CN214301286U - Grouting material hopper for installing anti-seismic support - Google Patents

Grouting material hopper for installing anti-seismic support Download PDF

Info

Publication number
CN214301286U
CN214301286U CN202022716727.3U CN202022716727U CN214301286U CN 214301286 U CN214301286 U CN 214301286U CN 202022716727 U CN202022716727 U CN 202022716727U CN 214301286 U CN214301286 U CN 214301286U
Authority
CN
China
Prior art keywords
grouting
support
pipe
composite pipe
supporting base
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022716727.3U
Other languages
Chinese (zh)
Inventor
李晓阁
吕自福
李世仲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Construction Group Hangzhou Construction Co ltd
China Railway Construction Group Infrastructure Construction Co Ltd
Original Assignee
China Railway Construction Group Hangzhou Construction Co ltd
China Railway Construction Group Infrastructure Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Construction Group Hangzhou Construction Co ltd, China Railway Construction Group Infrastructure Construction Co Ltd filed Critical China Railway Construction Group Hangzhou Construction Co ltd
Priority to CN202022716727.3U priority Critical patent/CN214301286U/en
Application granted granted Critical
Publication of CN214301286U publication Critical patent/CN214301286U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The utility model discloses a grouting material bucket for installing an anti-seismic support, which belongs to the technical field of grouting material bucket devices and comprises a supporting base, a support, a funnel and a grouting composite pipe, wherein a guide wheel is arranged below the supporting base, an integrally formed pushing handle is arranged on one side of the supporting base, the supporting base is fixedly connected with the lower part of the support, an integrally formed fixed ring is arranged on the upper part of the support, the fixed ring is movably connected with the funnel, a discharging pipe is arranged below the funnel, the discharging pipe is connected with the grouting composite pipe in a clamping sleeve manner, the inner layer of the grouting composite pipe is an aluminum-plastic pipe, the middle layer is a vibration belt, the outermost layer is a threading hose, one end of the vibration belt is connected with a power switch, traction ropes are arranged on two sides of the tail end of the grouting composite pipe, the problems that grouting is not full and uniform, operation is inconvenient, time and labor are wasted when gaps between a bridge support and the pad and preformed holes are grouted by traditional workers can be effectively solved.

Description

Grouting material hopper for installing anti-seismic support
Technical Field
The utility model relates to a grout fill technical field, concretely relates to grout fill for antidetonation support installation.
Background
In the process of bridge construction, the mounting height of a support is adjusted by using a triangular steel plate on a supporting pad in advance, when a steel box girder and a cable support are hoisted together in place, a sleeve on a cable support plate under the cable support is inserted into a preformed hole of the supporting pad, the whole girder body falls on a steel box girder supporting frame body, the stress balance of each point is ensured, the counter force of each point on the pad is ensured to be closely attached to four triangular pad fulcrums, a steel wedge block with a gap is wedged between the cable support and the gap pad iron, the central position of the cable support is found to be aligned with the central line of the pad stone, the top surface of the leveling steel box girder is adjusted to a designed elevation, and the steel box girder elevation is ensured to reach the designed elevation.
Install bridge beam supports back on the bed stone, there are space and preformed hole between bridge beam supports and bed stone, can fill no shrink high strength filling material to filling in space and the preformed hole usually, in order to ensure being connected between bridge beam supports and the lower part bed stone, on the one hand, because the space leads to traditional technique to adopt artifical mode of pouring backward very inconvenient for a short time, waste time and energy, can't transport the filling material to the preformed hole even sometimes, on the other hand, the artifical in-process of pouring backward of tradition often can appear the grout not full, inhomogeneous problem. Therefore, the grouting material hopper for installing the anti-seismic support is quite significant.
SUMMERY OF THE UTILITY MODEL
To the above-mentioned not enough, the utility model aims at providing a grout fill for antidetonation support installation can solve not full, inhomogeneous, the operation inconvenient and waste time and energy problem of grout that exists when space and preformed hole grout to bridge beam supports and stone pad to traditional manual work.
In order to achieve the above purpose, the technical scheme adopted by the utility model is as follows: the utility model provides a grout fill for antidetonation support installation, which comprises a supporting pedestal and is characterized by further comprising, a support, the funnel, compound pipe in grout, support the base below and install the leading wheel, it is provided with integrated into one piece's pushing handle to support base one side, support base and support lower part fixed connection, support upper portion is provided with integrated into one piece's retainer plate all around, retainer plate and funnel swing joint, the funnel below is provided with the discharging pipe, the discharging pipe is connected with compound pipe ferrule formula in grout, compound inside pipe layer in grout is the plastic-aluminum pipe, the intermediate level is the vibrations area, it is outmost threading hose to be, vibrations area one end is connected with switch, compound pipe in grout terminal both sides are provided with the haulage rope.
The utility model has the advantages that: the utility model provides a grouting material bucket for installing an anti-seismic support, the inner layer of a grouting composite pipe is an aluminum-plastic pipe, free bending in a gap between a bridge support and a pad stone can be ensured, and the grouting material bucket is light in material and convenient to use; the middle layer is a vibration belt, so that when the grouting composite pipe is inserted into a preformed hole between the bridge support and the pad stone for grouting, the grouting is full and uniform through the vibration of the vibration belt; the outermost layer is a threading hose, so that the flexibility of the grouting composite pipe is further improved, and meanwhile, the vibration belt and the grouting are separated, so that the normal use of the vibration belt is ensured; the two sides of the tail end of the grouting composite pipe are provided with the hauling ropes, so that the left and right directions of the grouting composite pipe can be conveniently controlled in the process of inserting the grouting composite pipe into the preformed hole, and the grouting composite pipe can be inserted into the preformed hole in a narrow space more smoothly; the grouting material hopper is provided with the push handle and the guide wheel, so that the grouting material hopper can be freely pushed on the ground, and the whole grouting material hopper is very convenient and labor-saving to carry during use.
Furthermore, the upper part and the lower part of the bracket are fixedly connected through screws, and a plurality of positioning holes are uniformly formed in the lower part of the bracket.
The beneficial effect of adopting the further technical scheme is that: through the locating hole, can adjust the height of whole grout hopper according to actual need, it is very convenient.
Furthermore, a valve is arranged on the discharge pipe.
The beneficial effect of adopting the further technical scheme is that: a valve is arranged on a discharge pipe of the grouting hopper, and the grouting injection speed can be controlled.
Furthermore, the handle pushing handle is provided with an anti-slip sleeve.
The beneficial effect of adopting the further technical scheme is that: the pushing handle is provided with the anti-slip sleeve, so that the safety of the grouting hopper in the pushing and conveying process is improved.
Drawings
Fig. 1 is a front view of the present invention;
fig. 2 is a top view of the present invention;
FIG. 3 is a partially enlarged view of the composite grouting pipe of the present invention;
wherein, 1, a handle is pushed; 2. a support base; 3. a funnel; 4. a discharge pipe; 5. a valve; 6. grouting the composite pipe; 7. a support; 8. a guide wheel; 9. a hauling rope; 10. a power switch; 11. positioning holes; 12. a stationary ring; 13. an aluminum-plastic pipe; 14. a vibration band; 15. a threading hose; 16. an anti-slip sleeve.
Detailed Description
The following detailed description of the embodiments of the present invention will be made with reference to the accompanying drawings.
In one embodiment of the utility model, as shown in fig. 1-3, a grouting material bucket for earthquake-proof support installation is provided, which comprises a support base 2, a support 7, a funnel 3 and a grouting composite pipe 6, a guide wheel 8 is arranged below the support base 2, an integrally formed handle 1 is arranged on one side of the support base 2, an anti-slip sleeve 16 is arranged on the handle 1 to improve the safety of the grouting material bucket in the pushing process, the support base 2 is fixedly connected with the lower part of the support 7, an integrally formed fixed ring 12 is arranged around the upper part of the support 7, the upper part and the lower part of the support 7 are fixedly connected through screws, a plurality of positioning holes 11 are uniformly arranged on the lower part of the support 7, the fixed ring 12 is movably connected with the funnel 3, a discharging pipe 4 is arranged below the funnel 3, a valve 5 is arranged on the discharging pipe 4, the discharging pipe 4 is in a clamping sleeve type connection with the grouting composite pipe 6, the inner layer of the grouting composite pipe 6 is an aluminum-plastic pipe 13, so that the grouting composite pipe can be freely bent in a gap between the bridge support and the pad stone; the middle layer is a vibration belt 14, so that when the grouting composite pipe is inserted into a preformed hole between the bridge support and the pad for grouting, the grouting is full and uniform through the vibration of the vibration belt; the outmost layer is a threading hose 15, one end of a vibration belt 14 is connected with a power switch 10, two sides of the tail end of the grouting composite pipe 6 are provided with traction ropes 9, and the left and right directions of the grouting composite pipe 6 can be conveniently controlled in the process of inserting the grouting composite pipe 6 into the preformed hole, so that the grouting composite pipe can be inserted into the preformed hole more smoothly in a narrow space; through being provided with push handle 1 and leading wheel 8, can make it freely promote on ground, it is very convenient and laborsaving with the transport of whole grouting hopper during the use.
When the grouting material bucket is used, the height of the grouting material bucket is adjusted according to actual needs, the grouting composite pipe 6 is inserted into a gap or a reserved hole between a bridge support and a pad under the assistance of the traction rope 9, and the grouting work can be started by opening the power switch 10 of the vibration belt 14.
While the present invention has been described in detail and with reference to the accompanying drawings, it is not to be considered as limited to the scope of the invention. Various modifications and changes may be made by those skilled in the art without inventive step within the scope of the appended claims.

Claims (4)

1. The grouting material hopper for the installation of the anti-seismic support is characterized by comprising a supporting base (2), a support (7), a funnel (3) and a grouting composite pipe (6), wherein a guide wheel (8) is installed below the supporting base (2), an integrally-formed pushing handle (1) is arranged on one side of the supporting base (2), the supporting base (2) is fixedly connected with the lower part of the support (7), an integrally-formed fixing ring (12) is arranged on the periphery of the upper part of the support (7), the fixing ring (12) is movably connected with the funnel (3), a discharging pipe (4) is arranged below the funnel (3), the discharging pipe (4) is connected with the grouting composite pipe (6) in a clamping sleeve manner, the inner layer of the grouting composite pipe (6) is an aluminum plastic pipe (13), the middle layer of the grouting composite pipe is a vibration belt (14), and the outermost layer of the grouting composite pipe is a threading hose (15), one end of the vibration belt (14) is connected with a power switch (10), and two sides of the tail end of the grouting composite pipe (6) are provided with a traction rope (9).
2. The grouting material hopper for the installation of the aseismic support according to claim 1, wherein the upper part and the lower part of the bracket (7) are fixedly connected through screws, and a plurality of positioning holes (11) are uniformly arranged at the lower part of the bracket (7).
3. Grouting material bucket for seismic abutment mounting according to claim 1, characterised in that a valve is provided on the tapping pipe (4).
4. Grouting material bucket for the installation of earthquake-resistant supports according to claim 1, characterised in that the push handle (1) is provided with an anti-slip sleeve (16).
CN202022716727.3U 2020-11-20 2020-11-20 Grouting material hopper for installing anti-seismic support Active CN214301286U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022716727.3U CN214301286U (en) 2020-11-20 2020-11-20 Grouting material hopper for installing anti-seismic support

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022716727.3U CN214301286U (en) 2020-11-20 2020-11-20 Grouting material hopper for installing anti-seismic support

Publications (1)

Publication Number Publication Date
CN214301286U true CN214301286U (en) 2021-09-28

Family

ID=77843219

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022716727.3U Active CN214301286U (en) 2020-11-20 2020-11-20 Grouting material hopper for installing anti-seismic support

Country Status (1)

Country Link
CN (1) CN214301286U (en)

Similar Documents

Publication Publication Date Title
CN106320346A (en) Construction method for supporting deep foundation pit through grouting after pile arrangement and anchor cable mounting
CN108678752A (en) Shaft equipment rapid installation process
CN214301286U (en) Grouting material hopper for installing anti-seismic support
CN107542086B (en) Anchor cable construction method for filling slope
CN213417832U (en) Enclosing purlin mounting structure
CN207108307U (en) The portable boom hoisting of urban viaduct construction in later period
JP2010216162A (en) Pressure receiving device for anchoring method, and the anchoring method
US10900191B2 (en) Pulling-out device for prefabricated concrete support wall
CN209145296U (en) A kind of installation lifting device for material distributing machine
CN109944246A (en) A kind of construction method of broken pile head
CN108277817B (en) Construction method of high-pile bearing platform tower crane foundation reinforcing structure
CN206829752U (en) A kind of single-pipe tower
CN212026256U (en) Guide platform for building
CN216713350U (en) Steel construction that intensity height installation is convenient
CN214785468U (en) High-strength prefabricated staircase
CN107313786A (en) Chassis trailer system
CN201326287Y (en) Device for preventing electric pole from tilting
CN202012079U (en) Pile anchor for cable crane
CN111764384B (en) Adopt single-deck bellows and resin material to realize anticorrosive anchor rope structure of double-deck
CN206941583U (en) A kind of crawler belt bonds formula anchor cable installation instrument
CN208587175U (en) A kind of prestressed structure of prestressed anchor
CN209854728U (en) Cement perfusion catheter
CN207362840U (en) A kind of taper anchor cable suitable for rock side slope
CN104818716B (en) Recyclable prestressed pit supporting fender pile
KR20200060176A (en) The epoxy charging device of the upper plate of bridge and method thereof

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant