body crossing department constructional column unilateral template reinforcing apparatus
CN111877350A (en) But reuse's steel reinforcement cage shape adjustable triangular supports frame of preapring for an unfavorable turn of events
CN213597334U (en) Construction prefab steel bar joint connecting device
CN104805910A (en) Embedded part for cast-in-place concrete component and construction method of embedded part
CN213329456U (en) Building steel structure connecting piece
CN109307108A (en) A kind of concrete delivery pump pipe angle turning tool formula fixed structure and its construction method
CN210947726U (en) Simple and easy anchor clamps of building templates
CN208072933U (en) A kind of scaffold easy to assemble
CN217840352U (en) Threaded connection embedded part
CN214534828U (en) Novel cross pipe clamp
CN211059146U (en) Adjustable pre-buried sleeve
CN216976234U (en) Steel collar mechanism is restoreed to sewage owner's net
CN220828027U (en) Wall-penetrating wall connecting piece
CN218117182U (en) Connecting node for installing scaffold
CN218758667U (en) Turnover type dismounting-free outer frame wall connecting piece device
CN211114825U (en) Vertical pipeline reserved hole formwork device
CN219952644U (en) Pre-buried sleeve even wall spare
CN211341783U (en) Novel water stop bolt for building
CN217108588U (en) Expansion bolt fastening type steel pipe joint
CN218176611U (en) Wall connecting piece structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant