CN210232766U CN201920822778.9U CN201920822778U CN210232766U CN 210232766 U CN210232766 U CN 210232766U CN 201920822778 U CN201920822778 U CN 201920822778U CN 210232766 U CN210232766 U CN 210232766U
Authority
CN
China
Prior art keywords
frame
heat exchanger
plate
end plate
plate heat
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920822778.9U
Other languages
Chinese (zh)
Inventor
Ming Chen
陈明
Peng Wang
王鹏
Jian Lu
卢健
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
YANGZHOU PANSTAR HEAT EXCHANGE EQUIPMENT CO Ltd
Original Assignee
YANGZHOU PANSTAR HEAT EXCHANGE EQUIPMENT CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by YANGZHOU PANSTAR HEAT EXCHANGE EQUIPMENT CO Ltd filed Critical YANGZHOU PANSTAR HEAT EXCHANGE EQUIPMENT CO Ltd
Priority to CN201920822778.9U priority Critical patent/CN210232766U/en
Application granted granted Critical
Publication of CN210232766U publication Critical patent/CN210232766U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Heat-Exchange Devices With Radiators And Conduit Assemblies (AREA)

Abstract

The utility model belongs to the technical field of the heat exchanger, especially, a plate heat exchanger equipment strutting arrangement, which comprises a frame, the frame is provided with two, and two frames set up through a support frame vertical braces and bilateral symmetry respectively, be equipped with the U-shaped fixed slot that is used for fixed front end plate on the frame, the front end plate passes through the screw fastening in the U-shaped fixed slot, be equipped with the rubber pad on the cell wall that the frame corresponds the U-shaped fixed slot. The utility model discloses a random adjusting clamp screw of front end plate thickness can avoid the front end plate surface mar to appear, the situation of losing lacquer appears, the utility model discloses can be used in multiple frame to often only need alone just can accomplish the assembly when facing small-size plate heat exchanger, and greatly shortened the assemble duration, when facing the plate heat exchanger of super large model, basically also only need two people just can accomplish the equipment, the effectual work efficiency that has increased, and reduced personnel and increased.

Description

Plate heat exchanger equipment strutting arrangement
Technical Field
The utility model relates to a heat exchanger technical field specifically is a plate heat exchanger equipment strutting arrangement.
Background
The heat exchanger is a device for transferring partial heat of hot fluid to cold fluid, also called heat exchanger, and among the heat exchangers, the plate heat exchanger is the most typical dividing wall type heat exchanger, which has a long history in industrial application and still has a dominant position in all heat exchangers till now; the major structure comprises the adhesive tape between heat transfer slab and the inter-plate, and during traditional plate heat exchanger frame construction equipment, because there are two frames on a platen heat exchanger, so need use two driving and hang simultaneously and accomplish the equipment, then can only adorn a platen heat exchanger in the same time, the heat exchanger frame that leads to work efficiency low and big model is bigger, and is higher, thereby needs many people to assemble and has increased manpower and financial resources.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
Not enough to prior art, the utility model provides a plate heat exchanger equipment strutting arrangement has solved work efficiency low, has increased the problem of manpower and financial resources.
(II) technical scheme
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a plate heat exchanger equipment strutting arrangement, includes the frame, the frame is provided with two, and two frames set up through a support frame vertical support and bilateral symmetry respectively, be equipped with the U-shaped fixed slot that is used for fixed front end plate on the frame, the front end plate passes through the bolt fastening in the U-shaped fixed slot, be equipped with the rubber pad on the cell wall that the frame corresponds the U-shaped fixed slot, it is equipped with the limiting plate to correspond on the top of frame and the bottom lateral wall, be equipped with the spacing groove on the limiting plate, one-to-one between two limiting plates on two frames, and be connected through the chi board with spacing groove looks adaptation between two limiting plates that.
As an optimal technical scheme of the utility model, frame and rubber pad correspond around being equipped with the installation screw with screw looks adaptation.
As a preferred technical scheme of the utility model, the support frame comprises the lower margin and the bracing piece that sets up on the lower margin, and the bracing piece is provided with two, the one end of two bracing pieces respectively with the both ends lateral wall fixed connection of lower margin, the other end fixed connection of two bracing pieces, the face on a perpendicular to ground is constituteed with the lower margin to two bracing pieces, the lateral wall of frame and the connecting end fixed connection of two bracing pieces.
As an optimized technical scheme of the utility model, the connected mode of frame and two bracing piece link is the welding.
As an optimized technical scheme of the utility model, weld between frame and two bracing piece link.
As a preferred technical scheme of the utility model, the length of chi board is the same with the width of front end plate.
(III) advantageous effects
Compared with the prior art, the utility model provides a plate heat exchanger equipment strutting arrangement possesses following beneficial effect:
this plate heat exchanger equipment strutting arrangement adjusts clamping screw at will through the thickness of front end plate, and the cell wall facing has the rubber pad in the frame, can avoid the front end plate surface mar, the situation of losing lacquer to appear, the utility model discloses can be used in multiple frame to often only need alone just can accomplish the assembly when in the face of small-size plate heat exchanger, and greatly shortened the assemble duration, when in the face of the plate heat exchanger of super large model, also basically only need two people just can accomplish the equipment, the effectual work efficiency that has increased to the personnel that have reduced increase.
Drawings
Fig. 1 is a schematic structural view of the present invention;
fig. 2 is a schematic view of the frame structure of the present invention.
In the figure: 1. a frame; 2. a support frame; 3. a ruler plate; 4. a limiting plate; 5. a screw; 6. a rubber pad; 7. mounting a screw hole; 8. a front end plate.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Examples
Referring to fig. 1-2, the present invention provides the following technical solutions: the utility model provides a plate heat exchanger equipment strutting arrangement, including frame 1, frame 1 is provided with two, two frames 1 set up through 2 vertical braces of a support frame and bilateral symmetry respectively, be equipped with the U-shaped fixed slot that is used for fixed front end plate 8 on frame 1, front end plate 8 fastens in the U-shaped fixed slot through screw 5, be equipped with rubber pad 6 on the cell wall of frame 1 correspondence U-shaped fixed slot, it is equipped with limiting plate 4 to correspond on the top of frame 1 and the bottom lateral wall, be equipped with the spacing groove on limiting plate 4, one-to-one between two limiting plates 4 on two frames 1, and be connected through chi board 3 with spacing groove looks adaptation between two limiting plates 4 that correspond the setting.
In this embodiment, the front end plate 8 is hung to the assembly area after by the driving, directly place the front end plate 8 side in the U-shaped fixed slot of two frames 1, make front end plate 8 and ground vertical, and screw up by screw 5, front end plate 8 can break away from the driving, post the rubber pad on the cell wall of U-shaped fixed slot in the frame 1, can avoid 8 surperficial mar of front end plate to appear, the situation of losing the lacquer appears, confirm front end plate 8's width and remove to make it directly begin to assemble plate heat exchanger structure after placing in another equipment strutting arrangement by chi board 3, front end plate 8 still need use the driving to hang it to the assembly area, just then can directly assemble parts such as upper and lower guide arm, the stand, slab and bolt, the quick completion equipment task.
Specifically, the frame 1 and the rubber pad 6 are correspondingly provided with mounting screw holes 7 which are matched with the screws 5 in the front and back directions.
In this embodiment, the front end plate 8 is assembled in the U-shaped fixing grooves of the two frames 1 by the bolt fitting of the screw 5 and the mounting screw hole 7, and the screw 5 is adjusted according to the thickness of the front end plate 8, so that the front end plates 8 with different thicknesses can be fastened.
Specifically, support frame 2 comprises lower margin and the bracing piece that sets up on the lower margin, and the bracing piece is provided with two, the one end of two bracing pieces respectively with the both ends lateral wall fixed connection of lower margin, the other end fixed connection of two bracing pieces, the face on a perpendicular to ground is constituteed with the lower margin to two bracing pieces, the lateral wall of frame 1 and the connecting end fixed connection of two bracing pieces.
In this embodiment, the effect of fixed stay bracing piece is played in the setting of lower margin, and two bracing pieces and frame 1's lateral wall fixed connection to make frame 1 perpendicular to ground, convenient assembling.
Specifically, the connection mode of the frame 1 and the connection ends of the two support rods is welding.
In this embodiment, adopt the welded mode can improve the connection structure intensity of frame 1 and two bracing piece links, guarantee the stability of structure.
Specifically, the frame 1 is welded to the connecting ends of the two support rods.
In this embodiment, adopt the welding to fasten between the link of frame 1 and two bracing pieces, promoted the intensity of junction.
Specifically, the length of the blade 3 is the same as the width of the front end plate 8.
In this embodiment, the length of chi board 3 and the same setting of front end plate 8's width can be based on chi board 3 and confirm the width of front end plate 8, and the width of front end plate 8 is confirmed and with chi board 3 joint in the spacing inslot of limiting plate 4 by chi board 3 again, can directly begin to assemble plate heat exchanger structure after making chi board 3 level place, can directly begin to assemble plate heat exchanger structure after confirming the frame width and removing another device and making it level place by chi board 3.
The utility model discloses a theory of operation and use flow: during assembly, the front end plate 8 is firstly hung to an assembly area through a travelling crane, the side edge of the front end plate 8 is directly placed in the U-shaped fixing grooves of the two frames 1, the front end plate 8 is perpendicular to the ground and is screwed by the screw 5, and the front end plate 8 can be separated from the travelling crane; the width of the front end plate 8 is determined by the ruler plate 3, and the other device is moved to be horizontally placed, so that the plate type heat exchanger structure can be directly assembled, the front end plate 8 still needs to be hung to an assembly area by a crane, then parts such as an upper guide rod, a lower guide rod, an upright post, a plate sheet, a bolt and the like can be directly assembled, and the assembly task can be rapidly completed.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments described in the foregoing embodiments, or equivalents may be substituted for elements thereof. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (6)

1. A plate heat exchanger assembly support device, comprising a frame (1), characterized in that: frame (1) is provided with two, and two frames (1) are respectively through a support frame (2) vertical braces and bilateral symmetry setting, be equipped with the U-shaped fixed slot that is used for fixed front end plate (8) on frame (1), front end plate (8) are fastened in the U-shaped fixed slot through screw (5), be equipped with rubber pad (6) on the cell wall that frame (1) corresponds the U-shaped fixed slot, it is equipped with limiting plate (4) to correspond on the top of frame (1) and the bottom lateral wall, be equipped with the spacing groove on limiting plate (4), one-to-one between two limiting plate (4) on two frames (1), and be connected through chi board (3) with spacing groove looks adaptation between two limiting plate (4) that correspond the setting.
2. A plate heat exchanger assembly support device according to claim 1, wherein: and mounting screw holes (7) matched with the screws (5) are correspondingly arranged on the frame (1) and the rubber pad (6) in a front-back manner.
3. A plate heat exchanger assembly support device according to claim 1, wherein: the supporting frame (2) is composed of ground feet and supporting rods arranged on the ground feet, the supporting rods are provided with two supporting rods, one ends of the two supporting rods are respectively fixedly connected with the side walls of the two ends of the ground feet, the other ends of the two supporting rods are fixedly connected, the two supporting rods and the ground feet form a surface perpendicular to the ground, and the side walls of the frame (1) are fixedly connected with the connecting ends of the two supporting rods.
4. A plate heat exchanger assembly support device according to claim 3, wherein: the connection mode of the frame (1) and the connection ends of the two support rods is welding.
5. A plate heat exchanger assembly support device according to claim 3, wherein: the frame (1) is welded with the connecting ends of the two support rods.
6. A plate heat exchanger assembly support device according to claim 1, wherein: the length of the ruler plate (3) is the same as the width of the front end plate (8).
CN201920822778.9U 2019-06-03 2019-06-03 Plate heat exchanger equipment strutting arrangement Active CN210232766U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920822778.9U CN210232766U (en) 2019-06-03 2019-06-03 Plate heat exchanger equipment strutting arrangement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920822778.9U CN210232766U (en) 2019-06-03 2019-06-03 Plate heat exchanger equipment strutting arrangement

Publications (1)

Publication Number Publication Date
CN210232766U true CN210232766U (en) 2020-04-03

Family

ID=69973242

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920822778.9U Active CN210232766U (en) 2019-06-03 2019-06-03 Plate heat exchanger equipment strutting arrangement

Country Status (1)

Country Link
CN (1) CN210232766U (en)

Similar Documents

Publication Publication Date Title
CN210232766U (en) Plate heat exchanger equipment strutting arrangement
CN215747426U (en) Welding tool for scaffold board
CN211580048U (en) Intelligent security camera with expansion heat dissipation mechanism
CN217782488U (en) Supporting and connecting device for curtain wall installation
CN215803166U (en) A wooden template for civil engineering construction easy to assemble and disassemble
CN211958649U (en) Combined cable bridge
CN213508987U (en) Window edge sealing fixing piece of assembled building external wall heat insulation integrated plate
CN213040178U (en) Fixing support of water pump device
CN211396641U (en) Formwork diagonal bracing for building construction
CN207939439U (en) A kind of dead-weight solar bracket
CN207906609U (en) A kind of power station high temperature and pressure coal economizer heat exchanging tube support construction
CN215255118U (en) Anti-deformation guardrail
CN214497159U (en) Assembled pier convenient to install and connect
CN219227469U (en) Support base for solar photovoltaic
CN211313427U (en) Fixing device for top stay bar
CN211903853U (en) Plate heating type heat exchanger convenient to connect
CN218668075U (en) Curtain wall construction convenient to dismouting
CN218469395U (en) Splicing type frame structure of water chilling unit
CN212836911U (en) Side plate structure of spliced container house
CN214384278U (en) Water heating pipe installation support for building
CN214064250U (en) Electromechanical installation engineering is with installation base
CN215519717U (en) Quick mounting structure of repeatedly usable floor
CN219493287U (en) Square tube connecting base
CN214663526U (en) Adjustable oil cooler support
CN216142213U (en) Honeycomb aluminum plate of high sound insulation

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant