CN214272352U - Town road engineering flood prevention rainwater well structure - Google Patents
Town road engineering flood prevention rainwater well structure Download PDFInfo
- Publication number
- CN214272352U CN214272352U CN202120167471.7U CN202120167471U CN214272352U CN 214272352 U CN214272352 U CN 214272352U CN 202120167471 U CN202120167471 U CN 202120167471U CN 214272352 U CN214272352 U CN 214272352U
- Authority
- CN
- China
- Prior art keywords
- well
- fixedly connected
- flood prevention
- road engineering
- pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 230000002265 prevention Effects 0.000 title claims abstract description 24
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 44
- 238000004140 cleaning Methods 0.000 claims abstract description 21
- 239000010865 sewage Substances 0.000 claims description 20
- 238000001914 filtration Methods 0.000 claims description 9
- 239000011148 porous material Substances 0.000 claims description 5
- 238000010276 construction Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000010438 heat treatment Methods 0.000 description 1
- 239000012535 impurity Substances 0.000 description 1
- 238000009440 infrastructure construction Methods 0.000 description 1
Images
Landscapes
- Sewage (AREA)
Abstract
The utility model discloses a municipal road engineering flood prevention rainwater well structure, which relates to the technical field of municipal road engineering, and comprises a base layer, wherein a drainage pipeline is arranged in the base layer, a well is fixedly connected in the base layer and positioned at the top of the drainage pipeline, the municipal road engineering flood prevention rainwater well structure comprises a cleaning roller, a second filter plate and a second blowdown plate, water flows into an inner cavity below the well through a filter hole and then falls into the well, then the water strikes the cleaning brush, so that the cleaning brush rotates, the cleaning roller rotates, the cleaning brush cleans sundries, the sundries are guided by a guide plate to move into a connecting groove, then the sundries enter the first drainage pipe through the connecting groove and then enter the inside of a dirt storage pool through the second blowdown plate, thereby preventing the water flowing into the well from carrying the sundries into the drainage pipeline, the drainage pipeline is blocked, so that the flood prevention work has problems.
Description
Technical Field
The utility model relates to a town road engineering technical field specifically is a town road engineering flood prevention rainwater well structure.
Background
In China, municipal infrastructure refers to various buildings, structures, equipment and the like which are arranged in planning and construction ranges of urban areas and towns (villages) and provide paid or unpaid public products and services for residents based on government responsibilities and obligations. Various public infrastructure construction supporting in urban life all belong to municipal works category, for example common urban road, bridge, subway, underground pipeline, tunnel, river course, track traffic, sewage treatment, refuse treatment processing etc. engineering, for example again with the life closely relevant various pipelines: rainwater, sewage, water supply, reclaimed water, electric power (parts except red lines), telecommunication, heating power, gas and the like, and construction of squares, urban greening and the like belong to the municipal engineering category. The existing municipal road engineering flood prevention rainwater well structure can not treat garbage brought into the flood prevention rainwater well by water flow, so that the interior of the flood prevention rainwater well is easy to block, the running of a city drainage system is caused to be in a problem, the flood prevention function of the city drainage system is reduced, and the drainage efficiency of the city drainage system is reduced.
SUMMERY OF THE UTILITY MODEL
Not enough to prior art, the utility model provides a town road engineering flood prevention rainwater well structure has solved the problem that proposes in the above-mentioned background art.
In order to achieve the above purpose, the utility model discloses a following technical scheme realizes: a municipal road engineering flood prevention rainwater well structure comprises a base layer, wherein a drainage pipeline is arranged inside the base layer, a well is fixedly connected to the top of the drainage pipeline inside the base layer and above the drainage pipeline, a dirt storage pool is fixedly connected to both sides of the well inside the base layer, a well cover is arranged above the drainage pipeline and at the top of the base layer, a water collecting plate is arranged inside the drainage pipeline and at the bottom of the well cover, a water collecting tank is arranged at the top of the water collecting plate, connecting columns are fixedly connected to both sides of the water collecting tank and at the top of the water collecting plate, the top of each connecting column is fixedly connected with the bottom of the well cover, a fixing pipe is fixedly connected to the bottom of the water collecting plate, a second filter plate is fixedly connected to the bottom of the fixing pipe, cleaning rollers are rotatably connected to both sides of the water collecting tank inside the fixing pipe, and cleaning brushes are arranged, the top of second filter plate just is located the below of cleaning the roller and has all seted up the filtration pore, the fixed pipe is located one side of cleaning the roller and has all seted up the spread groove, the outside of fixed pipe just is located the first drain pipe of the equal fixedly connected with in one side of spread groove, the top of second filter plate just is located the equal fixedly connected with deflector in one side of spread groove, store up the equal fixedly connected with second blowdown board in one side that dirty pond is close to first drain pipe, the one end of second blowdown board all extends to inside the well, well and the inside intercommunication of drainage pipe.
Preferably, the second sewage draining plate is communicated with the inside of the connecting groove through a first sewage draining pipe.
Preferably, the guide plates are located below the connecting grooves.
Preferably, a second access ladder is arranged on one side of the inner cavity of the hoistway.
Preferably, both sides of well inner chamber all fixedly connected with supporting shoe, the top of supporting shoe all contacts with the bottom of second filter plate.
Preferably, store up dirty pond inside and all be provided with first entering ladder, the below that stores up dirty pond inside and be located first entering ladder all is provided with first filter plate, the equal fixedly connected with drainage communicating pipe in bottom of storing up dirty pond, the one end of drainage communicating pipe all extends to inside the drainage pipe.
The utility model provides a town road engineering flood prevention rainwater well structure possesses following beneficial effect:
1. this town road engineering flood prevention rainwater well structure, through being provided with the cleaning roller, second filter plate and second blowdown board, rivers flow in the inner chamber of well below through the filtration pore, then fall into inside the well, then rivers are hit and are beaten the brush cleaner, thereby make the brush cleaner rotate, make the brush cleaner clean debris, make debris pass through the deflector direction and remove inside to the spread groove, then debris pass through inside the spread groove gets into first blowdown pipe, then get into inside storing up dirty pond through the second blowdown board, thereby prevent that the rivers that flow in the well from carrying debris and get into inside the drainage pipe, cause drainage pipe to plug up, make the condition of flood prevention work problem take place.
2. This town road engineering flood prevention rainwater well structure through being provided with spliced pole, supporting shoe and water-collecting plate, operating personnel can pull out filtration pore, water-collecting plate and the fixed pipe that set up below the well lid in the lump when opening the well lid to make things convenient for the staff to get into inside the well.
Drawings
FIG. 1 is a schematic view of the internal structure of the present invention;
FIG. 2 is an enlarged view of the point A of FIG. 1 according to the present invention;
fig. 3 is an enlarged view of fig. 1 at B.
In the figure: 1. a base layer; 2. a water discharge pipeline; 3. a hoistway; 4. a sewage storage tank; 5. a drainage communicating pipe; 6. a first filter plate; 8. a well cover; 9. a water collection plate; 10. connecting columns; 11. a water collection tank; 12. a fixed tube; 13. connecting grooves; 14. a first drain pipe; 15. a guide plate; 16. a second sewage disposal plate; 17. a second filter plate; 18. filtering holes; 19. a support block; 20. cleaning with a brush; 21. a first access ladder; 22. a second access ladder; 23. and cleaning the roller.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1 to 3, the present invention provides a technical solution: a municipal road engineering flood prevention rainwater well structure comprises a base layer 1, wherein a drainage pipeline 2 is arranged inside the base layer 1, a well 3 is fixedly connected inside the base layer 1 and positioned at the top of the drainage pipeline 2, a dirt storage pool 4 is fixedly connected inside the base layer 1 and positioned at two sides of the well 3, a well cover 8 is arranged at the top of the base layer 1 and positioned above the drainage pipeline 2, a water collecting plate 9 is arranged at the bottom of the well cover 8 and positioned inside the drainage pipeline 2, a water collecting groove 11 is formed in the top of the water collecting plate 9, connecting columns 10 are fixedly connected at the top of the water collecting plate 9 and positioned at two sides of the water collecting groove 11, the top of the connecting columns 10 are fixedly connected with the bottom of the well cover 8, a fixed pipe 12 is fixedly connected at the bottom of the water collecting plate 9, a second filter plate 17 is fixedly connected at the bottom of the fixed pipe 12, and cleaning rollers 23 are rotatably connected inside the fixed pipe 12 and positioned at two sides of the water collecting groove 11, the outside of cleaning roller 23 all is provided with brush cleaner 20, the filtration pore 18 has all been seted up at the top of second filter plate 17 and the below that is located cleaning roller 23, spread groove 13 has all been seted up to one side that fixed pipe 12 is located cleaning roller 23, the outside of fixed pipe 12 and the first blowdown pipe 14 of the equal fixedly connected with in one side that is located spread groove 13, the top of second filter plate 17 and the equal fixedly connected with deflector 15 in one side that is located spread groove 13, store up dirty pond 4 and be close to the equal fixedly connected with second blowdown board 16 in one side of first blowdown pipe 14, the one end of second blowdown board 16 all extends to inside the well 3, well 3 and the inside intercommunication of drainage pipe 2.
The second sewage draining plate 16 is communicated with the inside of the connecting groove 13 through the first sewage draining pipe 14, so that sundries enter the first sewage draining pipe 14 through the connecting groove 13, the guide plate 15 is positioned below the connecting groove 13, so that the sundries are guided to enter the inside of the connecting groove 13 through the guide plate 15, one side of the inner cavity of the well 3 is provided with a second entering ladder 22, so that workers can enter the inside of the well 3 through the second entering ladder 22 to work, both sides of the inner cavity of the well 3 are fixedly connected with supporting blocks 19, the tops of the supporting blocks 19 are both contacted with the bottom of the second filtering plate 17, so as to conveniently support and limit the second filtering plate 17, the inside of the sewage storage tank 4 is provided with a first entering ladder 21, the inside of the sewage storage tank 4 and the position below the first entering ladder 21 are both provided with a first filtering plate 6, the bottom of the sewage storage tank 4 is both fixedly connected with a water draining communicating pipe 5, one end of the water draining communicating pipe 5 extends to the inside of the water draining pipe 2, the water in the impurities flows into the drainage communicating pipe 5 through the first filter plate 6 and then falls into the drainage pipeline 2.
In conclusion, when the municipal road engineering flood prevention rainwater well structure is used, rainwater flows into the inside of the water collection tank 11 through the water inlet formed in the well cover 8 during raining, then enters the inside of the fixed pipe 12 through the water collection tank 11, sundries in the water are blocked at the top of the second filter plate 17, water flows into the inner cavity below the well 3 through the filter holes 18, then falls into the inside of the well 3, then the water flow hits the cleaning brush 20, so that the cleaning brush 20 rotates, the cleaning roller 23 rotates, the cleaning brush 20 cleans the sundries, the sundries are guided and move to the inside of the connecting groove 13 through the guide plate 15, then the sundries enter the inside of the first sewage discharge pipe 14 through the connecting groove 13, then enter the inside of the sewage storage tank 4 through the second sewage discharge plate 16, the water in the sundries flows into the inside of the water discharge communicating pipe 5 through the first filter plate 6, then falls into the inside of the water discharge pipe 2, and when the rainwater needs to enter the inside of the well 3, operating personnel opens well lid 8, then 8 rebound of pulling well lid for well lid 8 passes through spliced pole 10 and drives water-collecting plate 9, second filter plate 17 and fixed pipe 12 and move up, then get into inside the well 3 through the second and get into ladder 22, when the well 3 is closed to needs, then operating personnel puts into well 3 inside with the second filter plate 17 of well lid 8 bottom, until the bottom that makes second filter plate 17 contacts with the top of supporting shoe 19, then fixes well lid 8.
Above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the design of the present invention, equivalent replacement or change should be covered within the protection scope of the present invention.
Claims (6)
1. The utility model provides a town road engineering flood prevention rainwater well structure, includes basic unit (1), its characterized in that: the improved sewage treatment device is characterized in that a drainage pipeline (2) is arranged inside a base layer (1), the inside of the base layer (1) is located in a top fixedly connected with well (3) of the drainage pipeline (2), the inside of the base layer (1) is located in a both sides fixedly connected with sewage storage tank (4) of the well (3), the top of the base layer (1) is located above the drainage pipeline (2) and is provided with a well cover (8), the bottom of the well cover (8) is located in the drainage pipeline (2) and is provided with a water collecting plate (9), a water collecting tank (11) is arranged at the top of the water collecting plate (9), connecting columns (10) are fixedly connected at the top of the water collecting plate (9) and are located at both sides of the water collecting tank (11), the top of the connecting columns (10) is fixedly connected with the bottom of the well cover (8), and the bottom fixedly connected with fixing pipes (12) of the water collecting plate (9), the bottom fixedly connected with second filter plate (17) of fixed pipe (12), the inside of fixed pipe (12) and the both sides that are located water catch bowl (11) all rotate and are connected with and clean roller (23), the outside that cleans roller (23) all is provided with brush cleaner (20), filtration pore (18) have all been seted up to the top of second filter plate (17) and the below that is located and cleans roller (23), fixed pipe (12) are located and all have seted up spread groove (13) in one side of cleaning roller (23), the outside of fixed pipe (12) and the one side that is located spread groove (13) all fixedly connected with first blowdown pipe (14), the top of second filter plate (17) and the one side that is located spread groove (13) all fixedly connected with deflector (15), the equal fixedly connected with second blowdown board (16) in one side that storage dirty pond (4) is close to first blowdown pipe (14), one end of the second sewage draining plate (16) extends to the inside of the well (3), and the well (3) is communicated with the inside of the water draining pipeline (2).
2. The municipal road engineering flood prevention rainwater well structure according to claim 1, characterized in that: the second sewage draining plate (16) is communicated with the inside of the connecting groove (13) through a first sewage draining pipe (14).
3. The municipal road engineering flood prevention rainwater well structure according to claim 1, characterized in that: the guide plates (15) are all positioned below the connecting grooves (13).
4. The municipal road engineering flood prevention rainwater well structure according to claim 1, characterized in that: and a second entering ladder (22) is arranged on one side of the inner cavity of the well (3).
5. The municipal road engineering flood prevention rainwater well structure according to claim 1, characterized in that: both sides of well (3) inner chamber all fixedly connected with supporting shoe (19), the top of supporting shoe (19) all contacts with the bottom of second filter plate (17).
6. The municipal road engineering flood prevention rainwater well structure according to claim 1, characterized in that: store up dirty pond (4) inside and all be provided with first entering ladder (21), the below that stores up dirty pond (4) inside and be located first entering ladder (21) all is provided with first filter plate (6), the equal fixedly connected with drainage communicating pipe (5) in bottom of storing up dirty pond (4), the one end of drainage communicating pipe (5) all extends to inside drainage pipe (2).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202120167471.7U CN214272352U (en) | 2021-01-21 | 2021-01-21 | Town road engineering flood prevention rainwater well structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202120167471.7U CN214272352U (en) | 2021-01-21 | 2021-01-21 | Town road engineering flood prevention rainwater well structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN214272352U true CN214272352U (en) | 2021-09-24 |
Family
ID=77764961
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202120167471.7U Expired - Fee Related CN214272352U (en) | 2021-01-21 | 2021-01-21 | Town road engineering flood prevention rainwater well structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN214272352U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115387173A (en) * | 2022-08-21 | 2022-11-25 | 穆怀安 | Town road drainage structures with prevent function of flowing backwards |
-
2021
- 2021-01-21 CN CN202120167471.7U patent/CN214272352U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115387173A (en) * | 2022-08-21 | 2022-11-25 | 穆怀安 | Town road drainage structures with prevent function of flowing backwards |
CN115387173B (en) * | 2022-08-21 | 2023-09-22 | 甘肃华程大路建设工程有限公司 | Municipal road drainage structures with prevent flowing backwards function |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107642204B (en) | Automatic force self-cleaning roof rainwater collecting and processing system device | |
CN212506628U (en) | Drainage device for municipal works | |
CN110984351A (en) | Automatic diverging device of initial stage rainwater | |
CN215406437U (en) | Municipal administration road drainage structure | |
CN214272352U (en) | Town road engineering flood prevention rainwater well structure | |
CN114751602A (en) | Water collection and recycling system for living community | |
CN112962753B (en) | Rain and sewage diversion system | |
CN214302102U (en) | Town road drainage structures | |
CN111001222A (en) | Construction site rain and sewage recycling system and using method thereof | |
CN212001479U (en) | Municipal administration rainwater drainage system | |
CN211006218U (en) | Water accumulation structure is prevented with road to hydraulic design | |
CN112814126A (en) | Municipal road-based rainwater collection device and construction method thereof | |
CN113047408B (en) | Rainwater storage tank operation device and method | |
CN206706890U (en) | A kind of sponge Urban roof rainwater delay shunt recovery system | |
CN213805773U (en) | Water collecting device of residential area sponge facility | |
CN210947096U (en) | Sponge urban rainwater pipeline system | |
CN209620224U (en) | It is a kind of to cut dirty box culvert-type Vatch basin for city river | |
CN112031169A (en) | Assembled box type house with rainwater collecting function | |
CN208455709U (en) | A kind of villa rainwater cyclic utilization system | |
CN111779121A (en) | Road surface drainage structures convenient to rubbish clearance | |
CN214089313U (en) | Sponge city district road structure | |
CN214246039U (en) | Sponge urban drainage device | |
CN220013929U (en) | Urban sewage pipeline for filtering sludge | |
CN218842770U (en) | Road drainage system | |
CN216920372U (en) | High protection nature underground structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |