SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a prefabricated pump station of integration prewhirl base to the inconvenient installation that proposes in solving above-mentioned background is fixed, the problem that function singleness and intelligence are low.
In order to achieve the above object, the utility model provides a following technical scheme: an integrated prefabricated pump station pre-rotation base comprises a prefabricated pump station main body, a fixing mechanism, a lifting mechanism and an installation mechanism, wherein the bottom of the prefabricated pump station main body is connected with the fixing mechanism in an embedded mode, the inside of the prefabricated pump station main body is connected with the lifting mechanism in an embedded mode, the top of the prefabricated pump station main body is connected with the installation mechanism in an embedded mode, the bottom of the fixing mechanism is connected with a pre-embedded base in an embedded mode, the top end of the pre-embedded base is connected with an installation groove in an embedded mode, one side of the top end of the pre-embedded base is connected with a fixed block in an embedded mode, the middle of one end of the fixed block is connected with a fixer in an embedded mode, the inner side of the installation groove is connected with a connecting thread in an embedded mode, one end of each hydraulic telescopic column is connected with a fixed plate in an embedded mode, and a sealing gasket is tightly attached to one end of each fixed plate, the utility model discloses a water pump lifting mechanism, including fixed establishment's top, hoist mechanism's bottom opposite side through connection has the rose box, hoist mechanism's bottom through connection has the water pump, hoist mechanism's middle part through connection has the connecting pipe, the top embedding of connecting pipe is connected with the connecting block, the one end embedding of connecting block is connected with the connector, the top through connection of connecting pipe has the check valve, hoist mechanism's top one side through connection has the control valve, the one end embedding of control valve is connected with the delivery port, installation mechanism's inside middle part embedding is connected with operation platform, installation mechanism's top one side embedding is connected with the control box, installation mechanism's top opposite side swing joint has sealed lid, installation mechanism's other end bottom through connection has the water inlet.
Preferably, the middle part of the other end of the mounting mechanism is embedded and connected with a hanging ring.
Preferably, a filter is connected to the middle of the water inlet in a penetrating manner.
Preferably, a liquid level meter is embedded and connected to one side of the bottom inside the mounting mechanism.
Preferably, the fixing mechanism is formed by combining an embedded base at the bottom end of the fixing mechanism, a mounting groove at the top end of the embedded base, a fixing block on one side of the top end of the embedded base, a fixer at the middle part of one end of the fixing block, a connecting thread on the inner side of the mounting groove, a hydraulic telescopic column on one side of the middle part of the inner side of the mounting groove, a fixing plate at one end of the hydraulic telescopic column, a sealing gasket at one end of the fixing plate and a mounting plate at the top of the fixing mechanism.
Preferably, the lifting mechanism is formed by combining a filter box at the other side of the bottom of the lifting mechanism, a water pump at the bottom of the lifting mechanism, a connecting pipe at the middle part of the lifting mechanism, a connecting block at the top of the connecting pipe, a connector at one end of the connecting block, a check valve at the top end of the connecting pipe, a control valve at one side of the top of the lifting mechanism and a water outlet at one end of the control valve.
Compared with the prior art, the beneficial effects of the utility model are that:
1. this kind of prefabricated pump station of integration prewhirl base, fixed establishment comprises pre-buried base, mounting groove, fixed block, fixer, connecting thread, hydraulic telescoping post, fixed plate, sealed pad and mounting panel to reach and install the fixed effect of installation mechanism, fixed establishment helps installing fixedly to installation mechanism, thereby has improved the stability of device, and then accelerates operating personnel to the speed of building of pump station.
2. This kind of prefabricated pump station of integration prewhirl base, hoist mechanism comprise rose box, water pump, connecting pipe, connecting block, connector, check valve, control valve and delivery port to reach the effect that promotes sewage, hoist mechanism helps promoting the inside sewage of pump station, thereby has improved the work efficiency of device, and then has improved the practicality of device.
Drawings
Fig. 1 is a schematic view of the overall cross-sectional structure of the present invention;
FIG. 2 is a schematic view of the cross-sectional structure of the fixing mechanism of the present invention;
fig. 3 is a schematic view of a cross-sectional structure of the lifting mechanism of the present invention;
fig. 4 is a schematic sectional structure view of the mounting mechanism of the present invention.
The labels in the figure are: 1. prefabricating a pump station main body, 2, a fixing mechanism, 201, an embedded base, 202, a mounting groove, 203, a fixing block, 204, a fixer, 205, a connecting thread, 206, a hydraulic telescopic column, 207, a fixing plate, 208, a sealing gasket, 209, a mounting plate, 3, a lifting mechanism, 301, a filter box, 302, a water pump, 303, a connecting pipe, 304, a connecting block, 305, a connector, 306, a check valve, 307, a control valve, 308, a water outlet, 4, an installation mechanism, 401, an operation platform, 402, a liquid level meter, 403, a control box, 404, a sealing cover, 405, a hanging ring, 406, a water inlet, 407 and a filter.
Detailed Description
The technical solution in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, rather than all embodiments, and all other embodiments obtained by a person of ordinary skill in the art without creative work belong to the protection scope of the present invention based on the embodiments of the present invention.
Referring to fig. 1-4, the present invention provides a technical solution: an integrated prefabricated pump station pre-rotation base comprises a prefabricated pump station main body 1, a fixing mechanism 2, a lifting mechanism 3 and an installation mechanism 4, wherein the bottom of the prefabricated pump station main body 1 is connected with the fixing mechanism 2 in an embedded mode, the interior of the prefabricated pump station main body 1 is connected with the lifting mechanism 3 in an embedded mode, the top of the prefabricated pump station main body 1 is connected with the installation mechanism 4 in an embedded mode, the bottom end of the fixing mechanism 2 is connected with a pre-embedded base 201 in an embedded mode, the top end of the pre-embedded base 201 is connected with an installation groove 202 in an embedded mode, one side of the top end of the pre-embedded base 201 is connected with a fixing block 203 in an embedded mode, the middle portion of one end of the fixing block 203 is connected with a fixer 204 in an embedded mode, the inner side of the installation groove 202 is connected with a connecting thread 205 in an embedded mode, one side of the middle portion of the inner side of the installation groove 202 is connected with a hydraulic telescopic column 206 in an embedded mode, one end of the hydraulic telescopic column 206 is connected with a fixing plate 207 in an embedded mode, and a sealing gasket 208 is tightly attached to one end of the fixing plate 207, fixed establishment 2's top embedding is connected with mounting panel 209, lifting mechanism 3's bottom opposite side through connection has filter tank 301, lifting mechanism 3's bottom through connection has water pump 302, lifting mechanism 3's middle part through connection has connecting pipe 303, the top embedding of connecting pipe 303 is connected with connecting block 304, the one end embedding of connecting block 304 is connected with connector 305, the top through connection of connecting pipe 303 has check valve 306, lifting mechanism 3's top one side through connection has control valve 307, the one end embedding of control valve 307 is connected with delivery port 308, installation mechanism 4's inside middle part embedding is connected with operation platform 401, installation mechanism 4's top one side embedding is connected with control box 403, installation mechanism 4's top opposite side swing joint has sealed lid 404, installation mechanism 4's other end bottom through connection has water inlet 406.
Preferably, the middle part of the other end of the mounting mechanism 4 is embedded and connected with a hanging ring 405, when an operator installs the device, the operator is connected with the hanging ring 405 in the middle part of the other end of the mounting mechanism 4 through a hoisting device, so that the mounting mechanism 4 is hoisted, the operator can conveniently carry and install the mounting mechanism 4, the hanging ring 405 is beneficial to being connected with the hoisting device, the hoisting device can be conveniently hoisted, moved or carried, and the operator can conveniently carry out mounting and fixing.
Preferably, the middle part through connection of water inlet 406 has filter 407, and when the device was in the use, operating personnel opened water inlet 406 to external sewage gets into the pump station along water inlet 406, and when sewage passed through the filter 407 of water inlet 406 middle part, impurity in filter 407 can the filtration sewage, thereby prevent that impurity from blockking up water inlet 406, increase the cost of maintenance of device, filter 407 helps filtering the impurity in the sewage, thereby has improved the multifunctionality of device.
Preferably, installation mechanism 4's inside bottom one side embedding is connected with level gauge 402, when the device is in the use, operating personnel begins the operation through the level gauge 402 of the inside bottom one side of remote control panel control installation mechanism 4, thereby level gauge 402 monitors the water level in the pump station, and then control box 403 is sent to information, thereby control box 403 passes through signal transceiver and transmits remote control panel, and then make things convenient for operating personnel to know the inside water level condition of pump station, level gauge 402 helps monitoring the inside water level of pump station, thereby the intelligence of device has been improved.
Preferably, the fixing mechanism 2 is formed by combining a pre-buried base 201 at the bottom end of the fixing mechanism 2, a mounting groove 202 at the top end of the pre-buried base 201, a fixing block 203 at one side of the top end of the pre-buried base 201, a fixing device 204 at the middle part of one end of the fixing block 203, a connecting thread 205 at the inner side of the mounting groove 202, a hydraulic telescopic column 206 at one side of the middle part of the inner side of the mounting groove 202, a fixing plate 207 at one end of the hydraulic telescopic column 206, a sealing gasket 208 at one end of the fixing plate 207 and a mounting plate 209 at the top end of the fixing mechanism 2 together, when an operator needs to use the device, after the operator carries the mounting mechanism 4 onto the fixing mechanism 2 through a hoisting device, the operator installs and fixes the mounting mechanism 4 through the connecting thread 205 at the inner side of the mounting groove 202, so that the operator fixes the mounting groove 202 through the fixing block 203 at one side of the top end of the pre-buried base 201 and the fixing device 204 at the middle part of one end of the fixing block 203, prevent that mounting groove 202 from rocking, and then operating personnel control, the flexible post 206 of hydraulic pressure of the inboard middle part one side of mounting groove 202 extends, thereby promote the fixed plate 207 of the flexible post 206 one end of hydraulic pressure and support the inner wall of installation mechanism 4, and then consolidate installation mechanism 4, prevent installation mechanism 4 from removing, and then install installation mechanism 4 on fixed establishment 2, the sealed pad 208 of fixed plate 207 one end helps sealing up between installation mechanism 4 and the fixed establishment 2, it appears to place the phenomenon of leaking, fixed establishment 2 helps installing installation mechanism 4 fixedly, thereby the stability of device has been improved, and then accelerate the speed of building of operating personnel to the pump station.
Preferably, the lifting mechanism 3 is formed by combining a filter tank 301 at the other side of the bottom of the lifting mechanism 3, a water pump 302 at the bottom of the lifting mechanism 3, a connecting pipe 303 at the middle part of the lifting mechanism 3, a connecting block 304 at the top of the connecting pipe 303, a connector 305 at one end of the connecting block 304, a check valve 306 at the top end of the connecting pipe 303, a control valve 307 at one side of the top of the lifting mechanism 3 and a water outlet 308 at one end of the control valve 307, when an operator installs and fixes the lifting mechanism 3 in the installation mechanism 4, the operator installs and fixes the connecting pipe 303 at the middle part of the lifting mechanism 3 through the connecting block 304 at the top of the connecting pipe 303 and the connector 305 at one end of the connecting block 304, so as to facilitate the device to lift the sewage, and further the operator controls the water pump 302 at the bottom of the lifting mechanism 3 to start operating through a remote control panel, so that the water pump 302 pumps the sewage in the pump station to the top of the lifting mechanism 3, and then discharge through the delivery port 308 of control valve 307 one end, the check valve 306 on connecting pipe 303 top and the control valve 307 of 3 top one sides of hoist mechanism help controlling the discharge amount and the discharge velocity of sewage, the rose box 301 of 3 bottom opposite sides of hoist mechanism helps filtering the deposit in the inside sewage of pump station, thereby prevent that the deposit from blockking up water pump 302, cause water pump 302 to damage, reduce water pump 302's life, hoist mechanism 3 helps promoting the inside sewage of pump station, thereby the work efficiency of device has been improved, and then the practicality of device has been improved.
The working principle is as follows: at first, installation mechanism 4's other end middle part embedding is connected with rings 405, and when operating personnel was installing the device, operating personnel was connected with the rings 405 of installation mechanism 4 other end middle part through hoisting equipment to hang installation mechanism 4, and then made things convenient for operating personnel to carry the installation mechanism 4 installation, rings 405 helps connecting hoisting equipment, thereby be convenient for hang and remove or carry, and then made things convenient for operating personnel to install fixedly.
Then, the fixing mechanism 2 is formed by combining the pre-buried base 201 at the bottom end of the fixing mechanism 2, the mounting groove 202 at the top end of the pre-buried base 201, the fixing block 203 at one side of the top end of the pre-buried base 201, the fixer 204 at the middle part of one end of the fixing block 203, the connecting thread 205 at the inner side of the mounting groove 202, the hydraulic telescopic column 206 at one side of the middle part of the inner side of the mounting groove 202, the fixing plate 207 at one end of the hydraulic telescopic column 206, the sealing pad 208 at one end of the fixing plate 207 and the mounting plate 209 at the top end of the fixing mechanism 2, when the operator needs to use the device, after the operator carries the mounting mechanism 4 to the fixing mechanism 2 through the hoisting equipment, the operator installs and fixes the mounting mechanism 4 through the connecting thread 205 at the inner side of the mounting groove 202, so that the operator fixes the mounting groove 202 through the fixing block 203 at one side of the top end of the pre-buried base 201 and the fixer 204 at the middle part of one end of the fixing block 203, prevent that mounting groove 202 from rocking, and then operating personnel control, the flexible post 206 of hydraulic pressure of the inboard middle part one side of mounting groove 202 extends, thereby promote the fixed plate 207 of the flexible post 206 one end of hydraulic pressure and support the inner wall of installation mechanism 4, and then consolidate installation mechanism 4, prevent installation mechanism 4 from removing, and then install installation mechanism 4 on fixed establishment 2, the sealed pad 208 of fixed plate 207 one end helps sealing up between installation mechanism 4 and the fixed establishment 2, it appears to place the phenomenon of leaking, fixed establishment 2 helps installing installation mechanism 4 fixedly, thereby the stability of device has been improved, and then accelerate the speed of building of operating personnel to the pump station.
Then, the middle part through connection of water inlet 406 has filter 407, and when the device was in the use, operating personnel opened water inlet 406 to external sewage gets into the pump station along water inlet 406, and when sewage passed through the filter 407 of water inlet 406 middle part, impurity in filter 407 can the filtration sewage, thereby prevent that impurity from blockking up water inlet 406, increase the cost of maintenance of device, filter 407 helps filtering the impurity in the sewage, thereby has improved the multifunctionality of device.
Next, installation mechanism 4's inside bottom one side embedding is connected with level gauge 402, when the device is in the use, operating personnel begins the operation through level gauge 402 of the inside bottom one side of remote control panel control installation mechanism 4, thereby level gauge 402 monitors the water level in the pump station, and then control box 403 is sent to information, thereby control box 403 passes through signal transceiver and transmits the remote control panel, and then make things convenient for operating personnel to know the inside water level condition of pump station, level gauge 402 helps monitoring the inside water level of pump station, thereby the intelligence of device has been improved.
Finally, the lifting mechanism 3 is formed by combining a filter tank 301 at the other side of the bottom of the lifting mechanism 3, a water pump 302 at the bottom of the lifting mechanism 3, a connecting pipe 303 at the middle part of the lifting mechanism 3, a connecting block 304 at the top of the connecting pipe 303, a connector 305 at one end of the connecting block 304, a check valve 306 at the top end of the connecting pipe 303, a control valve 307 at one side of the top of the lifting mechanism 3 and a water outlet 308 at one end of the control valve 307, when an operator installs and fixes the lifting mechanism 3 in the installation mechanism 4, the operator installs and fixes the connecting pipe 303 at the middle part of the lifting mechanism 3 through the connecting block 304 at the top of the connecting pipe 303 and the connector 305 at one end of the connecting block 304, so that the sewage can be lifted conveniently by the device, and then the operator controls the water pump 302 at the bottom of the lifting mechanism 3 to start to operate through a remote control panel, so that the water pump 302 pumps the sewage in the pump station to the top of the lifting mechanism 3, and then the delivery port 308 through control valve 307 one end is discharged, the check valve 306 on the top of connecting pipe 303 and the control valve 307 of 3 top one sides of hoist mechanism help controlling the discharge amount and the discharge velocity of sewage, the rose box 301 of 3 bottom opposite sides of hoist mechanism helps filtering the precipitate in the inside sewage of pump station, thereby prevent that the precipitate from blockking up water pump 302, cause water pump 302 to damage, reduce water pump 302's life, hoist mechanism 3 helps promoting the inside sewage of pump station, thereby the work efficiency of device has been improved, and then the practicality of device has been improved, this is the theory of operation of this kind of prefabricated pump station prewhirl base of integration.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.