CN214364023U - Prefabricated wallboard and prefabricated building - Google Patents

Prefabricated wallboard and prefabricated building Download PDF

Info

Publication number
CN214364023U
CN214364023U CN202022345596.2U CN202022345596U CN214364023U CN 214364023 U CN214364023 U CN 214364023U CN 202022345596 U CN202022345596 U CN 202022345596U CN 214364023 U CN214364023 U CN 214364023U
Authority
CN
China
Prior art keywords
wallboard
prefabricated
main part
wall panel
vertical
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022345596.2U
Other languages
Chinese (zh)
Inventor
黄昆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Caogen Minshu House Manufacturing Co ltd
Original Assignee
Guangdong Caogen Minshu House Manufacturing Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Caogen Minshu House Manufacturing Co ltd filed Critical Guangdong Caogen Minshu House Manufacturing Co ltd
Priority to CN202022345596.2U priority Critical patent/CN214364023U/en
Application granted granted Critical
Publication of CN214364023U publication Critical patent/CN214364023U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Panels For Use In Building Construction (AREA)

Abstract

The application provides prefabricated wallboard and prefabricated assembled building, prefabricated wallboard includes the wallboard main part, be equipped with the wallboard skeleton in the wallboard main part, the wallboard skeleton includes many edges the length direction interval distribution's of wallboard main part vertical siphunculus and locating the wallboard main part is used for connecting many in the ascending both ends of direction of height the connection piece of vertical siphunculus, be equipped with in the vertical siphunculus and run through the wallboard inserted bar hole of wallboard main part. In this application, the wallboard skeleton is through many vertical siphunculus and connect many the connection piece of vertical siphunculus just can form frame construction, simple structure, and convenient preparation, and when the prefabricated assembled wallboard of this application to wallboard skeleton cast concrete shaping, the inside of vertical siphunculus just can directly form the wallboard dowel hole that runs through the wallboard main part, has simplified the preparation flow of wallboard, effectively improves the production efficiency of prefabricated assembled wallboard.

Description

Prefabricated wallboard and prefabricated building
[ technical field ] A method for producing a semiconductor device
The application relates to the technical field of prefabricated buildings, in particular to a prefabricated wallboard and a prefabricated building.
[ background of the invention ]
The prefabricated concrete wallboard is adopted to build the fabricated building, so that the factory and mechanical construction degree can be improved, the field wet operation is reduced, the field labor is saved, the seasonal influence is overcome, and the building construction period is shortened. However, the existing precast concrete wall panel has complicated production steps due to the structure, which affects the production efficiency of the precast concrete wall panel, and therefore, the precast concrete wall panel capable of improving the production efficiency of a factory needs to be designed.
[ summary of the invention ]
In order to solve the problem, the application provides a prefabricated wallboard and a prefabricated building applying the prefabricated wallboard.
The application is realized by the following technical scheme:
prefabricated assembled wallboard, including the wallboard main part, be equipped with the wallboard skeleton in the wallboard main part, the wallboard skeleton includes many edges the vertical siphunculus of the length direction interval distribution of wallboard main part and locating the wallboard main part is used for connecting many in the ascending both ends of direction of height the connection piece of vertical siphunculus, be equipped with in the vertical siphunculus and run through the wallboard dowel hole of wallboard main part.
Prefabricated assembled wallboard as above, be equipped with a plurality of edges on the wallboard skeleton the connection rope of the direction of height distribution of wallboard main part, it is double-deck setting and is formed with and is located to connect the rope blind end on the wallboard skeleton, the connection rope of double-deck setting is kept away from after a vertical siphunculus is walked around to the tip of blind end, follow pass in the blind end and extend to in the wallboard skeleton to make the connection rope of partial double-deck setting extend to the wallboard main part outer with the wallboard main part forms double-deck go-between.
According to the prefabricated wallboard, the connecting groove extending along the height direction is formed in the wallboard main body, and the connecting rope stretches out of the connecting groove from the interior of the wallboard main body.
According to the prefabricated wallboard, the exposed connecting piece fixedly connected with the vertical through pipe is arranged on the side face of the wallboard main body in the height direction.
According to the prefabricated wallboard, the exposed connecting piece is the connecting nut.
As above prefabricated assembled wallboard, the wallboard framework comprises a reinforcing mesh which connects the vertical through pipe and the connecting sheet.
According to the prefabricated wallboard, the steel wire anti-cracking net is arranged on the reinforcing steel bar net.
According to the prefabricated wallboard, the vertical through pipe is a square through pipe.
As above prefabricated assembled wallboard, be equipped with on the wallboard skeleton pre-buried socket and with pre-buried socket is linked together and follows the ripple spool that the direction of height of wallboard main part extends, the wallboard skeleton is in one side on the wallboard main part direction of height is equipped with and plays to hang the piece.
The application also discloses prefabricated building, including ground foundation and prefabricated assembled floor, still include as above prefabricated assembled wallboard.
Compared with the prior art, the method has the following advantages:
1. in this application, the wallboard skeleton is through many vertical siphunculus and connect many the connection piece of vertical siphunculus just can form frame construction, simple structure, and convenient preparation, and when the prefabricated assembled wallboard of this application to wallboard skeleton cast concrete shaping, the inside of vertical siphunculus just can directly form the wallboard dowel hole that runs through the wallboard main part, has simplified the preparation flow of wallboard, effectively improves the production efficiency of prefabricated assembled wallboard.
2. In this application, connect the rope and bind on vertical siphunculus through binding structure, can improve the connection stability of connecting the rope in the wallboard main part, the firm degree when also further improving two prefabricated assembled wallboards and connect through connecting the rope.
[ description of the drawings ]
In order to more clearly illustrate the technical solutions in the embodiments of the present application, the drawings used in the description of the embodiments will be briefly introduced below.
FIG. 1 is an exploded schematic view of a prefabricated building;
FIG. 2 is a schematic view of a prefabricated wall panel;
FIG. 3 is a schematic view of a wallboard framework;
FIG. 4 is an enlarged schematic view of section A of FIG. 3;
FIG. 5 is a schematic view of two prefabricated wall panels connected by a connecting rope;
FIG. 6 is a schematic view of the connection of two double-layered connection rings;
fig. 7 is an enlarged schematic view of a portion B of fig. 3.
[ detailed description ] embodiments
In order to make the technical problems, technical solutions and advantageous effects solved by the present application more clear and obvious, the present application is further described in detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative of the present application and are not intended to limit the present application.
When the embodiments of the present application refer to ordinal numbers such as "first", "second", etc., it should be understood that the terms are used for distinguishing only when the context clearly indicates that the order is changed.
In the description of the present application, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "connected," and "connected" are to be construed broadly, e.g., as meaning either a fixed connection, a removable connection, or an integral connection; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present application can be understood in a specific case by those of ordinary skill in the art.
As shown in fig. 1 to 6 prefabricated wallboard, including wallboard main part 1, be equipped with wallboard skeleton 2 in wallboard main part 1, wallboard skeleton 2 includes many edges wallboard main part 1's length direction interval distribution's vertical siphunculus 21 and locate wallboard main part 1 is used for connecting many in the ascending both ends of direction of height vertical siphunculus 21's connection piece 22, be equipped with in the vertical siphunculus 21 and run through wallboard inserted bar hole 23 of wallboard main part 1. In this embodiment, the wallboard skeleton is through many vertical siphunculus and connect many the connection piece of vertical siphunculus just can form frame construction, simple structure, and convenient preparation, and when the prefabricated assembled wallboard of this application to wallboard skeleton pouring concrete shaping, the inside of vertical siphunculus just can directly form the wallboard dowel hole that runs through the wallboard main part, has simplified the preparation flow of wallboard, effectively improves the production efficiency of prefabricated assembled wallboard. In order to facilitate the connection of the connecting sheet and the vertical through pipe, the vertical through pipe 21 is a square through pipe, and the connecting sheet is a metal connecting sheet.
Further, in order to improve the connection stability between two prefabricated assembled wallboards, be equipped with a plurality of edges on wallboard skeleton 2 the connection rope 3 of wallboard main part 1's direction of height distribution, it is double-deck setting and is formed with and is located to connect rope 3 blind end 31 on wallboard skeleton 2, the connection rope 3 of double-deck setting is kept away from after a vertical siphunculus 21 is walked around to the tip of blind end 31, follow pass in the blind end 31 and extend to in wallboard skeleton 2 to make the connection rope 3 of partial double-deck setting extend to wallboard main part 1 outer with wallboard main part 1 forms double-deck go-between ring 32. In this embodiment, connect the rope and extend to the wallboard main part outside and form double-deck go-between structure with the wallboard main part, when wallboard main part and wallboard main part were through double-deck go-between interconnect separately, the ring can form the two knot structures of ring about wall and wall junction, and the security is better. In addition, the part of the connecting rope in the wallboard main body embraces the wallboard framework in a lantern ring knot mode for anchoring, and the reliability of anchoring is higher by means of a mechanical structure.
Further, be equipped with the spread groove 11 that extends along the direction of height on wallboard main part 1, connect rope 3 certainly stretch out in wallboard main part 1 to outside spread groove 11. In order to improve the connection strength of the double-layer connection ring protruding out of the main body of the wall panel, a fixing piece 34 for fixing the double-layer connection ring 32 is provided in the connection groove 11. When two adjacent prefabricated wallboards are connected, the respective connecting grooves 11 are oppositely arranged, and the two adjacent prefabricated wallboards are connected with each other through the respective double-layer connecting rings 32, as shown in fig. 5 and 6, when in connection, each layer of connecting rings in the double-layer connecting rings 32 of one prefabricated wallboard is staggered with each layer of connecting rings in the double-layer connecting rings 32 corresponding to the other prefabricated wallboard to form connecting jacks 33, and the two adjacent prefabricated wallboards are connected by inserting the connecting steel bars 10 into the connecting jacks 33. The anchor stability between wallboard main part can increase and the connecting reinforcement 10 through double-deck go-between ring structure, and the connecting reinforcement inserts in connect the jack 33, links together with making two adjacent prefabricated assembled wallboards steadily through pouring concrete in to the spread groove again.
Further, the side surface of the wallboard main body 1 in the height direction is provided with an exposed connecting piece 4 fixedly connected with the vertical through pipe 21. Preferably, the exposed connector 4 is a coupling nut. Through setting up with vertical siphunculus 21 fixed connection's expose connecting piece 4, when the prefabricated assembled wallboard of shaping, wallboard skeleton accessible exposes connecting piece 4 and fixes on the mould, makes things convenient for the shaping construction. In addition, in the process of installing the prefabricated wall panel to the ground foundation, the inclined strut structure is often needed to assist in positioning the wall panel main body, and the inclined strut structure can be conveniently connected with the wall panel main body stably through being connected with the exposed connecting piece 4 through the exposed connecting piece 4. Further, two adjacent prefabricated wall panels can be connected by connecting the corresponding exposed connecting members 4 of the two adjacent prefabricated wall panels through the connecting steel plates 12. In the process of assembling the prefabricated wallboard on the ground foundation, the two adjacent prefabricated wallboards are connected by arranging the connecting steel plates 5, the number of the inclined strut structures for assisting in positioning the prefabricated wallboard can be reduced, the assembly flow of the whole prefabricated building is effectively optimized, the assembly efficiency is improved, and the construction cost is saved.
Further, the wall panel framework 2 includes a steel mesh 24 connecting the vertical through pipe 21 and the connecting sheet 22. In order to improve the crack resistance of the wallboard main body, the steel wire anti-cracking net 5 is arranged on the reinforcing mesh 24.
For convenient use, be equipped with on wallboard skeleton 2 pre-buried socket 6 and with pre-buried socket 6 is linked together and follows the corrugated pipe 7 that the direction of height of wallboard main part 1 extends.
In order to conveniently hoist the prefabricated wallboard, the wallboard framework 2 is provided with a hoisting piece 8 on one side of the wallboard main body 1 in the height direction.
The working principle of the embodiment is as follows:
in this embodiment, the wallboard skeleton is through many vertical siphunculus and connect many the connection piece of vertical siphunculus just can form frame construction, simple structure, and convenient preparation, and when the prefabricated assembled wallboard of this application to wallboard skeleton pouring concrete shaping, the inside of vertical siphunculus just can directly form the wallboard dowel hole that runs through the wallboard main part, has simplified the preparation flow of wallboard, effectively improves the production efficiency of prefabricated assembled wallboard.
The foregoing is illustrative of the various embodiments provided in connection with the detailed description and the specific implementations of the application are not intended to be limited to the illustrations. Similar or identical methods, structures, etc. as used herein, or several technical deductions or substitutions made on the premise of the idea of the present application, should be considered as the protection scope of the present application.

Claims (10)

1. Prefabricated assembled wallboard, including wallboard main part (1), be equipped with wallboard skeleton (2) in wallboard main part (1), its characterized in that, wallboard skeleton (2) include many edges the length direction interval distribution's of wallboard main part (1) vertical siphunculus (21) and locate wallboard main part (1) is used for connecting many in the both ends on the direction of height connection piece (22) of vertical siphunculus (21), be equipped with in vertical siphunculus (21) and run through wallboard inserted bar hole (23) of wallboard main part (1).
2. The prefabricated wallboard of claim 1, wherein the wallboard framework (2) is provided with a plurality of connecting ropes (3) distributed along the height direction of the wallboard main body (1), the connecting ropes (3) are arranged in a double-layer manner and are formed with closed ends (31) located on the wallboard framework (2), the end parts of the connecting ropes (3) far away from the closed ends (31) bypass a vertical through pipe (21), and penetrate through the closed ends (31) and extend into the wallboard framework (2), and part of the connecting ropes (3) arranged in the double-layer manner extend out of the wallboard main body (1) and form double-layer connecting rings (32) with the wallboard main body (1).
3. Prefabricated wall panel according to claim 2, characterized in that the wall panel body (1) is provided with attachment grooves (11) extending in the height direction, and the attachment cords (3) extend from the inside of the wall panel body (1) to the outside of the attachment grooves (11).
4. Prefabricated wall panel according to claim 1, characterized in that the side of the wall panel body (1) in the height direction is provided with an exposed connector (4) fixedly connected with the vertical through tube (21).
5. Prefabricated wall panel according to claim 4, characterized in that the exposed connector (4) is a connection nut.
6. Prefabricated wall panel according to claim 1, characterized in that the wall panel skeleton (2) comprises a mesh reinforcement (24) connecting the vertical tubes (21) and the connecting pieces (22).
7. Prefabricated wall panel according to claim 6, wherein said reinforcing mesh (24) is provided with a steel wire anti-cracking mesh (5).
8. Prefabricated wall panel according to claim 1, characterized in that the vertical tubes (21) are square tubes.
9. The prefabricated wallboard of claim 1, wherein the wallboard framework (2) is provided with pre-embedded sockets (6) and corrugated conduits (7) communicated with the pre-embedded sockets (6) and extending along the height direction of the wallboard main body (1), and one side of the wallboard framework (2) in the height direction of the wallboard main body (1) is provided with a lifting piece (8).
10. Prefabricated building comprising a ground foundation (91) and prefabricated floor slabs (92), characterized in that it further comprises prefabricated wall panels according to any one of claims 1 to 9.
CN202022345596.2U 2020-10-20 2020-10-20 Prefabricated wallboard and prefabricated building Active CN214364023U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022345596.2U CN214364023U (en) 2020-10-20 2020-10-20 Prefabricated wallboard and prefabricated building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022345596.2U CN214364023U (en) 2020-10-20 2020-10-20 Prefabricated wallboard and prefabricated building

Publications (1)

Publication Number Publication Date
CN214364023U true CN214364023U (en) 2021-10-08

Family

ID=77968448

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022345596.2U Active CN214364023U (en) 2020-10-20 2020-10-20 Prefabricated wallboard and prefabricated building

Country Status (1)

Country Link
CN (1) CN214364023U (en)

Similar Documents

Publication Publication Date Title
CN112177168A (en) Connecting structure of prefabricated building
CN105113708B (en) The assembled architecture of precast reinforced concrete structure and its composition
KR101086222B1 (en) PC slave for building having reinforcement structure as a set
KR102197689B1 (en) Vertical core structure horizontally assembled and construction method therewith
KR20140087834A (en) prefabricated concrete arch rib and it's construction method
CN111501839B (en) Cable shaft
CN108571169B (en) Construction method for factory prefabricated steel concrete superposed shear wall assembly type building
CN214364023U (en) Prefabricated wallboard and prefabricated building
CN113089950B (en) Hoisting and installing method for high-strength prefabricated stairway
CN220644578U (en) Rural construction assembled building
WO2019050475A1 (en) A method for constructing a building
CN113136961A (en) Lifting structure for large-span truss and lifting method thereof
CN212453065U (en) Assembled building frame structure member
CN111622347A (en) Cross-shaped node connecting structure of assembled frame structure and construction method thereof
CN214329297U (en) Connecting structure of prefabricated building
KR100973503B1 (en) Vertical RC structure construction method using prefabricated steel bar multi story unit
CN212926451U (en) Column base connecting assembly, prefabricated column and prefabricated column connecting structure
CN212405472U (en) Cross node connection structure of assembled frame structure
KR101701495B1 (en) Top-down construction method using steel tube column with horizontal and vertical reinforcement
CN214117088U (en) A pre-buried wire rope structure and building construction for prefabricating assembled building
CN209179366U (en) A kind of precast stair
KR20130022656A (en) Hybrid building construction method combining dry type and wet type
CN210238860U (en) Horizontal splicing joint connecting device for upper and lower prefabricated shear walls
CN111287459B (en) Construction method of anchoring tower barrel section
KR102659857B1 (en) Precast Concrete Panel for exterior wall and construction method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant