CN214301830U - A prefabricated post installs positioner fast for rim of a cup basis - Google Patents

A prefabricated post installs positioner fast for rim of a cup basis Download PDF

Info

Publication number
CN214301830U
CN214301830U CN202023346627.2U CN202023346627U CN214301830U CN 214301830 U CN214301830 U CN 214301830U CN 202023346627 U CN202023346627 U CN 202023346627U CN 214301830 U CN214301830 U CN 214301830U
Authority
CN
China
Prior art keywords
positioning frame
frame
sub
frames
positioning
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202023346627.2U
Other languages
Chinese (zh)
Inventor
张云峰
洪钟
郑延莉
王玉岩
许昕
任泽宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China State Construction Technology Huzhou Co Ltd
Original Assignee
China State Construction Technology Huzhou Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China State Construction Technology Huzhou Co Ltd filed Critical China State Construction Technology Huzhou Co Ltd
Priority to CN202023346627.2U priority Critical patent/CN214301830U/en
Application granted granted Critical
Publication of CN214301830U publication Critical patent/CN214301830U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a rapid mounting and positioning device for a prefabricated column of a cup rim foundation, which comprises an upper positioning frame and a lower positioning frame, wherein rectangular holes are arranged in the upper positioning frame and the lower positioning frame; the four corners of the upper positioning frame and the lower positioning frame are fixedly connected through angle steels; the upper layer positioning frame and the lower layer positioning frame are formed by butting two sub-frames; the outside of two sub-frames of lower floor's locating frame is provided with one section channel-section steel board that has the rule and the size that outwards extends, is provided with the screw via hole in the channel-section steel board. The split positioning frame can realize quick alignment installation, simplifies the prefabricated column installation process of the cup mouth foundation and improves the installation efficiency of the prefabricated column.

Description

A prefabricated post installs positioner fast for rim of a cup basis
Technical Field
The utility model belongs to the technical field of assembly type structure construction installation, a positioner is installed fast to prefabricated post for rim of a cup basis is related to.
Background
If the vertical component of the fabricated concrete frame structure adopts a prefabricated building mode, prefabrication can be carried out from positive and negative zeros. The prefabrication splitting mode and the construction process necessarily relate to the conversion position from the cast-in-place foundation to the connection of the prefabricated columns on the first floor, namely the conversion from the cast-in-place to the prefabrication. The traditional method for converting the position of the assembly type frame structure is characterized in that a sleeve grouting connection technology is adopted, a prefabricated column longitudinal inserting rib is reserved on a cast-in-place foundation, a grouting sleeve is pre-buried at the bottom of the prefabricated column during production, then the prefabricated column is hoisted on site, the inserting rib of the cast-in-place foundation is inserted into the sleeve at the bottom of the prefabricated column, and finally sleeve grouting operation is carried out to realize the construction connection from the cast-in-place to the prefabricated converting position. However, there are many disadvantages to this conventional process:
(1) the embedded positioning error of the joint bars during the construction of the cast-in-place foundation is large, the position of a bottom grouting sleeve and the position of the embedded joint bars possibly have large deviation when the prefabricated column is hoisted, the hoisting of the prefabricated column is affected to be in place, the bending adjustment of the joint bars generally exists in a construction site, and the joint bars are broken off seriously;
(2) the sleeve grouting construction process quality is greatly influenced by personnel and environment, hidden dangers exist in the construction quality, the quality detection means is immature, and simple and rapid nondestructive detection cannot be realized.
Aiming at the situation, the connection between the first-layer prefabricated column of the assembly type concrete frame structure and the cast-in-place foundation at the present stage begins to adopt a cup-mouth foundation form, namely, the cast-in-place foundation adopts the cup-mouth foundation, the bottom of the prefabricated column is not embedded with a grouting sleeve, the prefabricated column is hoisted in place to the cast-in-place cup-mouth foundation during field construction, and then fine stone concrete is poured into the cup mouth to realize the connection between the prefabricated and the cast-in-place foundation after the verticality is adjusted and temporarily fixed. This connected mode can avoid because of cast in situ concrete construction error is great, the unable problem of installing of prefabricated post. But the connected form of prefabricated post rim of a cup basis also has several shortcomings, and it is comparatively difficult mainly that the location of prefabricated post for the axis position, the wooden wedge of processing scaling-off is generally adopted when traditional rim of a cup basis post hoists to take one's place, and the post hoists to take one's place the back and is squeezed into the wooden wedge all around and fix the post and adjust the straightness that hangs down, but this kind of mode is loaded down with trivial details and the wooden wedge can not reuse, and relative hoist installation effectiveness is lower.
SUMMERY OF THE UTILITY MODEL
The to-be-solved technical problem of the utility model is: the utility model provides a but provides a quick installation positioner of prefabricated post for rim of a cup basis specially, the device reuse, the simple and fast realization of while is prefabricated the post location in the rim of a cup basis, improves the efficiency of construction.
In order to achieve the above purpose, the utility model provides a technical scheme as follows:
a prefabricated column rapid mounting and positioning device for a cup rim foundation comprises an upper layer positioning frame and a lower layer positioning frame, wherein rectangular holes are formed in the upper layer positioning frame and the lower layer positioning frame; the four corners of the upper positioning frame and the lower positioning frame are fixedly connected through angle steels; the upper layer positioning frame and the lower layer positioning frame are formed by butting two sub-frames; the outer portions of the two sub-frames of the lower-layer positioning frame are provided with a section of outwards-extending channel steel plate with a scribing line and a size, and screw through holes are formed in the channel steel plate.
Compared with the prior art, the utility model discloses the beneficial effect who has is:
1. the split positioning frame can realize quick alignment installation, simplifies the prefabricated column installation process of the cup rim foundation and improves the installation efficiency of the prefabricated column;
2. the device has applicability in a certain range, is suitable for prefabricated columns with different section sizes, can be disassembled and assembled, realizes recycling, and saves cost;
3. have certain difference in height between the double-deck locating frame, restrict two high planes of prefabricated post, guaranteed the straightness that hangs down of prefabricated post.
Drawings
In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the drawings used in the description of the embodiments will be briefly described below.
FIG. 1 is a top view of a precast column quick mount positioning device;
fig. 2 is a schematic view of the positioning device mounted at the cup opening device.
Detailed Description
The technical solution in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention.
Examples
Shown in fig. 1 is a precast column rapid installation positioning device, which is installed on a cup foundation 70 and comprises an upper layer positioning frame 10 and a lower layer positioning frame 20, wherein rectangular holes 30 are respectively arranged in the upper layer positioning frame 10 and the lower layer positioning frame 20, and the size of the rectangular hole 30 is matched with that of a precast column. The four corners of the upper positioning frame 10 and the lower positioning frame 20 are fixedly connected through angle steel 40, so as to ensure the perpendicularity of the prefabricated column by utilizing the upper and lower positioning frames 20. Preferably, the angle iron 40 is fixed between the upper positioning frame 10 and the lower positioning frame 20 by a welding process. The upper-layer positioning frame 10 and the lower-layer positioning frame 20 are formed by butt joint of a left sub-frame 50 and a right sub-frame 50, the positioning frames can be split into two parts, the positioning frames can be rapidly disassembled after the prefabricated columns are hoisted in place and temporarily fixed in installation, and the positioning frames can be disassembled and reused. The outer portions of the two sub-frames 50 of the lower-layer positioning frame 20 are provided with a section of outwards extending channel steel plate 60 with a scribing line and a size, scales on the channel steel plate 60 correspond to the axis of a building popped out from the cup opening, the channel steel plate 60 and the positioning device are fixed on the cup wall of the cup opening foundation 70, then the perpendicularity between the upper positioning frame and the lower positioning frame is adjusted, and the prefabricated column is hoisted after rechecking is completed. Screw through holes 61 are formed in the slotted steel plate 60, and bolts are inserted through the screw through holes 61 to fix the lower positioning frame 20 to the cup base 70.
When the prefabricated column is prepared, the positioning device is used for replacing the original positioning of various wood wedges, a certain height difference is formed between the double-layer positioning frames, two height planes of the prefabricated column are limited, the perpendicularity of the prefabricated column can be adjusted by adjusting the relative position precision between the two sub frames, the prefabricated column mounting process of the cup rim foundation 70 is simplified, and the mounting efficiency of the prefabricated column is improved. Moreover, the positioning device has applicability in a certain range, is applicable to prefabricated columns with different section sizes, can be disassembled and assembled, realizes recycling, and saves cost.
In this embodiment, two opposite sub-frames 50 in the same positioning frame are quickly connected by bolts, and the positioning frame can be quickly disassembled after the bolts are screwed out.
The butt joint arm of one of the sub-frames in the same positioning frame is positioned at the inner side, the butt joint arm of the other sub-frame is positioned at the outer side, and the sub-frames at the same side of the upper positioning frame and the lower positioning frame are both positioned at the inner side, so that the vertical precision between the two positioning frames is not influenced. Be located and be provided with rectangular hole 90 on the butt joint arm in the outside, the bolt is worn into rectangular hole internal lock and is advanced or the butt is on being located inboard butt joint arm, and at the location in-process, if the condition of location pine or tension appears, only need unscrew the bolt, slide one of them branch frame alright go to adjust the size of locating frame according to the actual size of prefabricated post.
According to the direction shown in fig. 2, the size of the positioning frame in the long axis direction can be adjusted by designing the positioning frame into a structure with a left split body and a right split body, in this embodiment, the split frame is designed to be formed by butting a front L-shaped steel plate and a rear L-shaped steel plate 80, the two L-shaped steel plates 80 are connected through a bolt, and in the positioning process, if the positioning is too loose or too tight, the bolt is only required to be unscrewed, and one L-shaped steel plate is slid, so that the size of the positioning frame can be adjusted according to the actual size of the prefabricated column.
Various modifications to these embodiments will be readily apparent to those skilled in the art, and the generic principles defined herein may be applied to other embodiments without departing from the spirit or scope of the invention. Thus, the present invention is not intended to be limited to the embodiments shown herein but is to be accorded the widest scope consistent with the principles and novel features disclosed herein.

Claims (6)

1. A prefabricated column rapid mounting and positioning device for a cup rim foundation is characterized by comprising an upper layer positioning frame and a lower layer positioning frame, wherein rectangular holes are formed in the upper layer positioning frame and the lower layer positioning frame; the four corners of the upper positioning frame and the lower positioning frame are fixedly connected through angle steels; the upper layer positioning frame and the lower layer positioning frame are formed by butting two sub-frames; the outer portions of the two sub-frames of the lower-layer positioning frame are provided with a section of outwards-extending channel steel plate with a scribing line and a size, and screw through holes are formed in the channel steel plate.
2. The device for quickly installing and positioning the prefabricated column for the cup rim foundation as claimed in claim 1, wherein the two opposite sub frames are connected through bolts.
3. The apparatus as claimed in claim 2, wherein the docking arm of one of the sub-frames is located at the inner side, and the docking arm of the other sub-frame is located at the outer side.
4. The device for quickly installing and positioning the precast column used for the cup rim foundation according to claim 3, wherein the butt joint arm positioned at the outer side is provided with a strip-shaped hole, and a bolt penetrates into the strip-shaped hole to be locked or abutted against the butt joint arm positioned at the inner side.
5. The device for quickly installing and positioning the precast column for the cup rim foundation according to claim 1, wherein the sub-frame is formed by butting two L-shaped steel plates; and the two L-shaped steel plates are connected through bolts.
6. The device for quickly installing and positioning the prefabricated column for the cup-mouth foundation as claimed in claim 1, wherein the angle steel is fixed between the upper-layer positioning frame and the lower-layer positioning frame by adopting a welding process.
CN202023346627.2U 2020-12-31 2020-12-31 A prefabricated post installs positioner fast for rim of a cup basis Active CN214301830U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202023346627.2U CN214301830U (en) 2020-12-31 2020-12-31 A prefabricated post installs positioner fast for rim of a cup basis

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202023346627.2U CN214301830U (en) 2020-12-31 2020-12-31 A prefabricated post installs positioner fast for rim of a cup basis

Publications (1)

Publication Number Publication Date
CN214301830U true CN214301830U (en) 2021-09-28

Family

ID=77822214

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202023346627.2U Active CN214301830U (en) 2020-12-31 2020-12-31 A prefabricated post installs positioner fast for rim of a cup basis

Country Status (1)

Country Link
CN (1) CN214301830U (en)

Similar Documents

Publication Publication Date Title
CN2773156Y (en) Integrated template of cast-in-situs concrete barrier for bridge
CN109707173B (en) Construction method of assembly type laminated beam plate installation auxiliary device
US11898447B2 (en) Full-circle secondary lining inverted arch construction formwork system for long-distance tunnel and formwork transporting method
CN105464216B (en) Construction method based on integral lifting formwork-strengthening system superelevation super-section batter post
CN105804395A (en) Staircase one-step continuous casting forming construction method based on integral shaped formwork
CN108756441A (en) A kind of hydraulic lifting flipped device and its hanging method for reducing tower
CN106930192B (en) Assembled variable cross-section contracture sliding mode system and its construction method
CN214301830U (en) A prefabricated post installs positioner fast for rim of a cup basis
CN103343639B (en) A kind of sliding mode system of efficient adjustment
CN106437146A (en) Template used for casting floor beam and construction method of floor beam
CN109779247A (en) The formwork erection device and construction method of steel column cornerite
CN208686187U (en) A kind of hydraulic lifting flipped device for variable diameter tower
CN201347590Y (en) Quick connection and calibration clamp for steel column joint
CN212001240U (en) Accurate positioner of street lamp basis and built-in fitting
CN108425634A (en) A kind of anchor cable of adjustable-angle pulls out light rig job platform
CN211775746U (en) Sewage treatment pond cone basis steel form and matrix connection structure thereof
CN208252046U (en) A kind of anchor cable of adjustable-angle pulls out light rig job platform
CN205330172U (en) A formwork support device that is used for wall body corner position to be under construction
CN108385710B (en) Reusable tower foundation and installation method thereof
CN207331733U (en) A kind of concrete column leg structure
CN104110132A (en) Adjustable combined stairway steel formwork for high-rise building and assembling method thereof
CN205330190U (en) PCF board fixing device
CN218622223U (en) Large-diameter pile foundation reinforcement cage positioning structure arranged on steel platform
CN219060932U (en) Drawknot mechanism for discharging platform
CN215482968U (en) Bulky copper stagnant water reinforcing system for concrete construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant