CN214226093U - Mountain torrent geological disaster early warning system - Google Patents

Mountain torrent geological disaster early warning system Download PDF

Info

Publication number
CN214226093U
CN214226093U CN202023252556.XU CN202023252556U CN214226093U CN 214226093 U CN214226093 U CN 214226093U CN 202023252556 U CN202023252556 U CN 202023252556U CN 214226093 U CN214226093 U CN 214226093U
Authority
CN
China
Prior art keywords
early warning
warning system
column
mountain torrent
insertion groove
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202023252556.XU
Other languages
Chinese (zh)
Inventor
肖坚
陈红梅
黄凤辰
花再军
谭丽洲
朱茜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Jiangyuan Information Technology Co ltd
Original Assignee
Nanjing Jiangyuan Information Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Jiangyuan Information Technology Co ltd filed Critical Nanjing Jiangyuan Information Technology Co ltd
Priority to CN202023252556.XU priority Critical patent/CN214226093U/en
Application granted granted Critical
Publication of CN214226093U publication Critical patent/CN214226093U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A50/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE in human health protection, e.g. against extreme weather

Abstract

The utility model relates to an early warning system technical field just discloses a mountain torrent geological disasters early warning system, including support column, extension fixed column, the support column inserts with extension fixed column and connects, the top of extension fixed column is provided with the insertion groove, the bottom of support column can insert in the insertion groove and rather than threaded connection, the fixed surface of extension fixed column has cup jointed the installation disc, be provided with a plurality of countersunk head screw holes on the installation disc, the screw thread has inserted the extension dead lever in the countersunk head screw hole. This mountain torrent geological disaster early warning system buries the most of extension fixed column in the soil to the compaction of filling out, later insert each countersunk head screw hole with the extension dead lever, and on inserting the compacted soil, at last with the rotatory messenger of extension dead lever and countersunk head screw hole threaded connection, accomplish the further reinforcement to this early warning system, need not the building cement platform and install, can save cost and installation time greatly.

Description

Mountain torrent geological disaster early warning system
Technical Field
The utility model relates to an early warning system technical field specifically is a mountain torrent geological disasters early warning system.
Background
Mountain torrents disasters occur in many places in summer every year in China, the mountain torrents are sudden, the water concentration flow rate is high, the scouring destructive power is high, and local flood disasters are often caused by silt, even stones and the like carried in water flow, so that the early warning of the mountain torrents has important significance. The mountain torrent disasters can cause a large amount of casualties and economic losses, the country increases the treatment force on the mountain torrent disasters, and a series of measures such as returning to cultivation and planting and afforestation are fundamental measures for preventing and controlling the mountain torrent disasters, but the period is long, so that the cooperation of monitoring the mountain torrent disasters is needed to realize the maximization of the disaster prevention and control effect.
Because mountain torrent geological disaster early warning system often need install on the river limit, detect the water level together, and the soil property on river limit is softer, and is very inconvenient to this early warning system of installation, current mountain torrent geological disaster early warning system when the installation, is at ground construction cement platform, later fixes early warning system's bracing piece on cement platform, and this mounting means can increase installation cost in a large number, need wait for cement solidification moreover, and the engineering time is too long.
SUMMERY OF THE UTILITY MODEL
The utility model provides a not enough to prior art, the utility model provides a mountain torrent geological disasters early warning system possesses under the prerequisite of firm installation early warning system, can save the cost, improves installation time's advantage, has solved current mountain torrent geological disasters early warning system when the installation, is at ground construction cement platform, later fixes early warning system's bracing piece at cement bench, and this mounting means can increase installation cost in a large number, need wait for cement to solidify moreover, the too long problem of engineering time.
The utility model provides a following technical scheme: a mountain torrent geological disaster early warning system comprises a supporting column and an elongated fixing column, wherein the supporting column and the elongated fixing column are inserted and connected, an insertion groove is formed in the top of the elongated fixing column, an internal thread is formed in the inner wall of the insertion groove, an external thread matched with the internal thread in the inner wall of the insertion groove is formed in the bottom of the outer surface of the supporting column, the bottom of the supporting column can be inserted into the insertion groove and is in threaded connection with the insertion groove, an installation disc is fixedly sleeved on the outer surface of the elongated fixing column, a plurality of countersunk head threaded holes are formed in the installation disc, an elongated fixing rod is inserted into the countersunk head threaded holes in a threaded manner, an external thread matched with the internal thread in the countersunk head threaded holes is arranged above the outer surface of the elongated fixing rod, a protective cover is sleeved on the outer surface of the supporting column, and the top of the elongated fixing column can be shielded by the protective cover, detachably installs on the support column and controls box, solar cell panel and connecting rod, control and install control system in the box, control system contains information acquisition module, data processing module, signal transceiver module, the right side fixed mounting of connecting rod bottom has video monitor, the right side fixed mounting at connecting rod top has the rainfall monitor, video monitor and rainfall monitor all with control system electric connection in the box, the top fixed mounting of support column has the arrester.
Preferably, the number of the countersunk threaded holes is at least three.
Preferably, the top surface of the protective cover is inclined downward from the center toward the outside.
Preferably, the number of the solar cell panels is two, and the two solar cell panels are arranged in a bilateral symmetry manner.
Preferably, the mounting disc and the lengthened fixing column are integrally formed.
Preferably, the connecting rod is a cuboid.
Compared with the prior art, the utility model discloses possess following beneficial effect:
1. this mountain torrent geological disaster early warning system, through with extension fixed column and support column threaded connection, thereby the length of this early warning system support column of greatly increased, can bury the most of extension fixed column in the soil, and the compaction of filling up, later insert each countersunk head screw hole with the extension dead lever, and insert on the compacted soil, at last make its and countersunk head screw hole threaded connection with the rotation of extension dead lever, the completion is to this early warning system's further reinforcement, need not the building cement platform and install, can save cost and installation time greatly.
2. This mountain torrent geological disaster early warning system can prevent through the installation safety cover that the rainwater from getting into the insertion groove, corrodes the internal thread of external screw thread and insertion groove inner wall, and makes it condense together to can keep the convenient state of dismantling of extension fixed column and support column.
3. This mountain torrent geological disaster early warning system can improve the utilization ratio of solar energy through installing two solar cell panels, makes it absorb more solar energy in one day and provides sufficient electric energy for this early warning system.
4. This mountain torrent geological disasters early warning system can prevent through the arrester that the thunder and lightning from hitting this early warning system, and makes it suffer damage, protects early warning system and can normal operating in thunderstorm weather.
Drawings
FIG. 1 is a schematic front view of the present invention;
FIG. 2 is a schematic view of the cross-sectional structure of the support column and the extended fixing column in front view;
fig. 3 is a schematic view of the front view structure of the lengthened fixing rod of the present invention.
In the figure: 1. lengthening the fixing column; 2. installing a disc; 3. a protective cover; 4. a support pillar; 5. a control box body; 6. a solar panel; 7. a lightning arrester; 8. a rainfall monitor; 9. a video monitor; 10. an external thread; 11. inserting the groove; 12. countersunk threaded holes; 13. the fixing rod is lengthened.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, a mountain torrent geological disaster early warning system comprises a supporting column 4, an elongated fixed column 1, the supporting column 4 and the elongated fixed column 1 are inserted and connected, the top of the elongated fixed column 1 is provided with an insertion groove 11, the inner wall of the insertion groove 11 is provided with an internal thread, the bottom of the outer surface of the supporting column 4 is provided with an external thread 10 matched with the internal thread of the inner wall of the insertion groove 11, the bottom of the supporting column 4 can be inserted into the insertion groove 11 and connected with the insertion groove by the thread, the length of the early warning system supporting column can be greatly increased by connecting the elongated fixed column 1 with the supporting column 4 by the thread, most of the elongated fixed column 1 can be buried in the ground and compacted in the ground, then an elongated fixed rod 13 is inserted into each countersunk head threaded hole 12 and inserted into the compacted ground, and finally the elongated fixed rod 13 is rotated to be connected with the countersunk head threaded hole 12 by the thread, the early warning system is further reinforced without being installed on a building cement platform, the cost and the installation time can be greatly saved, the installation disc 2 is fixedly sleeved on the outer surface of the lengthened fixed column 1, the installation disc 2 is rotated to drive the lengthened fixed column 1 to rotate, so that the lengthened fixed column 1 can be connected with the supporting column 4, the installation disc 2 and the lengthened fixed column 1 are integrally formed, the connection firmness of the installation disc 2 and the lengthened fixed column 1 is improved, meanwhile, the integrated forming during production and processing can be conveniently realized, the production efficiency is improved, the installation disc 2 is provided with a plurality of countersunk threaded holes 12, the number of the countersunk threaded holes 12 is at least three, and when the number of the countersunk threaded holes 12 is three, the three countersunk threaded holes 12 are arranged in a 120-degree circumference manner, the balanced stress is ensured, the installation firmness is improved, and the lengthened fixed rod 13 is inserted into the countersunk threaded hole 12, an external thread matched with an internal thread in the countersunk head threaded hole 12 is arranged above the outer surface of the lengthened fixed rod 13, so that the lengthened fixed rod 13 is in threaded connection with the countersunk head threaded hole 12 and is connected into a whole to reinforce the early warning system, the outer surface of the supporting column 4 is fixedly sleeved with the protective cover 3, the protective cover 3 can shield the top of the lengthened fixed column 1, rainwater can be prevented from entering the insertion groove 11 by installing the protective cover 3, the external thread 10 and the internal thread on the inner wall of the insertion groove 11 are corroded and are condensed together, therefore, the state that the lengthened fixed column 1 and the supporting column 4 are convenient to disassemble can be kept, the top surface of the protective cover 3 is downwards inclined from the center to the outer side, rainwater falling on the top of the protective cover 3 can smoothly flow down along the top surface of the protective cover 3, the control box body 5, the solar cell panel 6 and the connecting rod are detachably installed on the supporting column 4, the solar cell panels 6 can provide electricity for the early warning system, natural resources are effectively utilized, energy consumption is saved, the number of the solar cell panels 6 is two, the two solar cell panels 6 are arranged in bilateral symmetry, the utilization rate of solar energy can be improved by installing the two solar cell panels 6, the early warning system can absorb more solar energy in one day to provide enough electric energy for the early warning system, a control system is installed in the control box body 5 and comprises an information acquisition module, a data processing module and a signal transceiving module, a video monitor 9 is fixedly installed on the right side of the bottom of the connecting rod, a rainfall monitor 8 is fixedly installed on the right side of the top of the connecting rod, the video monitor 9 and the rainfall monitor 8 are both electrically connected with the control system in the control box body 5, the video monitor 9 can shoot the site environment and the water level of rivers in real time, and the rainfall monitor 8 can detect rainfall, and data transmission who gathers rainfall monitor 8 and video monitor 9 gives the information acquisition module, the information acquisition module gives the data transmission for data processing module, be the signal of telecommunication with data processing, later signal of telecommunication transmits to signal transceiver module, give remote terminal system with signal transmission, staff's accessible remote terminal system carries out the on-the-spot condition of real-time observation and rainfall, come the probability that analysis mountain torrents geological disasters took place, in time ready for precaution, the top fixed mounting of support column 4 has arrester 7, can prevent through arrester 7 that the thunder from hitting this early warning system, and make it suffer damage, protection early warning system can normal operating in thunderstorm weather.
The working principle is as follows: when the early warning system is used, firstly, the assembly is carried out, the bottom of the supporting column 4 is aligned to the insertion groove 11 at the top of the lengthened fixed column 1, then the installation disc 2 is rotated, the installation disc 2 drives the lengthened fixed column 1 to rotate, so that the lengthened fixed column 1 and the supporting column 4 can be connected together, finally, the lengthened fixed column 1 is buried in a hole dug in advance and compacted by filling soil, then, the lengthened fixed rod 13 is inserted into each countersunk head threaded hole 12 and inserted into compacted soil, finally, the lengthened fixed rod 13 is rotated to be in threaded connection with the countersunk head threaded hole 12, the further reinforcement of the early warning system is completed, the firmness of the early warning system can be ensured because the lengthened fixed column 1 and the lengthened fixed rod 13 are long enough, after the installation is completed, the video monitor 9 can shoot the water level of the site environment and the river in real time, and the rainfall monitor 8 can detect the rainfall, and data transmission that gathers rainfall monitor 8 and video monitor 9 gives the information acquisition module, the information acquisition module gives the data transmission for data processing module, be the signal of telecommunication with data processing, later signal of telecommunication transmits to signal transceiver module, give remote terminal system with signal transmission, staff's accessible remote terminal system carries out the on-the-spot condition of real-time observation and rainfall, come the probability that the analysis mountain torrents geological disasters took place, in time make and take precautions against and prepare, wherein solar cell panel 6 can provide the electric quantity for this early warning system, effectively utilize natural resources, energy saving.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a mountain torrent geological disaster early warning system, includes support column (4), extension fixed column (1), support column (4) and extension fixed column (1) insert the connection, its characterized in that: an insertion groove (11) is formed in the top of the lengthened fixing column (1), an internal thread is formed in the inner wall of the insertion groove (11), an external thread (10) matched with the internal thread in the inner wall of the insertion groove (11) is formed in the bottom of the outer surface of the supporting column (4), the bottom of the supporting column (4) can be inserted into the insertion groove (11) and is in threaded connection with the insertion groove, an installation disc (2) is sleeved on the outer surface of the lengthened fixing column (1), a plurality of countersunk threaded holes (12) are formed in the installation disc (2), a lengthened fixing rod (13) is inserted into the countersunk threaded holes (12) in a threaded mode, an external thread matched with the internal thread in the countersunk threaded holes (12) is arranged above the outer surface of the lengthened fixing rod (13), a protection cover (3) is sleeved on the outer surface of the supporting column (4), and the top of the lengthened fixing column (1) can be shielded by the protection cover (3), detachably installs on support column (4) and controls box (5), solar cell panel (6) and connecting rod, control and install control system in box (5), control system contains information acquisition module, data processing module, signal transceiver module, the right side fixed mounting of connecting rod bottom has video monitor (9), the right side fixed mounting at connecting rod top has rainfall monitor (8), video monitor (9) and rainfall monitor (8) all with control system electric connection in box (5), the top fixed mounting of support column (4) has arrester (7).
2. The mountain torrent geological disaster early warning system of claim 1, characterized in that: the number of the countersunk head threaded holes (12) is at least three.
3. The mountain torrent geological disaster early warning system of claim 2, characterized in that: the top surface of the protective cover (3) is inclined downwards from the center to the outer side.
4. The mountain torrent geological disaster early warning system of claim 3, characterized in that: the number of the solar cell panels (6) is two, and the two solar cell panels (6) are arranged in a bilateral symmetry mode.
5. The mountain torrent geological disaster early warning system of claim 4, characterized in that: the installation disc (2) and the lengthened fixing column (1) are integrally formed.
6. The mountain torrent geological disaster early warning system of claim 5, characterized in that: the connecting rod is a cuboid.
CN202023252556.XU 2020-12-29 2020-12-29 Mountain torrent geological disaster early warning system Active CN214226093U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202023252556.XU CN214226093U (en) 2020-12-29 2020-12-29 Mountain torrent geological disaster early warning system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202023252556.XU CN214226093U (en) 2020-12-29 2020-12-29 Mountain torrent geological disaster early warning system

Publications (1)

Publication Number Publication Date
CN214226093U true CN214226093U (en) 2021-09-17

Family

ID=77707843

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202023252556.XU Active CN214226093U (en) 2020-12-29 2020-12-29 Mountain torrent geological disaster early warning system

Country Status (1)

Country Link
CN (1) CN214226093U (en)

Similar Documents

Publication Publication Date Title
WO2020259362A1 (en) Real-time monitoring apparatus and method for groundwater level and soil moisture in gully head landfill region
CN109461287B (en) Geological disaster monitoring and early warning device
CN201772910U (en) One-pole and one-station type multifunctional automatic monitor
CN111754732A (en) Data acquisition device for monitoring mountain torrent disasters
CN214226093U (en) Mountain torrent geological disaster early warning system
CN207799866U (en) A kind of strike-slip fault High Cut Slope safety monitoring system based on high and cold mountain area
CN209117116U (en) A kind of groundwater level monitoring device
CN206648713U (en) Mud-rock flow mud level monitoring system based on high and cold mountain area
CN206649638U (en) Support installation system for the monitoring of high and cold mountain area mud-rock flow mud position
CN210268800U (en) Underground water level monitoring device for forecasting and early warning of root and new water generation of populus diversifolia forest
CN215107550U (en) Protection canopy for building engineering
KR20120022419A (en) Step retaining wall structure having solar power generation function
CN213576615U (en) Building engineering that protecting effect is good detects and uses detector
CN209179350U (en) A kind of novel rainwater standpipe disconnecting energy dissipator
CN211736553U (en) A monitoring facilities installation protector for hydrology monitoring well
CN210268717U (en) Real-time monitoring device for underground water level and soil humidity of ditch head landfill area
CN209339163U (en) A kind of support construction for open-pit slope
CN110186532A (en) A kind of groundwater level monitoring device and Populus Euphratica evil of being completely cured newly need water forecasting and warning method
CN203149139U (en) Throughfall measurement device in rubber plantation
CN206627645U (en) A kind of device for being used to monitor geological disaster
CN217360350U (en) Universal Beidou geological disaster monitoring device
CN216433165U (en) Hydraulic engineering water level monitoring device
CN109750849A (en) A kind of method of pile for prestressed pipe vast sky stake position fall arrest
CN219951985U (en) Slope protection reinforcing apparatus
CN210774019U (en) Hydraulic level monitoring device suitable for earth surface monitoring

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant