CN212359042U - Novel construction worker is with ascending a height device - Google Patents

Novel construction worker is with ascending a height device Download PDF

Info

Publication number
CN212359042U
CN212359042U CN202020467260.0U CN202020467260U CN212359042U CN 212359042 U CN212359042 U CN 212359042U CN 202020467260 U CN202020467260 U CN 202020467260U CN 212359042 U CN212359042 U CN 212359042U
Authority
CN
China
Prior art keywords
connecting rod
slant
footboard
main body
rods
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020467260.0U
Other languages
Chinese (zh)
Inventor
吴莉莎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ruili Rongfeng National Culture Communication Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202020467260.0U priority Critical patent/CN212359042U/en
Application granted granted Critical
Publication of CN212359042U publication Critical patent/CN212359042U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Steps, Ramps, And Handrails (AREA)

Abstract

The utility model discloses a novel construction worker is with ascending a height device, including the side link, the side link is two sets of, the side link is provided with bottom transverse connection pole between two sets of, the upper portion position of side link is provided with upper portion slant connecting rod No. one, be provided with No. two upper portion slant connecting rods in the top position that is located an upper portion slant connecting rod on the side link, be provided with movable footboard in the top position that is located an upper portion slant connecting rod on the side link, be provided with slant stair frame between one side of activity footboard and the bottom transverse connection pole. A novel construction worker is with ascending a height device, through the slant stair frame that sets up between the footboard transverse connection pole on bottom transverse connection pole and activity footboard, make things convenient for construction worker to climb the device of ascending a height from top to bottom for the workman scrambles the device of ascending a height more simply, makes things convenient for construction worker work.

Description

Novel construction worker is with ascending a height device
Technical Field
The utility model relates to a device field of ascending a height, in particular to novel construction worker is with ascending a height device.
Background
Construction worker is when the indoor outdoor decoration of building, often can use a device of ascending a height, traditional device of ascending a height connects into the rectangle through the connecting rod of two sets of intercrossings around mostly, place the activity footboard at the top, this kind of device of ascending a height structure is fairly simple, but because the height ratio of device of ascending a height is than higher, lead to construction worker to be difficult to climb the device of ascending a height, and construction worker will carry certain material usually, it is more difficult when leading to its climbing device, especially indoor construction worker often independently accomplishes the work of an aspect, when carrying material climbing device of ascending a height, just have to find people to help, relatively influence workman's work efficiency easily.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a novel construction worker is with ascending a height device can effectively solve the problem in the background art.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a novel construction worker is with ascending a height device, includes the side link, the side link is two sets of, the side link is provided with bottom transverse connection pole between two sets of, the upper portion position of side link is provided with upper portion slant connecting rod No. one, be provided with No. two upper portion slant connecting rods in the top position that is located an upper portion slant connecting rod on the side link, be provided with movable footboard in the top position that is located an upper portion slant connecting rod on the side link, be provided with slant stair frame between one side of movable footboard and the bottom transverse connection pole.
Preferably, the side connection frame comprises a main body connection rod, a bottom sleeve, two main body side connection rods, three inner inclined support plates, a bottom transverse support plate and a connection screw rod, the bottom sleeve is located below the main body connection rods, the main body connection rods are arranged in two groups, the main body side connection rods are arranged in three groups, the main body side connection rods are located between the two groups of main body connection rods, the bottom transverse support plates are located at the bottom of the main body connection rods, the two inner inclined support plates are also arranged in two groups, one group of the inner inclined support plates is located at the upper position of the front main body connection rods, the other group of the inner inclined support plates is located at the upper position of the rear main body connection rods, the inner inclined support plate in front of the left side connection frame is higher than the inner inclined support plate in rear, the front inner inclined support plate, the connecting screw rods are positioned on the inner oblique supporting plate and the bottom transverse supporting plate.
Preferably, through holes are arranged at the two ends of the bottom transverse connecting rod, the first upper oblique connecting rod and the second upper oblique connecting rod, the middle part of the first upper oblique connecting rod is provided with a connecting screw rod, the middle part of the second upper oblique connecting rod is also provided with a through hole, two ends of the bottom transverse connecting rod are movably arranged on the connecting screw rod of the bottom transverse supporting plate through the through hole, the first upper oblique connecting rod and the second upper oblique connecting rod are sequentially and movably arranged on the connecting screw rod of the inner oblique supporting plate in a staggered manner, the connecting screw rod in the middle of the first upper oblique connecting rod penetrates through the middle through hole of the second upper oblique connecting rod, the other ends of the connecting screw rods are fixedly provided with fixing nuts, through connecting screw rod and fixation nut isotructure, with bottom transverse connection pole and upper portion slant connecting rod and No. two upper portion slant connecting rods movable mounting.
Preferably, the slant stair frame includes stair slant connecting rod, middle part connecting rod and No. two couples, the stair slant connecting rod is two sets of, the middle part connecting rod is four groups, and is located between the stair slant connecting rod, No. two couples are four groups, and are located the upper and lower both ends of stair slant connecting rod respectively, and the slant stair frame through setting up conveniently scrambles.
Preferably, the activity footboard includes footboard transverse connection pole, footboard side connecting rod, couple and middle part footboard, footboard transverse connection pole is two sets of, footboard side connecting rod is two sets of equally, and is located the inboard position in both ends of footboard side connecting rod, a couple is four groups, and is located the both ends outside position of footboard side connecting rod, the middle part footboard is located the middle part position of footboard side connecting rod, through the activity footboard structure that sets up, makes things convenient for self installation and the installation of slant stair frame.
Compared with the prior art, the utility model discloses following beneficial effect has:
the utility model discloses in, through the slant stair frame that sets up between bottom transverse connection pole and footboard transverse connection pole for the supplementary climbing of this slant stair frame of construction worker accessible device of ascending a height makes the climbing of device of ascending a height become simple, carries the material to indoor workman and scrambles alone and can play good complementary action.
Drawings
Fig. 1 is a schematic view of the overall front structure of a novel ascending device for construction workers of the present invention;
fig. 2 is a schematic side structure view of the novel ascending device for construction workers of the present invention;
fig. 3 is a schematic top view of the first upper oblique connecting rod and the second upper oblique connecting rod of the novel ascending device for construction workers according to the present invention;
fig. 4 is the utility model discloses a novel construction worker is with movable footboard of device of ascending a height.
In the figure: 1. a side connecting frame; 2. a bottom transverse connecting rod; 3. a movable pedal; 4. an upper oblique connecting rod; 5. a middle pedal; 6. a second upper oblique connecting rod; 7. an oblique stair frame; 8. a stair slant connecting rod; 9. a middle connecting rod; 10. a first hook; 11. a second hook; 12. a body connecting rod; 13. a bottom sleeve; 14. a main body side connecting rod; 15. an inner diagonal support plate; 16. a bottom transverse support plate; 17. connecting a screw rod; 18. fixing a nut; 19. a pedal transverse connecting rod; 20. pedal side connecting rod.
Detailed Description
In order to make the technical means, creation features, achievement purposes and functions of the present invention easy to understand, the present invention is further described below with reference to the following embodiments.
In the description of the present invention, it should be noted that the terms "upper", "lower", "inner", "outer", "front end", "rear end", "both ends", "one end", "the other end" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element to which the reference is made must have a specific orientation, be constructed in a specific orientation, and be operated, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first" and "second" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "disposed," "connected," and the like are to be construed broadly, and for example, "connected" may be either fixedly connected or detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
As shown in fig. 1-4, a novel climbing device for construction workers comprises a side connecting frame 1, wherein the side connecting frame 1 is divided into two groups, a bottom transverse connecting rod 2 is arranged between the two groups of side connecting frames 1, an upper oblique connecting rod 4 is arranged at the upper position of the side connecting frame 1, an upper oblique connecting rod 6 is arranged at the position above the upper oblique connecting rod 4 on the side connecting frame 1, a movable pedal 3 is arranged at the position above the upper oblique connecting rod 4 on the side connecting frame 1, and an oblique stair frame 7 is arranged between one side of the movable pedal 3 and the bottom transverse connecting rod 2.
The side connecting frame 1 comprises main body connecting rods 12, bottom sleeves 13, main body side connecting rods 14, inner oblique supporting plates 15, bottom transverse supporting plates 16 and connecting screws 17, the bottom sleeves 13 are positioned at the lower positions of the main body connecting rods 12, the main body connecting rods 12 are divided into two groups, the main body side connecting rods 14 are divided into three groups, the main body side connecting rods 14 are positioned between the two groups of main body connecting rods 12, the bottom transverse supporting plates 16 are positioned at the bottoms of the main body connecting rods 12, the inner oblique supporting plates 15 are also divided into two groups, one group of the inner oblique supporting plates 15 is positioned at the upper positions of the front main body connecting rods 12, the other group of the inner oblique supporting plates 15 is positioned at the upper positions of the rear main body connecting rods 12, the inner oblique supporting plate 15 in front of the left side connecting frame 1 is higher than the inner oblique supporting plate 15 in rear, the, the connecting screw rods 17 are positioned on the inner oblique supporting plate 15 and the bottom transverse supporting plate 16; through holes are formed in two ends of the bottom transverse connecting rod 2, the first upper oblique connecting rod 4 and the second upper oblique connecting rod 6, a connecting screw rod 17 is arranged in the middle of the first upper oblique connecting rod 4, through holes are also formed in the middle of the second upper oblique connecting rod 6, two ends of the bottom transverse connecting rod 2 are movably mounted on the connecting screw rod 17 of the bottom transverse supporting plate 16 through the through holes, the first upper oblique connecting rod 4 and the second upper oblique connecting rod 6 are sequentially and movably mounted on the connecting screw rod 17 of the inner oblique supporting plate 15 in a staggered mode, the connecting screw rod 17 in the middle of the first upper oblique connecting rod 4 penetrates through the through hole in the middle of the second upper oblique connecting rod 6, and fixing nuts 18 are fixedly mounted at the other end of; the inclined stair frame 7 comprises stair inclined connecting rods 8, middle connecting rods 9 and second hooks 11, the stair inclined connecting rods 8 are divided into two groups, the middle connecting rods 9 are divided into four groups and located between the stair inclined connecting rods 8, and the second hooks 11 are divided into four groups and located at the upper end and the lower end of the stair inclined connecting rods 8 respectively; the movable pedal 3 comprises a pedal transverse connecting rod 19, a pedal side connecting rod 20, a hook 10 and a middle pedal 5, the pedal transverse connecting rod 19 is two groups, the pedal side connecting rod 20 is also two groups, the pedal side connecting rod 20 is located at the inner side positions of two ends of the pedal side connecting rod 20, the hook 10 is four groups, the pedal side connecting rod 20 is located at the outer side positions of two ends of the pedal side connecting rod 20, and the middle pedal 5 is located at the middle position of the pedal side connecting rod 20.
It should be noted that the utility model relates to a novel ascending device for construction workers, wherein a bottom transverse connecting rod 2 is arranged on a bottom transverse supporting plate 16 at the bottom of two groups of side connecting frames 1, a first upper oblique connecting rod 4 is movably arranged on inner oblique supporting plates 15 at the left front and the right rear of the two groups of side connecting frames 1 through a connecting screw rod 17 and a fixing nut 18, and a second upper oblique connecting rod 6 is movably arranged on inner oblique supporting plates 15 at the left rear and the right front of the two groups of side connecting frames 1, so that the two groups of side connecting frames 1 are connected, at the moment, a movable pedal 3 is movably arranged on a main body side connecting rod 14 at the uppermost end of the side connecting frame 1 through four first hooks 10 at the two sides of the movable pedal 3, and then a second hook 11 at one end of an oblique stair frame 7 is hung on the bottom transverse connecting rod 2, no. two couples 11 of the other end are hung on footboard transverse connection pole 19 on movable pedal 3, movable mounting is on slant stair frame 7, construction worker can be through pulling main part connecting rod 12 of a upper portion slant connecting rod 4 or No. two upper portion slant connecting rods 6 or side one hand, the foot is stepped on middle part connecting rod 9 on slant stair frame 7, through slant stair frame 7 supplementary workman climbing device, make climbing device's climbing simpler, make things convenient for construction worker.
The basic principles and the main features of the invention and the advantages of the invention have been shown and described above. It will be understood by those skilled in the art that the present invention is not limited to the above embodiments, and that the foregoing embodiments and descriptions are provided only to illustrate the principles of the present invention without departing from the spirit and scope of the present invention. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (5)

1. The utility model provides a novel construction worker is with ascending a height device which characterized in that: including side link (1), side link (1) is two sets of, side link (1) is provided with bottom transverse connection pole (2) between two sets of, the upper portion position of side link (1) is provided with upper portion slant connecting rod (4) No. one, be provided with No. two upper portion slant connecting rods (6) in the top position that is located upper portion slant connecting rod (4) on side link (1), be provided with movable footboard (3) in the top position that is located upper portion slant connecting rod (4) on side link (1), be provided with slant stair frame (7) between one side of movable footboard (3) and bottom transverse connection pole (2).
2. The novel ascending device for construction workers according to claim 1, wherein: the side connecting frame (1) comprises a main body connecting rod (12), a bottom sleeve (13), main body side connecting rods (14), inner oblique supporting plates (15), bottom transverse supporting plates (16) and connecting screw rods (17), wherein the bottom sleeve (13) is positioned below the main body connecting rods (12), the main body connecting rods (12) are divided into two groups, the main body side connecting rods (14) are divided into three groups, the main body side connecting rods (14) are positioned between the two groups of main body connecting rods (12), the bottom transverse supporting plates (16) are positioned at the bottom of the main body connecting rods (12), the inner oblique supporting plates (15) are also divided into two groups, one group of the inner oblique supporting plates (15) is positioned at the upper part of the front main body connecting rods (12), and the other group of the inner oblique supporting plates (15) is positioned at the upper part of the rear main body connecting rods (12), and inside slant backup pad (15) in left side link (1) the place ahead is higher than inside slant backup pad (15) in rear, inside slant backup pad (15) in the place ahead on side link (1) right side is less than inside slant backup pad (15) in rear, connecting screw (17) are located inside slant backup pad (15) and bottom transverse support board (16).
3. The novel ascending device for construction workers according to claim 2, wherein: through holes are arranged at the two ends of the bottom transverse connecting rod (2), the first upper oblique connecting rod (4) and the second upper oblique connecting rod (6), the middle part of the first upper oblique connecting rod (4) is provided with a connecting screw rod (17), the middle part of the second upper oblique connecting rod (6) is also provided with a through hole, the two ends of the bottom transverse connecting rod (2) are movably arranged on a connecting screw rod (17) of a bottom transverse supporting plate (16) through the through hole, the first upper oblique connecting rod (4) and the second upper oblique connecting rod (6) are sequentially and movably arranged on the connecting screw rod (17) of the inner oblique supporting plate (15) in a staggered manner, the connecting screw rod (17) in the middle of the first upper oblique connecting rod (4) penetrates through the middle through hole of the second upper oblique connecting rod (6), and the other ends of the connecting screw rods (17) are fixedly provided with fixing nuts (18).
4. The novel ascending device for construction workers according to claim 1, wherein: slant stair frame (7) include stair slant connecting rod (8), middle part connecting rod (9) and No. two couples (11), stair slant connecting rod (8) are two sets of, middle part connecting rod (9) are four groups, and are located between stair slant connecting rod (8), No. two couples (11) are four groups, and are located the upper and lower both ends of stair slant connecting rod (8) respectively.
5. The novel ascending device for construction workers according to claim 1, wherein: activity footboard (3) include footboard transverse connection pole (19), footboard side connecting rod (20), couple (10) and middle part footboard (5), footboard transverse connection pole (19) are two sets of, footboard side connecting rod (20) are two sets of equally, and are located the inboard position in both ends of footboard side connecting rod (20), couple (10) are four groups, and are located the both ends outside position of footboard side connecting rod (20), middle part footboard (5) are located the middle part position of footboard side connecting rod (20).
CN202020467260.0U 2020-04-02 2020-04-02 Novel construction worker is with ascending a height device Active CN212359042U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020467260.0U CN212359042U (en) 2020-04-02 2020-04-02 Novel construction worker is with ascending a height device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020467260.0U CN212359042U (en) 2020-04-02 2020-04-02 Novel construction worker is with ascending a height device

Publications (1)

Publication Number Publication Date
CN212359042U true CN212359042U (en) 2021-01-15

Family

ID=74138903

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020467260.0U Active CN212359042U (en) 2020-04-02 2020-04-02 Novel construction worker is with ascending a height device

Country Status (1)

Country Link
CN (1) CN212359042U (en)

Similar Documents

Publication Publication Date Title
CN212359042U (en) Novel construction worker is with ascending a height device
CN215055325U (en) Steel construction truss plate is short to be chosen board outward and is exempted from formwork device
CN217175614U (en) Adjustable size stair
CN212129883U (en) Connecting structure for attaching lifting scaffold and wall of floating window of residential building
CN206944438U (en) Air-conditioner outdoor unit rack in system is built in a kind of room
CN111962856A (en) Wall-attached support of attached lifting scaffold
CN215337185U (en) Air source heat pump with noise reduction structure
CN214885472U (en) Climbing frame formwork elevation regulator
CN220572476U (en) Infusion support
CN216428964U (en) Scaffold structure of high security of easy dismouting
CN212730927U (en) Maintain photovoltaic equipment with footboard structure
CN214259611U (en) Clamping plate mounting and fastening device for orthopedics department
CN215760346U (en) Bearing stores pylon for civil engineering
CN221420541U (en) Lifting protection mechanism of assembled building wallboard
CN215082772U (en) Drainage frame for large internal medicine department
CN214748076U (en) Mounting structure of rotary encoder for elevator motor
CN215797893U (en) Side cover plate for marble assembly
CN210482957U (en) Retractable integration handling frame
CN214658711U (en) A net piece mounting structure for building climb frame
CN214834993U (en) Building installation has protector of stability
CN212359596U (en) Multifunctional ladder for building construction
CN213115416U (en) Combined aluminum frame
CN212583162U (en) Assembled integral protection operation platform
CN210739841U (en) Dual-purpose ground beam
CN214399439U (en) Elevator shaft with heat insulation function

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20230721

Address after: No. 30, Maoshou Road, Ruili City, Dehong Dai and Jingpo Autonomous Prefecture, Yunnan Province 678600

Patentee after: RUILI RONGFENG NATIONAL CULTURE COMMUNICATION Co.,Ltd.

Address before: 518000 202, 2nd floor, building 3, Hongxiang Industrial Zone, Huancheng South Road, Bantian street, Longgang District, Shenzhen City, Guangdong Province

Patentee before: Wu Lisha