CN214364899U CN202120437418.4U CN202120437418U CN214364899U CN 214364899 U CN214364899 U CN 214364899U CN 202120437418 U CN202120437418 U CN 202120437418U CN 214364899 U CN214364899 U CN 214364899U
Authority
CN
China
Prior art keywords
upper portion
scaffold
connecting pipe
pipe
main part
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202120437418.4U
Other languages
Chinese (zh)
Inventor
张瑞生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinohydro Bureau 9 Co Ltd
Original Assignee
Sinohydro Bureau 9 Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinohydro Bureau 9 Co Ltd filed Critical Sinohydro Bureau 9 Co Ltd
Priority to CN202120437418.4U priority Critical patent/CN214364899U/en
Application granted granted Critical
Publication of CN214364899U publication Critical patent/CN214364899U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a scaffold for construction, including the scaffold main part, the upper end of scaffold main part is provided with the upper portion connecting rod, the upper portion position of scaffold main part is provided with the upper portion footboard, the positive front-back position of scaffold main part is provided with positive slant connecting rod, the side is provided with the connecting pipe No. one in the side about the scaffold main part, be provided with the connecting pipe No. two in the side connecting pipe, be provided with a plurality of upper portion horizontal pole between the connecting pipe No. one in the side, be provided with a plurality of lower part sleeve pipe on the connecting pipe No. two in the side, be provided with the lower part horizontal pole between the lower part sleeve pipe. A scaffold for construction belongs to the construction field, through the side connection pipe and the side connection pipe isotructure of No. two that set up, outside slant pulls open for the ladder presents the slant and puts, and it is more convenient when user carries article and scrambles, and this structure is convenient for accomodate.

Description

Scaffold for building construction
Technical Field
The utility model relates to a scaffold field, in particular to scaffold for construction.
Background
On the building site, often use the scaffold, the staff of being convenient for climbs the operation, and the left and right sides of traditional scaffold all is provided with fixed knot structure's ladder, because this ladder is vertical fixed mounting, when the staff climbs carrying article, the operation is inconvenient, and the user of being not convenient for scrambles, is not convenient for use.
SUMMERY OF THE UTILITY MODEL
The utility model discloses a main aim at provides a scaffold for construction can effectively solve the problem in the background art.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
a scaffold for building construction comprises a scaffold main body, wherein an upper connecting rod is arranged at the upper end of the scaffold main body, an upper pedal is arranged at the upper position of the scaffold main body, front oblique connecting rods are arranged at the front and rear positions of the front side of the scaffold main body, a first side connecting pipe is arranged at the left side and the right side of the scaffold main body, a second side connecting pipe is arranged in the first side connecting pipe, a plurality of upper cross rods are arranged between the first side connecting pipes, a plurality of lower sleeves are arranged on the second side connecting pipe, a lower cross rod is arranged between the lower sleeves, a lower fixing bolt is arranged at the outer side position of the lower sleeve, a plurality of side screw holes are arranged at the position, corresponding to the lower fixing bolt, of the outer side of the second side connecting pipe, the lower fixing bolt is movably arranged in the side screw holes, the connecting pipe of side No. two is last to be provided with the lower part fender body in the below position that lies in lower sheathed tube, the side position on side No. two connecting pipe upper portions is provided with the side movable rod, the position that the side of connecting pipe of side No. one corresponds the side movable rod is provided with the side movable groove, side movable rod movable mounting is in the side movable groove.
Preferably, the left side and the right side of the upper pedal are provided with hooks, and the hooks and the upper connecting rod are movably mounted.
Preferably, the upper end of side connecting pipe No. one is provided with the upper portion sleeve pipe, the upper portion of scaffold main part corresponds upper portion sheathed tube position and is provided with the upper portion dwang, the upper portion dwang is located the below position of upper portion connecting rod, upper portion sleeve pipe movable mounting is on the dwang of upper portion.
Preferably, the lower extreme position that corresponds No. two connecting pipes in side in the scaffold main part is provided with the lower part connecting rod, be provided with two lower parts on the lower part connecting rod and accomodate the hole, the lower extreme movable mounting of No. two connecting pipes in side is in the lower part is accomodate downtheholely.
Preferably, upper portion connecting rod, upper portion dwang and lower part connecting rod all through welding and scaffold main part fixed mounting.
Compared with the prior art, the utility model discloses following beneficial effect has:
the utility model discloses in, through the side connecting pipe and the side No. two connecting pipe isotructures that set up, take side No. two connecting pipes out, the slant pulls open for the lower extreme and the installation face contact of side No. two connecting pipes, make the ladder wholly present the slant and discharge, thereby convenient to use user carries article and scrambles, and it is more convenient to use, and this structure is convenient for accomodate.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is an enlarged view taken at A in FIG. 1;
FIG. 3 is an enlarged view at B in FIG. 2;
fig. 4 is a schematic side view of the first side connecting pipe and the second side connecting pipe of the present invention.
In the figure: 1. a scaffold main body; 2. a connecting rod with a front inclined; 3. an upper pedal; 4. hooking; 5. the side surface is a first connecting pipe; 6. a second connecting pipe on the side surface; 7. a side movable groove; 8. a side movable rod; 9. side screw holes; 10. a lower casing; 11. a lower fixing bolt; 12. a lower stopper; 13. an upper connecting rod; 14. an upper rotating rod; 15. a lower connecting rod; 16. an upper casing; 17. an upper cross bar; 18. a lower cross bar; 19. the lower part is provided with a receiving hole.
Detailed Description
In order to make the technical means, creation features, achievement purposes and functions of the present invention easy to understand, the present invention is further described below with reference to the following embodiments.
In the description of the present invention, it should be noted that the terms "upper", "lower", "inner", "outer", "front end", "rear end", "both ends", "one end", "the other end" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element to which the reference is made must have a specific orientation, be constructed in a specific orientation, and be operated, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first" and "second" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "disposed," "connected," and the like are to be construed broadly, and for example, "connected" may be either fixedly connected or detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
As shown in fig. 1-4, a construction frame for building construction comprises a construction frame main body 1, an upper connecting rod 13 is arranged at the upper end of the construction frame main body 1, an upper pedal 3 is arranged at the upper position of the construction frame main body 1, front oblique connecting rods 2 are arranged at the front and rear positions of the construction frame main body 1, side first connecting pipes 5 are arranged at the left and right sides of the construction frame main body 1, side second connecting pipes 6 are arranged in the side first connecting pipes 5, a plurality of upper cross rods 17 are arranged between the side first connecting pipes 5, a plurality of lower sleeves 10 are arranged on the side second connecting pipes 6, lower cross rods 18 are arranged between the lower sleeves 10, lower fixing bolts 11 are arranged at the outer side positions of the lower sleeves 10, a plurality of side screw holes 9 are arranged at the outer side of the side second connecting pipes 6 corresponding to the positions of the lower fixing bolts 11, the lower fixing bolts 11 are movably installed in the side screw holes 9, a lower baffle 12 is arranged below a lower sleeve 10 on the second side connecting pipe 6, a side movable rod 8 is arranged at the side position of the upper part of the second side connecting pipe 6, a side movable groove 7 is arranged at the position, corresponding to the side movable rod 8, of the side of the first side connecting pipe 5, and the side movable rod 8 is movably arranged in the side movable groove 7.
In this embodiment, in order to facilitate the installation of the upper step 3, hooks 4 are provided on both left and right sides of the upper step 3, and are movably installed through the hooks 4 and the upper connecting rod 13.
In this embodiment, in order to facilitate the connection pipe 5 at the side surface to be turned outward, thereby placing the ladder in a slant manner, the upper end of the connection pipe 5 at the side surface is provided with an upper sleeve 16, an upper turning rod 14 is provided at a position corresponding to the upper sleeve 16 at the upper portion of the scaffold body 1, the upper turning rod 14 is located at a position below the upper connection rod 13, and the upper sleeve 16 is movably mounted on the upper turning rod 14.
In this embodiment, in order to facilitate the storage of the lower end of the second side connecting pipe 6, a lower connecting rod 15 is disposed on the scaffold body 1 corresponding to the lower end of the second side connecting pipe 6, two lower storage holes 19 are disposed on the lower connecting rod 15, and the lower end of the second side connecting pipe 6 is movably mounted in the lower storage hole 19.
The upper connecting rod 13, the upper turning rod 14, and the lower connecting rod 15 are fixedly attached to the scaffold main body 1 by welding, and are more fixed in structure.
It should be noted that, the utility model relates to a construction frame for building construction, when the user needs to carry the article to climb the main body 1 of the construction frame, the part of the second side connecting pipe 6 is pushed upwards, the part of the second side connecting pipe 6 is moved upwards in the first side connecting pipe 5, the lower end of the second side connecting pipe 6 is drawn out from the lower receiving hole 19 of the lower connecting rod 15, then the first side connecting pipe 5 is rotated outwards, the upper end of the first side connecting pipe 5 is rotated outwards on the upper rotating rod 14 through the upper sleeve 16, the part of the first side connecting pipe 5 is inclined outwards, then the second side connecting pipe 6 is pulled downwards, the second side connecting pipe 6 is moved downwards, the lower end of the second side connecting pipe 6 is contacted with the mounting surface, the part of the second side connecting pipe 6 is moved downwards synchronously in the side movable groove 7 by the side movable rod 8, then upwards move a plurality of lower part sleeve pipe 10 on the connecting pipe 6 No. two of side in proper order to suitable position, through lower part fixing bolt 11 and the side screw 9 fixed mounting of lower part sleeve pipe 10 side to make the lower part horizontal pole 18 between the lower part sleeve pipe 10 move suitable position in proper order, thereby make whole ladder present the slant and put, the climbing from top to bottom of the user carrying article of being convenient for.
The basic principles and the main features of the invention and the advantages of the invention have been shown and described above. It will be understood by those skilled in the art that the present invention is not limited to the above embodiments, and that the foregoing embodiments and descriptions are provided only to illustrate the principles of the present invention without departing from the spirit and scope of the present invention. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (5)

1. The utility model provides a scaffold for construction which characterized in that: including scaffold main part (1), the upper end of scaffold main part (1) is provided with upper portion connecting rod (13), the upper portion position of scaffold main part (1) is provided with upper portion footboard (3), the positive front and back position of scaffold main part (1) is provided with positive slant connecting rod (2), the side is provided with connecting pipe (5) No. one in the side about scaffold main part (1), be provided with connecting pipe (6) No. two in the side in connecting pipe (5), be provided with a plurality of upper portion horizontal pole (17) between connecting pipe (5) in the side, be provided with a plurality of lower part sleeve pipe (10) on connecting pipe (6) in the side No. two, be provided with lower part horizontal pole (18) between lower part sleeve pipe (10), the outside position of lower part sleeve pipe (10) is provided with lower part fixing bolt (11), the outside of connecting pipe (6) No. two in the side corresponds the position of lower part fixing bolt (11) and is provided with a plurality of side Face screw (9), lower part fixing bolt (11) movable mounting is in side screw (9), be provided with lower part fender body (12) in the below position that lies in lower part sleeve pipe (10) on No. two connecting pipe in side (6), the side position on No. two connecting pipe in side (6) upper portion is provided with side movable rod (8), the position that the side of connecting pipe (5) corresponds side movable rod (8) in side is provided with side movable groove (7), side movable rod (8) movable mounting is in side movable groove (7).
2. A scaffold for construction as claimed in claim 1, wherein: the left side and the right side of the upper pedal (3) are provided with hooks (4) which are movably arranged through the hooks (4) and an upper connecting rod (13).
3. A scaffold for construction as claimed in claim 1, wherein: the upper end of side connecting pipe (5) is provided with upper portion sleeve pipe (16), the position that the upper portion of scaffold main part (1) corresponds upper portion sleeve pipe (16) is provided with upper portion dwang (14), upper portion dwang (14) are located the below position of upper portion connecting rod (13), upper portion sleeve pipe (16) movable mounting is on upper portion dwang (14).
4. A scaffold for construction as claimed in claim 1, wherein: the lower extreme position that corresponds No. two connecting pipes in side (6) on scaffold main part (1) is provided with lower part connecting rod (15), be provided with two lower parts on lower part connecting rod (15) and accomodate hole (19), the lower extreme movable mounting of No. two connecting pipes in side (6) is in hole (19) are accomodate in the lower part.
5. A scaffold for construction as claimed in claim 1, wherein: the upper connecting rod (13), the upper rotating rod (14) and the lower connecting rod (15) are fixedly installed with the scaffold main body (1) through welding.
CN202120437418.4U 2021-03-01 2021-03-01 Scaffold for building construction Expired - Fee Related CN214364899U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120437418.4U CN214364899U (en) 2021-03-01 2021-03-01 Scaffold for building construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120437418.4U CN214364899U (en) 2021-03-01 2021-03-01 Scaffold for building construction

Publications (1)

Publication Number Publication Date
CN214364899U true CN214364899U (en) 2021-10-08

Family

ID=77967745

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120437418.4U Expired - Fee Related CN214364899U (en) 2021-03-01 2021-03-01 Scaffold for building construction

Country Status (1)

Country Link
CN (1) CN214364899U (en)

Similar Documents

Publication Publication Date Title
CN201802297U (en) Aluminum ladder
CN214364899U (en) Scaffold for building construction
CN206071228U (en) A kind of temporary safety fence
CN205456714U (en) Portable removal law enforcement equipment box
CN213822869U (en) Vagina lavage device
CN217407505U (en) Spiral perch pole location structure
CN208578501U (en) A kind of electric power first-aid ladder convenient for fetching tool
CN220101167U (en) Rope ladder type roof ladder stand
CN213449356U (en) Wall brush for wall painting of home decoration
CN218912158U (en) Scaffold convenient to climb for construction
CN216641157U (en) Semi-grouting sleeve for fabricated building
CN218894141U (en) Energy-saving environment-friendly water tank for building construction
CN215606361U (en) Light gathering equipment for gynecological operation
CN216567487U (en) High-efficient water-saving irrigation device in farmland
CN212671097U (en) Scaffold for building construction
CN210482957U (en) Retractable integration handling frame
CN213115448U (en) Guide rail for building climbing frame
CN212793756U (en) Integral reinforcing device for opening of large pressure container
CN216240065U (en) Noise reduction type building construction enclosure
CN212359042U (en) Novel construction worker is with ascending a height device
CN216640529U (en) Environmental engineering river course device of decontaminating
CN215519864U (en) Support structure of climbing frame template
CN214035507U (en) Anti-tilt extension ladder
CN210430067U (en) Antenna boom that communication engineering construction used
CN218514901U (en) Sapling support frame for garden engineering

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20211008