- CN214384278U CN214384278U CN202023276890.9U CN202023276890U CN214384278U CN 214384278 U CN214384278 U CN 214384278U CN 202023276890 U CN202023276890 U CN 202023276890U CN 214384278 U CN214384278 U CN 214384278U
- Authority
- CN
- China
- Prior art keywords
- connecting frame
- frame
- water heating
- heating pipe
- cross beam
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 title claims abstract description 21
- 238000010438 heat treatment Methods 0.000 title claims abstract description 20
- 238000009434 installation Methods 0.000 title claims description 12
- 238000010276 construction Methods 0.000 claims description 4
- 238000003466 welding Methods 0.000 claims description 2
- 238000010030 laminating Methods 0.000 abstract description 5
- 238000003825 pressing Methods 0.000 abstract description 4
- 238000009435 building construction Methods 0.000 abstract description 2
- 238000000034 method Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 230000001737 promoting effect Effects 0.000 description 1
- 230000035939 shock Effects 0.000 description 1
Images
Landscapes
- Supports For Pipes And Cables (AREA)
Abstract
The utility model belongs to the technical field of building construction, in particular to a mounting bracket for a water heating pipeline for building, which comprises a mounting bracket, a cross beam, a connecting frame and a connecting frame A, wherein the mounting bracket is symmetrically distributed on two sides of the cross beam and is fixedly connected with the cross beam, the connecting frame is positioned on the front side and the rear side of the cross beam and is fastened with a cross beam bolt, and the connecting frame A is hinged on one side of the connecting frame away from the cross beam; accomplish the regulation to length between connection frame A and the connection frame B, thereby people can adjust the distance between connection frame A and the connection frame B as required, increase bearing area and support intensity, make things convenient for people to install the operation to the pipeline, arrange the pipeline between backing plate and the hoop, drive pipeline and backing plate laminating through pressing down the hoop, and promote the backing plate and continue to move down to suitable position, the spring atress is kick-backed and is promoted backing plate and pipeline and closely laminate, it is not hard up effectively to avoid installing, and carry out the antidetonation operation to the pipeline.
Description
Technical Field
The utility model belongs to the technical field of the construction, concretely relates to water heating pipe way installing support for building.
Background
The building construction refers to production activities in the engineering construction implementation stage, is the construction process of various buildings, and also can be a process of changing various lines on a design drawing into a real object in a designated place.
In order to solve the problem, the application provides a water heating pipeline mounting bracket for buildings.
SUMMERY OF THE UTILITY MODEL
To solve the problems set forth in the background art described above. The utility model provides a water heating pipe way installing support for building has the characteristics of adjusting the holding surface size, the shock attenuation clamping.
In order to achieve the above object, the utility model provides a following technical scheme: a water heating pipeline mounting bracket for buildings comprises mounting brackets, a cross beam, a connecting frame and a connecting frame A, wherein the mounting brackets are symmetrically distributed on two sides of the cross beam and fixedly connected with the cross beam, the connecting frame is positioned on the front side and the rear side of the cross beam and is fastened with the cross beam through bolts, the connecting frame A is hinged on one side, away from the cross beam, of the connecting frame, the bottom of one side, away from the cross beam, of the connecting frame is hinged with a loop bar, the loop bar is internally threaded at one end, away from the connecting frame, of the loop bar, the connecting rod is rotatably connected at one end, away from the loop bar, of the connecting rod is hinged with a connecting frame B, the connecting frame B is oppositely arranged with the connecting frame A, and the connecting frame B is provided with connecting plates and is in sliding connection with the connecting plates on the front side and the rear side of the opposite to the connecting frame A, the top of the connecting frame A and the top of the connecting frame B are both fastened with supporting plates through bolts, and hoops are inserted in the centers of the tops of the supporting plates.
As the utility model relates to a water heating pipe way installing support is preferred for building, correspond between the connecting plate the splice box A with the gag lever post, two have all been welded to the position department of splice box B the gag lever post is located respectively the splice box A with in the splice box B, and with splice box A and splice box B sliding connection.
As the utility model relates to a hot-water line installs support is preferred for building, the carriage A and carriage B with logical groove has all been seted up to the junction of gag lever post.
As the utility model relates to a water heating pipe way installing support is preferred for building, the screw rod lateral wall is close to a pot head of connecting rod is equipped with the knob, the knob with screw rod fixed connection.
As the utility model relates to a water heating pipe erection support is preferred for building, the backup pad top corresponds the notch has been seted up to the position department of hoop, sliding connection has the backing plate in the notch of backup pad.
As the utility model relates to a building water heating pipe installing support is preferred, backup pad notch inner wall corresponds the spout has been seted up to the equal symmetry in the left and right sides of backing plate position department, the welding has the slide bar in the spout of backup pad, the slide bar overcoat is equipped with the sliding sleeve, the sliding sleeve extends one side of backup pad with backing plate fixed connection, the slide bar is located outward the backup pad and the coiling has the spring between the sliding sleeve, the both ends of spring respectively with the sliding sleeve and backup pad fixed connection.
As the utility model relates to a building water heating pipe installing support is preferred, the backing plate top corresponds the position department of hoop sets up the inner groovy of arc structure.
Compared with the prior art, the beneficial effects of the utility model are that:
it is rotatory to drive the screw rod through rotatory knob, the screw rod when promoting the connecting rod to remove along the loop bar, the connecting rod promotes splice box B and removes to suitable position along the connecting plate, the completion is to the regulation of length between splice box A and the splice box B, thereby people can adjust the distance between splice box A and the splice box B as required, increase bearing area and support intensity, make things convenient for people to install the operation to the pipeline, arrange the pipeline between backing plate and the hoop in, drive pipeline and backing plate laminating through pressing down the hoop, and promote the backing plate and continue downstream to suitable position, spring atress resilience promotes backing plate and pipeline and closely laminates, effectively avoid the installation not hard up, and carry out the antidetonation operation to the pipeline.
Drawings
The accompanying drawings are included to provide a further understanding of the invention, and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention, and together with the description serve to explain the invention and not to limit the invention. In the drawings:
fig. 1 is a schematic structural view of the present invention;
fig. 2 is a schematic structural view between the middle cross beam and the connecting frame B of the present invention;
fig. 3 is a schematic structural view between the connecting frame and the connecting frame B of the present invention;
FIG. 4 is a schematic structural view between the support plate and the backing plate of the present invention;
in the figure: 1. a mounting frame; 2. a cross beam; 3. a connecting frame; 4. a support plate; 5. a hoop; 6. a base plate; 7. a connecting plate; 8. a connecting frame A; 9. a loop bar; 10. a connecting frame B; 11. a connecting rod; 12. a knob; 13. a screw; 14. a limiting rod; 15. a sliding sleeve; 16. a spring; 17. a slide bar.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Example 1
As shown in fig. 1-4, a mounting bracket for a water heating pipeline for buildings comprises mounting brackets 1, a cross beam 2, connecting frames 3 and connecting frames A8, wherein the mounting brackets 1 are symmetrically distributed on two sides of the cross beam 2 and fixedly connected with the cross beam 2, the connecting frames 3 are positioned on the front and back sides of the cross beam 2 and are fastened with the cross beam 2 by bolts, the connecting frame A8 is hinged on one side of the connecting frame 3 away from the cross beam 2, a loop bar 9 is hinged on the bottom of one side of the connecting frame 3 away from the cross beam 2, a screw 13 is connected in a threaded manner on one end of the loop bar 9 away from the connecting frame 3, one end of the screw 13 away from the loop bar 9 is rotatably connected with a connecting rod 11, one end of the connecting rod 11 away from the screw 13 is hinged with a connecting frame B10, the connecting frame B10 is arranged opposite to the connecting frame A8, connecting plates 7 are arranged on the front and back sides of the opposite surface of the connecting frame B10 to the connecting frame A8 and are connected with the connecting plates 7 in a sliding manner, the connecting frame a supporting plate 4 is fastened by bolts, and a supporting plate 4 is arranged on the top of the connecting frame A8 and a connecting frame B10, the center of the top of the supporting plate 4 is inserted with a hoop 5.
In this embodiment: drive the screw rod 13 through rotatory knob 12 and rotate, when the screw rod 13 promoted connecting rod 11 along loop bar 9 and moved, connecting rod 11 promoted link B10 and moved to suitable position along connecting plate 7, the completion is to the regulation of length between link A8 and the link B10, thereby people can adjust the distance between link A8 and the link B10 as required, increase bearing area and support intensity, make things convenient for people to install the operation to the pipeline.
In an alternative embodiment, the position between the connecting plates 7 corresponding to the connecting frame A8 and the connecting frame B10 is welded with the limiting rods 14, and the two limiting rods 14 are respectively located in the connecting frame A8 and the connecting frame B10 and are slidably connected with the connecting frame A8 and the connecting frame B10.
In an optional embodiment, through grooves are formed at the connecting positions of the connecting frame A8 and the connecting frame B10 and the limiting rod 14.
In an alternative embodiment, a knob 12 is sleeved on one end of the outer side wall of the screw 13 close to the connecting rod 11, and the knob 12 is fixedly connected with the screw 13.
In this embodiment: drive the screw rod 13 through rotatory knob 12 and rotate, when the screw rod 13 promoted connecting rod 11 along loop bar 9 and moved, connecting rod 11 promoted link B10 and moved to suitable position along connecting plate 7, the completion is to the regulation of length between link A8 and the link B10, thereby people can adjust the distance between link A8 and the link B10 as required, increase bearing area and support intensity, make things convenient for people to install the operation to the pipeline.
In an alternative embodiment, a notch is formed at the top of the support plate 4 corresponding to the hoop 5, and a backing plate 6 is slidably connected in the notch of the support plate 4.
In an alternative embodiment, sliding grooves are symmetrically formed in the left side and the right side of the inner wall of the notch of the support plate 4 corresponding to the position of the backing plate 6, a sliding rod 17 is welded in the sliding groove of the support plate 4, a sliding sleeve 15 is sleeved outside the sliding rod 17, one side, extending out of the support plate 4, of the sliding sleeve 15 is fixedly connected with the backing plate 6, a spring 16 is wound between the support plate 4 and the sliding sleeve 15 outside the sliding rod 17, and two ends of the spring 16 are fixedly connected with the sliding sleeve 15 and the support plate 4 respectively.
In an alternative embodiment, the top of the shim plate 6 is provided with an inner groove of arcuate configuration at a location corresponding to the collar 5.
In this embodiment: arrange the pipeline in between backing plate 6 and hoop 5, drive pipeline and the laminating of backing plate 6 through pressing hoop 5 to promote backing plate 6 and continue to move down to suitable position, spring 16 atress resilience promotes backing plate 6 and the inseparable laminating of pipeline, effectively avoids the installation not hard up, and carries out the antidetonation operation to the pipeline.
The utility model discloses a theory of operation and use flow: it is rotatory to drive screw rod 13 through rotatory knob 12, when screw rod 13 promoted connecting rod 11 along loop bar 9 and removes, connecting rod 11 promotes splice frame B10 and removes to suitable position along connecting plate 7, the completion is to the regulation of length between splice frame A8 and the splice frame B10, thereby people can adjust the distance between splice frame A8 and the splice frame B10 as required, increase bearing area and support intensity, make things convenient for people to carry out the installation operation to the pipeline, place the pipeline between backing plate 6 and hoop 5, drive pipeline and the laminating of backing plate 6 through pressing hoop 5, and promote backing plate 6 and continue to remove to suitable position downwards, spring 16 atress resilience promotes backing plate 6 and the pipeline closely laminates, effectively avoid the installation not hard up, and carry out antidetonation operation to the pipeline.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments described in the foregoing embodiments, or equivalents may be substituted for elements thereof. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Claims (7)
1. The utility model provides a water heating pipe installation support for building, includes mounting bracket (1), crossbeam (2), link (3) and connection frame A (8), mounting bracket (1) symmetric distribution is in the both sides of crossbeam (2), and with crossbeam (2) fixed connection, link (3) are located both sides around crossbeam (2), and with crossbeam (2) bolt-up, connection frame A (8) articulate link (3) are kept away from one side of crossbeam (2), its characterized in that: the bottom of one side of the connecting frame (3) far away from the cross beam (2) is hinged with a loop bar (9), a screw rod (13) is connected with the inner thread of one end of the loop bar (9) far away from the connecting frame (3), one end of the screw rod (13) far away from the loop bar (9) is rotationally connected with a connecting rod (11), one end of the connecting rod (11) far away from the screw (13) is hinged with a connecting frame B (10), the connecting frame B (10) and the connecting frame A (8) are oppositely arranged, and the front side and the rear side of the opposite surface of the connecting frame B (10) and the connecting frame A (8) are both provided with a connecting plate (7) and are connected with the connecting plate (7) in a sliding way, the top of the connecting frame A (8) and the top of the connecting frame B (10) are both fastened with a support plate (4) through bolts, and the center of the top of the support plate (4) is spliced with a hoop (5).
2. The water heating pipe installation bracket for buildings according to claim 1, wherein: correspond between connecting plate (7) splice frame A (8) with position department of splice frame B (10) all welds gag lever post (14), two gag lever post (14) are located respectively splice frame A (8) with in splice frame B (10), and with splice frame A (8) and splice frame B (10) sliding connection.
3. A mounting bracket for a water heating pipe for construction according to claim 2, characterized in that: the connecting frame A (8) and the connecting frame B (10) are connected with the limiting rod (14) through grooves are formed in the connecting position.
4. The water heating pipe installation bracket for buildings according to claim 1, wherein: the outer side wall of the screw rod (13) is close to one end of the connecting rod (11) and is sleeved with a knob (12), and the knob (12) is fixedly connected with the screw rod (13).
5. The water heating pipe installation bracket for buildings according to claim 1, wherein: the top of the supporting plate (4) is provided with a notch corresponding to the hoop (5), and a backing plate (6) is connected in the notch of the supporting plate (4) in a sliding manner.
6. The water heating pipe installation bracket for buildings according to claim 5, wherein: backup pad (4) notch inner wall corresponds the equal symmetry in left and right sides of backing plate (6) position department has seted up the spout, welding has slide bar (17) in the spout of backup pad (4), slide bar (17) overcoat is equipped with sliding sleeve (15), sliding sleeve (15) extend one side of backup pad (4) with backing plate (6) fixed connection, slide bar (17) are located outward backup pad (4) and around having spring (16) between sliding sleeve (15), the both ends of spring (16) respectively with sliding sleeve (15) and backup pad (4) fixed connection.
7. The water heating pipe installation bracket for buildings according to claim 5, wherein: an inner groove with an arc structure is formed in the position, corresponding to the hoop (5), of the top of the base plate (6).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202023276890.9U CN214384278U (en) | 2020-12-29 | 2020-12-29 | Water heating pipe installation support for building |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202023276890.9U CN214384278U (en) | 2020-12-29 | 2020-12-29 | Water heating pipe installation support for building |
Publications (1)
Publication Number | Publication Date |
---|---|
CN214384278U true CN214384278U (en) | 2021-10-12 |
Family
ID=77991067
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202023276890.9U Expired - Fee Related CN214384278U (en) | 2020-12-29 | 2020-12-29 | Water heating pipe installation support for building |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN214384278U (en) |
-
2020
- 2020-12-29 CN CN202023276890.9U patent/CN214384278U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN215846636U (en) | Semi-automatic welding device for steel pipe pole cross arm of power transmission tower | |
CN214384278U (en) | Water heating pipe installation support for building | |
CN210451526U (en) | Elbow pipe fitting welding tool | |
CN218426658U (en) | Anti-abrasion sleeve welding positioning device | |
CN217618651U (en) | Self-adaptive tool for pipeline welding | |
CN212705100U (en) | Automatic welding equipment for machining | |
CN211396641U (en) | Formwork diagonal bracing for building construction | |
CN210937771U (en) | Stirrup welding set convenient to adjust width | |
CN210587810U (en) | Automobile chassis welding support frame | |
CN210239214U (en) | Constructional engineering frame roof beam reinforcing apparatus | |
CN209811565U (en) | Welding angle deformation control tool for steel pipe combined column | |
CN209177855U (en) | A kind of flexible C-shaped sling | |
CN109848626B (en) | Welding angle deformation control tool for steel pipe combined column | |
CN210232766U (en) | Plate heat exchanger equipment strutting arrangement | |
CN216680988U (en) | Hydraulic cylinder earring oil pipe welding auxiliary fixtures | |
CN217965649U (en) | Outer sleeve of vertical rod for disc type scaffold | |
CN201366564Y (en) | Cylindrical automatic straight seam submerged arc welding device | |
CN112775530A (en) | Linkage principle-based suspension type electric welding gun fixing device | |
CN221048363U (en) | Guide frame for quickly manufacturing assembled adjustable arc wall templates | |
CN219968881U (en) | Water conservancy pipeline interfacing apparatus | |
CN216706390U (en) | Battery panel welding device | |
CN211852415U (en) | Seamless splicing structure between pipes | |
CN209039958U (en) | A kind of Steel Tubes For Bridge Application bracket assembled connecting node | |
CN220613712U (en) | Vertical roll mechanism for welded pipe production | |
CN217890019U (en) | Novel multidirectional adjustment mechanism for positioning of bushing mounting hole of auxiliary frame |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20211012 |