CN214358521U - Large-diameter steel pipe conveying device in PC pipe gallery - Google Patents

Large-diameter steel pipe conveying device in PC pipe gallery Download PDF

Info

Publication number
CN214358521U
CN214358521U CN202023221322.9U CN202023221322U CN214358521U CN 214358521 U CN214358521 U CN 214358521U CN 202023221322 U CN202023221322 U CN 202023221322U CN 214358521 U CN214358521 U CN 214358521U
Authority
CN
China
Prior art keywords
pipeline
pipe
cantilever beam
transportation platform
pipe gallery
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202023221322.9U
Other languages
Chinese (zh)
Inventor
郑东
宋文学
周俊雄
应本意
侯伯英
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Third Construction Co Ltd of China Construction Eighth Engineering Divison Co Ltd
Original Assignee
Third Construction Co Ltd of China Construction Eighth Engineering Divison Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Third Construction Co Ltd of China Construction Eighth Engineering Divison Co Ltd filed Critical Third Construction Co Ltd of China Construction Eighth Engineering Divison Co Ltd
Priority to CN202023221322.9U priority Critical patent/CN214358521U/en
Application granted granted Critical
Publication of CN214358521U publication Critical patent/CN214358521U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Electric Cable Installation (AREA)

Abstract

The utility model discloses a heavy-calibre steel pipe conveyer in PC piping lane, including the transportation platform, the ball chassis of pipe lane arc preparation is pressed in the installation of transportation platform bottom, and platform upper portion installation pipeline fixing device guarantees that pipeline focus, platform focus and ball chassis focus are on same vertical plane. A lifting device is installed on the transportation platform, the lifting device adopts an electric jack in the embodiment, and the lifting beam can be opened and closed. And opening the cross beam and hoisting the pipeline on the transportation platform. The utility model discloses can be convenient, the efficient carry on the narrow and small space of piping lane and structure upper portion can not provide the heavy steel pipe horizontal transport of heavy-calibre and the promotion of handling stress point, reduce workman's intensity of labour, improve conveying efficiency.

Description

Large-diameter steel pipe conveying device in PC pipe gallery
Technical Field
The utility model relates to a large-scale pipeline transportation equipment field specifically is a heavy-calibre steel pipe conveyer in PC piping lane.
Background
Install heavy-calibre steel pipe in prefabricated PC circular pipe gallery, pipeline total extension meter is long up to several kilometers or even longer, and single root canal branch of academic or vocational study weight reaches more than 10t, and circular PC pipe gallery space is narrow and small, and ground also is the arc, and present horizontal transport mostly carries out horizontal transport after pouring the plane terrace, and dirty material consumption is big, still need wait for ground intensity to reach and just can transport after the requirement, consuming time long.
SUMMERY OF THE UTILITY MODEL
To the technical problem, the utility model provides a heavy-calibre steel pipe conveyer in PC piping lane can be convenient, the efficient carries out the narrow and small space of piping lane and structure upper portion can not provide heavy (more than 10 t) steel pipe horizontal transport of heavy (DN >1200mm) of heavy (10 t) of handling stress point and promotes, reduces workman's intensity of labour, improves conveying efficiency.
In order to realize the technical purpose, the utility model adopts the following technical scheme:
the utility model provides a heavy-calibre steel pipe conveyer in PC piping lane, includes:
the bottom of the transportation platform is provided with an arc-shaped chassis matched with the inner arc surface of the pipe gallery, and the arc-shaped chassis is in rolling connection with the inner wall surface of the pipe gallery through a moving unit;
the pipeline positioning component is arranged on the upper surface of the transportation platform, and the pipeline positioning component enables the gravity center of a pipeline, the gravity center of the transportation platform and the gravity center of the arc-shaped chassis to be positioned on the same vertical plane;
the vertical telescopic mechanisms are arranged on the transportation platform and are provided with a plurality of groups along the length direction of the pipeline, each group of vertical telescopic mechanisms comprises two vertical telescopic units which are arranged in a central symmetry manner by the pipeline, namely a first vertical telescopic unit and a second vertical telescopic unit, wherein the upper end of the first vertical telescopic unit is connected with a first connecting arm, and the upper end of the second vertical telescopic unit is connected with a second connecting arm;
one end of the first cantilever beam is rotatably connected with the first connecting arm, and the other end of the first cantilever beam is provided with a first connecting piece;
one end of the second cantilever beam is rotatably connected with the second connecting arm, and the other end of the second cantilever beam is provided with a second connecting piece;
the first connecting piece and the second connecting piece are respectively provided with a connecting hole, and the two connecting holes can be overlapped;
the first cantilever beam is provided with a first hook, the second cantilever beam is provided with a second hook, and after the first cantilever beam and the second cantilever beam are butted and fixed, the first hook and the second hook are symmetrically arranged along the axis of the pipeline;
the locking mechanism can penetrate through the two connecting holes and fix the first connecting piece and the second connecting piece;
the pipe clamp hoop is connected to the pipeline;
and the traction mechanism is in traction connection with the pipe clamp hoop through a traction rope and is used for driving the pipeline and the whole transportation platform to move in the pipe gallery.
The vertical telescopic unit is an electric jack.
The connecting hole is a screw hole, and the locking mechanism comprises a screw connected with the screw hole in a threaded manner and a locking nut connected with the screw in a threaded manner.
The traction mechanism is a winch;
the pipe strap anchor ear is rotatably connected with a fixed pulley, the axis of the fixed pulley is horizontally arranged, and a steel wire rope on the winch is in winding connection with the fixed pulley on the pipe strap anchor ear.
The pipe strap staple bolt includes two semi-circular clamp units, and the both ends of two semi-circular clamp units are equipped with the connecting portion that supply bolt fastener to connect respectively, are first connecting portion and second connecting portion respectively, and two semi-circular clamp units pass through the anchor ring that the pipe strap staple bolt that forms after the connecting portion butt joint belongs to has contained angle A with the cross section of pipeline.
And an inner liner for increasing friction is arranged on the side wall of the inner side of the pipe clamp hoop.
The pipeline positioning component is arranged on the upper surface of the transportation platform and used for supporting a pipeline supporting and blocking device, the pipeline supporting and blocking device comprises a plurality of pairs, and the plurality of pairs of pipeline supporting and blocking devices are uniformly arranged on the transportation platform at intervals along the length direction of the pipeline.
The moving unit is a universal wheel.
Has the advantages that:
first, the utility model relates to a heavy-calibre steel pipe conveyer in PC piping lane, transportation platform bottom are the arc chassis, are applicable to the interior transportation of convex piping lane to can follow circular arc minimum rectilinear movement automatically, can not be partial to.
And secondly, the pipeline horizontal transportation and vertical lifting device are integrated, so that the operation is convenient.
And thirdly, the pipeline lifting beam can be opened and closed, so that the pipeline can be conveniently placed on the transportation platform.
Fourthly, the stress point of the steel wire rope dragging the pipeline to advance is of a clamping and pressing structure, and the steel wire rope is convenient to mount and dismount.
Drawings
Fig. 1 is a schematic view of a connection structure between a transportation platform and a pipe gallery of the present invention;
wherein, 1, a pipe gallery; 2. a cantilever beam; 3. a vertical telescopic mechanism; 4. a transport platform; 5. a mobile unit; 6. a pipeline support block; 7. a locking mechanism; 8. a connecting arm;
FIG. 2 is a top view of the transportation platform of the present invention;
FIG. 3 is a schematic structural view of the cantilever beam of the present invention;
wherein, 9, screw holes; 10. a connecting member;
FIG. 4 is a schematic view of a pipe and pipe clamp connection;
11, a large-caliber steel pipe; 12. a pipe clamp hoop;
FIG. 5 is a side view of FIG. 4;
13, a fixed pulley 14 and a bolt.
Detailed Description
As shown in FIG. 1, the utility model discloses use shaped steel preparation pipeline transportation platform, transportation platform bottom installation is according to the ball chassis of piping lane arc preparation, and pipeline fixing device is installed on platform upper portion, guarantees that pipeline focus, platform focus and ball chassis focus are on same vertical plane.
The utility model provides a heavy-calibre steel pipe conveyer in PC piping lane, includes:
the bottom of the transportation platform is provided with an arc-shaped chassis matched with the inner arc surface of the pipe gallery, and the arc-shaped chassis is in rolling connection with the inner wall surface of the pipe gallery through a moving unit;
pipeline fender 6 sets up the upper surface of transportation platform, the pipeline is placed pipeline fender 6 is last back, the focus of pipeline, the focus of transportation platform and the focus of arc chassis is located same vertical plane.
The vertical telescopic mechanisms are arranged on the transportation platform and are provided with a plurality of groups along the length direction of the pipeline, each group of vertical telescopic mechanisms comprises two electric jacks which are arranged in a central symmetry manner with the pipeline, namely a first electric jack and a second electric jack, wherein the upper end of the first electric jack is connected with a first connecting arm, and the upper end of the second electric jack is connected with a second connecting arm;
one end of the first cantilever beam is rotatably connected with the first connecting arm, and the other end of the first cantilever beam is provided with a first connecting piece;
one end of the second cantilever beam is rotatably connected with the second connecting arm, and the other end of the second cantilever beam is provided with a second connecting piece;
the first connecting piece and the second connecting piece are respectively provided with a screw hole, and the two screw holes can be overlapped;
the first cantilever beam is provided with a first hook, the second cantilever beam is provided with a second hook, and after the first cantilever beam and the second cantilever beam are butted and fixed, the first hook and the second hook are symmetrically arranged along the axis of the pipeline;
and the locking mechanism comprises a screw rod in threaded connection with the screw rod hole and a locking nut in threaded connection with the screw rod.
The pipe clamp hoop is connected to the pipeline;
and the winch is connected with the pipe clamp hoop on the pipeline through a steel wire rope and is used for driving the pipeline and the whole transportation platform to move in the pipe gallery. The pipe strap anchor ear is rotatably connected with a fixed pulley, the axis of the fixed pulley is horizontally arranged, and a steel wire rope on the winch is in winding connection with the fixed pulley on the pipe strap anchor ear.
The pipe strap staple bolt includes two semi-circular clamp units, and the both ends of two semi-circular clamp units are equipped with the connecting portion that supply bolt fastener to connect respectively, are first connecting portion and second connecting portion respectively, and two semi-circular clamp units pass through the anchor ring that the pipe strap staple bolt that forms after the connecting portion butt joint belongs to has contained angle A with the cross section of pipeline. The pipe strap hoop is obliquely arranged, so that the first connecting part at the upper part of the hoop generates downward decomposition force after the pipe strap hoop is stressed, the second connecting part at the bottom generates upward decomposition force, and the pipeline is enabled to clamp the fastening force generated by the pipeline only by the hoop from the front.
Preferably, in order to further ensure that the pipe clamp hoop and the pipeline do not slip relatively during movement, an inner liner for increasing friction is arranged on the inner side wall of the pipe clamp hoop.
The moving unit is a universal wheel.
In this embodiment, the lifting device is an electric jack, and the lifting beam is openable and closable.
And opening the cross beam and hoisting the pipeline on the transportation platform. The cross beam is formed by inserting a screw rod on a connecting piece into a section of steel section hole of the other cross beam to form a stressed cross beam, and when the stressed cross beam is opened, the two sections of cross beams horizontally rotate in the clockwise direction and the anticlockwise direction respectively to enable the screw rod to be separated from the section steel hole of the other section of cross beam.
The pipe clamp hoop is arranged at the tail end of the installed fixed pipeline, the guide pulley is arranged on the pipe clamp hoop, the pipe clamp hoop is arranged at the end part of the pipeline to be transported, and stress points of the pipe clamp hoop are all arranged on the gravity center vertical plane of the pipeline and the transportation platform.
The winch is arranged at the stacking position of the pipeline, and a steel wire rope of the winch penetrates through the pipe clamp guide pulley and then is connected to a stressed pipe clamp of the pipeline to be transported.
And starting the winch to drag the pipeline to the installation position.
And starting the jack to lift the pipeline to the installation height.
And after the pipeline support is fixed, the jack is unloaded, and the pipeline is separated from the transportation platform.
The transportation platform returns to the pipeline stacking position and starts the next pipeline transportation.

Claims (8)

1. The utility model provides a heavy-calibre steel pipe conveyer in PC piping lane which characterized in that includes:
the bottom of the transportation platform is provided with an arc-shaped chassis matched with the inner arc surface of the pipe gallery, and the arc-shaped chassis is in rolling connection with the inner wall surface of the pipe gallery through a moving unit;
the pipeline positioning component is arranged on the upper surface of the transportation platform, and the pipeline positioning component enables the gravity center of a pipeline, the gravity center of the transportation platform and the gravity center of the arc-shaped chassis to be positioned on the same vertical plane;
the vertical telescopic mechanisms are arranged on the transportation platform and are provided with a plurality of groups along the length direction of the pipeline, each group of vertical telescopic mechanisms comprises two vertical telescopic units which are arranged in a central symmetry manner by the pipeline, namely a first vertical telescopic unit and a second vertical telescopic unit, wherein the upper end of the first vertical telescopic unit is connected with a first connecting arm, and the upper end of the second vertical telescopic unit is connected with a second connecting arm;
one end of the first cantilever beam is rotatably connected with the first connecting arm, and the other end of the first cantilever beam is provided with a first connecting piece;
one end of the second cantilever beam is rotatably connected with the second connecting arm, and the other end of the second cantilever beam is provided with a second connecting piece;
the first connecting piece and the second connecting piece are respectively provided with a connecting hole, and the two connecting holes can be overlapped;
the first cantilever beam is provided with a first hook, the second cantilever beam is provided with a second hook, and after the first cantilever beam and the second cantilever beam are butted and fixed, the first hook and the second hook are symmetrically arranged along the axis of the pipeline;
the locking mechanism can penetrate through the two connecting holes and fix the first connecting piece and the second connecting piece;
the pipe clamp hoop is connected to the pipeline;
and the traction mechanism is in traction connection with the pipe clamp hoop through a traction rope and is used for driving the pipeline and the whole transportation platform to move in the pipe gallery.
2. The large-caliber steel pipe transportation device in the PC pipe gallery according to claim 1, wherein the vertical telescopic unit is an electric jack.
3. The transportation device for the large-diameter steel pipes in the PC pipe gallery according to claim 1, wherein the connection hole is a screw hole, and the locking mechanism comprises a screw in threaded connection with the screw hole and a locking nut in threaded connection with the screw.
4. The transportation device for the large-caliber steel pipes in the PC pipe gallery according to claim 1, wherein the traction mechanism is a winch;
the pipe strap anchor ear is rotatably connected with a fixed pulley, the axis of the fixed pulley is horizontally arranged, and a steel wire rope on the winch is in winding connection with the fixed pulley on the pipe strap anchor ear.
5. The transportation device for the large-caliber steel pipes in the PC pipe gallery according to claim 1, wherein the pipe clamp hoop comprises two semicircular hoop units, two ends of each semicircular hoop unit are respectively provided with a connecting part for connecting a bolt fastener, namely a first connecting part and a second connecting part, and an annular surface of the pipe clamp hoop formed by butting the two semicircular hoop units through the connecting parts forms an included angle A with the cross section of the pipeline.
6. The transportation device for large-caliber steel pipes in a PC pipe gallery according to claim 1, wherein the inner side wall of the pipe clamp hoop is provided with an inner liner for increasing friction.
7. The transportation device for the large-diameter steel pipes in the PC pipe gallery according to claim 1, wherein the pipeline positioning component is a pipeline retaining block which is arranged on the upper surface of the transportation platform and used for supporting the pipeline, and the pipeline retaining block comprises a plurality of pairs which are uniformly arranged on the transportation platform at intervals along the length direction of the pipeline.
8. The transportation device for large-caliber steel pipes in a PC pipe gallery according to claim 1, wherein the moving unit is a universal wheel.
CN202023221322.9U 2020-12-28 2020-12-28 Large-diameter steel pipe conveying device in PC pipe gallery Active CN214358521U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202023221322.9U CN214358521U (en) 2020-12-28 2020-12-28 Large-diameter steel pipe conveying device in PC pipe gallery

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202023221322.9U CN214358521U (en) 2020-12-28 2020-12-28 Large-diameter steel pipe conveying device in PC pipe gallery

Publications (1)

Publication Number Publication Date
CN214358521U true CN214358521U (en) 2021-10-08

Family

ID=77948163

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202023221322.9U Active CN214358521U (en) 2020-12-28 2020-12-28 Large-diameter steel pipe conveying device in PC pipe gallery

Country Status (1)

Country Link
CN (1) CN214358521U (en)

Similar Documents

Publication Publication Date Title
CN108426094A (en) A kind of push pipe poling construction equipment and its method
CN108343783B (en) The installation method and hanging apparatus of high-altitude large-diameter pipeline under complex environment
CN112722734B (en) Method for transporting heavy steel pipes with large calibers in pipe gallery
CN207918257U (en) Prefabricated post hanger structure
CN214358521U (en) Large-diameter steel pipe conveying device in PC pipe gallery
CN112660988B (en) A conveyer that is used for heavy steel pipe of heavy bore in piping lane
CN216235734U (en) Vertical transportation hoisting structure for curtain wall unit plate
CN111509622B (en) Cable laying method in comprehensive pipe rack
CN213475219U (en) Roof concrete lifting and sliding conveying system
CN111946900B (en) Pipe joint installation device and method
CN210559074U (en) Holding pole for mounting tunnel component
CN110790171B (en) Simple detachable electric power hoisting tool
CN217917949U (en) Pipeline transportation device
CN217780637U (en) Multi-functional transport vechicle of warm drain cover plate and pipeline
CN216301182U (en) Pipeline short-distance portable transportation device
CN219384451U (en) Culvert lifting device
CN215946554U (en) Pipe elevator
CN210798968U (en) Shaft concrete unloading pipe installation and disassembly device
CN214337366U (en) Cable traction device for buried ground wire pipe of household distribution box
CN216893413U (en) Industry platform for concrete cylinder construction
CN219469634U (en) Simple and easy convenient many pipe fittings automatic lifting device
CN214093284U (en) Pipe jacking and penetrating construction equipment
CN210065020U (en) Portable double hoisting frame device
CN218603054U (en) Cable traction device of wind turbine generator
CN216943122U (en) Multifunctional trolley for hoisting plastic pipes

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant