CN214362501U - Steel wire rope splicing device - Google Patents
Steel wire rope splicing device Download PDFInfo
- Publication number
- CN214362501U CN214362501U CN202023078247.5U CN202023078247U CN214362501U CN 214362501 U CN214362501 U CN 214362501U CN 202023078247 U CN202023078247 U CN 202023078247U CN 214362501 U CN214362501 U CN 214362501U
- Authority
- CN
- China
- Prior art keywords
- base
- pole
- point awl
- wire rope
- grafting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910000831 Steel Inorganic materials 0.000 title claims description 28
- 239000010959 steel Substances 0.000 title claims description 28
- 238000000034 method Methods 0.000 description 8
- 238000003780 insertion Methods 0.000 description 2
- 230000037431 insertion Effects 0.000 description 2
- 238000003466 welding Methods 0.000 description 2
- 239000003245 coal Substances 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000003825 pressing Methods 0.000 description 1
- 238000007789 sealing Methods 0.000 description 1
- 238000009941 weaving Methods 0.000 description 1
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
Wire rope grafting device, which comprises a base, install grafting point awl and action bars on the base, characterized by, the base includes the base frame, side fixed mounting has base upper bracket and base lower carriage on the base frame, operation platform is installed to base frame below, be provided with grafting point awl between base upper bracket and the base lower carriage, grafting point awl includes the point awl pole, the bottom of point awl pole is provided with the point awl, fixed mounting has the action bars on the point awl pole, the action bars includes the atress pole, the tip and the articulated connection of base frame of atress pole, the middle part and the articulated connection of point awl pole of atress pole. The end part of the stress rod is an arc-shaped sheet, and the bottom of the base frame is provided with a base seat. The upper support and the lower support of the base are provided with holes, and the pointed conical rod moves up and down in the holes.
Description
Technical Field
The utility model relates to a colliery is wire rope grafting device in pit.
Background
The steel wire rope splicing refers to a method for splicing two ropes by a small splicing method or a large splicing method, wherein the small splicing method is that strands of the two ropes are combined together within the range of a joint, so that the rope end is thickened, and the length of the joint is shorter.
The rope strand of two rope heads is cut into half by the large connection method, then the two rope heads are spliced together, the length of the joint of the rope is longer, the thickness of the rope connected by the method is unchanged, and the position of the joint cannot be seen on the surface.
At present, the underground coal mine steel wire rope is spliced by adopting 2 persons for matching operation, one person stabilizes the steel wire rope, one person uses a steel chisel to separate strands, then uses hands to draw the rope, and repeats the work for many times, the steel wire rope has strong rigidity, is careless and is easy to be damaged by the steel wire rope, so that the labor efficiency is influenced, and meanwhile, the potential safety hazard also exists.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a wire rope grafting device has overcome job site winch eave tile, safety rope grafting, safety rope eave tile, the local too many that need use grafting work such as the car fag end of sealing, and present colliery is wire rope grafting technique in the pit consumes a large amount of manpowers and time, in order to realize above-mentioned purpose, the technical scheme of the utility model is that: wire rope grafting device, which comprises a base, install grafting point awl and action bars on the base, characterized by, the base includes the base frame, side fixed mounting has base upper bracket and base lower carriage on the base frame, operation platform is installed to base frame below, be provided with grafting point awl between base upper bracket and the base lower carriage, grafting point awl includes the point awl pole, the bottom of point awl pole is provided with the point awl, fixed mounting has the action bars on the point awl pole, the action bars includes the atress pole, the tip and the articulated connection of base frame of atress pole, the middle part and the articulated connection of point awl pole of atress pole. The end part of the stress rod is an arc-shaped sheet, and the bottom of the base frame is provided with a base seat.
The upper support and the lower support of the base are provided with holes, and the pointed conical rod moves up and down in the holes.
This design adopts the action bars to make a round trip to put the platform down and press the control grafting pointed cone and make wire rope broken strand, after the broken strand of sharp cone of grafting, utilizes the weight of action bars self to stabilize broken strand wire rope's clearance to make a round trip to alternate single strand wire rope, manual work is with the operation of the broken wire rope of hand hammer cooperation pointed cone before the innovation, slowly and easily hinder in one's hands, after the innovation fast and solved the problem of hindering the hand promptly, the intensity of labour who has alleviateed the worker greatly has increased the security simultaneously.
Drawings
Fig. 1 is a schematic structural diagram of the present invention;
FIG. 2 is a schematic view of the structure of the base of the present invention;
FIG. 3 is a schematic view of the structure of the plug-in taper of the present invention;
fig. 4 is a schematic structural view of the operation rod of the present invention.
In the drawings: 1. a base upper bracket; 2. a tapered rod; 3. an arc-shaped sheet; 4. a base frame; 5. a stress beam; 6. a base lower bracket; 8. a pointed cone; 9. an operating platform; 10. a base seat.
Detailed Description
The present invention will be further described with reference to the accompanying drawings 1-4,
the steel wire rope insertion device consists of a base, an insertion pointed cone and an operating rod. The upper part of the base is a hollow cuboid which is 3mm thick steel plate and 200mm long, 200mm wide and 400mm high, the bottom of the base is a square which is 400mm long and cut by 10mm thick steel plate, and the middle part of the base is formed by welding a square tube which is 50mm х 50mm in length; the splicing pointed cone is formed by welding a steel pointed cone by using a steel pipe with the length of 500mm and the diameter of 26 mm; the operating rod is made of a 600mm long and 26mm diameter hexagonal drill rod into a semi-circular arc shape at one end and is connected with the plugging pointed cone, and the plugging pointed cone is operated by using a lever principle.
Fixing the steel wire rope splicing device at a safe place of a construction site, enabling the steel wire rope splicing device not to shake, selecting the steel wire rope, utilizing the steel wire rope splicing device to break the steel wire rope, weaving the steel wire rope with broken strands into a rope sleeve, utilizing an operating rod to go back and forth to go up a platform and press down to control a splicing pointed cone to break the steel wire rope, utilizing the self weight of the operating rod to stabilize the gap of the steel wire rope with broken strands after the splicing pointed cone breaks the strands, so as to go back and forth to insert the single-stranded steel wire rope until the splicing length of the single-stranded steel wire rope meets the length specified by regulations, and cutting off redundant single-stranded steel wire ropes.
The method has good effect through popularization and use in the mine:
1) the working efficiency is improved, and the original two-person operation is changed into one-person operation.
2) The operating rod is used for pressing the inserting pointed cone back and forth to control the inserting pointed cone to break the strand of the steel wire rope, the problem that the steel wire rope is broken by matching a hand hammer with the pointed cone in the prior art is solved, and the safety of operation is enhanced.
Claims (3)
1. Wire rope grafting device, which comprises a base, install grafting point awl and action bars on the base, characterized by, the base includes base frame (4), side fixed mounting has base upper bracket (1) and base lower carriage (6) on base frame (4), operation platform (9) are installed to base frame (4) below, be provided with grafting point awl between base upper bracket (1) and base lower carriage (6), grafting point awl includes point awl pole (2), the bottom of point awl pole (2) is provided with point awl (8), fixed mounting has the action bars on point awl pole (2), the action bars includes atress pole (5), the tip and the base frame (4) of atress pole (5) are articulated to be connected, the middle part and the point awl pole (2) of atress pole (5) are articulated to be connected.
2. A steel cable splicing device according to claim 1, wherein the end of the stress rod (5) is provided with an arc-shaped piece (3), and the bottom of the base frame (4) is provided with a base seat (10).
3. A steel cable splicing device according to claim 1, wherein the upper base bracket (1) and the lower base bracket (6) are provided with holes, and the tapered rod (2) moves up and down in the holes.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202023078247.5U CN214362501U (en) | 2020-12-20 | 2020-12-20 | Steel wire rope splicing device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202023078247.5U CN214362501U (en) | 2020-12-20 | 2020-12-20 | Steel wire rope splicing device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN214362501U true CN214362501U (en) | 2021-10-08 |
Family
ID=77986959
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202023078247.5U Expired - Fee Related CN214362501U (en) | 2020-12-20 | 2020-12-20 | Steel wire rope splicing device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN214362501U (en) |
-
2020
- 2020-12-20 CN CN202023078247.5U patent/CN214362501U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN200985742Y (en) | Wire cable pressurization hoisting type rotary digging drill | |
CN104746442B (en) | For changing the withdrawing steel wire of the old suspension rod of arched bridge pre-stressed boom and hole cleaning device assembly and the method removed for old suspension rod thereof | |
CN200985744Y (en) | Spiral drilling type rotary digging drill | |
CN214362501U (en) | Steel wire rope splicing device | |
CN211922618U (en) | Walking lifting disc type pile head cutting mechanism | |
CN106401196A (en) | Steel strand tensioning device for pre-stressed anchorage device | |
CN101403257B (en) | Nondestructive demounting method for prefabricated part of IMS system Dai nationality folk house major structure | |
CN205165973U (en) | Top bar planting dowelling jig hole strutting arrangement | |
CN201087421Y (en) | Pile extractor | |
CN211922619U (en) | Pile head breaking device | |
CN205444961U (en) | Tool room safety protection canopy with double -deck shed roof structure | |
CN102182181B (en) | Device for lowering anchor cable | |
CN210178366U (en) | Scattered cable saddle portal system of narrow space tunnel anchor of super large inclination | |
CN202055748U (en) | Rotary drilling rig | |
CN102162553A (en) | Insertion type ejecting device for pipelines | |
CN211473435U (en) | Straight-line-section prestressed pipeline through hole device | |
CN210548286U (en) | Electric drill support capable of adjusting drilling depth | |
CN102528922A (en) | Drawing and pulling device of rubber rod broken off in precast box girder hole | |
CN210947786U (en) | Tool for mounting hanger rod on concrete ceiling | |
CN209835410U (en) | Device for quick aerial tripping in steel structure hoisting | |
CN204435882U (en) | Concrete construction joint side dabbing device | |
CN101358451A (en) | Construction method and apparatus with steel strand built-in | |
CN202730764U (en) | Immersed tube pile ramming and expanding machine | |
CN202039373U (en) | Anchor rope hauling-down device | |
CN217582171U (en) | Small-section tunnel steel grating mounting tool |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20211008 |
|
CF01 | Termination of patent right due to non-payment of annual fee |