CN214365052U - Appurtenance is used in gypsum board installation - Google Patents

Appurtenance is used in gypsum board installation Download PDF

Info

Publication number
CN214365052U
CN214365052U CN202120187596.6U CN202120187596U CN214365052U CN 214365052 U CN214365052 U CN 214365052U CN 202120187596 U CN202120187596 U CN 202120187596U CN 214365052 U CN214365052 U CN 214365052U
Authority
CN
China
Prior art keywords
gypsum board
rod
piece
board installation
auxiliary tool
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120187596.6U
Other languages
Chinese (zh)
Inventor
刘勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Yisheng Construction Engineering Co ltd
Original Assignee
Beijing Yisheng Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Yisheng Construction Engineering Co ltd filed Critical Beijing Yisheng Construction Engineering Co ltd
Priority to CN202120187596.6U priority Critical patent/CN214365052U/en
Application granted granted Critical
Publication of CN214365052U publication Critical patent/CN214365052U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model relates to an appurtenance is used in gypsum board installation relates to the field of decorating equipment for the engineering, is provided with the supporting piece that is used for bearing the gypsum board including setting up in the top of the base on ground, base, and the base is provided with the jacking piece that is used for promoting supporting piece lift between the supporting piece. This application has the advantage of can assisting the staff more laborsaving install the gypsum board in the roof.

Description

Appurtenance is used in gypsum board installation
Technical Field
The application relates to the field of equipment for decoration engineering, in particular to an auxiliary tool for mounting a gypsum board.
Background
The gypsum board is one of common ornamental material, in-process carrying out interior decoration, the staff often need hoist the gypsum board to indoor roof, among the correlation technique, the staff is installing the gypsum board to the in-process on indoor roof, need two people mutually support lift the gypsum board to roof position department through the cat ladder or the scaffold frame and carry out fixed mounting, the staff is great at the working strength who lifts the gypsum board to the in-process staff on roof, make the staff produce the fatigue easily.
SUMMERY OF THE UTILITY MODEL
In order to improve the problem that the gypsum board comparatively consumes the manpower at the in-process of installing to the roof, this application provides a appurtenance for the gypsum board installation.
The application provides a pair of appurtenance is used in gypsum board installation adopts following technical scheme:
the utility model provides an appurtenance is used in gypsum board installation, is provided with the supporting piece that is used for bearing the gypsum board including setting up in the top of the base on ground, base, and the base is provided with the jacking piece that is used for promoting supporting piece lift between the supporting piece.
Through adopting above-mentioned technical scheme, the staff at first places the gypsum board in the supporting piece before installing the gypsum board in the roof, and the jacking piece can drive the gypsum board through the supporting piece and rise to the roof position, makes more laborsaving convenience of staff at the in-process of installation gypsum board like this.
Optionally, a fixing mechanism for fixing the gypsum board is arranged on the supporting member.
Through adopting above-mentioned technical scheme, fixed establishment can fix the gypsum board of placing on the supporting piece for the gypsum board is at the in-process stability more that rises along with the supporting piece.
Optionally, the fixing mechanism comprises two groups of symmetrical clamping assemblies arranged on the supporting piece, each clamping assembly comprises a connecting rod and an adjusting frame, one end of each connecting rod is fixedly connected to the supporting piece, a first slide way is arranged on each connecting rod, each adjusting frame is connected to the corresponding first slide way in a sliding mode, meanwhile, a fixing piece used for fixing the position of each adjusting frame on the corresponding connecting rod is further arranged on each connecting rod, and a clamping piece used for clamping and fixing the gypsum board from the side wall of the gypsum board is arranged on each adjusting frame.
Through adopting above-mentioned technical scheme, the staff can change the interval between the clamping piece in two sets of clamping components through making the alignment jig slide on first slide to form the clamp to the gypsum board and fix.
Optionally, the adjusting bracket includes first pole and the second pole that integrative set up, first pole and second pole mutually perpendicular, and first pole slides and connects in first slide, and the holder includes two joint boards, and two joint boards are installed respectively in the both ends position department of second pole, and the joint board includes integrative first portion and the second portion that sets up, and first portion is laid along the length direction of second pole, and the length direction of second pole is laid along first pole in second portion.
Through adopting above-mentioned technical scheme, four joint boards can be fixed four corner positions of gypsum board to make the gypsum board place more stable in the supporting piece.
Optionally, be provided with on the second pole with first slide vertically second slide, it is connected with two regulation poles to slide in the second slide, installs two setting elements on the second pole, two setting elements respectively with two regulation pole one-to-ones, the setting element is used for fixing the position of regulation pole on the second pole, two joint boards rigid coupling respectively in two regulation poles.
Through adopting above-mentioned technical scheme for the staff can adjust the interval between two joint plates on the same fixed subassembly according to actual needs, thereby makes the bearing piece can adapt to the gypsum board of as much width as possible.
Optionally, a plurality of first balls are rotatably connected to the inner side wall of the clamping plate.
Through adopting above-mentioned technical scheme, when the gypsum board was fixed in the roof by the staff, the staff made the piston rod shrink of jacking piece, and the frictional force that receives when breaking away from the mount is littleer owing to the existence of first ball this moment to make the gypsum board break away from with the mount more easily.
Optionally, the upper surface of the adjusting bracket is rotatably connected with a plurality of second balls.
Through adopting above-mentioned technical scheme, the staff is when adjusting the alignment jig, and the second ball can reduce the frictional force between alignment jig and the gypsum board.
Optionally, the upper surface of the adjusting rod is rotatably connected with a plurality of third balls.
Through adopting above-mentioned technical scheme, when the staff adjusted the regulation pole, the third ball can reduce the frictional force between regulation pole and the gypsum board.
Optionally, a guide for increasing the stability of the support is arranged between the support and the base.
Through adopting above-mentioned technical scheme, the guide can carry on spacingly at the in-process that the bearing piece goes up and down to make the bearing piece more stable at the in-process that goes up and down.
Optionally, the guide member is a telescopic rod, and two ends of the telescopic rod are fixedly connected with the connecting rod and the base respectively.
Through adopting above-mentioned technical scheme, the telescopic link can stretch out and draw back along with the lift of supporting piece.
In summary, the present application includes at least one of the following beneficial technical effects:
1. by arranging the supporting piece and the jacking piece used for pushing the supporting piece to lift, the jacking piece can push the gypsum board to lift to a roof position through the supporting piece, so that a worker can install the gypsum board more conveniently;
2. through set up fixed subassembly on the support, fixed subassembly makes the gypsum board place more stable on the support, can also make the support adapt to as big as possible gypsum board simultaneously.
Drawings
Fig. 1 is a schematic structural diagram of an external shape of an auxiliary tool in an embodiment of the present application.
Fig. 2 is a schematic view showing a state where the gypsum board is mounted on the auxiliary tool in the embodiment of the present application.
Fig. 3 is a schematic structural diagram of the external shape of the clamping member in the embodiment of the present application.
Description of reference numerals: 1. a base; 11. a base plate; 12. a universal wheel; 2. a jacking piece; 3. a support plate; 4. a clamping assembly; 41. a connecting rod; 411. a first chute; 4111. a second chute; 42. an adjusting bracket; 421. a first lever; 4211. a slider; 422. a second lever; 4221. a first sliding groove; 4222. a second sliding groove; 423. a second caulking groove; 4231. a second ball bearing; 43. adjusting a rod; 431. a sliding block; 432. a third caulking groove; 4321. a third ball bearing; 44. a first puller bolt; 45. a second puller bolt; 46. a clamping and connecting plate; 461. a first part; 462. a second section; 463. a first caulking groove; 4631. a first ball bearing; 5. a protective shell; 51. a sleeve; 511. an ear plate; 52. a cover plate; 521. a through hole; 522. a first splice; 523. a second splice; 6. a telescopic rod; 7. a gypsum board.
Detailed Description
The present application is described in further detail below with reference to figures 1-3.
The embodiment of the application discloses appurtenance is used in gypsum board installation. Referring to fig. 1, appurtenance includes base 1, jacking piece 2 and support plate 3, and jacking piece 2 installs in base 1, and support plate 3 installs in jacking piece 2, and support plate 3 is used for bearing gypsum board 7, and jacking piece 2 can be installed through supporting plate 3 with gypsum board 7 promotion to roof position department.
Base 1 includes bottom plate 11 and four universal wheels 12, and bottom plate 11 sets up to rectangular plate structure, and bottom plate 11 level sets up, and four universal wheels 12 are fixed mounting respectively in four corner positions departments of bottom plate 11 lower surface, and the aim at that the universal wheel 12 set up makes things convenient for the staff to the regulation of appurtenance position.
The jacking piece 2 can be a multi-stage hydraulic cylinder which is coaxially and fixedly connected on the upper surface of the bottom plate 11, and a piston rod of the jacking piece 2 extends upwards.
The bearing plate 3 is set to be a circular plate-shaped structure, the bearing plate 3 is horizontally arranged right above the jacking piece 2, the lower surface of the bearing plate 3 is fixedly connected with the piston rod of the jacking piece 2, and the axis of the bearing plate 3 is coaxial with the jacking piece 2.
Referring to fig. 2, the staff is placing gypsum board 7 in the upper surface of support plate 3, and then the staff starts jacking piece 2, and jacking piece 2 can promote gypsum board 7 through support plate 3 and rise to appointed position department and install, makes gypsum board 7 more convenient at the in-process of installation like this.
Referring to fig. 1 and 3, in order to make the gypsum board 7 more stable in the process of rising along with the supporting plate 3, a fixing mechanism for fixing the gypsum board 7 is arranged on the supporting plate 3, the fixing mechanism comprises two groups of clamping assemblies 4, and the two groups of clamping assemblies 4 are symmetrically arranged on the supporting plate 3.
Specifically, the clamping assembly 4 includes a connecting rod 41, an adjusting bracket 42 and two adjusting rods 43, the connecting rod 41 is fixedly connected to the outer side surface of the supporting plate 3 along the radial direction of the supporting plate 3, a first sliding groove 411 is formed in the upper surface of the connecting rod 41, the first sliding groove 411 extends to the end surface of one end of the connecting rod 41 far away from the supporting plate 3, a second sliding groove 4111 is formed in two side walls of the first sliding groove 411 in the length direction, and the second sliding groove 4111 is arranged along the length direction of the connecting rod 41.
The adjusting frame 42 comprises a first rod 421 and a second rod 422 which are integrally arranged, the first rod 421 and the second rod 422 are perpendicular to each other, and the first rod 421 and the second rod 422 jointly form a T-shaped adjusting frame 42;
the first rod 421 slides along the length direction of the connecting rod 41 and is connected to the first sliding groove 411, the second rod 422 is located at the end of the first rod 421 away from the supporting plate 3, two side walls of the first rod 421 are fixedly connected with sliders 4211 matched with the second sliding groove 4111, and the two sliders 4211 slide in the two second sliding grooves 4111 respectively. The lower surface of the connecting rod 41 is provided with a first tightening bolt 44 in a penetrating manner, and the first tightening bolt 44 upwards penetrates into the first sliding groove 411 to tighten the first rod 421.
The upper surface of the second rod 422 is provided with a first sliding groove 4221, the first sliding groove 4221 is arranged along the length direction of the second rod 422, two ends of the first sliding groove 4221 respectively extend to the end surfaces of two ends of the second rod 422, two side walls in the length direction in the first sliding groove 4221 are respectively provided with a second sliding groove 4222, and the second sliding groove 4222 is arranged along the length direction of the second rod 422;
the two adjusting rods 43 are connected in the first sliding groove 4221 in a sliding manner, the two side walls of the two adjusting rods 43 in the length direction are fixedly connected with sliding blocks 431 matched with the first sliding groove 4221, and the two sliding blocks 431 on the same adjusting rod 43 are respectively connected in the two second sliding grooves 4222 in a sliding manner. Two second puller bolts 45 penetrate through the lower surface of the second rod 422, the second puller bolts 45 penetrate upwards into the first sliding groove 411 and tightly prop the adjusting rod 43 in the groove, and the two second puller bolts 45 respectively correspond to the two adjusting rods 43 one by one.
The ends of the two adjusting rods 43 facing away from each other are fixedly connected with a clamping plate 46, the clamping plate 46 includes a first portion 461 and a second portion 462 which are integrally arranged, the first portion 461 is arranged along the length direction of the second rod 422, and the second portion 462 is arranged along the length direction of the first rod 421.
In the process of installing the gypsum board 7, a worker firstly changes the positions of the adjusting frames 42 on the connecting rods 41 according to the size of the gypsum board 7, then adjusts the positions of the two adjusting rods 43 on the adjusting frames 42, then places the gypsum board 7 on the supporting plate 3, then readjusts the positions of the adjusting frames 42 and the adjusting rods 43 to enable the four clamping plates 46 to be abutted against the gypsum board 7, then fixes the position of the adjusting frames 42 by using the first tightening bolts 44, and fixes the position of the adjusting rods 43 by using the second tightening bolts 45. Then the staff starts jacking piece 2, and jacking piece 2 promotes supporting plate 3 and gypsum board 7 upward movement to roof position department and waits for staff's installation.
A plurality of first caulking grooves 463 are formed in the inner side surface of the clamping plate 46, the first caulking grooves 463 are uniformly distributed on the first portion 461 and the second portion 462 of the clamping plate 46, first balls 4631 are embedded in the first caulking grooves 463, the first balls 4631 and the first caulking grooves 463 are connected in a sliding manner, and the wrapping amount of the first caulking grooves 463 for the first balls 4631 exceeds one half of the ball.
Like this when gypsum board 7 is fixed in the roof by the staff, the staff makes the piston rod of jacking piece 2 shrink, makes the gypsum board 7 when breaking away from joint plate 46 receive frictional force littleer owing to the existence of first ball 4631 this moment to make gypsum board 7 break away from with joint plate 46 more easily.
A plurality of second caulking grooves 423 are formed in the upper surface of the adjusting frame 42, second balls 4231 are embedded in the second caulking grooves 423, the second balls 4231 are connected with the second caulking grooves 423 in a sliding mode, the wrapping amount of the second caulking grooves 423 for the second balls 4231 exceeds one half of the wrapping amount of the second balls 4231, and the topmost position of the second balls 4231 is flush with the upper surfaces of the connecting rod 41 and the bearing plate 3. When the worker adjusts the adjusting bracket 42, the second ball 4231 can reduce the friction between the adjusting bracket 42 and the gypsum board 7.
The upper surface of the adjusting rod 43 is provided with a plurality of third caulking grooves 432, third balls 4321 are embedded in the third caulking grooves 432, the wrapping amount of the third caulking grooves 432 to the third balls 4321 exceeds one half of the third balls 4321, the third balls 4321 and the third caulking grooves 432 are connected in a sliding mode, and the height of the topmost part of the third balls 4321 is flush with the height of the topmost part of the second balls 4231. The third ball 4321 can support the gypsum board 7, and the third ball 4321 can reduce the friction between the gypsum board 7 and the adjusting rod 43 when the worker adjusts the adjusting bracket 42 and the adjusting rod 43.
Referring to fig. 1, in order to better protect the jacking member 2, a protective shell 5 is vertically installed on the upper surface of the bottom plate 11, the protective shell 5 comprises a sleeve 51 and a cover plate 52, the sleeve 51 is vertically sleeved on the periphery of the jacking member 2, an ear plate 511 is fixedly connected to the outer peripheral surface of the bottom of the sleeve 51, and the ear plate 511 is fixed with the bottom plate 11 through a plurality of bolts;
the cover plate 52 is erected on the upper end surface of the sleeve 51, the cover plate 52 and the sleeve 51 are fixed together through a plurality of bolts, and the upper surface of the cover plate 52 is provided with a through hole 521 for a piston rod of the jacking piece 2 to pass through; in order to facilitate the installation of the cover plate 52 by the worker, the cover plate 52 is uniformly divided into the first splicing part 522 and the second splicing part 523.
The upper surface rigid coupling of bottom plate 11 has many telescopic links 6, and the vertical setting of telescopic link 6, and the both ends of telescopic link 6 respectively with the upper surface of bottom plate 11 and connecting rod 41 rigid coupling. The telescopic rod 6 can stretch out and draw back along with the lift of mount, and the telescopic rod 6 can also carry on spacingly to the bearing board 3 at the in-process that the bearing board 3 goes up and down simultaneously for the in-process stability more that the bearing board 3 goes up and down.
The implementation principle of 7 installation appurtenance of using of gypsum board of this application embodiment is: the staff at first adjusts adjusting bracket 42 and regulation pole 43 according to the size of gypsum board 7 before installation gypsum board 7, later the staff places gypsum board 7 on supporting plate 3, and adjust adjusting bracket 42 and regulation pole 43 once more, make four joint plate 46's medial surface all with gypsum board 7 butt, later start jacking piece 2 and make supporting plate 3 and gypsum board 7 rise to assigned position department, then the staff is after fixed gypsum board 7 to the roof, the staff starts jacking piece 2 once more, it can to make fixed subassembly descend.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (10)

1. The utility model provides an appurtenance is used in gypsum board installation which characterized in that: the gypsum board support device is characterized in that a support piece for supporting a gypsum board (7) is arranged above a base (1) and the base (1) on the ground, and a jacking piece (2) used for pushing the support piece to lift is arranged between the support piece and the base (1).
2. The auxiliary tool for gypsum board installation according to claim 1, wherein: the supporting piece is provided with a fixing mechanism for fixing the gypsum board (7).
3. The auxiliary tool for gypsum board installation according to claim 2, wherein: fixing mechanism sets up in clamping component (4) of supporting piece including two sets of symmetries, clamping component (4) include connecting rod (41) and alignment jig (42), the one end rigid coupling of connecting rod (41) is in supporting piece, be provided with first slide on connecting rod (41), alignment jig (42) slide and connect in first slide, still be provided with on connecting rod (41) simultaneously and be used for carrying out the fixed mounting to alignment jig (42) position on connecting rod (41), install on alignment jig (42) and be used for following gypsum board (7) lateral wall and press from both sides tight fixed clamping piece to gypsum board (7).
4. The auxiliary tool for gypsum board installation according to claim 3, wherein: the adjusting frame (42) comprises a first rod (421) and a second rod (422) which are integrally arranged, the first rod (421) and the second rod (422) are perpendicular to each other, the first rod (421) is connected to the first slideway in a sliding mode, the clamping piece comprises two clamping plates (46), the two clamping plates (46) are respectively installed at two ends of the second rod (422), each clamping plate (46) comprises a first portion (461) and a second portion (462) which are integrally arranged, the first portion (461) is arranged along the length direction of the second rod (422), and the second portion (462) is arranged along the length direction of the first rod (421).
5. The auxiliary tool for gypsum board installation according to claim 4, wherein: be provided with on second pole (422) with first slide vertically second slide, the second slide is internal to slide and is connected with two regulation poles (43), installs two setting elements on second pole (422), two setting elements respectively with two regulation poles (43) one-to-one, the setting element is used for fixing the position of adjusting pole (43) on second pole (422), two joint board (46) respectively the rigid coupling in two regulation poles (43).
6. The auxiliary tool for gypsum board installation according to claim 5, wherein: a plurality of first balls (4631) are rotatably connected to the inner side wall of the clamping plate (46).
7. The auxiliary tool for gypsum board installation according to claim 3, wherein: the upper surface of the adjusting frame (42) is rotatably connected with a plurality of second balls (4231).
8. The auxiliary tool for gypsum board installation according to claim 5, wherein: the upper surface of the adjusting rod (43) is rotatably connected with a plurality of third balls (4321).
9. The auxiliary tool for gypsum board installation according to claim 2, wherein: a guide piece used for increasing the stability of the bearing piece is arranged between the bearing piece and the base (1).
10. The auxiliary tool for gypsum board installation according to claim 9, wherein: the guide piece is set to be a telescopic rod (6), and two ends of the telescopic rod (6) are fixedly connected with the connecting rod (41) and the base (1) respectively.
CN202120187596.6U 2021-01-23 2021-01-23 Appurtenance is used in gypsum board installation Active CN214365052U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120187596.6U CN214365052U (en) 2021-01-23 2021-01-23 Appurtenance is used in gypsum board installation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120187596.6U CN214365052U (en) 2021-01-23 2021-01-23 Appurtenance is used in gypsum board installation

Publications (1)

Publication Number Publication Date
CN214365052U true CN214365052U (en) 2021-10-08

Family

ID=77958708

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120187596.6U Active CN214365052U (en) 2021-01-23 2021-01-23 Appurtenance is used in gypsum board installation

Country Status (1)

Country Link
CN (1) CN214365052U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114212726A (en) * 2021-12-22 2022-03-22 安徽亚遥工程机械有限公司 Quick lifting mechanism for mounting armor seam

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114212726A (en) * 2021-12-22 2022-03-22 安徽亚遥工程机械有限公司 Quick lifting mechanism for mounting armor seam

Similar Documents

Publication Publication Date Title
CN111962887B (en) Assembled wall included angle adjusting device and construction method thereof
CN214365052U (en) Appurtenance is used in gypsum board installation
CN212389003U (en) High-efficient assembly building structure
CN212428134U (en) Assembled wall body included angle adjusting device
CN210316214U (en) Assembled steel construction building dysmorphism post
CN213268981U (en) Locating rack for quickly installing prefabricated wall panel
CN212773344U (en) Adjustable lifting platform for prefabricated building
CN112576048A (en) Assembly type building spandrel girder handling mounting system
CN107717846B (en) Special jig for disassembling cutter
CN219792367U (en) U-shaped jacking system
CN216042535U (en) Climbing frame for building construction
CN219429659U (en) Municipal administration drain pipe maintenance companion ladder
CN213062864U (en) Building construction equipment of building a wall
CN219773679U (en) Double-joist assembly platform
CN215666643U (en) Plate lifting device for constructional engineering
CN213326364U (en) Transfer tool and crane
CN218640114U (en) Mold positioning clamp
CN220999133U (en) Lifting device for ALC light partition board construction
CN210260892U (en) Safety protection device of bridge crane
CN220036137U (en) Building template for concrete building
CN218025194U (en) Hydraulic jack with safety valve
CN112982992B (en) Steel structure engineering installation construction method
CN216613852U (en) Tool for mounting high and ultrahigh ALC (autoclaved lightweight concrete) wallboard
CN210086544U (en) Novel fixed code and connecting structure thereof
CN213359315U (en) Lifting construction platform

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant