CN214247304U - A support is prevented spouting in oil-water well test for oil production factory - Google Patents
A support is prevented spouting in oil-water well test for oil production factory Download PDFInfo
- Publication number
- CN214247304U CN214247304U CN202120217528.XU CN202120217528U CN214247304U CN 214247304 U CN214247304 U CN 214247304U CN 202120217528 U CN202120217528 U CN 202120217528U CN 214247304 U CN214247304 U CN 214247304U
- Authority
- CN
- China
- Prior art keywords
- wall
- oil
- support
- water well
- internal thread
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 title claims abstract description 20
- 238000004519 manufacturing process Methods 0.000 title claims abstract description 16
- 238000009434 installation Methods 0.000 claims abstract description 18
- 230000002265 prevention Effects 0.000 claims description 24
- 238000001514 detection method Methods 0.000 claims description 16
- 238000000605 extraction Methods 0.000 claims 3
- 241000282326 Felis catus Species 0.000 description 4
- 239000003129 oil well Substances 0.000 description 4
- 210000001503 joint Anatomy 0.000 description 2
- 238000005096 rolling process Methods 0.000 description 2
- 239000002689 soil Substances 0.000 description 2
- 230000009193 crawling Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000001771 impaired effect Effects 0.000 description 1
- 239000011435 rock Substances 0.000 description 1
Images
Landscapes
- Ladders (AREA)
Abstract
The utility model discloses a support is prevented spouting in oil and water well test for oil production factory, including work platform, work platform bottom outer wall four corners position is provided with four support columns respectively, and four support column one side outer walls are provided with the installation piece, and four support column one side outer walls are provided with two connecting plates respectively, and work platform top outer wall is opened there is circular through-hole, and circular through-hole inner wall sliding connection has the detecting tube, and the detecting tube outer wall is provided with preventer. The utility model discloses a set up second internal thread sleeve, first gear, second gear and pivot, when needs highly adjust the test tube, only need rotate the pivot through the second turning handle to let the second gear drive first gear and rotate, drive two first gears through setting up two second gears and rotate, can let second internal thread sleeve can be more stable when rotating, second internal thread sleeve can drive the test tube through the external screw thread and carry out the removal of upper and lower position when rotating.
Description
Technical Field
The utility model relates to an oil well equipment technical field especially relates to a support is prevented spouting in oil-water well test for oil production factory.
Background
In oil field production, often need carry out oil-water well oil pipe test, the traditional mode needs single bare-handed operation installation, does not have any support or support, especially when laying the test instrument, needs single bare-handed hand to lift the tester that reaches dozens of kilograms emphatically in high altitude and operates, so the physical demands to the workman is higher because of operating time is long to very dangerous, thereby lead to the physical strength not to support easily and fall from the high altitude, cause the incident.
Through the retrieval, chinese patent application number is CN 201320713626.8's patent, discloses a support is prevented spouting in oil-water well test, including the support body, lay the platform, hang the ladder, the side props, block ware, sealed interface, light, lay the platform and fix in support body upper end, the block ware is fixed at support body lower extreme, it is equipped with the side prop to lay the platform lower extreme, and the side props through the bolt fastening under laying the platform, but above-mentioned technical scheme is because only using the side prop to support and fix whole support, consequently still has the staff and lays the platform and produce easily and rock the problem that leads to the test tube impaired or staff carelessly to fall when carrying out work.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the defects existing in the prior art, and providing an oil-water well testing blowout prevention support for an oil production plant.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a support is prevented spouting in oil and water well test for oil production factory, comprises a work platform, work platform bottom outer wall four corners position is provided with four support columns respectively, four support column one side outer walls are provided with the installation piece, four support column one side outer walls are provided with two connecting plates respectively, work platform top outer wall is opened there is circular through-hole, circular through-hole inner wall sliding connection has the detecting tube, the detecting tube outer wall is provided with the preventer, the detecting tube runs through the installation piece, the installation piece inner wall is provided with adjustment mechanism, detecting tube bottom outer wall is provided with the block ware, connecting plate top outer wall is provided with the cat ladder, cat ladder top outer wall sets up on work platform's bottom outer wall.
As a further aspect of the present invention: adjustment mechanism includes second internal thread sleeve, two first gears, two second gears, pivot and second turning handle, the test tube outer wall is opened there is the external screw thread, second internal thread sleeve passes through the screw thread to be fixed in on the outer wall of test tube, two first gears set up respectively on second internal thread sleeve's outer wall, second internal thread sleeve passes through rolling bearing to rotate to be connected on the inner wall of installation piece, the pivot is passed through rolling bearing and is rotated and connect on the inner wall of installation piece, two second gears set up respectively on the outer wall of pivot, the second turning handle sets up on the top outer wall of pivot, the second gear is connected with first gear engagement.
As a further aspect of the present invention: the outer wall of the top of the working platform is provided with a fence, and a fence door is fixed to the outer wall of one side of the fence through hinges respectively.
As a further aspect of the present invention: the outer wall of the top of the fence is provided with an installation rod, and the outer wall of the top of the installation rod is provided with a lighting lamp.
As a further aspect of the present invention: four outer walls of the bottom of the support columns are respectively provided with four universal wheels.
As a further aspect of the present invention: four circular through holes are formed in the outer wall of the top of the connecting plate respectively, four inner walls of the circular through holes are provided with four first internal thread sleeves respectively, four inner walls of the first internal thread sleeves are fixedly provided with four positioning columns through threads respectively, and the outer wall of the top of each positioning column is provided with a first rotating handle.
As a further aspect of the present invention: the outer wall of one side of the support column is fixed with a fixing piece through a spring hinge, and the outer wall of one side of the fixing piece is fixed on the outer wall of one side of the first rotating handle through a screw.
The utility model has the advantages that:
1. through setting up second internal thread sleeve, first gear, second gear and pivot, when needs are adjusted the height of detecting tube, only need rotate the pivot through the second turning handle, thereby let the second gear drive first gear and rotate, drive two first gears through setting up two second gears and rotate, can let second internal thread sleeve can be more stable when rotating, second internal thread sleeve can drive the removal that the detecting tube carried out upper and lower position through the external screw thread when rotating, thereby let the height of detecting tube can be adjusted by convenient, let butt joint between detecting tube and the different oil pipe become portably.
2. Through setting up support column, installation piece and connecting plate, the support column can carry out effectual support to work platform, lets work platform can not take place too big rocking easily when the staff carries out the work, and connecting plate and installation piece can connect into a relatively stable whole with four support columns simultaneously, have further improved and have prevented spouting the holistic stability of support.
3. Through setting up first internal thread sleeve, reference column and first turning handle, the staff will prevent spouting after the support removes suitable position, can let the reference column through first internal thread sleeve downstream through rotating first turning handle to let the reference column prick into near earth of oil well, carry out effectual location to the position of preventing spouting the support, the accessible rotates first turning handle promptly after the detection and removes the reference column from earth, thereby removes the location to preventing spouting the support.
Drawings
Fig. 1 is a schematic view of a main view structure of an oil-water well testing blowout prevention bracket for an oil production plant according to the present invention;
fig. 2 is a schematic bottom view of the blowout prevention bracket for testing the oil-water well in the oil production plant according to the present invention;
fig. 3 is a schematic structural view of a positioning column of the blowout prevention support for testing an oil-water well in an oil production plant according to the present invention;
fig. 4 is the structural schematic diagram of the adjusting mechanism of the oil-water well testing blowout prevention bracket for the oil production plant.
In the figure: 1-a working platform, 2-a fence, 3-an installation rod, 4-a lighting lamp, 5-a detection pipe, 6-a blowout preventer, 7-a fence door, 8-a support column, 9-a ladder, 10-a universal wheel, 11-a clamping device, 12-a connecting plate, 13-an external thread, 14-an installation block, 16-a first gear, 17-a second gear, 18-a first rotating handle, 19-a positioning column, 20-a fixing plate, 21-a first internal thread sleeve, 22-a second rotating handle, 23-a rotating shaft and 24-a second internal thread sleeve.
Detailed Description
The technical solution of the present patent will be described in further detail with reference to the following embodiments.
Reference will now be made in detail to embodiments of the present patent, examples of which are illustrated in the accompanying drawings, wherein like or similar reference numerals refer to the same or similar elements or elements having the same or similar function throughout. The embodiments described below with reference to the drawings are exemplary only for the purpose of explaining the present patent and are not to be construed as limiting the present patent.
In the description of this patent, it is to be understood that the terms "center," "upper," "lower," "front," "rear," "left," "right," "vertical," "horizontal," "top," "bottom," "inner," "outer," and the like are used in the orientations and positional relationships indicated in the drawings for the convenience of describing the patent and for the simplicity of description, and are not intended to indicate or imply that the referenced devices or elements must have a particular orientation, be constructed and operated in a particular orientation, and are not to be considered limiting of the patent.
In the description of this patent, it is noted that unless otherwise specifically stated or limited, the terms "mounted," "connected," and "disposed" are to be construed broadly and can include, for example, fixedly connected, disposed, detachably connected, disposed, or integrally connected and disposed. The specific meaning of the above terms in this patent may be understood by those of ordinary skill in the art as appropriate.
The utility model provides a support is prevented spouting in oil and water well test for oil production factory, as shown in fig. 1-4, including work platform 1, 1 bottom outer wall four corners position of work platform is provided with four support columns 8 respectively, four 8 side outer walls of support columns are provided with installation piece 14, 8 one side outer walls of four support columns are provided with two connecting plates 12 respectively, 1 top outer wall of work platform is opened there is circular through-hole, circular through-hole inner wall sliding connection has detecting tube 5, 5 outer walls of detecting tube are provided with preventer 6, detecting tube 5 runs through installation piece 14, 14 inner walls of installation piece are provided with adjustment mechanism, 5 bottom outer walls of detecting tube are provided with block ware 11, 12 top outer walls of connecting plates are provided with cat ladder 9, cat ladder 9 top outer wall sets up on work platform 1's bottom outer wall.
In order to adjust the vertical position of the detection tube 5; as shown in fig. 4, the adjusting mechanism includes a second internal thread sleeve 24, two first gears 16, two second gears 17, a rotating shaft 23 and a second rotating handle 22, the outer wall of the detecting tube 5 is provided with an external thread 13, the second internal thread sleeve 24 is fixed on the outer wall of the detecting tube 5 through a thread, the two first gears 16 are respectively arranged on the outer wall of the second internal thread sleeve 24, the second internal thread sleeve 24 is rotatably connected on the inner wall of the mounting block 14 through a rotating bearing, the rotating shaft 23 is rotatably connected on the inner wall of the mounting block 14 through a rotating bearing, the two second gears 17 are respectively arranged on the outer wall of the rotating shaft 23, the second rotating handle 22 is arranged on the top outer wall of the rotating shaft 23, and the second gears 17 are engaged with the first gears 16; through setting up external screw thread 13, second internal thread sleeve 24, first gear 16, second gear 17 and pivot 23, when needs are adjusted the height of detecting tube 5, only need rotate pivot 23 through second turning handle 22, thereby let second gear 17 drive first gear 16 and rotate, drive two first gears 16 through setting up two second gears 17 and rotate, can let second internal thread sleeve 24 can be more stable when rotating, second internal thread sleeve 24 can drive the removal that position about detecting tube 5 carried out through external screw thread 13 when rotating, thereby let the height of detecting tube 5 can be adjusted by convenient, let butt joint between detecting tube 5 and the different oil pipes become simple and convenient.
In order to improve the safety of the blowout prevention support; as shown in fig. 1, a fence 2 is arranged on the outer wall of the top of the working platform 1, and a fence door 7 is fixed on the outer wall of one side of the fence 2 through hinges respectively; through setting up rail 2, can protect the personnel of working on work platform 1, avoid the staff to fall from work platform 1 carelessly.
To improve the functionality of the blowout prevention mount; as shown in fig. 1, the outer wall of the top of the fence 2 is provided with a mounting rod 3, and the outer wall of the top of the mounting rod 3 is provided with a lighting lamp 4; through setting up light 4, the staff can open light 4 when detecting to let prevent spouting more bright around the support, make things convenient for the staff to detect oil pipe.
In order to conveniently move the blowout prevention bracket; as shown in fig. 1, four universal wheels 10 are respectively arranged on the outer walls of the bottoms of the four support columns 8; through setting up universal wheel 10, the staff can be through the convenient removal of spouting the support of universal wheel 10.
In order to effectively position the position of the blowout prevention support; as shown in fig. 3, four circular through holes are respectively formed in the outer walls of the tops of the two connecting plates 12, four first internal thread sleeves 21 are respectively arranged on the inner walls of the four circular through holes, four positioning columns 19 are respectively fixed on the inner walls of the four first internal thread sleeves 21 through threads, and first rotating handles 18 are arranged on the outer walls of the tops of the positioning columns 19; through setting up first internal thread sleeve 21, reference column 19 and first turning handle 18, after the staff will prevent spouting the support and move to suitable position, can let reference column 19 move down through first internal thread sleeve 21 through rotating first turning handle 18 to let reference column 19 prick into near earth of oil well, carry out effectual location to preventing spouting the position of support, the accessible rotates first turning handle 18 promptly after the detection and moves reference column 19 out from earth, thereby relieves the location to preventing spouting the support.
To avoid the positioning posts 19 from affecting the movement of the blowout prevention stand; as shown in fig. 3, a fixing plate 20 is fixed on the outer wall of one side of the supporting column 8 through a spring hinge, and the outer wall of one side of the fixing plate 20 is fixed on the outer wall of one side of the first rotating handle 18 through a screw; through setting up stationary blade 20, when preventing spouting the support and removing, the staff can use the screw to fix the position of first turning handle 18 through stationary blade 20, avoids preventing spouting the support and producing the whereabouts after rotating because of rocking when removing positioning column 19, and the problem that influences preventing spouting the support and normally removing appears.
The working principle is as follows: by arranging the supporting columns 8, the mounting blocks 14 and the connecting plates 12, the supporting columns 8 can effectively support the working platform 1, so that the working platform 1 cannot easily shake when a worker works, meanwhile, the connecting plates 12 and the mounting blocks 14 can connect the four supporting columns 8 into a relatively stable whole, the stability of the whole blowout prevention support is further improved, the worker can connect the detection pipe 5 with an oil pipe to be detected through the clamping device 11, then climb onto the working platform 1 through the crawling ladder 9, open the blowout preventer 6 to perform corresponding detection on the oil pipe, close the blowout preventer 6 after the detection is finished, when the height of the detection pipe 5 needs to be adjusted, the second rotating handle 22 is only needed to rotate the rotating shaft 23, so that the second gear 17 drives the first gears 16 to rotate, and two second gears 17 are arranged to drive the two first gears 16 to rotate, the second internal thread sleeve 24 can be more stable when rotating, the second internal thread sleeve 24 can drive the detection tube 5 to move up and down when rotating or through the external thread 13, so that the height of the detection tube 5 can be conveniently adjusted, the fence 2 can be arranged to protect personnel working on the working platform 1, the illuminating lamp 4 can be turned on when the personnel carry out detection, so that the periphery of the blowout prevention support is brighter, the personnel can conveniently detect the oil tube, the personnel can conveniently move the blowout prevention support through the universal wheel 10, after the personnel move the blowout prevention support to a proper position, the positioning column 19 can move downwards through the first internal thread sleeve 21 by rotating the first rotating handle 18, so that the positioning column 19 can be pricked into soil near an oil well to effectively position the blowout prevention support, after detection is finished, the positioning column 19 can be moved out of soil by rotating the first rotating handle 18, when the blowout prevention support moves, a worker can fix the position of the first rotating handle 18 through the fixing piece 20 by using a screw, and the blowout prevention support is prevented from falling after the positioning column 19 rotates due to shaking when moving.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.
Claims (7)
1. A blowout prevention support for testing an oil-water well in an oil production plant comprises a working platform (1), the anti-blowout device is characterized in that four support columns (8) are arranged at four corners of the outer wall of the bottom of the working platform (1) respectively, an installation block (14) is arranged on the outer wall of one side of each of the four support columns (8), two connecting plates (12) are arranged on the outer wall of one side of each of the four support columns (8), a circular through hole is formed in the outer wall of the top of the working platform (1), a detection pipe (5) is connected to the inner wall of the circular through hole in a sliding mode, a blowout preventer (6) is arranged on the outer wall of the bottom of the working platform (1), the installation block (14) is provided with an adjusting mechanism, a clamping device (11) is arranged on the outer wall of the bottom of the detection pipe (5), a ladder stand (9) is arranged on the outer wall of the top of the connecting plate (12), and the outer wall of the top of the ladder stand (9) is arranged on the outer wall of the bottom of the working platform (1).
2. The oil-water well testing blowout prevention support for the oil production plant is characterized in that the adjusting mechanism comprises a second internal thread sleeve (24), two first gears (16), two second gears (17), a rotating shaft (23) and a second rotating handle (22), the outer wall of the detection pipe (5) is provided with an external thread (13), the second internal thread sleeve (24) is fixed on the outer wall of the detection pipe (5) through threads, the two first gears (16) are respectively arranged on the outer wall of the second internal thread sleeve (24), the second internal thread sleeve (24) is rotatably connected on the inner wall of the mounting block (14) through a rotating bearing, the rotating shaft (23) is rotatably connected on the inner wall of the mounting block (14) through a rotating bearing, the two second gears (17) are respectively arranged on the outer wall of the rotating shaft (23), the second rotating handle (22) is arranged on the outer wall of the top of the rotating shaft (23), the second gear (17) is in meshed connection with the first gear (16).
3. The oil-water well testing blowout prevention support for the oil extraction plant is characterized in that a fence (2) is arranged on the outer wall of the top of the working platform (1), and fence doors (7) are fixed on the outer wall of one side of the fence (2) through hinges respectively.
4. The oil-water well test blowout prevention support for the oil extraction plant is characterized in that the outer wall of the top of the fence (2) is provided with a mounting rod (3), and the outer wall of the top of the mounting rod (3) is provided with a lighting lamp (4).
5. The oil-water well test blowout prevention support for the oil extraction plant is characterized in that four universal wheels (10) are respectively arranged on the outer walls of the bottoms of the four supporting columns (8).
6. The oil-water well testing blowout prevention support for the oil production plant is characterized in that four circular through holes are formed in the outer walls of the tops of two connecting plates (12), four first internal threaded sleeves (21) are arranged on the inner walls of the four circular through holes, four positioning columns (19) are fixed to the inner walls of the four first internal threaded sleeves (21) through threads, and first rotating handles (18) are arranged on the outer walls of the tops of the positioning columns (19).
7. The oil-water well test blowout prevention support for the oil production plant is characterized in that a fixing piece (20) is fixed on the outer wall of one side of the supporting column (8) through a spring hinge, and the outer wall of one side of the fixing piece (20) is fixed on the outer wall of one side of the first rotating handle (18) through a screw.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202120217528.XU CN214247304U (en) | 2021-01-27 | 2021-01-27 | A support is prevented spouting in oil-water well test for oil production factory |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202120217528.XU CN214247304U (en) | 2021-01-27 | 2021-01-27 | A support is prevented spouting in oil-water well test for oil production factory |
Publications (1)
Publication Number | Publication Date |
---|---|
CN214247304U true CN214247304U (en) | 2021-09-21 |
Family
ID=77795992
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202120217528.XU Expired - Fee Related CN214247304U (en) | 2021-01-27 | 2021-01-27 | A support is prevented spouting in oil-water well test for oil production factory |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN214247304U (en) |
-
2021
- 2021-01-27 CN CN202120217528.XU patent/CN214247304U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN113266159B (en) | Prefabricated post installation device that installation accuracy is high | |
CN117889935B (en) | Wireless liquid level acquisition device and method thereof | |
CN210198384U (en) | Stable support of total station | |
CN214247304U (en) | A support is prevented spouting in oil-water well test for oil production factory | |
CN115388293B (en) | Multifunctional building measuring rack | |
CN214091155U (en) | Novel civil construction bearing structure | |
CN114754199B (en) | Height-adjustable's petroleum pipeline antidetonation gallows | |
CN108678353A (en) | External wall workbench | |
CN111042560A (en) | Scaffold reinforcing apparatus | |
CN220059410U (en) | Electric power insulating ladder | |
CN205808410U (en) | A kind of portable laser level | |
CN220666862U (en) | Automatic lifting scaffold device for building house construction | |
CN221778963U (en) | Supporting and fixing pile foundation structure for building climbing frame | |
CN115751059A (en) | Environmental monitoring device for building engineering | |
CN216109595U (en) | Combined scaffold for civil engineering | |
CN221609685U (en) | Building engineering protection network | |
CN220620993U (en) | Annular wall-attached scaffold for dismantling cooling tower and high-rise structure | |
CN213231455U (en) | Functional foot rest for land arrangement and removal | |
CN216593507U (en) | Building engineering environment detection device | |
CN219773708U (en) | Building engineering protection network | |
CN210917032U (en) | Bridge construction is with safe support bracket | |
CN209874420U (en) | Noise reduction type building construction platform | |
CN220014414U (en) | Wall-attached connection seat of climbing frame | |
CN221839397U (en) | Tripod is detected in building engineering | |
CN212082358U (en) | Measuring device is used in civil engineering construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20210921 |