CN214245375U - Detachable pier body construction work platform - Google Patents

Detachable pier body construction work platform Download PDF

Info

Publication number
CN214245375U
CN214245375U CN202022090915.XU CN202022090915U CN214245375U CN 214245375 U CN214245375 U CN 214245375U CN 202022090915 U CN202022090915 U CN 202022090915U CN 214245375 U CN214245375 U CN 214245375U
Authority
CN
China
Prior art keywords
work platform
construction work
connecting rod
working platform
column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202022090915.XU
Other languages
Chinese (zh)
Inventor
糜勤年
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yizheng Jingbo Machinery Parts Co ltd
Original Assignee
Yizheng Jingbo Machinery Parts Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yizheng Jingbo Machinery Parts Co ltd filed Critical Yizheng Jingbo Machinery Parts Co ltd
Priority to CN202022090915.XU priority Critical patent/CN214245375U/en
Application granted granted Critical
Publication of CN214245375U publication Critical patent/CN214245375U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a dismantlement formula pier shaft construction work platform, including work platform, support column and rail guard, work platform bottom four corners department is provided with down the spliced pole, be provided with the link on a work platform lateral wall. Has the advantages that: the utility model discloses a set up the slide, the mounting panel, electric putter and place the board, the staff places the instrument on placing the board, then promote through the electric putter on the mounting panel and place the board and remove along the slide, need hand-carry the instrument when avoiding the staff to remove, be convenient for remove, improve device's practicality, through setting up the link, the connecting rod, connecting bolt and screw hole, can rotate along the link through the connecting rod, then use the connecting bolt installation threaded hole of connecting rod one end department, connect two work platforms fixedly, guarantee device's stability, avoid causing the potential safety hazard to staff's operational environment.

Description

Detachable pier body construction work platform
Technical Field
The utility model relates to a construction work platform field, concretely relates to dismantlement formula pier shaft construction work platform.
Background
The pier body is the main body of the middle supporting structure of the multi-span bridge, the main materials are wood, stone, concrete, reinforced concrete and steel, the bridge is constructed at home and abroad, most of cast-in-place pier columns adopt the conventional construction process of erecting scaffolds or templates and self-carrying detachable supports and binding reinforcing steel bars on site, and the construction of viaduct pier columns in the land areas of a few areas is realized.
Present dismantlement formula pier shaft construction work platform is in the use, because when pier shaft is built, staff's use tools is more, when leading to the staff to move to upper platform, carry a large amount of instruments, inconvenient removal, reduce the practicality of device, and because present dismantlement formula pier shaft construction work platform is in the use, it is fixed to rely on spliced pole and adapter sleeve to connect between the work platform, do not fix between the work platform, influence the stability of device, cause the potential safety hazard to staff's operational environment, consequently, it solves current problem to need a dismantlement formula pier shaft construction work platform.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
In order to overcome prior art not enough, a dismantlement formula pier shaft construction work platform has now been proposed, current dismantlement formula pier shaft construction work platform has been solved in the use, because when pier shaft is built, staff's use tools are more, when leading to the staff to remove to upper platform, carry a large amount of instruments, inconvenient removal, reduce the practicality of device, and because current dismantlement formula pier shaft construction work platform is in the use, rely on spliced pole and adapter sleeve to connect fixedly between the work platform, do not fix between the work platform, influence the stability of device, cause the problem of potential safety hazard to staff's operational environment.
(II) technical scheme
The utility model discloses a following technical scheme realizes: the utility model provides a dismantlement formula pier shaft construction work platform, including work platform, support column and rail guard, work platform bottom four corners department is provided with down the spliced pole, be provided with the link on the work platform lateral wall, be provided with the connecting rod in the link, connecting rod one end is provided with connecting bolt, the connecting rod below is provided with the screw hole, work platform top four corners department is provided with the support column, the support column top is provided with the spliced pole, it is provided with the adapter sleeve to go up spliced pole a week, support column one side is provided with the rail guard, rail guard one side is provided with the slide, slide one side is provided with the mounting panel, the mounting panel top is provided with electric putter, the electric putter top is provided with places the board.
Further, the working platform is connected with the supporting column through bolts, and the guard rail is connected with the supporting column through bolts.
By adopting the technical scheme, the protective guard can protect workers on the working platform.
Further, the connecting frame with work platform welding, the connecting rod with the connecting frame rotates to be connected.
By adopting the technical scheme, the connecting bolt on the connecting rod can move to the threaded hole.
Furthermore, the connecting bolt is in threaded connection with the connecting rod, and the threaded hole is formed in the working platform.
By adopting the technical scheme, the working platform can be fixedly connected through the connecting bolt and the threaded hole.
Furthermore, the lower connecting column is welded with the working platform, and the lower connecting column is spliced with the connecting sleeve.
By adopting the technical scheme, the lower connecting column can be inserted into the connecting sleeve to connect the operation platform.
Further, the electric push rod is connected with the placing plate through a bolt, and the placing plate is connected with the slide way in a sliding mode.
Through adopting above-mentioned technical scheme, can pass through electric putter promotes place the board and follow the slide removes.
(III) advantageous effects
Compared with the prior art, the utility model, following beneficial effect has:
1. for solving present dismantlement formula pier shaft construction work platform current in the use, because when the pier shaft was built, staff's use tools is more, when leading to the staff to remove to upper platform, carries a large amount of instruments, inconvenient removal, the problem of the practicality of reducing means, the utility model discloses a set up slide, mounting panel, electric putter and place the board, the staff places the instrument on placing the board, then promotes through the electric putter on the mounting panel and places the board and remove along the slide, need hand-carry the instrument when avoiding the staff to remove, the removal of being convenient for improves the practicality of device.
2. For solving at present because current dismantlement formula pier shaft construction work platform is in the use, rely on spliced pole and adapter sleeve to connect fixedly between the work platform, not fix between the work platform, influence the stability of device, cause the problem of potential safety hazard to staff's operational environment, the utility model discloses a set up link, connecting rod, connecting bolt and screw hole, can rotate along the link through the connecting rod, then use the connecting bolt installation threaded hole of connecting rod one end department, connect two work platforms fixedly, guarantee the stability of device, avoid causing the potential safety hazard to staff's operational environment.
Drawings
Fig. 1 is a front view of a detachable pier construction platform according to the present invention;
fig. 2 is a right side view of the platform for disassembling pier body construction according to the present invention;
fig. 3 is a top view of the detachable pier shaft construction platform.
The reference numerals are explained below:
1. a working platform; 2. a lower connecting column; 3. a connecting frame; 4. a connecting rod; 5. a connecting bolt; 6. a threaded hole; 7. a support pillar; 8. an upper connecting column; 9. connecting sleeves; 10. protecting the fence; 11. a slideway; 12. mounting a plate; 13. an electric push rod; 14. placing the plate.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative of the invention and are not intended to limit the invention.
As shown in fig. 1-3, the detachable pier body construction work platform in this embodiment includes a work platform 1, support columns 7 and guard rails 10, the four corners of the bottom of the work platform 1 are provided with lower connection columns 2, the lower connection columns 2 can be inserted into connection sleeves 9 to connect the work platform, a side wall of the work platform 1 is provided with a connection frame 3, a connection rod 4 is arranged in the connection frame 3, the connection frame 3 can be provided with the connection rod 4, and can enable the connection rod 4 to rotate, one end of the connection rod 4 is provided with a connection bolt 5, the connection rod 4 can drive the connection bolt 5 to move to a threaded hole 6, so that the connection bolt 5 can be installed in the threaded hole 6 to connect the work platform 1, the threaded hole 6 is arranged below the connection rod 4, the connection bolt 5 can be installed in the threaded hole 6, the support columns 7 are arranged at the four corners above the work platform 1, protective guard 10 can be installed to support column 7, 7 tops of support column are provided with upper connection post 8, 8 a week of upper connection post is provided with adapter sleeve 9, adapter sleeve 9 can install down spliced pole 2, 7 one side of support column is provided with protective guard 10, protective guard 10 can protect the staff, protective guard 10 one side is provided with slide 11, slide 11 conveniently places board 14 and removes, slide 11 one side is provided with mounting panel 12, electric putter 13 can be installed to mounting panel 12, mounting panel 12 top is provided with electric putter 13, electric putter 13 can promote to place board 14 and remove along slide 11, electric putter 13 top is provided with places board 14, it can the placement tool to place board 14.
As shown in fig. 1 to 3, in this embodiment, the working platform 1 is bolted to the support column 7, the guard rail 10 is bolted to the support column 7, the connecting frame 3 is welded to the working platform 1, the connecting rod 4 is rotatably connected to the connecting frame 3, the connecting bolt 5 is in threaded connection with the connecting rod 4, and the threaded hole 6 is formed in the working platform 1.
As shown in fig. 1 to 3, in the present embodiment, the lower connecting column 2 is welded to the working platform 1, the lower connecting column 2 is inserted into the connecting sleeve 9, the electric push rod 13 is connected to the placing plate 14 by a bolt, and the placing plate 14 is connected to the slideway 11 in a sliding manner.
The specific implementation process of this embodiment is as follows: when the device is used, a worker can stand on the working platform 1 to work, the worker is protected through the supporting columns 7 and the protective guards 10 on the working platform 1, when the height of the working platform needs to be increased, the lower connecting column 2 at the bottom of the other working platform 1 is inserted into the connecting sleeve 9 above the supporting column 7 to connect the two working platforms, then the connecting rod 4 on the connecting frame 3 is rotated to enable the connecting bolt 5 at one end of the connecting rod 4 to be installed in the threaded hole 6 on the working platform 1 to connect and fix the two working platforms 1, the stability of the device is ensured, the potential safety hazard to the working environment of the worker is avoided, when the worker needs to move to the other working platforms 1, a tool can be placed on the placing plate 14, and then the placing plate 14 is pushed to move along the slide rail 11 through the electric push rod 13 on the mounting plate 12, the tool is moved to the other layer, so that the fact that a worker needs to carry the tool when moving is avoided, the tool is convenient to move, and the practicability of the device is improved.
The above-described embodiments are merely illustrative of the preferred embodiments of the present invention and are not intended to limit the spirit and scope of the present invention. Without departing from the design concept of the present invention, various modifications and improvements made by the technical solution of the present invention by those skilled in the art should fall into the protection scope of the present invention, and the technical contents claimed by the present invention have been fully recorded in the claims.

Claims (6)

1. The utility model provides a dismantlement formula pier shaft construction work platform which characterized in that: comprises a working platform (1), supporting columns (7) and protective guards (10), wherein lower connecting columns (2) are arranged at four corners of the bottom of the working platform (1), a connecting frame (3) is arranged on one side wall of the working platform (1), a connecting rod (4) is arranged in the connecting frame (3), a connecting bolt (5) is arranged at one end of the connecting rod (4), a threaded hole (6) is arranged below the connecting rod (4), the supporting columns (7) are arranged at four corners of the upper part of the working platform (1), an upper connecting column (8) is arranged at the top of each supporting column (7), a connecting sleeve (9) is arranged around each upper connecting column (8), the protective guards (10) are arranged on one side of each supporting column (7), a slide way (11) is arranged on one side of each protective guard (10), and a mounting plate (12) is arranged on one side of each slide way (11), an electric push rod (13) is arranged above the mounting plate (12), and a placing plate (14) is arranged above the electric push rod (13).
2. The detachable pier body construction work platform according to claim 1, wherein: the working platform (1) is connected with the supporting column (7) through bolts, and the guard rail (10) is connected with the supporting column (7) through bolts.
3. The detachable pier body construction work platform according to claim 1, wherein: the connecting frame (3) is welded with the working platform (1), and the connecting rod (4) is rotatably connected with the connecting frame (3).
4. The detachable pier body construction work platform according to claim 1, wherein: the connecting bolt (5) is in threaded connection with the connecting rod (4), and the threaded hole (6) is formed in the working platform (1).
5. The detachable pier body construction work platform according to claim 1, wherein: the lower connecting column (2) is welded with the working platform (1), and the lower connecting column (2) is spliced with the connecting sleeve (9).
6. The detachable pier body construction work platform according to claim 1, wherein: the electric push rod (13) is connected with the placing plate (14) through bolts, and the placing plate (14) is connected with the slide way (11) in a sliding mode.
CN202022090915.XU 2020-09-22 2020-09-22 Detachable pier body construction work platform Expired - Fee Related CN214245375U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022090915.XU CN214245375U (en) 2020-09-22 2020-09-22 Detachable pier body construction work platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022090915.XU CN214245375U (en) 2020-09-22 2020-09-22 Detachable pier body construction work platform

Publications (1)

Publication Number Publication Date
CN214245375U true CN214245375U (en) 2021-09-21

Family

ID=77715295

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022090915.XU Expired - Fee Related CN214245375U (en) 2020-09-22 2020-09-22 Detachable pier body construction work platform

Country Status (1)

Country Link
CN (1) CN214245375U (en)

Similar Documents

Publication Publication Date Title
CN214245375U (en) Detachable pier body construction work platform
CN212642729U (en) Drilling operation machine with adjustable go up and down with tunnel support function
CN115095269B (en) Novel insulating operation platform
CN114457708B (en) Construction method for dismantling bracket system of expressway widening overpass group
CN215167778U (en) But height-adjusting's stable form engineering construction scaffold
CN214497216U (en) Novel movable protective shed of bracket and steel pipe column combined gantry type
CN214613741U (en) Height limiting device for road and bridge
CN210888006U (en) Station auxiliary trolley
CN211775585U (en) Building scaffold with protective structure
CN214143285U (en) Town road bridge maintenance device
CN206986736U (en) A kind of box girder bridge transverse prestress construction mobile closed formula platform
CN219951910U (en) Operation platform suitable for bored concrete pile well head detects operation
CN213538706U (en) Movable protection device for dismantling and recovering existing bridge guardrail
CN214942212U (en) Photovoltaic field area construction work platform
CN219726706U (en) Prefabricated box girder reinforcing bar bed-jig installation positioner
CN212454427U (en) Self-propelled operation platform capable of effectively improving underground mine net hanging support efficiency
CN218813173U (en) A moving platform for public road bridge roof beam anticollision barrier
CN212388940U (en) Recoverable steel bar scaffold based on building economy
CN218597186U (en) Strip mining side slope protector
CN206076831U (en) A kind of quick transition assembled lifts crossing frame certainly
CN214575510U (en) Large-span ultrahigh-degree steel structure net rack construction work platform
CN212052338U (en) Road and bridge construction strutting arrangement
CN220538519U (en) Auxiliary installation device for waveform protective fence
CN218581124U (en) Building scaffold with prevent dropping
CN221590673U (en) Road bridge construction pavement protector

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210921

CF01 Termination of patent right due to non-payment of annual fee