CN214329595U - Detachable truss support and floor support plate bottom structure formed by same - Google Patents

Detachable truss support and floor support plate bottom structure formed by same Download PDF

Info

Publication number
CN214329595U
CN214329595U CN202023042414.0U CN202023042414U CN214329595U CN 214329595 U CN214329595 U CN 214329595U CN 202023042414 U CN202023042414 U CN 202023042414U CN 214329595 U CN214329595 U CN 214329595U
Authority
CN
China
Prior art keywords
truss
truss support
bottom plate
support
bolt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202023042414.0U
Other languages
Chinese (zh)
Inventor
陈志友
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Enjoy Technology Co ltd
Original Assignee
Sichuan Enjoy Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Enjoy Technology Co ltd filed Critical Sichuan Enjoy Technology Co ltd
Priority to CN202023042414.0U priority Critical patent/CN214329595U/en
Application granted granted Critical
Publication of CN214329595U publication Critical patent/CN214329595U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model discloses a can dismantle truss support and building carrier plate substructure that constitutes thereof, include: the truss support, the truss support is whole to be the strip, and the middle part is equipped with the structure that is used for connecting bolt, and both sides are equipped with outside arch, and one side relative with the arch is equallyd divide in the truss support is radial and axial and is equipped with first recess and second recess respectively.

Description

Detachable truss support and floor support plate bottom structure formed by same
Technical Field
The utility model belongs to the technical field of the construction equipment, concretely relates to can dismantle truss support and building carrier plate substructure that constitutes thereof.
Background
The truss refers to a truss girder and is a lattice-structured girder type structure; the truss structure is commonly used in public buildings such as large-span factory buildings, exhibition halls, gymnasiums and bridges, wherein the simple truss structure formed by sequentially adding binary bodies by a basic hinged triangle is a commonly used truss structure type, in the field of building construction, the steel bar truss is more common, steel bars are used as upper chords, lower chords and web members, and the steel bar truss and a bottom plate are connected into an integral combined bearing plate through resistance spot welding, namely a steel bar truss floor bearing plate, and the assembled steel bar truss floor bearing plate has the advantages that mechanical production is realized, uniform arrangement intervals of the steel bars and uniform thickness of a concrete protective layer are facilitated, the construction quality of a floor is improved, the assembled steel bar truss floor bearing plate can obviously reduce the quantity of steel bar binding engineering on site, the construction progress is accelerated, the construction safety guarantee is increased, and civilized construction is realized; the assembled template and the connecting piece are convenient to disassemble and assemble, can be repeatedly used for many times, saves steel, and meets the national requirements of energy conservation and environmental protection.
However, in the prior art, the truss and the bottom plate need to be fixed together in the assembling process through modes such as welding, but the truss and the bottom plate are fixed by welding, the welding process is complicated, the construction progress is influenced, a molten pool formed by welding can generate thermal stress in the bottom plate, the bottom plate can deform and cannot be used due to repeated heating, the bottom plate of the floor bearing plate can be reused, and therefore damage to the bottom plate is reduced as much as possible.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a can dismantle truss support and building carrier plate substructure that constitutes and the building carrier plate that constitutes thereof, not only can ensure the stability of truss, be difficult not hard up, can be to the harmless dismouting of bottom plate moreover, the bottom plate of being convenient for recycles.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
a collapsible truss support comprising: the truss support, the truss support is whole to be the strip, and the middle part is equipped with the structure that is used for connecting bolt, and both sides are equipped with outside arch, and one side relative with the arch is equallyd divide in the truss support is radial and axial and is equipped with first recess and second recess respectively.
Furthermore, the structure for connecting the bolts is a structure which penetrates through the truss support and is provided with a through hole.
Further, the structure for connecting the bolt is a tubular body.
Further, the through hole in the tubular body is of a staggered structure.
The utility model provides a floor deck base structure, includes truss and bottom plate, its characterized in that: the truss support is arranged between the truss and the bottom plate, a butterfly card is arranged in the middle of the truss, and the truss, the butterfly card, the truss support and the bottom plate are fixedly connected through a group of bolts.
Further, the bottom plate below is equipped with the strengthening rib, the strengthening rib is rectangular tubulose, is equipped with the opening on the strengthening rib, truss, butterfly card, truss support, bottom plate and strengthening rib pass through a set of bolt fixed connection.
Furthermore, a sliding block is arranged in the reinforcing rib, and the truss, the butterfly clamp, the truss support, the bottom plate, the reinforcing rib and the sliding block are fixedly connected through a group of bolts.
Furthermore, the edge of the opening of the reinforcing rib is inward rolled, and the sliding block is clamped in the reinforcing rib.
The utility model discloses following beneficial effect has at least:
the truss support guarantees that no relative displacement exists between the truss support and the truss, the thickness of a protective layer of a truss reinforcing steel bar is guaranteed, and meanwhile, the use of a template cushion block is avoided.
The truss support is detachably connected, so that the position can be conveniently changed and adjusted according to the site.
Drawings
The accompanying drawings, which form a part of the specification, are included to provide a further understanding of the invention, and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention and together with the description serve to explain the invention and not to limit the invention.
In the drawings:
fig. 1 schematically shows a perspective structure diagram of the present invention;
fig. 2 schematically shows a side sectional structural view of the present invention;
fig. 3 schematically shows a top view of the present invention;
fig. 4 schematically shows a use state diagram of embodiment 2 of the present invention;
fig. 5 schematically shows a bubble surface structure diagram of embodiment 2 of the present invention;
FIG. 6 is a schematic diagram of a butterfly card;
FIG. 7 is a schematic view showing the structure of a reinforcing bar;
FIG. 8 schematically illustrates a structural view of the first bolt;
fig. 9 schematically shows a structural view of the second bolt.
Detailed Description
It should be noted that the following detailed description is exemplary and is intended to provide further explanation of the disclosure; unless defined otherwise, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this application belongs.
It is noted that the terminology used herein is for the purpose of describing particular embodiments only and is not intended to be limiting of example embodiments according to the present application; as used herein, the singular forms "a", "an" and "the" are intended to include the plural forms as well, and it should be understood that when the terms "comprises" and/or "comprising" are used in this specification, they specify the presence of stated features, steps, operations, devices, components, and/or combinations thereof, unless the context clearly indicates otherwise.
Furthermore, the terms "comprises," "comprising," and "having," and any variations thereof, are intended to cover a non-exclusive inclusion, such that a process, method, system, article, or apparatus that comprises a list of steps or elements is not necessarily limited to those steps or elements expressly listed, but may include other steps or elements not expressly listed or inherent to such process, method, article, or apparatus.
Spatially relative terms, such as "above … …," "above … …," "above … …, above," "overlying" and the like, may be used herein for ease of description to describe one device or feature's spatial relationship to another device or feature as illustrated in the figures; it will be understood that the spatially relative terms are intended to encompass different orientations of the device in use or operation in addition to the orientation depicted in the figures.
Example 1
As shown in fig. 1 to 4, a detachable truss support includes: truss support 3, truss support 3 is whole to be the strip, and the middle part is equipped with the structure that is used for connecting bolt, and connecting bolt's structure is for running through truss support 3 and being equipped with the structure of through-hole. Both sides are equipped with outside arch 302, and arch 302 card is in one side of the lower string 101 of truss 1 in the horizontal direction, and the one side plays supporting role to lower string 101 and keeps truss 1 and bottom plate 4's relative position, and on the other hand restricts truss support 3 and lower string 101 horizontal direction's relative position, avoids taking place relative displacement when concrete placement, keeps the relatively stable of structure.
The side of the truss support opposite to the protrusion 302 is provided with a first groove 303 and a second groove 304 in the radial and axial directions of the truss support 3, respectively. After the concrete is poured, the first groove 303 can enable the concrete to wrap the truss support 3 from the lower part, and the truss support 3 is prevented from falling off from the poured concrete. The second groove 304 reduces the contact area with the bottom plate 4, and simultaneously, the arc-shaped structure is used for ensuring the structural elasticity and providing pre-tightening force for the bolt. The bolt is guaranteed not to loosen after being fixed.
Example 2
As shown in fig. 5 to 7, in this embodiment, a floor deck bottom structure includes a truss 1 and a bottom plate 4, and is characterized in that: still include truss support 3, truss support 3 sets up between truss 1 and bottom plate 4, truss 1 middle part is equipped with butterfly card 2, is equipped with a pair of circular arc breach 201 on the butterfly card 2. Truss 1, butterfly card 2, truss support 3 and bottom plate 4 are through a set of bolt fixed connection, the bolt passes through-hole and the connecting hole on the butterfly card 2 on the truss support 3, make truss support 3 and the fixed centre gripping of butterfly card 2 on lower chord 101, the bolt concatenates truss support 3, butterfly card 2 and bottom plate 4 simultaneously, the relative displacement of truss 1 and bottom plate 4 has been restricted in vertical direction, the displacement on the lower chord 101 horizontal direction has been restricted to arch 302 on the truss support 3.
4 below of bottom plate are equipped with strengthening rib 5, strengthening rib 5 is rectangular tubulose, is equipped with the opening on the strengthening rib 5, truss 1, butterfly card 2, truss support 3, bottom plate 4 and strengthening rib 5 are through a set of bolt fixed connection.
The reinforcing ribs 5 prevent the bottom plate 4 from being bent after the cement is poured. Simultaneously, bottom plate 4 is the master and slave material mostly, and strengthening rib 5 has increased the area of contact of bolt end and bottom plate 4, prevents to take place the bolt and pull from bottom plate 4 under the effect of bolt pretightning force and cement gravity and wears, avoids bolt and 4 locking connection's of bottom plate destruction.
The reinforcing rib 5 is internally provided with a sliding block 6, and the truss 1, the butterfly clamp 2, the truss support 3, the bottom plate 4, the reinforcing rib 5 and the sliding block 6 are fixedly connected through a group of bolts. The slider 6 can slide in the strengthening rib 5, provides more nimble hookup location, has avoided corresponding at the loaded down with trivial details of 5 screw holes of strengthening rib. When the reinforcing ribs 5 are processed, most of the installation conditions can be met only by processing the strip-shaped connecting holes 501.
The edge of the opening of the reinforcing rib 5 is curled inwards, and the sliding block 6 is clamped in the reinforcing rib 5. With this structure, the required slide block 6 can be put into the reinforcing bar 5 at one time when in use, and the slide block 6 is not required to be held by one hand when in installation.
Example 3
As shown in fig. 5, 8 and 9, in the present embodiment, the structure of the connecting bolt of the truss support 3 is a tubular body 301, and the through hole inside the tubular body 301 is a staggered structure. In the present embodiment, the bolt is composed of a first bolt 701 and a second bolt 702, and the first bolt 701 is an internally threaded bolt. As shown in FIG. 5, in the use process, the end of the first bolt 701 props against the staggered platform of the tubular body 301, and applies pressure to the truss support 3 at the two ends and the middle part together with the lower string 101, so as to ensure that the stress on the upper surface of the truss support 3 is uniform. Meanwhile, the first bolt 701 simultaneously applies force to the butterfly card 2 and the truss support 3, so that the pulling force of the first bolt 701 and the pulling force of the second bolt 702 can be distributed on structures of different layers, and the locking force of the mechanism is more balanced.
Simultaneously, after cement pouring finishes, tear bottom plate 4 open, hang nail and equipment fixing's connection basis when the internal thread of first bolt 701 can regard as later stage fitment, avoid later stage fitment to punch and install the inflation screw on the cement roof.

Claims (8)

1. A can dismantle truss support which characterized in that: the method comprises the following steps: truss support (3), truss support (3) are whole to be the strip, and the middle part is equipped with the structure that is used for connecting bolt, and both sides are equipped with outside arch (302), and one side relative with arch (302) is equallyd divide in truss support (3) radially and axially and is equipped with first recess (303) and second recess (304) respectively.
2. A collapsible truss support as defined in claim 1 wherein: the structure for connecting the bolts is a structure which penetrates through the truss support (3) and is provided with a through hole.
3. A collapsible truss support as defined in claim 2 wherein: the structure for connecting the bolt is a tubular body (301).
4. A collapsible truss support as defined in claim 3 wherein: the through hole in the tubular body (301) is of a staggered structure.
5. A floor deck bottom structure, includes truss (1) and bottom plate (4), its characterized in that: the truss support (3) as claimed in any one of claims 1 to 4, wherein the truss support (3) is arranged between the truss (1) and the bottom plate (4), the butterfly clip (2) is arranged in the middle of the truss (1), and the truss (1), the butterfly clip (2), the truss support (3) and the bottom plate (4) are fixedly connected through a set of bolts.
6. A floor deck floor structure according to claim 5, wherein: bottom plate (4) below is equipped with strengthening rib (5), strengthening rib (5) are rectangular tubulose, are equipped with the opening on strengthening rib (5), truss (1), butterfly card (2), truss support (3), bottom plate (4) and strengthening rib (5) are through a set of bolt fixed connection.
7. A floor deck floor construction as claimed in claim 6 wherein: the novel butterfly-shaped truss is characterized in that a sliding block (6) is arranged in the reinforcing rib (5), and the truss (1), the butterfly card (2), the truss support (3), the bottom plate (4), the reinforcing rib (5) and the sliding block (6) are fixedly connected through a group of bolts.
8. A floor deck floor structure according to claim 7, wherein: the edge of the opening of the reinforcing rib (5) is inward rolled, and the sliding block (6) is clamped in the reinforcing rib (5).
CN202023042414.0U 2020-12-16 2020-12-16 Detachable truss support and floor support plate bottom structure formed by same Active CN214329595U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202023042414.0U CN214329595U (en) 2020-12-16 2020-12-16 Detachable truss support and floor support plate bottom structure formed by same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202023042414.0U CN214329595U (en) 2020-12-16 2020-12-16 Detachable truss support and floor support plate bottom structure formed by same

Publications (1)

Publication Number Publication Date
CN214329595U true CN214329595U (en) 2021-10-01

Family

ID=77900591

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202023042414.0U Active CN214329595U (en) 2020-12-16 2020-12-16 Detachable truss support and floor support plate bottom structure formed by same

Country Status (1)

Country Link
CN (1) CN214329595U (en)

Similar Documents

Publication Publication Date Title
US8234827B1 (en) Express framing building construction system
JP3177157U (en) A simple tower instrument in a high-rise bridge.
JPH0637790B2 (en) Truss, building structure including the truss, and method of assembling the building
CN101787732A (en) Cable-stayed multi-layer framework structure and construction control method thereof
CN113175091B (en) Fully assembled prestressed frame cable system combined structure
CN113863492B (en) Fabricated concrete beam-column self-resetting node based on friction steel plate connection and assembling method
CN113279582A (en) Hanging construction method for overhanging and hanging type cast-in-place plate
CN101285329B (en) Suspendome concrete integrated floor structure and construction method thereof
CN214329595U (en) Detachable truss support and floor support plate bottom structure formed by same
JP4336659B2 (en) Construction method of upper-floor type suspension floor slab bridge
JPH06200625A (en) Frame method of arch truss construction
CN215803085U (en) Upward-pulling type construction device for cantilever scaffold
CN212406104U (en) Floor support plate bottom plate and floor support plate formed by floor support plate bottom plate
CN213115585U (en) Stable form bearing structure that building engineering used
CN110805308B (en) Method for installing and dismantling temporary support at top center of silo
CN109610802B (en) External hanging frame operation platform
CN113550551A (en) Construction device and method for pull-up type overhanging scaffold
JP3247749B2 (en) Construction method of long span truss beams
CN216041273U (en) Steel construction basis that can install fast
KR100402030B1 (en) Concrete form for src slim floor
CN220376135U (en) Supporting device for hoisting point of steel girder of pitched roof
CN220133626U (en) Steel structure base for civil engineering
CN217759292U (en) Large-span truss plate mounting structure
GB2403230A (en) Principal roof truss for loft conversion
CN215442343U (en) Can expand available building area's three-layer steel construction of encorbelmenting

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant