CN214379751U - Cable construction draw gear - Google Patents
Cable construction draw gear Download PDFInfo
- Publication number
- CN214379751U CN214379751U CN202023288052.3U CN202023288052U CN214379751U CN 214379751 U CN214379751 U CN 214379751U CN 202023288052 U CN202023288052 U CN 202023288052U CN 214379751 U CN214379751 U CN 214379751U
- Authority
- CN
- China
- Prior art keywords
- guide
- cable
- cable construction
- lifting
- draw gear
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Electric Cable Installation (AREA)
Abstract
The utility model discloses a cable construction draw gear, install on the base its quick-witted case whole over-and-under type, slide through promoting the base and can realize whole draw gear's removal, and can carry out altitude mixture control to the structure that sets up on quick-witted case through the lift height of adjusting quick-witted case, furthermore, guide channel through paying out machine structure and first guiding mechanism cooperates and can once lead, the secondary direction can be realized to the second guide part of deuterogamying second guiding mechanism, cable through twice after the direction can fully provided the overhead line and lay the demand, and utilize static-removing structure still can avoid taking place the incident in the construction of part high dust occasion, thereby make whole draw gear fully adapt to different construction environment.
Description
Technical Field
The utility model relates to an electric power construction equipment, in particular to cable construction draw gear.
Background
The electric power engineering refers to an engineering that uses electricity as power and energy in various fields, and mainly includes various related engineering related to the production, transmission, and distribution of electric energy. And in actual electric power construction field, the erection or the laying operation that involve the cable often adopt the coiled cable unwrapping wire to lay, because the volume of cable book is great and weight is heavier, often need pull the release end by many people's cooperation after fixing the cable book, make the cable book unwrapping wire to the settlement position and erect, the artifical that needs is many in the whole operation process, the unwrapping wire process is difficult to control, technical staff still has great intensity of labour simultaneously, and even there is some cable reels to set the release motor and drive the cable and roll up the rotation unwrapping wire, also can have the angle of pulling and be difficult to adjust or the release end pulls hard problem.
SUMMERY OF THE UTILITY MODEL
The utility model discloses aim at solving one of the technical problem that exists among the prior art at least. Therefore, the utility model provides a cable construction draw gear has and is convenient for adjust and pull laborsaving advantage.
According to the utility model discloses cable construction draw gear, include:
the lower end of the base is provided with a sliding assembly used for moving, and the upper end of the base is provided with a lifting assembly capable of lifting;
the case is detachably connected with the lifting end of the lifting component;
the pay-off mechanism is movably arranged at the upper end of the case and is used for taking up and paying off cables;
the first guide mechanism is arranged close to a pay-off end of the pay-off mechanism, a lifting static electricity removing structure and a rotatable guide channel are arranged on the first guide mechanism, and the cable is attached to the static electricity removing structure and penetrates into the guide channel;
and the second guide mechanism is rotatably arranged at one end of the case, and a second guide part is arranged on the second guide mechanism close to the guide channel.
According to the utility model discloses cable construction draw gear has following technological effect at least:
the utility model provides a cable construction draw gear, install on the base its quick-witted case whole over-and-under type, slide through promoting the base and can realize whole draw gear's removal, and can carry out altitude mixture control to the structure that sets up on quick-witted case through the lift height of adjusting quick-witted case, furthermore, guide channel through paying out machine structure and first guiding mechanism cooperates and can carry out once the direction, the second guide part of deuterogamying second guiding mechanism can realize the secondary direction, cable through twice after the direction can fully provided the overhead line and lay the demand, and utilize static structure still can avoid taking place the incident in the construction of the high dust occasion of part, thereby make the different construction environment of whole draw gear fully adapted.
According to the utility model discloses a some embodiments, cable construction draw gear still includes: the fixing frame is detachably arranged at the upper end of the case and is movably provided with a connecting seat; the direction lifting hook can be connected with dismantling the connecting seat, under this kind of structure, when the construction place is not suitable for the base and slides, the accessible is dismantled and is installed the cable that pulls that slides on the construction cable behind the connecting seat, perhaps utilizes mount adaptation connection I track and the connecting seat slidable mounting of directly being convenient for, can fully adapt to complicated construction environment's cable through the direction lifting hook like this and pull the demand.
According to the utility model discloses a some embodiments, the direction lifting hook is provided with draws the passageway, be provided with on the direction lifting hook and be used for fixing the chucking structure of cable can stably carry out cable traction work through chucking structure with the cable chucking after on the direction lifting hook.
According to some embodiments of the utility model, the chucking structure is including setting up recess on the direction lifting hook and with the joint spare of recess adaptation, through the joint spare with agree with and lock of recess the cable, and then be convenient for carry out cable traction work.
According to the utility model discloses a some embodiments, be provided with the multiunit guide pulley on the connecting seat, multiunit guide pulley slidable mounting is in on the mount, obviously, the guide pulley here both can with the construction cable adaptation, also can with the I-shaped rail adaptation to can the fully provided user demand.
According to some embodiments of the utility model, paying out machine constructs and is provided with the drum that is used for receiving and releasing the cable.
According to the utility model discloses a some embodiments, quick-witted incasement is provided with and is used for the drive drum pivoted motor just reverses through the motor drive drum and can realize receiving and releasing the automatic control of cable to reach the purpose that reduces technical staff's intensity of labour.
According to some embodiments of the utility model, first guiding mechanism is provided with vertical pole and slope and connects the diagonal brace of vertical pole, static-removing structure rotates the setting and is in the upper end of vertical pole, the lower extreme of direction passageway rotates and connects the diagonal brace can realize the adjustment of first guiding mechanism's direction angle through rotating the diagonal brace.
According to the utility model discloses a some embodiments, destatic structure sets up to electrostatic precipitator bearing roller, and the emergence of electrostatic accident can be avoided to cable laminating electrostatic precipitator bearing roller when passing through.
According to the utility model discloses a some embodiments, second guiding mechanism is provided with to rotate and connects the telescopic link of quick-witted case, the second guide part can be connected with dismantling the flexible end of telescopic link, can realize second guiding mechanism's guiding angle and guiding height's adjustment through the flexible and turned angle of control telescopic link.
Additional aspects and advantages of the invention will be set forth in part in the description which follows and, in part, will be obvious from the description, or may be learned by practice of the invention.
Drawings
The above and/or additional aspects and advantages of the present invention will become apparent and readily appreciated from the following description of the embodiments, taken in conjunction with the accompanying drawings of which:
fig. 1 is a schematic overall structure diagram of a cable construction traction device according to an embodiment of the present invention;
fig. 2 is a schematic structural diagram of a connection seat according to an embodiment of the present invention;
reference numerals:
the device comprises a base 100, a case 200, a fixing frame 300, a paying-off mechanism 400, a first guide mechanism 500, a connecting seat 600, a guide hook 700 and a second guide mechanism 800.
Detailed Description
Reference will now be made in detail to embodiments of the present invention, examples of which are illustrated in the accompanying drawings, wherein like reference numerals refer to the same or similar elements or elements having the same or similar function throughout. The embodiments described below with reference to the drawings are exemplary only for the purpose of explaining the present invention, and should not be construed as limiting the present invention.
In the description of the present invention, it is to be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", "axial", "radial", "circumferential", and the like indicate orientations or positional relationships based on those shown in the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the device or element referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore should not be construed as limiting the present invention. Furthermore, a feature defined as "first" or "second" may explicitly or implicitly include one or more of that feature. In the description of the present invention, "a plurality" means two or more unless otherwise specified.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "connected," and "connected" are to be construed broadly, and may be, for example, fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases for a worker of ordinary skill in the art.
Referring to fig. 1 and 2, the utility model provides a cable construction draw gear, include:
a base 100 having a sliding member for movement at a lower end thereof, and a lifting member capable of being lifted and lowered at an upper end of the base 100;
a case 200 detachably connected to a lifting end of the lifting assembly;
the paying-off mechanism 400 is movably arranged at the upper end of the case 200, and the paying-off mechanism 400 is used for paying off and paying off cables;
the first guide mechanism 500 is arranged close to the pay-off end of the pay-off mechanism 400, the first guide mechanism 500 is provided with a lifting static electricity removing structure and a rotatable guide channel, and a cable is attached to the static electricity removing structure and penetrates into the guide channel;
the second guiding mechanism 800 is rotatably disposed at one end of the chassis 200, and a second guiding portion is disposed on the second guiding mechanism 800 near the guiding channel.
According to the structure, the utility model provides a cable construction draw gear, install on base 100 its quick-witted case 200 whole over-and-under type, slide through promoting base 100 and can realize whole draw gear's removal, and the elevating height through adjusting machine case 200 can carry out altitude mixture control to the structure that sets up on quick-witted case 200, furthermore, cooperate through paying out machine structure 400 and first guiding mechanism 500's direction passageway and can carry out once the direction, the secondary direction can be realized to the second guide part of deuterogamying second guiding mechanism 800, cable through after twice direction can fully satisfy the overhead line and lay the demand, and utilize to remove static structure and still can avoid taking place the incident in the construction of part high dust occasion, thereby make the different construction environment of whole draw gear fully adapted.
In some embodiments of the present invention, as shown in fig. 1, the cable construction traction apparatus further includes: a fixing bracket 300 detachably disposed at an upper end of the cabinet 200, the fixing bracket 300 movably provided with a connecting seat 600; guide lifting hook 700 can connect connecting seat 600 with dismantling, under this kind of structure, is unsuitable for when base 100 slides when the construction site, and the accessible is dismantled and is installed the cable that pulls that slides on the construction cable behind connecting seat 600, perhaps utilizes mount 300 adaptation connection I track and the connecting seat 600 slidable mounting of directly being convenient for, can fully adapt to complicated construction environment's cable through guide lifting hook 700 like this and pull the demand.
In some embodiments of the utility model, as shown in fig. 1, direction lifting hook 700 is provided with draws the passageway, is provided with the chucking structure who is used for fixed cable on the direction lifting hook 700, can stably carry out cable traction work behind the cable chucking on direction lifting hook 700 through chucking structure.
The utility model discloses an in some embodiments, as shown in FIG. 1, chucking structure including set up on direction lifting hook 700 the recess and with the joint spare of recess adaptation, through the joint spare with agreeing with of recess and locking the cable, and then be convenient for carry out cable traction work.
The utility model discloses an in some embodiments, joint spare here can set up to the wedge checkpost, and when the wedge checkpost chucking was in the recess, the wedge checkpost formed the fixed orifices with the cable adaptation with the recess cooperation to it is fixed with the cable.
In some embodiments of the utility model, as shown in fig. 2, be provided with the multiunit guide pulley on the connecting seat 600, multiunit guide pulley slidable mounting is on mount 300, and obviously, the guide pulley here both can with construction cable adaptation, also can with the I-shaped rail adaptation to can the fully provided user demand.
In some embodiments of the present invention, as shown in fig. 1, the paying out mechanism 400 is provided with a wire coil for taking up and paying out a cable.
The utility model discloses an in some embodiments, be provided with in quick-witted case 200 and be used for driving drum pivoted motor, just reverse through the motor drive drum and can realize receiving and releasing the automatic control of cable to reach the purpose that reduces technical staff's intensity of labour.
The utility model discloses an in some embodiments, as shown in FIG. 1, the upper end of machine case 200 is provided with the slide rail, and whole paying out machine structure 400 slidable mounting is on the slide rail, and through adjusting paying out machine structure 400 and sliding along the slide rail, can realize traction force and the adjustment of pulling the angle on the basis of further realizing the position control of paying out machine structure 400.
In some embodiments of the present invention, as shown in fig. 1, the first guiding mechanism 500 is provided with a vertical rod and a diagonal rod connected to the vertical rod in an inclined manner, the static electricity removing structure is rotatably disposed at the upper end of the vertical rod, the lower end of the guiding channel is rotatably connected to the diagonal rod, and the adjustment of the guiding angle of the first guiding mechanism 500 can be realized by rotating the diagonal rod.
The utility model discloses an in some embodiments, destatic structure sets up to electrostatic precipitator bearing roller, can avoid the emergence of electrostatic accident when cable laminating electrostatic precipitator bearing roller passes through.
In some embodiments of the present invention, as shown in fig. 1, the second guiding mechanism 800 is provided with a telescopic rod for rotatably connecting the case 200, the second guiding portion is detachably connected to the telescopic end of the telescopic rod, and the guiding angle and the guiding height of the second guiding mechanism 800 can be adjusted by controlling the extension and rotation angle of the telescopic rod.
In some embodiments of the present invention, the second guiding portion is also provided with an electrostatic dust removing roller for further improving the static electricity removing effect.
In some embodiments of the present invention, as shown in fig. 1, the sliding assembly arrangement is comprised of a plurality of pulleys with brakes for the convenience of the technician; and the lifting component consists of a telescopic rod or a threaded rod, and the height of the lifting end of the lifting component can be adjusted by stretching the telescopic rod or rotating the threaded rod.
In the description herein, references to the description of the term "one embodiment," "some embodiments," "an illustrative embodiment," "an example," "a specific example," or "some examples" or the like mean that a particular feature, structure, material, or characteristic described in connection with the embodiment or example is included in at least one embodiment or example of the present invention. In this specification, the schematic representations of the terms used above do not necessarily refer to the same embodiment or example. Furthermore, the particular features, structures, materials, or characteristics described may be combined in any suitable manner in any one or more embodiments or examples.
While embodiments of the present invention have been shown and described, it will be understood by those of ordinary skill in the art that: various changes, modifications, substitutions and alterations can be made to the embodiments without departing from the principles and spirit of the invention, the scope of which is defined by the claims and their equivalents.
Claims (10)
1. A cable construction pulling device is characterized by comprising:
the lower end of the base is provided with a sliding assembly used for moving, and the upper end of the base is provided with a lifting assembly capable of lifting;
the case is detachably connected with the lifting end of the lifting component;
the pay-off mechanism is movably arranged at the upper end of the case and is used for taking up and paying off cables;
the first guide mechanism is arranged close to a pay-off end of the pay-off mechanism, a lifting static electricity removing structure and a rotatable guide channel are arranged on the first guide mechanism, and the cable is attached to the static electricity removing structure and penetrates into the guide channel;
and the second guide mechanism is rotatably arranged at one end of the case, and a second guide part is arranged on the second guide mechanism close to the guide channel.
2. The cable construction pulling device according to claim 1, further comprising:
the fixing frame is detachably arranged at the upper end of the case and is movably provided with a connecting seat; and the guide lifting hook can be detachably connected with the connecting seat.
3. The cable construction pulling device according to claim 2, wherein the guide hook is provided with a pulling channel, and a clamping structure for clamping the cable is provided on the guide hook.
4. The cable construction traction device according to claim 3, wherein the clamping structure comprises a groove arranged on the guide hook and a clamping member adapted to the groove, and the cable is locked by the clamping member matching with the groove.
5. The cable construction traction device according to claim 4, wherein a plurality of sets of guide wheels are arranged on the connecting seat, and the plurality of sets of guide wheels are slidably mounted on the fixing frame.
6. The cable construction pulling apparatus as set forth in claim 1, wherein the paying out mechanism is provided with a reel for taking up and paying out a cable.
7. The cable construction traction device according to claim 6, wherein a motor for driving the wire coil to rotate is arranged in the case.
8. The cable construction traction device according to claim 1, wherein the first guide mechanism is provided with a vertical rod and a diagonal brace connected to the vertical rod in an inclined manner, the static electricity removing structure is rotatably provided at an upper end of the vertical rod, and a lower end of the guide channel is rotatably connected to the diagonal brace.
9. The cable construction pulling device according to claim 8, wherein the static electricity removing structure is provided as an electrostatic dust removal idler.
10. The cable construction traction apparatus according to claim 1, wherein the second guide mechanism is rotatably provided with a telescopic rod connected to the housing, and the second guide portion is detachably connected to a telescopic end of the telescopic rod.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202023288052.3U CN214379751U (en) | 2020-12-30 | 2020-12-30 | Cable construction draw gear |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202023288052.3U CN214379751U (en) | 2020-12-30 | 2020-12-30 | Cable construction draw gear |
Publications (1)
Publication Number | Publication Date |
---|---|
CN214379751U true CN214379751U (en) | 2021-10-08 |
Family
ID=77950143
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202023288052.3U Active CN214379751U (en) | 2020-12-30 | 2020-12-30 | Cable construction draw gear |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN214379751U (en) |
-
2020
- 2020-12-30 CN CN202023288052.3U patent/CN214379751U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN210457019U (en) | Communication cable winding and unwinding devices | |
CN211812684U (en) | Pay-off rack for electric power construction | |
CN209767009U (en) | automatic cable laying system and cable laying device thereof | |
CN209601927U (en) | A kind of steel coil strip lifting device | |
CN115360641A (en) | Auxiliary laying device and method for underground cable in power engineering | |
CN214379751U (en) | Cable construction draw gear | |
CN220306852U (en) | Cable traction device for cable laying | |
CN117154596B (en) | High-voltage wire traction pre-tightening device for pole tower | |
CN116913651B (en) | Transformer rack | |
CN113666206A (en) | Tension bracket for power transmission line | |
CN115076582B (en) | Automatic cable traction device of track shooting robot suitable for straight track and curved track | |
CN217984464U (en) | Direction device mechanism for cable laying | |
CN115947173A (en) | Cable winding and unwinding devices for power engineering | |
CN114715717A (en) | Electric power engineering construction cable laying equipment and method | |
CN210527573U (en) | Electric device for winding and unwinding adhesive tape | |
CN111525451A (en) | Tunnel cable laying device | |
CN218386445U (en) | Electric construction cable laying frame | |
CN117374822B (en) | Power transmission and distribution is cable laying structure for engineering | |
CN217322895U (en) | Optical cable winding and unwinding device | |
CN220950667U (en) | Adjustable automatic cable paying-off device | |
CN215885910U (en) | Portable cable reel winding and unwinding devices | |
CN220156091U (en) | Overhead ground wire lifting tool | |
CN218386444U (en) | Cable erecting device | |
CN218335049U (en) | Threading device | |
CN220485189U (en) | Winch capable of accurately controlling winding speed |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |