CN210186706U CN201920994884.5U CN201920994884U CN210186706U CN 210186706 U CN210186706 U CN 210186706U CN 201920994884 U CN201920994884 U CN 201920994884U CN 210186706 U CN210186706 U CN 210186706U
Authority
CN
China
Prior art keywords
management device
power grid
site management
pipe
spray room
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920994884.5U
Other languages
Chinese (zh)
Inventor
Xilei Zhou
周锡雷
Ting Zhu
朱挺
Jiaqi Zhu
朱佳启
Chengcheng Gong
龚澄澄
Lijun Liu
刘利军
Yong Yang
杨勇
Jie Song
宋杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huichen Zhidian Technology Co Ltd
Original Assignee
Huichen Zhidian Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huichen Zhidian Technology Co Ltd filed Critical Huichen Zhidian Technology Co Ltd
Priority to CN201920994884.5U priority Critical patent/CN210186706U/en
Application granted granted Critical
Publication of CN210186706U publication Critical patent/CN210186706U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model relates to an electric wire netting construction technical field discloses an electric wire netting construction wisdom building site management device, to the big problem of current electric wire netting construction building site dust, the following scheme is put forward now, and it includes the bottom plate, support column, water tank and water pump are installed respectively to the top of bottom plate, the spray room is installed at the top of support column, the reposition of redundant personnel case is installed to the top inner wall of spray room, and a plurality of atomizer are installed to the bottom of reposition of redundant personnel case, the dust absorption pipe is installed at the top of water tank, the one end and the spray room of dust absorption pipe are connected, the self priming pump is installed at the top of reposition of redundant personnel case, and the self priming pump is connected with the reposition of redundant personnel case, is connected with the suction tube on. The utility model discloses realize the dust absorption effect of building site dust, improve environmental quality, improve the utilization ratio of water resource, the convenient clearance of management device, convenient operation easily promotes.

Description

Power grid construction wisdom building site management device
Technical Field
The utility model relates to an electric wire netting construction technical field especially relates to an electric wire netting construction wisdom building site management device.
Background
In an electric power system, facilities and equipment for generating and using electricity are collectively referred to. It is an intermediate link for transmitting and distributing electric energy, and is mainly formed from power transmission line, transformer substation, distribution substation and distribution line which are connected into network. On the building site of electric wire netting construction, can produce great dust, the dust flies to dance and leads to the environment contaminated, influences constructor's health, consequently, needs an electric wire netting construction wisdom building site management device to solve above problem.
SUMMERY OF THE UTILITY MODEL
The utility model provides a pair of electric wire netting construction wisdom building site management device has solved the big problem of current electric wire netting construction building site dust.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
an intelligent construction site management device for power grid construction comprises a bottom plate, wherein a support column, a water tank and a water pump are respectively arranged at the top of the bottom plate, the top of the supporting column is provided with a spray room, the inner wall of the top of the spray room is provided with a flow distribution box, the bottom of the flow distribution box is provided with a plurality of atomizing nozzles, a dust suction pipe is arranged at the top of the water tank, one end of the dust suction pipe is connected with the spray chamber, a self-sucking pump is arranged at the top of the flow dividing box and is connected with the flow dividing box, a water suction pipe is connected onto the self-sucking pump, one end of the water suction pipe is connected with the water tank, the top of the spray chamber is provided with a fan, the bottom of the spray chamber is provided with a drain pipe, the bottom of the drain pipe is connected with a filter cylinder, the filter cartridge is internally provided with a filter plate in a sliding manner, the filter cartridge is arranged in an inclined manner, the bottom of the filter cartridge is connected with a water pump, the water pump is connected with a return pipe, and one end of the return pipe is connected with a water tank.
Preferably, a piston is arranged in the filter cylinder in a sliding mode, one end of the piston is connected with a connecting rod, one end of the connecting rod is connected with the filter plate, a mounting plate is arranged at the top of the bottom plate, a push rod motor is arranged on the mounting plate, and an output shaft of the push rod motor is connected with the piston.
Preferably, one end of the filter cylinder, which is close to the push rod motor, is provided with an opening, and the drain pipe is positioned between the piston and the filter plate.
Preferably, the inner wall of the top of the spray chamber is provided with a vertical rod, and the bottom of the vertical rod is connected with the flow distribution box.
Preferably, the dust suction pipe is positioned below the atomizing nozzle, and the fan is positioned above the flow dividing box.
Preferably, a valve is arranged on the sewage draining pipe.
The utility model has the advantages that:
when inhaling the dust through the fan and spraying indoorly, spray water through atomizer for the dust falls down, realizes the purpose of dust absorption, dust fall, filters through the filter plate, and in water returned to the water tank, realize the cyclic utilization of water, simultaneously, drive filter plate, piston through the push rod motor and shift out the cartridge filter, can discharge remaining filter residue on the filter plate, arrange the sediment convenience.
The utility model discloses realize the dust absorption effect of building site dust, improve environmental quality, improve the utilization ratio of water resource, the convenient clearance of management device, convenient operation easily promotes.
Drawings
Fig. 1 is the utility model provides a power grid construction wisdom building site management device's schematic structure diagram.
Fig. 2 is a sectional structural view of the filter cartridge.
In the figure: 1 bottom plate, 2 support columns, 3 spray rooms, 4 flow distribution boxes, 5 atomizer heads, 6 self priming pumps, 7 suction pipes, 8 water tanks, 9 dust absorption pipes, 10 fans, 11 blow off pipes, 12 filter cartridges, 13 push rod motors, 14 pistons, 15 connecting rods, 16 filter plates, 17 water pumps, 18 return pipes.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1-2, a power grid construction wisdom building site management device, comprising a base plate 1, a support column 2, a water tank 8 and a water pump 17 are respectively installed at the top of the base plate 1, a spray room 3 is installed at the top of the support column 2, a shunt box 4 is installed on the inner wall of the top of the spray room 3, a plurality of atomizing spray heads 5 are installed at the bottom of the shunt box 4, a dust suction pipe 9 is installed at the top of the water tank 8, one end of the dust suction pipe 9 is connected with the spray room 3, a self-priming pump 6 is installed at the top of the shunt box 4, the self-priming pump 6 is connected with the shunt box 4, a water suction pipe 7 is connected onto the self-priming pump 6, one end of the water suction pipe 7 is connected with the water tank 8, a fan 10 is arranged at the top of the spray room 3, a drain pipe 11 is installed at the bottom of the drain pipe 11, a filter cylinder, a return pipe 18 is connected to the water pump 17, and one end of the return pipe 18 is connected to the water tank 8.
In the embodiment, a piston 14 is slidably mounted in a filter cartridge 12, one end of the piston 14 is connected with a connecting rod 15, one end of the connecting rod 15 is connected with a filter plate 16, a mounting plate is mounted at the top of a bottom plate 1, a push rod motor 13 is mounted on the mounting plate, an output shaft of the push rod motor 13 is connected with the piston 14, one end of the filter cartridge 12, which is close to the push rod motor 13, is provided with an opening, a drain pipe 11 is positioned between the piston 14 and the filter plate 16, a vertical rod is mounted on the inner wall of the top of a spray chamber 3, the bottom of the vertical rod is connected with a flow dividing box 4, a dust suction pipe 9 is positioned below an atomizing nozzle 5, a fan 10 is positioned above the flow dividing box 4, a valve is arranged on the drain pipe 11, when dust is sucked into the spray chamber 3 by the fan 10, water is sprayed by the atomizing nozzle 5, so that the dust falls down, simultaneously, drive filter plate 16, piston 14 through push rod motor 13 and shift out cartridge filter 12, can discharge remaining filter residue on the filter plate 16, arrange the sediment convenience, the utility model discloses realize the dust absorption of building site dust, improve environmental quality, improve the utilization ratio of water resource, the convenient clearance of management device, convenient operation easily promotes.
In this embodiment, a controller is disposed on the bottom plate 1, the controller is an AT89C51 type controller, the controller is an AT89C51 type controller, the fan 10 is a 4-75 type fan, an output end of the controller is respectively connected to the fan 10, the push rod motor 13, the self-priming pump 2, and the water pump 17, the dust suction pipe 9 has a dust suction effect by discharging gas in the spray chamber 3 through the fan 10, when the gas is sucked into the spray chamber 3, water in the water tank 8 is sucked by the self-priming pump 6 and enters the flow dividing box 4 to be sprayed out through the atomizing nozzle 5, so that dust falls down, dust suction and dust fall are achieved, a valve of the drain pipe 11 is opened, mixed liquid enters the filter cartridge 12, the mixed liquid is filtered through the filter plate 16, the water is pumped into the water tank 8 by the water pump 17 and returns to the water tank 8, recycling of the water is achieved, meanwhile, the filter plate 16 is driven by the push rod motor 13, the piston 14 is moved out of the filter cartridge, the slag discharge is convenient.
In the description of the present invention, it is to be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", "clockwise", "counterclockwise", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and to simplify the description, but do not indicate or imply that the device or element referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore should not be construed as limiting the present invention.
Furthermore, the terms "first", "second" and "first" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of that feature. In the description of the present invention, "a plurality" means two or more unless specifically limited otherwise.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (6)

1. The utility model provides a power grid construction wisdom building site management device, includes bottom plate (1), its characterized in that, support column (2), water tank (8) and water pump (17) are installed respectively to the top of bottom plate (1), spray room (3) are installed at the top of support column (2), flow distribution box (4) are installed to the top inner wall of spray room (3), and a plurality of atomizer (5) are installed to the bottom of flow distribution box (4), dust absorption pipe (9) are installed at the top of water tank (8), the one end of dust absorption pipe (9) is connected with spray room (3), self priming pump (6) are installed at the top of flow distribution box (4), and self priming pump (6) are connected with flow distribution box (4), are connected with on pump (6) from suction pipe (7), and the one end and the water tank (8) of suction pipe (7) are connected, the top of spray room (3) is equipped with self priming fan (10), blow off pipe (11) are installed to the bottom of spray room (3), and the bottom of blow off pipe (11) is connected with cartridge filter (12), slidable mounting has filter plate (16) in cartridge filter (12), and cartridge filter (12) slope sets up, and the bottom of cartridge filter (12) has and is connected with water pump (17), is connected with back flow (18) on water pump (17), and the one end and the water tank (8) of back flow (18) are connected.
2. The intelligent construction site management device for the power grid construction is characterized in that a piston (14) is slidably mounted in the filter cylinder (12), one end of the piston (14) is connected with a connecting rod (15), one end of the connecting rod (15) is connected with the filter plate (16), a mounting plate is mounted at the top of the bottom plate (1), a push rod motor (13) is mounted on the mounting plate, and an output shaft of the push rod motor (13) is connected with the piston (14).
3. The intelligent site management device for power grid construction as claimed in claim 2, wherein the filter cylinder (12) is provided with an opening at one end close to the push rod motor (13), and the sewage draining pipe (11) is positioned between the piston (14) and the filter plate (16).
4. The intelligent construction site management device for the power grid construction as claimed in claim 1, wherein a vertical rod is mounted on the inner wall of the top of the spray chamber (3), and the bottom of the vertical rod is connected with the diversion box (4).
5. The intelligent site management device for power grid construction according to claim 1, wherein the dust suction pipe (9) is located below the atomizing nozzle (5), and the fan (10) is located above the flow dividing box (4).
6. The intelligent site management device for power grid construction as claimed in claim 1, wherein a valve is arranged on the sewage discharge pipe (11).
CN201920994884.5U 2019-06-28 2019-06-28 Power grid construction wisdom building site management device Active CN210186706U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920994884.5U CN210186706U (en) 2019-06-28 2019-06-28 Power grid construction wisdom building site management device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920994884.5U CN210186706U (en) 2019-06-28 2019-06-28 Power grid construction wisdom building site management device

Publications (1)

Publication Number Publication Date
CN210186706U true CN210186706U (en) 2020-03-27

Family

ID=69869694

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920994884.5U Active CN210186706U (en) 2019-06-28 2019-06-28 Power grid construction wisdom building site management device

Country Status (1)

Country Link
CN (1) CN210186706U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112246050A (en) * 2020-10-13 2021-01-22 郭峰 Dustproof atomizer is used in construction

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112246050A (en) * 2020-10-13 2021-01-22 郭峰 Dustproof atomizer is used in construction

Similar Documents

Publication Publication Date Title
CN204491488U (en) The special dedusting moisturizing device in a kind of building site
CN210186706U (en) Power grid construction wisdom building site management device
CN111350397A (en) Safety monitoring equipment for roads and bridges
CN216703823U (en) Dust device for building engineering
CN217247897U (en) Cement manufacture is with circulation dechlorination device
CN108797499A (en) A kind of Concrete Highway construction maintenance of surface device that can quickly sprinkle water
CN211321648U (en) Horizontal pumping circulating spray device
CN210138557U (en) Dust device for environmental protection engineering
CN211133387U (en) Atomizing dust fall machine for highway construction
CN209779848U (en) Enamel assembling type integrated lifting pump station
CN210577277U (en) Power equipment protection device
CN210901079U (en) Assembled irrigation equipment for hydraulic engineering
CN215901170U (en) Atomizing humidification dust suppression device of environmental engineering site operation
CN215027236U (en) Automatic change indoor place dust fall equipment
CN218796392U (en) Solid garbage crushing device
CN217383847U (en) Closed cooling tower with top rainwater diversion structure
CN218935738U (en) Intelligent power station auxiliary monitoring alarm system
CN212607278U (en) Building site environment-friendly refuse handling installation
CN220027416U (en) Multi-section type odor masking agent spraying device
CN215782690U (en) Exhaust treatment device for thermal power generation
CN215122875U (en) Irrigation device for hydraulic engineering
CN219004022U (en) Water tank sediment cleaning device
CN218590055U (en) Civil engineering is with watering dust device
CN220779513U (en) Dust collector for environmental protection engineering
CN213038478U (en) Energy-saving device for fabricated building