CN214245734U - Water conservancy bored concrete pile steel reinforcement cage construction equipment - Google Patents

Water conservancy bored concrete pile steel reinforcement cage construction equipment Download PDF

Info

Publication number
CN214245734U
CN214245734U CN202023208344.1U CN202023208344U CN214245734U CN 214245734 U CN214245734 U CN 214245734U CN 202023208344 U CN202023208344 U CN 202023208344U CN 214245734 U CN214245734 U CN 214245734U
Authority
CN
China
Prior art keywords
plate
reinforcement cage
electric telescopic
steel reinforcement
water conservancy
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202023208344.1U
Other languages
Chinese (zh)
Inventor
陈福军
赵颖颖
陆李密
潘升坤
王杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wenzhou Hongyuan Construction Group Co ltd
Original Assignee
Wenzhou Hongyuan Construction Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wenzhou Hongyuan Construction Group Co ltd filed Critical Wenzhou Hongyuan Construction Group Co ltd
Priority to CN202023208344.1U priority Critical patent/CN214245734U/en
Application granted granted Critical
Publication of CN214245734U publication Critical patent/CN214245734U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a water conservancy bored concrete pile steel reinforcement cage construction equipment, the on-line screen storage device comprises a base, all be equipped with first electric telescopic handle on the surface of base both sides avris, the top of first electric telescopic handle is equipped with the fixed plate, the surface of fixed plate is equipped with second electric telescopic handle and backup pad, two be equipped with first arc board and second arc board on the relative tip of second electric telescopic handle respectively, be equipped with the locating plate on the surface of second arc board both ends tip towards first arc board, the equal symmetry is equipped with the fixed column on the relative surface of first arc board, second arc board, the backup pad includes horizontal part and rake, it is equipped with the firm board to slide on the horizontal part; first electric telescopic handle and the operation of second electric telescopic handle, the fixed column passes inside steel reinforcement cage clearance and embedding steel reinforcement cage, and steel reinforcement cage is driven by the fixed column and is vertically moved down, is convenient for put in the steel reinforcement cage, and steel reinforcement cage hand-hole work progress is comparatively simple and convenient, labour saving and time saving.

Description

Water conservancy bored concrete pile steel reinforcement cage construction equipment
Technical Field
The utility model belongs to the technical field of water conservancy bored concrete pile construction engineering, concretely relates to water conservancy bored concrete pile steel reinforcement cage construction equipment.
Background
The cast-in-place concrete pile is a pile made up by placing concrete or reinforced concrete in place and forming hole, and can be divided into cast-in-situ bored pile, immersed tube bored pile, artificial hole-digging and hole-digging bottom-expanding bored pile, etc. according to the different hole-forming methods, and the construction process flow of the water conservancy cast-in-situ bored pile is as follows: the method comprises the steps of site leveling → pile position paying-off → slurry pool excavation, slurry ditch → pile casing embedding → drilling machine in-place, hole site correction → hole forming, slurry circulation, waste slurry removal, mud residue → hole cleaning and slurry changing → final hole acceptance → steel reinforcement cage and steel guide pipe → underwater concrete pouring → pile forming.
When current water conservancy bored concrete pile steel reinforcement cage hand-in construction, there is the steel reinforcement cage can be crooked, has increased frictional force between steel reinforcement cage and the pile casing, needs workman's auxiliary external force in the steel reinforcement cage is put in, and steel reinforcement cage hand-in process is not enough simple and convenient, labour saving and time saving's problem, for this we propose a water conservancy bored concrete pile steel reinforcement cage construction equipment.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a water conservancy bored concrete pile steel reinforcement cage construction equipment to the steel reinforcement cage that provides in solving above-mentioned background art can be crooked, has increased steel reinforcement cage and has protected frictional force between the section of thick bamboo, needs workman's auxiliary external force in the steel reinforcement cage is put in, the not enough simple and convenient, labour saving and time saving's of steel reinforcement cage hand-hole process problem.
In order to achieve the above object, the utility model provides a following technical scheme: a water conservancy cast-in-place pile reinforcement cage construction device comprises a base, wherein first electric telescopic rods are arranged on the surfaces of the side edges of two sides of the base, a fixed plate is arranged at the top end of each first electric telescopic rod, a second electric telescopic rod and a supporting plate are arranged on the surface of each fixed plate, a first arc plate and a second arc plate are respectively arranged at the opposite ends of the two second electric telescopic rods, positioning plates are arranged on the surfaces, facing the first arc plates, of the end parts of the two ends of each second arc plate, fixing columns are symmetrically arranged on the opposite surfaces of the first arc plates and the second arc plates, each supporting plate comprises a horizontal part and an inclined part, a stabilizing plate is arranged on the horizontal part in a sliding manner, a moving mechanism and two third fixing rods are arranged on the inner surface of the stabilizing plate, a blocking shell is arranged at the other end of each third fixing rod, each moving mechanism comprises a fixing cylinder, a sliding rod and a limiting plate, one end of the fixing cylinder is connected with the stabilizing plate, and the other end of the fixing cylinder is connected with the sliding rod, the other end of the sliding rod is connected with the limiting plate, and a spring is arranged inside the fixed cylinder.
Preferably, first electric telescopic handle is perpendicular with second electric telescopic handle, first electric telescopic handle is in vertical state, all be equipped with first dead lever on the base both sides avris, the fixed plate bottom is equipped with the second dead lever, the bottom embedding first dead lever top surface of second dead lever is inside, second dead lever and first dead lever sliding connection.
Preferably, the surfaces of the end parts of the two ends of the first arc plate facing the second arc plate are provided with first clamping grooves, the positioning plate is matched with the first clamping grooves, and the bending radii of the first arc plate and the second arc plate are the same.
Preferably, a placing groove is formed in the inclined portion of the supporting plate, and the second electric telescopic rod penetrates through the placing groove.
Preferably, the surface of the horizontal part of the support plate is provided with a sliding groove of an L-shaped structure and the inside of the horizontal part of the support plate is provided with a sliding cavity, the sliding groove is communicated with the sliding cavity, the inside of the horizontal part is provided with a sliding block, the sliding block is screwed with the stabilizing plate through a screw and is connected with the support plate in a sliding clamping manner.
Preferably, the fixed cylinder is of a hollow structure, the end part of the fixed cylinder, which is far away from the stabilizing plate, is sealed, the end part of the sliding rod, which is located in the fixed cylinder, is of a T-shaped structure, one end of the spring is connected with the stabilizing plate, and the other end of the spring is connected with the sliding rod.
Preferably, the blocking shell is in a hollow semi-sphere shape, the blocking shell and a point on the cross section of the center of the limiting plate are connected on the same circle in an inscribed mode, and the base is provided with a rectangular groove.
Compared with the prior art, the beneficial effects of the utility model are that:
1. through the stabilizing plate, fender shell, limiting plate, slide bar, solid fixed cylinder, spring that set up, the steel reinforcement cage that hangs to put is put in and the steel reinforcement cage is in between the opposite limiting plate, and the steel reinforcement cage is spacing fixed by limiting plate, fender shell, and the steel reinforcement cage reaches the steel reinforcement cage when crooked and touches on the limiting plate, and crooked steel reinforcement cage receives the elasticity that the spring produced, makes the steel reinforcement cage keep vertical stable state, does benefit to and puts in the steel reinforcement cage.
2. Through the first electric telescopic handle, second electric telescopic handle, first arc board, second arc board, the fixed column that set up, first electric telescopic handle and the operation of second electric telescopic handle, inside the fixed column passed reinforcement cage clearance and embedding reinforcement cage, reinforcement cage was driven by the fixed column and is vertically moved down, is convenient for put in reinforcement cage, reduces the workman and applys supplementary external force, and reinforcement cage hand-hole work progress is comparatively simple and convenient, labour saving and time saving.
Drawings
Fig. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic cross-sectional view of a first arc plate of the present invention;
FIG. 3 is a schematic top view of the stabilizing plate of the present invention;
FIG. 4 is a schematic cross-sectional view of the support plate of the present invention;
fig. 5 is a schematic top view of the supporting plate of the present invention;
fig. 6 is a schematic top view of the base of the present invention;
in the figure: 1. a base; 2. a first electric telescopic rod; 3. a fixing plate; 4. a second electric telescopic rod; 5. a first arc plate; 6. a second arc plate; 7. positioning a plate; 8. a support plate; 9. a stabilizing plate; 10. a first fixing lever; 11. a second fixing bar; 12. fixing a column; 13. a third fixing bar; 14. a blocking shell; 15. a fixed cylinder; 16. a slide bar; 17. a limiting plate; 18. a spring; 19. a slide block.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1 to 6, the present invention provides a technical solution: a water conservancy bored concrete pile steel reinforcement cage construction device comprises a base 1, wherein the surfaces of the two side edges of the base 1 are respectively provided with a first electric telescopic rod 2, the top end of the first electric telescopic rod 2 is provided with a fixed plate 3, the surface of the fixed plate 3 is provided with a second electric telescopic rod 4 and a supporting plate 8, the opposite end parts of the two second electric telescopic rods 4 are respectively provided with a first arc plate 5 and a second arc plate 6, the surface of the end part of the two ends of the second arc plate 6 facing the first arc plate 5 is provided with a positioning plate 7, the opposite surfaces of the first arc plate 5 and the second arc plate 6 are respectively and symmetrically provided with a fixed column 12, the first electric telescopic rod 2 and the second electric telescopic rod 4 run, the fixed column 12 passes through the gap of the steel reinforcement cage and is embedded into the steel reinforcement cage, the steel reinforcement cage is driven by the fixed column 12 to vertically move downwards, the steel reinforcement cage is convenient to put in, the construction process of a steel reinforcement cage hole is simple, time and labor saving, the supporting plate 8 comprises a horizontal part and an inclined part, slide on the horizontal part and be equipped with firm board 9, be equipped with moving mechanism and two third dead levers 13 on firm board 9's the internal surface, another tip of third dead lever 13 is equipped with fender shell 14, moving mechanism includes solid fixed cylinder 15, slide bar 16 and limiting plate 17, solid fixed cylinder 15 one end is connected with firm board 9 and the other end is connected with slide bar 16, slide bar 16's the other end is connected with limiting plate 17, the inside of solid fixed cylinder 15 is equipped with spring 18, when the steel reinforcement cage is crooked, the steel reinforcement cage touches on limiting plate 17, spring 18 produces elasticity, crooked steel reinforcement cage receives elasticity, make the steel reinforcement cage keep vertical stable state, do benefit to and put in the steel reinforcement cage.
In this embodiment, first electric telescopic handle 2 is perpendicular with second electric telescopic handle 4, first electric telescopic handle 2 is in vertical state, all be equipped with first dead lever 10 on the avris of base 1 both sides, 3 bottoms of fixed plate are equipped with second dead lever 11, inside the bottom embedding first dead lever 10 top surface of second dead lever 11, second dead lever 11 and first dead lever 10 sliding connection, first electric telescopic handle 2 and the operation of second electric telescopic handle 4 are convenient for adjust 3 vertical height of fixed plate and horizontal position.
In this embodiment, the end portions of the two ends of the first arc plate 5 face the surface of the second arc plate 6, and are respectively provided with a first clamping groove, the positioning plate 7 is matched with the first clamping grooves, the bending radii of the first arc plate 5 and the second arc plate 6 are the same, the first arc plate 5 is connected with the positioning plate 7 in a clamping manner, and the first arc plate 5 and the second arc plate 6 are in a stable state.
In this embodiment, seted up the standing groove on the 8 rake of backup pad, second electric telescopic handle 4 passes the standing groove, and the spout and the inside smooth chamber of having seted up of "L" type structure are seted up on the surface of 8 horizontal parts of backup pad, and the spout communicates with smooth chamber, and the inside of horizontal part is equipped with slider 19, and slider 19 closes with firm board 9 through the screw soon to be connected, and slider 19 is connected with 8 slip blocks of backup pad, is convenient for adjust the horizontal position of firm board 9.
In this embodiment, the fixing cylinder 15 is a hollow structure, the end of the fixing cylinder 15 far from the stabilizing plate 9 is sealed, the end of the sliding rod 16 located in the fixing cylinder 15 is a "T" shaped structure, one end of the spring 18 is connected with the stabilizing plate 9 and the other end is connected with the sliding rod 16, the retaining shell 14 is a hollow semi-sphere, the central points of the cross section of the retaining shell 14 and the limiting plate 17 are inscribed on the same circle, the base 1 is provided with a rectangular groove, the retaining shell 14 and the limiting plate 17 play a role in blocking, the reinforcement cage is placed between the retaining shell 14 and the limiting plate 17, the reinforcement cage is limited and fixed, and the reinforcement cage keeps a vertical stable state.
The utility model discloses a theory of operation and use flow:
when a water conservancy cast-in-place pile is used for steel reinforcement cage hole entering construction, the base 1 is arranged at a drilled hole, the stabilizing plate 9 slides along the horizontal length direction of the supporting plate 8 and then slides along the width direction, the stabilizing plate 9 is in a stable state, a hung steel reinforcement cage is arranged between the opposite stabilizing plates 9 and between the opposite limiting plates 17, the steel reinforcement cage is limited and fixed by the limiting plates 17 and the retaining shells 14, when the steel reinforcement cage is inclined, the steel reinforcement cage touches the limiting plates 17, the limiting plates 17 move, the sliding rods 16 slide under the action of force, the springs 18 are in a contraction state, the springs 18 generate elasticity, and the inclined steel reinforcement cage is subjected to elasticity, so that the steel reinforcement cage is kept in a vertical stable state, and the steel reinforcement cage can be conveniently put in;
2 operations of first electric telescopic handle, 2 and the vertical upwards shifting of fixed plate 3 of first electric telescopic handle, 4 operations of second electric telescopic handle, 4 horizontal migration of second electric telescopic handle, first arc board 5 and the outside at the steel reinforcement cage of second arc board 6 ring, fixed column 12 passes inside steel reinforcement cage clearance and embedding steel reinforcement cage, first electric telescopic handle 2 moves down with fixed plate 3 is vertical, the steel reinforcement cage is driven by fixed column 12 and is vertical to move down, 4 operations of second electric telescopic handle, 4 opposite direction movements of second electric telescopic handle, fixed column 12 leaves the steel reinforcement cage, repeat the above-mentioned operation, the steel reinforcement cage is driven and is vertical to move down, be convenient for put in the steel reinforcement cage, steel reinforcement cage hand-hole work progress is comparatively simple and convenient, time and labor saving.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (7)

1. The utility model provides a water conservancy bored concrete pile steel reinforcement cage construction equipment, includes base (1), its characterized in that: the surface of the two side edges of the base (1) is provided with a first electric telescopic rod (2), the top end of the first electric telescopic rod (2) is provided with a fixed plate (3), the surface of the fixed plate (3) is provided with a second electric telescopic rod (4) and a supporting plate (8), the opposite end parts of the two second electric telescopic rods (4) are respectively provided with a first arc plate (5) and a second arc plate (6), the surface of the end part of the two ends of the second arc plate (6) facing the first arc plate (5) is provided with a positioning plate (7), the opposite surfaces of the first arc plate (5) and the second arc plate (6) are respectively and symmetrically provided with a fixed column (12), the supporting plate (8) comprises a horizontal part and an inclined part, the horizontal part is provided with a stabilizing plate (9) in a sliding manner, the inner surface of the stabilizing plate (9) is provided with a moving mechanism and two third fixed rods (13), another tip of third dead lever (13) is equipped with fender shell (14), moving mechanism includes solid fixed cylinder (15), slide bar (16) and limiting plate (17), gu fixed cylinder (15) one end is connected with firm board (9) and the other end is connected with slide bar (16), the other end and the limiting plate (17) of slide bar (16) are connected, the inside of solid fixed cylinder (15) is equipped with spring (18).
2. The water conservancy bored concrete pile reinforcement cage construction equipment of claim 1, characterized in that: first electric telescopic handle (2) are perpendicular with second electric telescopic handle (4), first electric telescopic handle (2) are in vertical state, all be equipped with first dead lever (10) on base (1) both sides avris, fixed plate (3) bottom is equipped with second dead lever (11), the bottom embedding first dead lever (10) top surface inside of second dead lever (11), second dead lever (11) and first dead lever (10) sliding connection.
3. The water conservancy bored concrete pile reinforcement cage construction equipment of claim 1, characterized in that: first clamping grooves are formed in the surfaces, facing the second arc plate (6), of the end portions of the two ends of the first arc plate (5), the positioning plate (7) is matched with the first clamping grooves, and the bending radiuses of the first arc plate (5) and the second arc plate (6) are the same.
4. The water conservancy bored concrete pile reinforcement cage construction equipment of claim 1, characterized in that: a placing groove is formed in the inclined part of the supporting plate (8), and the second electric telescopic rod (4) penetrates through the placing groove.
5. The water conservancy bored concrete pile reinforcement cage construction equipment of claim 1, characterized in that: the surface of the horizontal part of the supporting plate (8) is provided with a sliding groove of an L-shaped structure and an inner sliding cavity, the sliding groove is communicated with the sliding cavity, a sliding block (19) is arranged in the horizontal part, the sliding block (19) is screwed with the stabilizing plate (9) through a screw, and the sliding block (19) is connected with the supporting plate (8) in a sliding clamping manner.
6. The water conservancy bored concrete pile reinforcement cage construction equipment of claim 1, characterized in that: the fixing cylinder (15) is of a hollow structure, the end part of the fixing cylinder (15) far away from the stabilizing plate (9) is sealed, the end part of the sliding rod (16) located in the fixing cylinder (15) is of a T-shaped structure, one end of the spring (18) is connected with the stabilizing plate (9), and the other end of the spring is connected with the sliding rod (16).
7. The water conservancy bored concrete pile reinforcement cage construction equipment of claim 1, characterized in that: the retaining shell (14) is in a hollow semi-spherical shape, points on the cross section of the centers of the retaining shell (14) and the limiting plate (17) are inscribed on the same circle, and the base (1) is provided with a rectangular groove.
CN202023208344.1U 2020-12-28 2020-12-28 Water conservancy bored concrete pile steel reinforcement cage construction equipment Active CN214245734U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202023208344.1U CN214245734U (en) 2020-12-28 2020-12-28 Water conservancy bored concrete pile steel reinforcement cage construction equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202023208344.1U CN214245734U (en) 2020-12-28 2020-12-28 Water conservancy bored concrete pile steel reinforcement cage construction equipment

Publications (1)

Publication Number Publication Date
CN214245734U true CN214245734U (en) 2021-09-21

Family

ID=77743262

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202023208344.1U Active CN214245734U (en) 2020-12-28 2020-12-28 Water conservancy bored concrete pile steel reinforcement cage construction equipment

Country Status (1)

Country Link
CN (1) CN214245734U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114703850A (en) * 2022-04-01 2022-07-05 天津弘野建设集团有限公司 Cast-in-place pile reinforcement cage hanging verticality correcting device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114703850A (en) * 2022-04-01 2022-07-05 天津弘野建设集团有限公司 Cast-in-place pile reinforcement cage hanging verticality correcting device
CN114703850B (en) * 2022-04-01 2024-04-12 天津弘野建设集团有限公司 Cast-in-place pile reinforcement cage hanging verticality correcting device

Similar Documents

Publication Publication Date Title
CN201280720Y (en) Minor diameter self-balancing filling pile root key pushing device
CN105970916B (en) A kind of construction method of deep basal pit plain concrete diaphram wall
CN214245734U (en) Water conservancy bored concrete pile steel reinforcement cage construction equipment
CN103422510B (en) Steel pipe frame type cofferdam structure and construction method
CN112064676A (en) Movable formwork structure and construction method thereof
CN117211271A (en) Double-pile-casing positioning pile-forming construction method for deep and thick filling layer filling pile of sea wall
CN110374109B (en) Application method of construction method pile enclosure in comprehensive pipe gallery foundation pit
CN217292798U (en) Supporting structure of prefabricated box girder
CN207828983U (en) For subway, the deep basal pit gib system of road construction
CN217630086U (en) Enclosure system shared by cast-in-place pipe gallery and box type tunnel
CN206768836U (en) A kind of I-steel gabion assembles counterfort supporting construction
CN213979023U (en) Novel pouring type pile foundation
CN205530345U (en) Modular many storehouses utility tunnel structure
CN211646240U (en) Anti-impact tooth wall regularization template
CN113235645A (en) Tower crane foundation reserved joint bar assembly type forming die construction method
CN211646246U (en) River course barricade
CN215165604U (en) Device for comprehensively cleaning sediment at bottom of rock-socketed pile
CN219886785U (en) Construction structure of building impervious wall
CN110258514A (en) A kind of steel of diaphram wall leads wall and its construction method
CN217758825U (en) Foundation pit supporting structure for pipeline pipe jacking construction
CN216109368U (en) Cushion block for controlling thickness of upper steel bar protective layer and floor slab
CN218990148U (en) Pile casing for bored pile
CN219008634U (en) Seat frame for vertically storing PC component plate
CN219410827U (en) Underground continuous wall structure of foundation is built in room
CN215629705U (en) Hydraulic engineering construction safety device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant