CN214381176U - Project design construction system based on cloud management and control - Google Patents

Project design construction system based on cloud management and control Download PDF

Info

Publication number
CN214381176U
CN214381176U CN202022976853.2U CN202022976853U CN214381176U CN 214381176 U CN214381176 U CN 214381176U CN 202022976853 U CN202022976853 U CN 202022976853U CN 214381176 U CN214381176 U CN 214381176U
Authority
CN
China
Prior art keywords
monitoring
control
management
camera
project design
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022976853.2U
Other languages
Chinese (zh)
Inventor
潘新炎
张蕾
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Nanfang Telecommunication Construction Co ltd
Original Assignee
Guangdong Nanfang Telecommunication Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Nanfang Telecommunication Construction Co ltd filed Critical Guangdong Nanfang Telecommunication Construction Co ltd
Priority to CN202022976853.2U priority Critical patent/CN214381176U/en
Application granted granted Critical
Publication of CN214381176U publication Critical patent/CN214381176U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a project design construction system based on cloud management and control, include: the intelligent gate machine comprises a cloud server and a collecting unit, a real-time supervision unit and a human-computer interaction unit which are in communication connection with the cloud server, wherein the collecting unit comprises an intelligent gate machine arranged at an entrance of a construction site, a face recognition device, an RFID electronic tag reader, an infrared temperature measuring device and an electronic display device are arranged on the intelligent gate machine, the implementation supervision unit comprises a first monitoring device, a second monitoring device and a communication device, the human-computer interaction unit comprises a fixed management terminal, a display screen and a mobile management terminal, and a one-key alarm button is arranged on the fixed management terminal. The utility model discloses a cloud platform realizes intelligent management and control, through inserting various types of monitoring device, can realize developing dynamic rapid grasp to the job site, in time makes the management and control to the development direction of job site.

Description

Project design construction system based on cloud management and control
Technical Field
The utility model relates to a construction technical field especially relates to a project design construction system based on cloud management and control.
Background
At present, the infrastructure of China is still in the peak period of development, and the infrastructure has wide market and development prospect. The building industry is gradually getting rid of the extensive development mode and getting away from the development road with intensive accuracy, so that the existing infrastructure engineering has the characteristics of tight construction period requirement, high quality requirement, multiple construction links and strict cost control in order to adapt to the development requirement of infrastructure, higher requirements are provided for the construction quality, and the management of the construction process is emphasized more.
At present, construction sites mostly adopt closed management, the supervision work intensity is high, the situation of mismatching with the work energy distribution of personnel is formed, the supervision range is small, the supervision system and effective enforcement are disjointed, the system has regulations, but the evidence obtaining means is lacked when punished according to the system and the regulations; the process is more, the connection is not tight, the construction information is controlled late, and engineering supervision and management personnel are difficult to control the development state of a construction site in time, so that the engineering quality and the construction period are influenced.
SUMMERY OF THE UTILITY MODEL
In order to overcome the not enough of prior art, the utility model aims to provide a project design construction system based on cloud management and control can effectively solve pain point, difficult point in the engineering management and control.
The utility model discloses a following technical scheme realizes: project design construction system based on cloud management and control includes:
the system comprises a cloud server, and a collection unit, a real-time supervision unit and a human-computer interaction unit which are in communication connection with the cloud server;
the acquisition unit comprises an intelligent gate arranged at an entrance of a construction site, and a face recognition device, an RFID electronic tag reader, an infrared temperature measuring device and an electronic display device are arranged on the intelligent gate;
the real-time monitoring unit comprises a first monitoring device, a second monitoring device and a communication device, wherein the first monitoring device comprises one or more intelligent collectors arranged on a construction site; the second monitoring device comprises a 1 st monitoring camera for shooting the construction area from a high place and 1 or more 2 nd monitoring cameras lower than the shooting position of the 1 st monitoring camera;
the man-machine interaction unit comprises a fixed management terminal, a display screen and a mobile management terminal, wherein a one-key alarm button is arranged on the fixed management terminal.
Furthermore, the intelligent collector comprises a radiation temperature sensor, a wind pressure difference sensor, a temperature and humidity sensor, an air quality sensor, a visual sensor and a reading and writing device.
Further, the 1 st monitoring camera is a high-definition panoramic camera, and the 2 nd monitoring camera is a high-definition detail camera.
Further, the second monitoring device further comprises a 3 rd monitoring camera, and the 3 rd monitoring camera is an infrared monitoring camera.
Furthermore, the man-machine interaction unit is also connected with a printing device.
Furthermore, the display screen is a touch display screen.
Further, the communication device comprises a smart phone, a tablet computer, an interphone and a notebook computer.
Compared with the prior art, the beneficial effects of the utility model reside in that:
(1) intelligent management, and very accurate records are recorded when constructors enter and exit the construction site.
(2) Through the cloud platform, insert various types of collector and camera, can realize in time mastering the job site development developments, in time make the management and control to the development direction of job site.
Drawings
Fig. 1 is a block diagram of the present invention.
Detailed Description
The embodiments of the present invention will be further described with reference to the accompanying drawings and the detailed description,
as shown in fig. 1, project design construction system based on cloud management and control, include:
the system comprises a cloud server, and a collection unit, a real-time supervision unit and a human-computer interaction unit which are in communication connection with the cloud server;
the acquisition unit comprises an intelligent gate arranged at an entrance of a construction site, and a face recognition device, an RFID electronic tag reader, an infrared temperature measuring device and an electronic display device are arranged on the intelligent gate;
at present, in order to facilitate management, a plurality of construction units install intelligent gate machines on construction sites, building site personnel enter the construction sites and pass through the gate machines at first, the identities can enter the building site by comparing successful people, and the people who do not compare the identities are prohibited from entering the building site, so that the building site safety is guaranteed, unnecessary troubles are avoided, but most of intelligent gate machines are matched with identity card readers through face recognition devices to complete personnel identity information acquisition, and identity cards are easy to lose. Therefore, in one embodiment, the RFID electronic tags can be arranged in the safety helmets or safety shoes of the workers, and the identity of the workers can be acquired based on the RFID electronic tag reader and the face recognition device, so that the method is simple and convenient.
The real-time monitoring unit comprises a first monitoring device, a second monitoring device and a communication device, wherein the first monitoring device comprises one or more intelligent collectors arranged on the construction site; the second monitoring device comprises a 1 st monitoring camera for shooting the construction area from a high place and 1 or more 2 nd monitoring cameras lower than the shooting position of the 1 st monitoring camera;
the intelligent collector comprises a radiation temperature sensor, a wind pressure difference sensor, a temperature and humidity sensor, an air quality sensor, a vision sensor and a reading and writing device, can detect the data of a construction site in real time, and timely knows the construction state of the construction site.
The 1 st surveillance camera head is high definition panorama camera, the 2 nd surveillance camera head is high definition detail camera. A panoramic camera with a large visual angle is accessed to realize panoramic monitoring; and accessing a small-range detail camera shooting to realize detail monitoring. The cooperation through panoramic camera and detail camera can help managers better know the behavior in construction area, can effectively stop the transmission of job site operation violating regulations.
In order to realize night monitoring, as a preferred embodiment, the second monitoring device further includes a 3 rd monitoring camera, and the 3 rd monitoring camera is an infrared monitoring camera. The infrared monitoring camera is arranged because the common high-definition camera at night is often difficult to effectively monitor the construction area, people can be detected to come in and go out at night when the infrared monitoring camera is arranged, the valuable articles in partial areas are prevented from being stolen, and the infrared monitoring camera can be selectively arranged at the key positions of some construction areas.
The man-machine interaction unit comprises a fixed management terminal, a display screen and a mobile management terminal, wherein a one-key alarm button is arranged on the fixed management terminal. When the emergency situation is found on the construction site through monitoring, the alarm can be timely processed through the one-key alarm button, and the loss is reduced.
Preferably, the human-computer interaction unit is further connected with a printing device, so that a user can conveniently print and browse the monitoring data.
The above embodiments are only preferred embodiments of the present invention, and the protection scope of the present invention cannot be limited thereby, and any insubstantial changes and substitutions made by those skilled in the art based on the present invention are all within the protection scope of the present invention.

Claims (7)

1. The utility model provides a project design construction system based on cloud management and control which characterized in that includes:
the system comprises a cloud server, and a collection unit, a real-time supervision unit and a human-computer interaction unit which are in communication connection with the cloud server;
the acquisition unit comprises an intelligent gate arranged at an entrance of a construction site, and a face recognition device, an RFID electronic tag reader, an infrared temperature measuring device and an electronic display device are arranged on the intelligent gate;
the real-time monitoring unit comprises a first monitoring device, a second monitoring device and a communication device, wherein the first monitoring device comprises one or more intelligent collectors arranged on a construction site; the second monitoring device comprises a 1 st monitoring camera for shooting the construction area from a high place and 1 or more 2 nd monitoring cameras lower than the shooting position of the 1 st monitoring camera;
the man-machine interaction unit comprises a fixed management terminal, a display screen and a mobile management terminal, wherein a one-key alarm button is arranged on the fixed management terminal.
2. The cloud management and control-based project design and construction system of claim 1, wherein the intelligent collector comprises a radiation temperature sensor, a wind pressure difference sensor, a temperature and humidity sensor, an air quality sensor, a vision sensor and a read-write device.
3. The cloud management and control based project design construction system of claim 1, wherein the 1 st surveillance camera is a high-definition panoramic camera, and the 2 nd surveillance camera is a high-definition detail camera.
4. The cloud management and control based project design construction system according to claim 1, wherein the second monitoring device further comprises a 3 rd monitoring camera, and the 3 rd monitoring camera is an infrared monitoring camera.
5. The project design and construction system based on cloud management and control as claimed in claim 1, wherein the human-computer interaction unit is further connected with a printing device.
6. The cloud management and control-based project design and construction system according to claim 1, wherein the display screen is a touch display screen.
7. The cloud management and control based project design and construction system according to claim 1, wherein the communication device comprises a smart phone, a tablet computer, an interphone and a notebook computer.
CN202022976853.2U 2020-12-07 2020-12-07 Project design construction system based on cloud management and control Active CN214381176U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022976853.2U CN214381176U (en) 2020-12-07 2020-12-07 Project design construction system based on cloud management and control

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022976853.2U CN214381176U (en) 2020-12-07 2020-12-07 Project design construction system based on cloud management and control

Publications (1)

Publication Number Publication Date
CN214381176U true CN214381176U (en) 2021-10-08

Family

ID=77983572

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022976853.2U Active CN214381176U (en) 2020-12-07 2020-12-07 Project design construction system based on cloud management and control

Country Status (1)

Country Link
CN (1) CN214381176U (en)

Similar Documents

Publication Publication Date Title
CN101196505A (en) Passageway security checking terminal system and security checking method using the same
CN110620906A (en) Electric power construction safety management system based on thing networking
CN108710827B (en) A kind of micro- police service inspection in community and information automatic analysis system and method
CN103544757A (en) Door access control method
CN203054575U (en) Pollution source on-line monitoring system
CN104766436A (en) Residential intelligent system with multiple alarming devices
CN202940921U (en) Real-time monitoring system based on face identification
CN208386939U (en) A kind of field work safe monitoring device
CN212519051U (en) Intelligent management system for traffic tunnel group construction safety in hydropower station field
CN115557384A (en) Wisdom building site tower crane monitoring system
CN115496640A (en) Intelligent safety system of thermal power plant
CN115497185A (en) Attendance checking method based on intelligent safety helmet and electronic fence
CN201138488Y (en) Safety detection apparatus for entrance and exit
CN201130382Y (en) Multifunctional identification automatic recognition robot
CN206920895U (en) Construction site management system
CN214381176U (en) Project design construction system based on cloud management and control
CN206431729U (en) A kind of intelligent channel system applied to anti-terrorism safety-security area
CN108985211A (en) A kind of criminal investigation fingerprint acquisition system
CN209543072U (en) A kind of laboratory indoor environment intelligent monitor system
CN210052214U (en) Device for identifying personnel identity information in oil field operation area
CN112702570A (en) Security protection management system based on multi-dimensional behavior recognition
CN211087319U (en) Intelligent card punching machine
CN206819497U (en) A kind of bicycle theft management system
CN201936452U (en) Automatic license plate recognition system
CN214896722U (en) Millimeter wave radar fuses transformer substation's operation orbit management and control device of video analysis

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant