CN214261249U - Waste gas and waste paint collecting device for spraying process in steel structure manufacturing - Google Patents

Waste gas and waste paint collecting device for spraying process in steel structure manufacturing Download PDF

Info

Publication number
CN214261249U
CN214261249U CN202021893760.7U CN202021893760U CN214261249U CN 214261249 U CN214261249 U CN 214261249U CN 202021893760 U CN202021893760 U CN 202021893760U CN 214261249 U CN214261249 U CN 214261249U
Authority
CN
China
Prior art keywords
supporting rod
gas
collecting
paint
gas collecting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021893760.7U
Other languages
Chinese (zh)
Inventor
黄蒙
张瑞君
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Second Metallurgy Group Co Ltd
Original Assignee
China Second Metallurgy Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Second Metallurgy Group Co Ltd filed Critical China Second Metallurgy Group Co Ltd
Priority to CN202021893760.7U priority Critical patent/CN214261249U/en
Application granted granted Critical
Publication of CN214261249U publication Critical patent/CN214261249U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Details Or Accessories Of Spraying Plant Or Apparatus (AREA)

Abstract

The utility model discloses a spraying process waste gas and waste paint collection device in steel construction manufacture relates to waste paint collection device technical field. The utility model discloses a structure includes workstation, gas collecting channel, branch pipe, house steward, collecting box, No. three branches, No. two branches, branch, side wall on the workstation sets up the collecting vat, the net platform is fixed at the collecting vat top, splendid attire paint diluent in the collecting vat, the bottom and the gas collecting channel roof intercommunication of branch pipe, the rear end and the house steward intercommunication of branch pipe, air pump and collecting box intercommunication are passed through to the bottom of house steward, the bottom mounting of No. three branches is on workstation rear portion top lateral wall, the top cover of No. three branches has a branch No. two, the recess endotheca of the front end of the horizon bar of No. two branches has a branch, the horizontal rod end of a branch is fixed with the gas collecting channel. The utility model discloses the position of adjustable gas collecting channel, and prevent that the paint adhesion is on the workstation.

Description

Waste gas and waste paint collecting device for spraying process in steel structure manufacturing
Technical Field
The utility model relates to a waste paint collection device technical field especially relates to a spraying process waste gas waste paint collection device in steel construction preparation.
Background
The steel structure manufacturing process relates to a spraying process, namely a layer of paint is sprayed on the surface of the steel structure to achieve the purpose of surface modification. Paint can be atomized in the paint spraying process, harmful substances in the paint can be volatilized into the air, and people can be harmful to health when being in the environment for a long time. The patent with the application number of 201721222984.3 provides a waste gas and waste paint collecting device in a spraying process in the manufacturing of a steel structure, and the structure of the device comprises a workbench, a paint pumping pipe, a first electric pump, a gas collecting hood, a gas pumping pipe, a second electric pump and a collecting box; the interior of the operating platform is provided with a cavity, the upper surface of the operating platform is provided with a plurality of through holes communicated with the cavity, the cavity is also communicated with a paint pumping pipe, the paint pumping pipe is connected with a collecting box, and the paint pumping pipe is also connected with a first electric pump; and a gas collecting hood is arranged right above the operating platform through a support, the gas collecting hood is communicated with the collecting box through an exhaust pipe, and a second electric pump is connected to the exhaust pipe. This patent can carry out same recovery to waste gas paint waste, but the shortcoming is that paint spouts can solidify in the air on the operation panel, can't flow into the operation panel cavity in the through-hole, and the fixed unable regulation in position of gas collecting channel, can't adapt to the steel construction of co-altitude and position.
Accordingly, one skilled in the art provides a subject to solve the problems set forth in the background above.
SUMMERY OF THE UTILITY MODEL
The utility model aims to solve the technical problem that, overcome prior art paint and spout and can solidify in the air on the operation panel, can't flow into the operation panel cavity in the through-hole, and the gas collecting channel rigidity can't be adjusted.
In order to solve the technical problems, the utility model provides a waste gas and waste paint collecting device in the spraying process in the manufacturing of a steel structure, which comprises a workbench, a gas collecting mechanism and a supporting mechanism,
the working table is of a cuboid structure, a cuboid groove serving as a collecting groove is formed in the top side wall of the working table, a net table is fixed to the top of the collecting groove, paint thinner is contained in the collecting groove, steel is supported on the net table, redundant waste paint leaks into the collecting groove from the net table when the steel is painted, and the paint thinner prevents paint from being solidified;
the gas collecting mechanism structure comprises a gas collecting hood, branch pipes, a header pipe and a collecting box, wherein the gas collecting hood is in an isosceles trapezoid cylinder groove structure, the bottom surface of the gas collecting hood is a notch, the gas collecting hood is arranged above the workbench, and mist during paint spraying floats into the gas collecting hood in a centralized manner; the branch pipes are of an L-shaped tubular structure, a plurality of branch pipes are uniformly arranged above the gas collecting hood respectively, the bottom ends of the branch pipes are communicated with the top wall of the gas collecting hood, and the branch pipes lead out mist in the gas collecting hood; the main pipe is in a T-shaped tubular structure, the rear ends of the branch pipes are communicated with a horizontal pipeline of the main pipe, the bottom end of the main pipe is communicated with the collecting box, and the main pipe collects mist in the branch pipes and guides the mist into the collecting box; the collecting box is of a cylindrical shell structure, an air pump is fixed on the top wall of the collecting box, an air inlet of the air pump is communicated with the bottom end of the header pipe, an air outlet of the air pump extends into the collecting box, and the air pump pumps mist in the header pipe into the collecting box;
the supporting mechanism structure comprises a third supporting rod, a second supporting rod and a first supporting rod, wherein the third supporting rod is of a cylindrical tubular structure, the bottom end of the third supporting rod is fixed on the top side wall of the rear part of the workbench, a second supporting rod is sleeved in a cylindrical groove at the top end of the third supporting rod, and the second supporting rod can move up and down in the third supporting rod; the second supporting rod is of an L-shaped cylindrical structure, a vertical rod of the second supporting rod is inserted into the third supporting rod, a first supporting rod is sleeved in a groove at the front end of a horizontal rod of the second supporting rod, and the first supporting rod can slide back and forth in the second supporting rod; a support rod is of an L-shaped cylindrical rod-shaped structure, the rear portion of a longitudinal rod of the support rod is inserted into a support rod II, a transverse rod end of the support rod is fixed with the gas collecting hood, and the support rod plays a role in supporting the gas collecting hood.
As a further aspect of the present invention: the branch pipes are communicated with the gas collecting hood through the spring pipes, and the spring pipes can stretch and retract, so that the gas collecting hood can be communicated with the branch pipes after moving.
As a further aspect of the present invention: the net table is formed by weaving iron wires in a crossed mode, and the iron wires are coated with an anti-sticking coating, so that paint can be prevented from being adhered to the net table.
As a further aspect of the present invention: the branch pipe and the main pipe are made of HDPE materials, and paint is not easy to attach to the HDPE materials.
As a further aspect of the present invention: fixed filter tube in the top lateral wall through-hole of collecting box, it has the active carbon filter screen to fill in the filter tube, gaseous emission from the filter tube in the collecting box, formaldehyde and benzene class gas in the active carbon filter screen adsorption gas prevent air pollution.
As a further aspect of the present invention: a paint discharging pipe is fixed in a through hole in the bottom side wall of the collecting tank, the bottom end of the paint discharging pipe is communicated with the collecting tank, a valve is arranged on the paint discharging pipe, and paint in the collecting tank can be conveniently discharged into the collecting tank through the paint discharging pipe.
As a further aspect of the present invention: four corners of the bottom side wall of the workbench are respectively fixed with a supporting leg, and the bottom end of each supporting leg is fixed with a universal self-locking wheel, so that the workbench can be conveniently pushed to move.
As a further aspect of the present invention: the bottom of the supporting leg is fixed with a bottom plate, and the collecting box can be placed on the bottom plate.
The utility model has the advantages that:
(1) the utility model is provided with a workbench, and when in use, the device is connected with an external power supply; placing the steel on a net table for spraying paint, and leaking sprayed redundant waste paint into a collecting groove from the net table, wherein the waste paint is dissolved with paint thinner; the sprayed paint mist floats upwards into the gas collecting hood, the mist in the gas collecting hood is guided into the main pipe from the spring pipe and the branch pipe, the air pump pumps the mist in the main pipe into the collecting box, and the mist is condensed into liquid paint in the collecting box. The utility model discloses prevent that the paint adhesion is on the workstation.
(2) The utility model discloses set up supporting mechanism, when the structure of steel is hour, can make the gas collecting channel move down with No. two branches lapse in No. three branches, slide forward No. two branches with a branch, make the gas collecting channel move forward, make the gas collecting channel directly over steel. The utility model discloses the position of adjustable gas collecting channel.
Drawings
Fig. 1 is a front view of the present invention;
fig. 2 is a right side sectional view of the present invention.
Wherein: the device comprises a workbench 10, a collecting tank 11, a net table 12, a paint diluent 13, a paint discharging pipe 14, a supporting leg 15, a bottom plate 16, a universal self-locking wheel 17, a gas collecting hood 20, a first supporting rod 21, a second supporting rod 22, a third supporting rod 23, a spring pipe 24, a branch pipe 25, a main pipe 26, a collecting tank 27, an air pump 28 and a filter pipe 29.
Detailed Description
The structure of the waste gas and waste paint collecting device in the spraying process in the manufacturing of the steel structure provided by the embodiment is shown in figures 1-2, and comprises a workbench 10, a gas collecting mechanism and a supporting mechanism,
the working table 10 is of a cuboid structure, a cuboid groove is formed in the top side wall of the working table 10 and is a collecting tank 11, a net table 12 is fixed to the top of the collecting tank 11, paint thinner 13 is contained in the collecting tank 11, steel is supported on the net table 12, redundant waste paint leaks into the collecting tank 11 from the net table 12 when the steel is painted, and the paint thinner 13 prevents paint from being solidified;
the gas collecting mechanism structure comprises a gas collecting hood 20, branch pipes 25, a main pipe 26 and a collecting box 27, wherein the gas collecting hood 20 is in an isosceles trapezoid cylinder groove structure, the bottom surface of the gas collecting hood 20 is a notch, the gas collecting hood 20 is arranged above the workbench 10, and mist during paint spraying floats into the gas collecting hood 20 in a centralized manner; the branch pipes 25 are in an L-shaped tubular structure, a plurality of the branch pipes 25 are respectively and uniformly arranged above the gas collecting hood 20, the bottom ends of the branch pipes 25 are communicated with the top wall of the gas collecting hood 20, and the branch pipes 25 lead out mist in the gas collecting hood 20; the main pipe 26 is in a T-shaped tubular structure, the rear ends of the branch pipes 25 are communicated with a horizontal pipeline of the main pipe 26, the bottom end of the main pipe 26 is communicated with the collecting tank 27, and the main pipe 26 collects mist in the branch pipes 25 and guides the mist into the collecting tank 27; the collecting box 27 is in a cylindrical shell structure, an air pump 28 is fixed on the top wall of the collecting box 27, an air inlet of the air pump 28 is communicated with the bottom end of the header pipe 26, an air outlet of the air pump 28 extends into the collecting box 27, and the air pump 28 pumps the mist in the header pipe 26 into the collecting box 27;
the supporting mechanism structure comprises a third supporting rod 23, a second supporting rod 22 and a first supporting rod 21, the third supporting rod 23 is of a cylindrical tubular structure, the bottom end of the third supporting rod 23 is fixed on the top side wall of the rear part of the workbench 10, a second supporting rod 22 is sleeved in a cylindrical groove at the top end of the third supporting rod 23, and the second supporting rod 22 can move up and down in the third supporting rod 23; the second supporting rod 22 is of an L-shaped cylindrical structure, a vertical rod of the second supporting rod 22 is inserted into the third supporting rod 23, a first supporting rod 21 is sleeved in a groove at the front end of a horizontal rod of the second supporting rod 22, and the first supporting rod 21 can slide back and forth in the second supporting rod 22; the first supporting rod 21 is of an L-shaped cylindrical rod-shaped structure, the rear part of a longitudinal rod of the first supporting rod 21 is inserted into the second supporting rod 22, a transverse rod end of the first supporting rod 21 is fixed with the gas collecting hood 20, and the first supporting rod 21 plays a role in supporting the gas collecting hood 20.
The branch pipes 25 are communicated with the gas collecting hood 20 through the spring pipes 24, and the spring pipes 24 can stretch and retract, so that the gas collecting hood 20 can be communicated with the branch pipes 25 after moving.
The net table 12 is formed by weaving iron wires in a crossed mode, and an anti-sticking coating is coated on the iron wires to prevent paint from being adhered to the net table 12.
The branch pipes 25 and the header pipe 26 are made of HDPE materials, and paint is not easy to attach to the HDPE materials.
A filter pipe 29 is fixed in the through hole of the top side wall of the collecting box 27, an active carbon filter screen is filled in the filter pipe 29, gas in the collecting box 27 is discharged from the filter pipe 29, and the active carbon filter screen adsorbs formaldehyde and benzene gas in the gas to prevent air pollution.
A paint discharge pipe 14 is fixed in a through hole in the bottom side wall of the collecting tank 11, the bottom end of the paint discharge pipe 14 is communicated with a collecting tank 27, a valve is arranged on the paint discharge pipe 14, and the paint discharge pipe 14 is convenient for discharging paint in the collecting tank 11 into the collecting tank 27.
Four corners of the bottom side wall of the workbench 10 are respectively fixed with a supporting leg 15, and the bottom end of each supporting leg 15 is fixed with a universal self-locking wheel 17, so that the workbench 10 can be conveniently pushed to move.
The bottom of the leg 15 is fixed to a bottom plate 16, and the collecting chamber 27 can be placed on the bottom plate 16.
The utility model discloses a theory of operation: when in use, the device is connected with an external power supply; placing the steel on a net table 12 for spraying paint, and leaking sprayed redundant waste paint into a collecting groove 11 from the net table 12, wherein the waste paint is dissolved with a paint thinner 13; the sprayed paint mist floats upwards into the gas collecting hood 20, the mist in the gas collecting hood 20 is guided into the main pipe 26 from the spring pipe 24 and the branch pipe 25, the air pump 28 pumps the mist in the main pipe 26 into the collecting box 27, and the mist is condensed into liquid paint in the collecting box 27; when the structure of the steel is small, the second support rod 22 can slide downwards in the third support rod 23 to move the gas-collecting hood 20 downwards, and the first support rod 21 can slide forwards in the second support rod 22 to move the gas-collecting hood 20 forwards, so that the gas-collecting hood 20 is covered right above the steel. The utility model discloses adjustable gas collecting channel 20's position, and prevent that the paint adhesion is on workstation 10.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Furthermore, it should be understood that although the present description refers to embodiments, not every embodiment may contain only a single embodiment, and such description is for clarity only, and those skilled in the art should integrate the description, and the embodiments may be combined as appropriate to form other embodiments understood by those skilled in the art.

Claims (5)

1. A waste gas and waste paint collecting device in the spraying process of steel structure manufacturing is characterized by comprising a workbench (10), a gas collecting mechanism and a supporting mechanism,
the working table (10) is of a cuboid structure, a cuboid groove is formed in the top side wall of the working table (10) and is a collecting tank (11), a net table (12) is fixed to the top of the collecting tank (11), paint thinner (13) is contained in the collecting tank (11), steel is supported on the net table (12), redundant waste paint leaks into the collecting tank (11) from the net table (12) when the steel is painted, and the paint thinner (13) prevents paint from being solidified;
the gas collecting mechanism structure comprises a gas collecting hood (20), branch pipes (25), a main pipe (26) and a collecting box (27), the gas collecting hood (20) is in an isosceles trapezoid cylinder groove structure, the bottom surface of the gas collecting hood (20) is a notch, the gas collecting hood (20) is arranged above the workbench (10), and mist during paint spraying floats into the gas collecting hood (20) in a centralized manner; the branch pipes (25) are of an L-shaped tubular structure, a plurality of branch pipes (25) are uniformly arranged above the gas collecting hood (20), the bottom ends of the branch pipes (25) are communicated with the top wall of the gas collecting hood (20), and the branch pipes (25) lead out mist in the gas collecting hood (20); the main pipe (26) is of a T-shaped tubular structure, the rear ends of the branch pipes (25) are communicated with a horizontal pipeline of the main pipe (26), the bottom end of the main pipe (26) is communicated with the collecting box (27), and the main pipe (26) collects mist in the branch pipes (25) and guides the mist into the collecting box (27); the collecting box (27) is of a cylindrical shell structure, an air pump (28) is fixed on the top wall of the collecting box (27), an air inlet of the air pump (28) is communicated with the bottom end of the header pipe (26), an air outlet of the air pump extends into the collecting box (27), and mist in the header pipe (26) is pumped into the collecting box (27) by the air pump (28);
the supporting mechanism structure comprises a third supporting rod (23), a second supporting rod (22) and a first supporting rod (21), the third supporting rod (23) is of a cylindrical tubular structure, the bottom end of the third supporting rod (23) is fixed on the top side wall of the rear portion of the workbench (10), the second supporting rod (22) is sleeved in a top end cylindrical groove of the third supporting rod (23), and the second supporting rod (22) can move up and down in the third supporting rod (23); the second supporting rod (22) is of an L-shaped cylindrical structure, a vertical rod of the second supporting rod (22) is inserted into the third supporting rod (23), a first supporting rod (21) is sleeved in a groove at the front end of a horizontal rod of the second supporting rod (22), and the first supporting rod (21) can slide back and forth in the second supporting rod (22); a first supporting rod (21) is of an L-shaped cylindrical rod-shaped structure, the rear part of a longitudinal rod of the first supporting rod (21) is inserted into a second supporting rod (22), the transverse rod end of the first supporting rod (21) is fixed with a gas collecting hood (20), and the first supporting rod (21) plays a role in supporting the gas collecting hood (20).
2. The device for collecting waste gas and waste paint generated in the spraying process in the manufacturing of the steel structure according to claim 1, is characterized in that: the branch pipes (25) are communicated with the gas collecting hood (20) through the spring pipes (24), and the spring pipes (24) can stretch and retract, so that the gas collecting hood (20) can be communicated with the branch pipes (25) after moving.
3. The device for collecting waste gas and waste paint generated in the spraying process in the manufacturing of the steel structure according to claim 1, is characterized in that: the net table (12) is formed by weaving iron wires in a crossed mode, and an anti-sticking coating is coated on the iron wires, so that paint can be prevented from being adhered to the net table (12).
4. The device for collecting waste gas and waste paint generated in the spraying process in the manufacturing of the steel structure according to claim 1, is characterized in that: the branch pipes (25) and the header pipe (26) are made of HDPE materials, and paint is not easy to attach to the HDPE materials.
5. The device for collecting waste gas and waste paint generated in the spraying process in the manufacturing of the steel structure according to claim 1, is characterized in that: fixed filter tube (29) in the top lateral wall through-hole of collecting box (27), it has the active carbon filter screen to fill in filter tube (29), gaseous emission from filter tube (29) in collecting box (27), formaldehyde and benzene class gas in the active carbon filter screen adsorbed gas prevent air pollution.
CN202021893760.7U 2020-08-26 2020-08-26 Waste gas and waste paint collecting device for spraying process in steel structure manufacturing Active CN214261249U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021893760.7U CN214261249U (en) 2020-08-26 2020-08-26 Waste gas and waste paint collecting device for spraying process in steel structure manufacturing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021893760.7U CN214261249U (en) 2020-08-26 2020-08-26 Waste gas and waste paint collecting device for spraying process in steel structure manufacturing

Publications (1)

Publication Number Publication Date
CN214261249U true CN214261249U (en) 2021-09-24

Family

ID=77804857

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021893760.7U Active CN214261249U (en) 2020-08-26 2020-08-26 Waste gas and waste paint collecting device for spraying process in steel structure manufacturing

Country Status (1)

Country Link
CN (1) CN214261249U (en)

Similar Documents

Publication Publication Date Title
CN214261249U (en) Waste gas and waste paint collecting device for spraying process in steel structure manufacturing
CN217608337U (en) Greenhouse fertilizer injection unit
CN209582616U (en) A kind of Manual cleaning cart with depositing dust function
CN210846862U (en) Dedicated environmental protection high efficiency flush coater of construction machinery
CN110732431A (en) water curtain cabinet for painting mirror frame
CN210699440U (en) Fountain clarification plant
CN214148254U (en) Remove formaldehyde environment-friendly air purification device
CN210753382U (en) Waterproof coating flush coater
CN210675685U (en) Novel water curtain cabinet
CN101745506A (en) Overhead cleaning system for overhead working truck
CN211538255U (en) 3M easily clean coating spraying structure convenient to clear up inside
CN203343003U (en) Paint spray chamber
CN210186706U (en) Power grid construction wisdom building site management device
CN207786190U (en) A kind of water circle device for dust collection equipment
CN219923419U (en) Anticorrosive coating smearing device
CN216605766U (en) Ground track line liquid coating booth
CN201596634U (en) High-altitude cleaning system for high-altitude working vehicle
CN216498104U (en) Fertilizer production case deodorizing device
CN112827733A (en) Furniture processing is with spouting baking finish device
CN205624095U (en) Vehicular forestry atomizer based on solar energy
CN219051809U (en) Workpiece spraying dust recycling equipment
CN213032823U (en) Waste gas and waste paint collecting device for spraying process in steel structure manufacturing
CN209237594U (en) A kind of municipal construction dust suppression device by water spray
CN218690765U (en) Spraying robot
CN212493621U (en) Energy-saving water curtain cabinet for metal wire drawing imitation spraying

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant