CN214237239U - Special tool for manufacturing front axle tube - Google Patents

Special tool for manufacturing front axle tube Download PDF

Info

Publication number
CN214237239U
CN214237239U CN202120313251.0U CN202120313251U CN214237239U CN 214237239 U CN214237239 U CN 214237239U CN 202120313251 U CN202120313251 U CN 202120313251U CN 214237239 U CN214237239 U CN 214237239U
Authority
CN
China
Prior art keywords
fixedly connected
plate
movable
special tool
front axle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120313251.0U
Other languages
Chinese (zh)
Inventor
叶凯
张小兵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Gangshi Machinery Manufacturing Co ltd
Original Assignee
Chongqing Gangshi Machinery Manufacturing Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Gangshi Machinery Manufacturing Co ltd filed Critical Chongqing Gangshi Machinery Manufacturing Co ltd
Priority to CN202120313251.0U priority Critical patent/CN214237239U/en
Application granted granted Critical
Publication of CN214237239U publication Critical patent/CN214237239U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Crystals, And After-Treatments Of Crystals (AREA)

Abstract

The utility model discloses a special tool for manufacturing front axle tube forming, which belongs to the technical field of machining and comprises a bottom plate and a base, wherein a plurality of limiting rods are fixedly connected to the top end of the bottom plate and are positioned at the corners of the bottom plate, a top plate is fixedly connected to the top ends of the limiting rods, a hydraulic rod is fixedly connected to the top plate, a movable plate is fixedly connected to the bottom end of the hydraulic rod, a guide sleeve is wound around the limiting rods, the bottom end of the guide sleeve is fixedly connected with the top end of the movable plate, the movable plate is movably connected with the limiting rods, a lower template is fixedly connected to the top end of the bottom plate, an upper template is fixedly connected to the bottom end of the movable plate, cooling tubes are respectively arranged inside the upper template and the lower template, one end of each cooling tube is fixedly connected with a water inlet tube, and the other end of each cooling tube is, have the absorbing function simultaneously, can prolong the life of frock.

Description

Special tool for manufacturing front axle tube
Technical Field
The utility model relates to the technical field of machining, specifically a be used for making fashioned purpose-built frock of front axle tube.
Background
The front axle of the automobile is used as a large assembly of the automobile, directly or indirectly bears the dead weight and the load of the automobile, the requirement on the safety coefficient is higher, and the traditional front axle consists of a front axle tube, a left end and a right end.
Among the prior art, the fashioned frock of central siphon need wait for the frock cooling after the casting is accomplished before the preparation, just can take out the central siphon before, and the natural cooling time of frock is longer, and the machining efficiency that can lead to the central siphon before can be lower, and simultaneously, the central siphon shaping frock can produce vibrations in the use before among the prior art, can cause the harm to the frock, influences the life of frock.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a be used for the fashioned purpose-built frock of preparation front axle tube to solve the problem that proposes among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme:
the utility model provides a purpose-built frock for preparation front axle tube shaping, includes bottom plate and base, a plurality of gag lever posts of top fixedly connected with of bottom plate, it is a plurality of the gag lever post is located the corner of bottom plate, and is a plurality of the top fixedly connected with roof of gag lever post, fixedly connected with hydraulic stem on the roof, the bottom fixedly connected with fly leaf of hydraulic stem, it is a plurality of around being equipped with the uide bushing around the gag lever post, the bottom of uide bushing and the top fixed connection of fly leaf, fly leaf and a plurality of gag lever post swing joint, the top fixedly connected with lower bolster of bottom plate, the bottom fixedly connected with cope match-plate pattern of fly leaf, the cooling tube has all been seted up with the inside of lower bolster to the cope match-plate pattern, the one end fixedly connected with inlet tube of cooling tube, the other end fixedly connected with outlet pipe of cooling tube.
As a further aspect of the present invention: the bottom of bottom plate and the equal fixedly connected with a plurality of fixed plates in top of base, the bottom mounting of a plurality of fixed plates of bottom plate bottom has the activity post on street, the top fixedly connected with fixed column of the fixed plate on base top, fixed column and activity post swing joint, around being equipped with the second spring fixed column and activity post, can play absorbing effect to preceding central siphon shaping frock.
As a further aspect of the present invention: spring grooves are formed in the movable column and the fixed column, a first spring is fixedly connected in each spring groove, two ends of each first spring are fixedly connected to the movable column and the fixed column respectively, the damping effect of the front axle tube forming tool is enhanced, and the service life of the front axle tube forming tool is prolonged.
As a further aspect of the present invention: a plurality of spouts have been seted up on the inner wall of activity post, it is a plurality of the top fixedly connected with a plurality of sliders of fixed column, every slider and every spout swing joint can be right the position of activity post is spacing, prevents that activity post and fixed column break away from in the use.
As a further aspect of the present invention: the upper die plate and the lower die plate are both provided with forming grooves, the shapes of the forming grooves are matched with the shapes of the front shaft tubes, one side of the upper die plate is provided with a filling port, and the filling port is communicated with the forming grooves, so that the front shaft tubes can be formed conveniently.
As a further aspect of the present invention: the bottom fixedly connected with slipmat of base increases the frictional force of front axle pipe shaping frock and ground or desktop, improves stability.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the utility model discloses in, seted up the cooling tube through the inside of cope match-plate pattern and lower bolster, the one end fixedly connected with inlet tube of cooling tube, other end fixedly connected with outlet pipe, after the raw materials pours into the completion, let in cold water from the inlet tube, rivers pass through the cooling tube, lower the temperature reduction to cope match-plate pattern and lower bolster, have reduced the cool time, conveniently take the preparation fashioned preceding central siphon, have solved the problem of natural cooling time overlength among the prior art, have reached the effect that improves preparation efficiency.
2. The utility model discloses in, through making activity post and fixed column swing joint, around being equipped with the second spring around activity post and fixed column, seted up the spring groove in activity post and fixed column, at the first spring of spring inslot fixedly connected with, played absorbing effect to preceding central siphon shaping frock through first spring and second spring, solved among the prior art vibrations and caused the problem of harm to preceding central siphon shaping frock, reached the life of central siphon shaping frock before the extension.
Drawings
Fig. 1 is a schematic structural view of the present invention;
fig. 2 is a schematic sectional view of the present invention;
fig. 3 is a schematic sectional structure diagram of the present invention;
fig. 4 is a partial structural diagram of a portion a in fig. 2.
In the figure: 1. a base plate; 2. a limiting rod; 3. a movable plate; 4. a top plate; 5. a guide sleeve; 6. a hydraulic lever; 7. a lower template; 8. mounting a template; 9. forming a groove; 10. a material injection port; 11. a water inlet pipe; 12. a water outlet pipe; 13. a cooling tube; 14. a fixing plate; 15. a movable post; 16. fixing a column; 17. a spring slot; 18. a first spring; 19. a second spring; 20. a chute; 21. a slider; 22. a base.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1 to 4, in an embodiment of the present invention, a special tool for manufacturing a front axle tube includes a bottom plate 1 and a base 22, a plurality of position-limiting rods 2 are fixedly connected to a top end of the bottom plate 1, the position-limiting rods 2 are located at corners of the bottom plate 1, a top plate 4 is fixedly connected to top ends of the position-limiting rods 2, a hydraulic rod 6 is fixedly connected to the top plate 4, a movable plate 3 is fixedly connected to a bottom end of the hydraulic rod 6, a guide sleeve 5 is wound around the position-limiting rods 2, a bottom end of the guide sleeve 5 is fixedly connected to a top end of the movable plate 3, the movable plate 3 is movably connected to the position-limiting rods 2, a lower plate 7 is fixedly connected to a top end of the bottom plate 1, an upper plate 8 is fixedly connected to a bottom end of the movable plate 3, cooling tubes 13 are respectively disposed inside the upper plate 8 and the lower plate 7, a water inlet tube 11 is fixedly connected to one end of the cooling tubes 13, and a water outlet tube 12 is fixedly connected to the other end of the cooling tubes 13, the cooling time can be reduced, and the machining efficiency of the front axle tube is improved.
The bottom end of the bottom plate 1 and the top end of the base 22 are fixedly connected with a plurality of fixed plates 14, the bottom ends of the fixed plates 14 at the bottom end of the bottom plate 1 are fixedly provided with movable columns 15, the top end of the fixed plate 14 at the top end of the base 22 is fixedly connected with a fixed column 16, the fixed column 16 is movably connected with the movable columns 15, and second springs 19 are wound around the fixed column 16 and the movable columns 15 and can play a role in damping on a front axle tube forming tool; the spring grooves 17 are formed in the movable column 15 and the fixed column 16, the first spring 18 is fixedly connected in the spring groove 17, and two ends of the first spring 18 are fixedly connected to the movable column 15 and the fixed column 16 respectively, so that the damping effect of the front axle tube forming tool is enhanced, and the service life of the front axle tube forming tool is prolonged; a plurality of sliding grooves 20 are formed in the inner walls of the movable columns 15, a plurality of sliding blocks 21 are fixedly connected to the top ends of the fixed columns 16, each sliding block 21 is movably connected with each sliding groove 20, the position of each movable column 15 can be limited, and the movable columns 15 and the fixed columns 16 are prevented from being separated in the using process; both the upper template 8 and the lower template 7 are provided with forming grooves 9, the shapes of the forming grooves 9 are matched with the shape of the front shaft tube, one side of the upper template 8 is provided with a filling port 10, and the filling port 10 is communicated with the forming grooves 9, so that the front shaft tube can be conveniently formed; the bottom fixedly connected with slipmat of base 22 increases the frictional force of front axle pipe shaping frock and ground or desktop, improves stability.
The utility model discloses a theory of operation is: when the device is used, the hydraulic rod 6 is started, the upper template 8 moves towards the lower template 7 under the driving of the hydraulic rod 6, the upper template 8 and the lower template 7 are both provided with a forming groove 9, the shape of the forming groove 9 is matched with that of the front shaft tube, the injection port 10 is communicated with the forming groove 9, then raw materials are injected into the forming groove 9 through the injection port 10, the upper template 8 and the lower template 7 are both provided with cooling tubes 13, after the injection is completed, cold water is introduced into the cooling tubes 13 through the water inlet tube 11 to cool the upper template 8 and the lower template 7, the self-cooling time is reduced, the processing efficiency of the front shaft tube is improved, vibration can be generated in the processing and forming process, the movable column 15 is movably connected with the fixed column 16, the second spring 19 is wound around the movable column 15 and the fixed column 16, and spring grooves 17 are formed in the movable column 15 and the fixed column 16, at the first spring 18 of the interior fixedly connected with of spring groove 17, played absorbing effect to central siphon shaping frock before through first spring 18 and second spring 19, a plurality of spouts 20 have been seted up on the inner wall of a plurality of activity posts 15, a plurality of sliders 21 of the top fixedly connected with of a plurality of fixed columns 16, a plurality of sliders 21 and a plurality of spouts 20 swing joint, can carry on spacingly to the position of activity post 15, prevent that activity post 15 and fixed column 16 from breaking away from in the use, the bottom fixedly connected with slipmat of base 22, can improve the stability of central siphon shaping frock before.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (6)

1. The utility model provides a purpose-built frock for making preceding central siphon fashioned, includes bottom plate (1) and base (22), its characterized in that: the top end of the bottom plate (1) is fixedly connected with a plurality of limiting rods (2), the limiting rods (2) are positioned at corners of the bottom plate (1), the top ends of the limiting rods (2) are fixedly connected with a top plate (4), the top plate (4) is fixedly connected with a hydraulic rod (6), the bottom end of the hydraulic rod (6) is fixedly connected with a movable plate (3), guide sleeves (5) are wound around the limiting rods (2), the bottom end of each guide sleeve (5) is fixedly connected with the top end of the movable plate (3), the movable plate (3) is movably connected with the limiting rods (2), the top end of the bottom plate (1) is fixedly connected with a lower template (7), the bottom end of the movable plate (3) is fixedly connected with an upper template (8), and cooling pipes (13) are arranged inside the upper template (8) and the lower template (7), one end fixedly connected with inlet tube (11) of cooling tube (13), the other end fixedly connected with outlet pipe (12) of cooling tube (13).
2. The special tool for manufacturing the forming of the front axle tube according to claim 1, wherein the special tool comprises: the bottom of bottom plate (1) and the equal a plurality of fixed plates of fixedly connected with (14) in top of base (22), the bottom mounting of a plurality of fixed plates (14) of bottom plate (1) bottom has movable post (15), the top fixedly connected with fixed column (16) of fixed plate (14) on base (22) top, fixed column (16) and movable post (15) swing joint, around being equipped with second spring (19) fixed column (16) and movable post (15).
3. The special tool for manufacturing the forming of the front axle tube according to the claim 2, characterized in that: spring grooves (17) are formed in the movable column (15) and the fixed column (16), a first spring (18) is fixedly connected in each spring groove (17), and two ends of each first spring (18) are fixedly connected to the movable column (15) and the fixed column (16) respectively.
4. The special tool for manufacturing the forming of the front axle tube according to the claim 2, characterized in that: a plurality of sliding grooves (20) are formed in the inner walls of the plurality of movable columns (15), a plurality of sliding blocks (21) are fixedly connected to the top ends of the plurality of fixed columns (16), and each sliding block (21) is movably connected with each sliding groove (20).
5. The special tool for manufacturing the forming of the front axle tube according to claim 1, wherein the special tool comprises: forming grooves (9) are formed in the upper template (8) and the lower template (7), the shape of the forming grooves (9) is matched with that of the front shaft tube, a filling opening (10) is formed in one side of the upper template (8), and the filling opening (10) is communicated with the forming grooves (9).
6. The special tool for manufacturing the forming of the front axle tube according to claim 1, wherein the special tool comprises: the bottom end of the base (22) is fixedly connected with an anti-skid pad.
CN202120313251.0U 2021-02-03 2021-02-03 Special tool for manufacturing front axle tube Active CN214237239U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120313251.0U CN214237239U (en) 2021-02-03 2021-02-03 Special tool for manufacturing front axle tube

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120313251.0U CN214237239U (en) 2021-02-03 2021-02-03 Special tool for manufacturing front axle tube

Publications (1)

Publication Number Publication Date
CN214237239U true CN214237239U (en) 2021-09-21

Family

ID=77796160

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120313251.0U Active CN214237239U (en) 2021-02-03 2021-02-03 Special tool for manufacturing front axle tube

Country Status (1)

Country Link
CN (1) CN214237239U (en)

Similar Documents

Publication Publication Date Title
CN201711512U (en) Multi-cavity die-casting die used for small parts
CN208906292U (en) A kind of anti-offset casting mould
CN214237239U (en) Special tool for manufacturing front axle tube
CN213856928U (en) Valve die produced through sand casting
CN205904389U (en) Almag thin -section casting device
CN107900307B (en) Mould with dual core-pulling structure
CN205818110U (en) A kind of mould for low-pressure casting
CN204735701U (en) Die casting die's of motormeter dish support cinder ladle structure of arranging
CN209424494U (en) A kind of shell core sand core anti-deformation tool
CN211539420U (en) High yield die casting die
CN208529372U (en) A kind of concrete precast block steel form
CN203470843U (en) Hydraulic lifting pattern stripping machine
CN205201933U (en) Foam molding machine
CN207657168U (en) A kind of punching molding integration mold
CN206276880U (en) Molten steel pouring device
CN214000350U (en) Injection mold with replaceable mold core
CN217142232U (en) Die for coupler convenient to demould
CN201543776U (en) Novel shock absorber casting die
CN215544721U (en) Casting die for machining of high-speed railway base plate
CN219817941U (en) Mould is used in iron casting production
CN204953855U (en) Motormeter dish support die casting die
CN218748817U (en) Mould for automobile part machining
CN210498265U (en) Improve production efficiency's porous board-like piece casting die that breeds
CN216607124U (en) Hub manufacturing mold for submarine oil drilling equipment
CN218310656U (en) Forging die frame with liftout device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant