CN214272573U - Steel construction curtain convenient to install fast - Google Patents

Steel construction curtain convenient to install fast Download PDF

Info

Publication number
CN214272573U
CN214272573U CN202022705648.2U CN202022705648U CN214272573U CN 214272573 U CN214272573 U CN 214272573U CN 202022705648 U CN202022705648 U CN 202022705648U CN 214272573 U CN214272573 U CN 214272573U
Authority
CN
China
Prior art keywords
bolt
hole
curtain wall
buckle
outer side
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022705648.2U
Other languages
Chinese (zh)
Inventor
卢延松
李歌
叶振余
季仁国
顾利嵘
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongyifeng Suzhou Green Architectural Development Co ltd
Original Assignee
Zhongyifeng Suzhou Green Architectural Development Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongyifeng Suzhou Green Architectural Development Co ltd filed Critical Zhongyifeng Suzhou Green Architectural Development Co ltd
Priority to CN202022705648.2U priority Critical patent/CN214272573U/en
Application granted granted Critical
Publication of CN214272573U publication Critical patent/CN214272573U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model relates to the technical field of steel structure building installation, and discloses a steel structure curtain wall convenient for quick installation, which comprises a stand column, wherein the inside of the stand column is connected with a first bolt, the outer side of the first bolt and the outer side of the stand column are connected with a crossbeam, the inside of the crossbeam comprises a U-shaped steel connected with the outer side of the stand column, the inside of the U-shaped steel comprises a third through hole connected with the outer side of the first bolt, the inside of the stand column is connected with a second bolt, the end of the second bolt is connected with a curtain wall plate, the inside of the curtain wall plate comprises a first screw hole connected with the end of the second bolt, the utility model discloses a buckle and a clamping seat, before the curtain wall plate is fixedly installed, a worker can insert the clamping seat at one side of the curtain wall plate into the buckle by utilizing the corresponding relation of the buckle and the clamping seat to quickly position the curtain wall plate and the stand column, the problem of be difficult to guarantee that curtain board is quick, correct location is solved.

Description

Steel construction curtain convenient to install fast
Technical Field
The utility model relates to a steel construction building installation technical field specifically is a steel construction curtain convenient to install fast.
Background
The curtain wall is an outer wall enclosure of a building and is hung like a curtain, so the curtain wall is also called a hanging wall, is a light wall with decorative effect commonly used by modern large and high-rise buildings, consists of a steel structure frame and an embedded plate, and is a building enclosure structure which does not bear the load and the function of a main structure.
There are multiple steel construction curtain in the existing market, but these steel construction curtain ubiquitous, the installation is complicated, is difficult to guarantee that the curtain board is quick, the butt joint of correct location and install and target in place, consequently, the technical personnel in the art provide the steel construction curtain convenient to install fast to solve the problem that proposes in the above-mentioned background art.
Disclosure of Invention
An object of the utility model is to provide a steel construction curtain convenient to install fast to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme:
the utility model provides a steel construction curtain convenient to quick installation, includes a set of stand, first through-hole has been seted up to the inside of a set of stand, the internal connection of first through-hole has first bolt, the outside that just is located the stand of first bolt is connected with the crossbeam, the inside of crossbeam is including connecting the U shaped steel in the stand outside, the inside of U shaped steel is including connecting the third through-hole in the first bolt outside, the nut has been cup jointed to the end of first bolt, the stand is kept away from the position of first through-hole and has been seted up the second through-hole, the internal connection of second through-hole has the second bolt, the end-to-end connection of second bolt has the curtain board, the inside of curtain board is including connecting at the terminal first screw of second bolt.
As a further aspect of the present invention: the utility model discloses a curtain wall board, including first bolt, second bolt, buckle, fourth through-hole, third screw has been seted up to the position that the second through-hole was kept away from to the inside of stand, the position that the outside of stand is close to the third screw is connected with the buckle, the fourth through-hole has been seted up to the inside of buckle, the internal connection of fourth through-hole has the third bolt, the outside of buckle is connected with the joint seat, the fifth through-hole has been seted up to the inside of joint seat, the internal connection of fifth through-hole has the fourth bolt, the end of fourth bolt is connected with the curtain wall board, the inside of curtain wall board is including connecting at the terminal second screw of fourth bolt.
As a further aspect of the present invention: the first bolt penetrates through the third through hole and the first through hole in sequence, and the stand column is fixedly connected with the U-shaped steel through the first bolt.
As a further aspect of the present invention: the second bolt runs through the inside of second through-hole and first screw in proper order, the curtain board passes through second bolt fixed connection with the stand.
As a further aspect of the present invention: the curtain wall plate and the upright post are movably clamped with the buckle through the clamping seat.
As a further aspect of the present invention: the position of the buckle corresponds to the position of the clamping seat.
Compared with the prior art, the beneficial effects of the utility model are that:
1. through buckle and joint seat, before carrying out fixed mounting to the curtain board, usable buckle of staff and the corresponding relation of joint seat position insert the buckle with the joint seat of curtain board one side inside, advance line location with curtain board and stand fast, solved and be difficult to guarantee that the curtain board is quick, the problem of pinpointing.
2. Through second bolt, second through-hole and first screw, after locating curtain board and stand again, insert the inside of second through-hole and first screw with the second bolt in proper order to screw up, with curtain board and stand fixed connection, be favorable to on the basis that buckle and joint seat are connected, increase the fastness between curtain board and the stand.
Drawings
Fig. 1 is a schematic structural view of the present invention;
FIG. 2 is a top cross-sectional view of the center pillar and the cross member of the present invention;
FIG. 3 is a side cross-sectional view of the curtain wall panel and the vertical column of the present invention;
fig. 4 is an enlarged view of a portion a in fig. 3.
In the figure: 1. a curtain wall plate; 101. a first screw hole; 102. a second screw hole; 2. a column; 21. a first through hole; 22. a second through hole; 23. a third screw hole; 3. u-shaped steel; 31. a third through hole; 4. a cross beam; 5. a first bolt; 51. a nut; 6. a second bolt; 7. a third bolt; 8. buckling; 81. a fourth via hole; 9. A clamping seat; 91. a fifth through hole; 10. and a fourth bolt.
Detailed Description
Please refer to fig. 1-4, in an embodiment of the present invention, a steel structure curtain wall convenient for quick installation, including a set of stand 2, first through-hole 21 has been seted up to the inside of a set of stand 2, the internal connection of first through-hole 21 has first bolt 5, the outside that the outside of first bolt 5 just is located stand 2 is connected with crossbeam 4, the inside of crossbeam 4 is including connecting the U shaped steel 3 in the stand 2 outside, the inside of U shaped steel 3 is including connecting the third through-hole 31 in the first bolt 5 outside, nut 51 has been cup jointed to the end of first bolt 5, second through-hole 22 has been seted up to the position that stand 2 kept away from first through-hole 21, the internal connection of second through-hole 22 has second bolt 6, the end-to-end connection of second bolt 6 has curtain wall board 1, the inside of curtain wall board 1 is including connecting at the terminal first screw 101 of second bolt 6.
In fig. 2 and 3: third screw 23 has been seted up to the position that second through-hole 22 was kept away from to the inside of stand 2, the position that the outside of stand 2 is close to third screw 23 is connected with buckle 8, fourth through-hole 81 has been seted up to buckle 8's inside, the internal connection of fourth through-hole 81 has third bolt 7, the outside of buckle 8 is connected with joint seat 9, fifth through-hole 91 has been seted up to joint seat 9's inside, the internal connection of fifth through-hole 91 has fourth bolt 10, the end of fourth bolt 10 is connected with curtain board 1, the inside of curtain board 1 is including connecting at the terminal second screw 102 of fourth bolt 10, insert the inside of fourth through-hole 81 and third screw 23 with third bolt 7 in proper order, and screw up, with buckle 8 and stand 2 fixed connection.
In fig. 1 and 2: first bolt 5 runs through the inside of third through-hole 31 and first through-hole 21 in proper order, and stand 2 passes through first bolt 5 fixed connection with U shaped steel 3, inserts the inside of third through-hole 31 and first through-hole 21 with first bolt 5 in proper order to screw up, with stand 2 and U shaped steel 3 fixed connection.
In fig. 1 and 3: second bolt 6 runs through the inside of second through-hole 22 and first screw 101 in proper order, and curtain board 1 passes through second bolt 6 fixed connection with stand 2, inserts second bolt 6 in proper order in the inside of second through-hole 22 and first screw 101 to screw up, with curtain board 1 and stand 2 fixed connection.
In fig. 3 and 4: curtain board 1 and stand 2 are through joint seat 9 and 8 movable joints of buckle, and it is inside to insert buckle 8 with the joint seat 9 of 1 one side of curtain board, makes curtain board 1 and the 2 movable joints of stand.
In fig. 3 and 4: the position of the buckle 8 corresponds to the position of the clamping seat 9, so that the curtain wall plate 1 and the upright post 2 can be quickly positioned.
The utility model discloses a theory of operation is: when needing to use this steel construction curtain convenient to quick installation, at first insert the inside of third through-hole 31 and first through-hole 21 with first bolt 5 in proper order, and screw up, with stand 2 and U shaped steel 3 fixed connection, the usable buckle 8 of staff and the corresponding relation in joint seat 9 position afterwards, insert buckle 8 inside with the joint seat 9 of curtain board 1 one side, make curtain board 1 and stand 2 activity joint, then insert the inside of second through-hole 22 and first screw 101 in proper order with second bolt 6, and screw up, with curtain board 1 and stand 2 fixed connection.
The above-mentioned, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (6)

1. The steel structure curtain wall convenient for quick installation comprises a set of stand columns (2) and is characterized in that a first through hole (21) is formed in the set of stand columns (2), a first bolt (5) is connected to the inside of the first through hole (21), a cross beam (4) is connected to the outer side of the first bolt (5) and the outer side of the stand column (2), a U-shaped steel (3) connected to the outer side of the stand column (2) is arranged in the cross beam (4), a third through hole (31) connected to the outer side of the first bolt (5) is formed in the U-shaped steel (3), a nut (51) is sleeved at the tail end of the first bolt (5), a second through hole (22) is formed in a position, away from the first through hole (21), of the stand column (2), a second bolt (6) is connected to the inside of the second through hole (22), and the tail end of the second bolt (6) is connected with a curtain wall plate (1), the interior of the curtain wall plate (1) comprises a first screw hole (101) connected to the tail end of the second bolt (6).
2. The steel structure curtain wall convenient for quick installation of the steel structure curtain wall as claimed in claim 1, a third screw hole (23) is arranged in the upright post (2) at a position far away from the second through hole (22), the outer side of the upright post (2) close to the third screw hole (23) is connected with a buckle (8), a fourth through hole (81) is arranged inside the buckle (8), a third bolt (7) is connected inside the fourth through hole (81), the outer side of the buckle (8) is connected with a clamping seat (9), a fifth through hole (91) is arranged inside the clamping seat (9), a fourth bolt (10) is connected inside the fifth through hole (91), the tail end of the fourth bolt (10) is connected with the curtain wall plate (1), the interior of the curtain wall plate (1) comprises a second screw hole (102) connected to the tail end of the fourth bolt (10).
3. The steel structure curtain wall convenient for quick installation of the claim 1 is characterized in that the first bolt (5) penetrates through the third through hole (31) and the first through hole (21) in sequence, and the upright column (2) is fixedly connected with the U-shaped steel (3) through the first bolt (5).
4. The steel structure curtain wall convenient for quick installation of the claim 1 is characterized in that the second bolt (6) sequentially penetrates through the second through hole (22) and the first screw hole (101), and the curtain wall board (1) is fixedly connected with the upright post (2) through the second bolt (6).
5. The steel structure curtain wall convenient for quick installation of the claim 2 is characterized in that the curtain wall board (1) and the upright post (2) are movably clamped with the clamp (8) through the clamping seat (9).
6. The steel structure curtain wall facilitating quick installation of the steel structure curtain wall as claimed in claim 2, wherein the position of the buckle (8) corresponds to the position of the buckle seat (9).
CN202022705648.2U 2020-11-20 2020-11-20 Steel construction curtain convenient to install fast Active CN214272573U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022705648.2U CN214272573U (en) 2020-11-20 2020-11-20 Steel construction curtain convenient to install fast

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022705648.2U CN214272573U (en) 2020-11-20 2020-11-20 Steel construction curtain convenient to install fast

Publications (1)

Publication Number Publication Date
CN214272573U true CN214272573U (en) 2021-09-24

Family

ID=77776939

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022705648.2U Active CN214272573U (en) 2020-11-20 2020-11-20 Steel construction curtain convenient to install fast

Country Status (1)

Country Link
CN (1) CN214272573U (en)

Similar Documents

Publication Publication Date Title
CN213296654U (en) Steel construction building supporting component
CN214272573U (en) Steel construction curtain convenient to install fast
CN210947315U (en) Unit curtain wall hanging system
CN108868218B (en) Small-size factory building of assembled
CN207794379U (en) Type unitized curtain wall system with cantilevered structure
CN113309272B (en) Hidden frame unit type panel component
CN214574716U (en) Beam column connecting component for assembled wood structure building
CN215769330U (en) Screen frame footing mounting structure
CN108222339B (en) High-precision unit system easy to construct
CN216689736U (en) Modular assembly type steel structure house system
CN205224356U (en) Unit side hangs sign indicating number system
CN111877772A (en) Installation method of unit type building exterior decoration ceiling system
CN216689983U (en) Unit curtain wall vertical keel hanging system
CN219240997U (en) Connecting structure on telescopic fixed unit type curtain wall
CN212125133U (en) Kuppe base positioner that air conditioning unit used
CN204343507U (en) For the aluminium sheet hanging structure of curtain wall
CN216553006U (en) Overhanging outer frame pull ring accurate positioning die
CN205330194U (en) Positioner of safe lifeline
CN210622277U (en) Hanging flower basket high support fixing device
CN213233962U (en) Exhibition room furred ceiling structural system
CN220377716U (en) Spliced aluminum veneer
CN217759439U (en) Connecting structure for upright post sleeve core at bottom of assembled curtain wall
CN214329654U (en) Steel-structure stairway for multi-story high-rise building housing
CN219977395U (en) Device for detecting stability of outer wall of assembled steel structure building
CN215829991U (en) Support joint for climbing frame at hollow position

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant