CN214192248U - Multi-pipe lifting appliance for galvanized pipe production line - Google Patents

Multi-pipe lifting appliance for galvanized pipe production line Download PDF

Info

Publication number
CN214192248U
CN214192248U CN202023117984.1U CN202023117984U CN214192248U CN 214192248 U CN214192248 U CN 214192248U CN 202023117984 U CN202023117984 U CN 202023117984U CN 214192248 U CN214192248 U CN 214192248U
Authority
CN
China
Prior art keywords
board
armful
holding plate
pipe
spout
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202023117984.1U
Other languages
Chinese (zh)
Inventor
张国斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Dasen Metal Products Co ltd
Original Assignee
Tianjin Dasen Metal Products Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Dasen Metal Products Co ltd filed Critical Tianjin Dasen Metal Products Co ltd
Priority to CN202023117984.1U priority Critical patent/CN214192248U/en
Application granted granted Critical
Publication of CN214192248U publication Critical patent/CN214192248U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Coating With Molten Metal (AREA)

Abstract

The utility model discloses a galvanized pipe is multitube hoist for production line, embrace board, shovel piece and gag lever post including hanger plate, first armful board, second, first spout and second spout have been seted up respectively to hanger plate bottom both ends, all rotate through the bearing in first spout and the second spout and install the lead screw, all overlap on the lead screw and be equipped with corresponding silk piece, the silk piece bottom of first spout is welded and is equipped with first armful board, the silk piece bottom of second spout is welded and is equipped with the second armful board, first armful board and second armful inboard bottom all are equipped with the shovel piece, first armful board and second are embraced the board outside and are distributed to weld and are equipped with the mounting bracket that corresponds the position with the shovel piece. Make personnel reach and carry out jack-up processing in step to the multiunit pipe fitting, help personnel better treat the pipe fitting of galvanization to the multiunit and concentrate the handling, use convenient nimble, and during the jack-up handling, need not personnel and tie up in addition between to the pipe fitting and establish fixedly, the high efficiency of greatly increased operation has higher practicality.

Description

Multi-pipe lifting appliance for galvanized pipe production line
Technical Field
The utility model relates to a galvanized pipe technical field, in particular to galvanized pipe is multitube hoist for production line.
Background
The galvanized pipe, also known as galvanized steel pipe, is divided into hot galvanizing and electrogalvanizing, and the hot galvanizing is thick, and has the advantages of uniform coating, strong adhesive force, long service life and the like.
In the galvanized pipe production line, need overhead hoist to treat galvanized pipe fitting and concentrate jack-up handling, and when carrying out the handling to multiunit pipe fitting at present, need personnel to tighten the processing in advance between the pipe fitting for whole handling machining efficiency is lower, lacks the supplementary hoist that can realize directly pressing from both sides the armful handling to multiunit pipe fitting. Therefore, a multi-pipe hanger for a galvanized pipe production line is provided.
Disclosure of Invention
The utility model discloses a main aim at provides a galvanized pipe is multitube hoist for production line can effectively solve the problem in the background art.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a galvanized pipe is multicell hoist for production line, embraces board, shovel piece and gag lever post including hanger plate, first armful board, second, first spout and second spout have been seted up respectively to hanger plate bottom both ends, all rotate through the bearing in first spout and the second spout and install the lead screw, all overlap on the lead screw and be equipped with the silk piece that corresponds, the silk piece bottom welding of first spout is equipped with first armful board, the silk piece bottom welding of second spout is equipped with the second armful board, first armful inboard bottom of board and second armful board all is equipped with the shovel piece, first armful board and second armful board outside distribution weld be equipped with the mounting bracket that corresponds the position with the shovel piece, the mounting bracket top all is equipped with hydraulic push rod, hydraulic push rod's output all runs through and establishes the connection with the shovel piece tip welding that corresponds.
Furthermore, the first board and the second of embracing are embraced inboard top and are all welded and are equipped with the gag lever post, first board and the second of embracing is embraced the board top and is located and has seted up the jack between the gag lever post respectively.
Further, the shovel piece and the gag lever post of board are embraced to first armful board and second all crisscross the installation of arranging between, first armful board and second are embraced the board bottom and are located the shovel piece between and seted up the slot.
Furthermore, servo motors are respectively installed at two ends of the hanging plate through bolts, the driving ends of the servo motors are connected with the rotating shafts of the corresponding screw rods in an installing mode, and the first sliding grooves and the second sliding grooves are respectively connected with two sides of the corresponding screw blocks in a sliding mode.
Compared with the prior art, the utility model discloses following beneficial effect has: the first holding plate and the second holding plate at the bottom of the hanging plate are respectively dropped to two sides of the pipe pile, and then the shovel block is pushed by the hydraulic push rod, so that the shovel block can insert and embed the bottoms of two sides of the piled pipe fittings in an in-and-out manner, thereby realizing clamping and holding of the pipe fittings, after the pipe fittings are all shoveled at the tops of the shoveling blocks, a worker drives the screw rods to rotate through the servo motors, so that the screw blocks on the screw rods respectively drive the first holding plates and the second holding plates to clamp in opposite directions, thereby realizing clamping the pipe fitting, and limiting and clamping the top of the clamped pipe fitting by the limiting rod, so that the personnel can synchronously lift a plurality of groups of pipe fittings, the centralized lifting treatment of a plurality of groups of pipe fittings to be galvanized can be better carried out by the personnel, the use is convenient and flexible, and when the jack-up handling, need not personnel and tie up fixedly between the pipe fitting in addition, the high efficiency of greatly increased operation has higher practicality.
Drawings
Fig. 1 is the overall structure schematic diagram of the multi-tube hanger for the galvanized pipe production line of the utility model.
Fig. 2 is the utility model discloses a galvanized pipe production line is with first armful board and second armful board clamp of multitube hoist embrace the structural sketch map.
Fig. 3 is the first plate holding main view structure schematic diagram of the multi-tube hanger for the galvanized pipe production line.
Fig. 4 is the second holding plate main view structure schematic diagram of the multi-pipe hanger for the galvanized pipe production line.
In the figure: 1. a hanger plate; 2. a first chute; 3. a second chute; 4. a screw rod; 5. silk blocks; 6. a first holding plate; 7. a second holding plate; 8. shoveling blocks; 9. a mounting frame; 10. a hydraulic push rod; 11. a limiting rod; 12. a jack; 13. a slot; 15. a servo motor.
Detailed Description
In order to make the technical means, creation features, achievement purposes and functions of the present invention easy to understand, the present invention is further described below with reference to the following embodiments.
As shown in fig. 1-4, a multi-pipe hanger for a galvanized pipe production line comprises a hanger plate 1, a first holding plate 6, a second holding plate 7, a shovel block 8 and a limiting rod 11, a first chute 2 and a second chute 3 are respectively arranged at two ends of the bottom of the hanging plate 1, a screw rod 4 is rotatably arranged in the first chute 2 and the second chute 3 through bearings, the lead screws 4 are all sleeved with corresponding wire blocks 5, the bottom of each wire block 5 of the first sliding chute 2 is welded with a first holding plate 6, a second holding plate 7 is welded at the bottom of the wire block 5 of the second chute 3, shoveling blocks 8 are arranged at the bottoms of the inner sides of the first holding plate 6 and the second holding plate 7, the outer sides of the first holding plate 6 and the second holding plate 7 are distributed and welded with mounting frames 9 corresponding to the shovel blocks 8, the top of the mounting frame 9 is equipped with a hydraulic push rod 10, and the output end of the hydraulic push rod 10 is connected with the end part of the corresponding shovel block 8 in a welding mode.
Wherein, first armful board 6 and the inboard top of second armful board 7 are all welded and are equipped with gag lever post 11, first armful board 6 and second armful board 7 top just are located and have seted up jack 12 between gag lever post 11 respectively.
In this embodiment, as shown in fig. 3, the insertion hole 12 is convenient for the first holding plate 6 and the second holding plate 7 to be clamped and held therebetween, and then the insertion hole 12 can be penetrated by the limiting rod 11 of the first holding plate 6 and the second holding plate 7.
Wherein, first shovel piece 8 and the gag lever post 11 of embracing board 6 and second and all crisscross the installation of arranging between embracing board 7, first board 6 and the second of embracing is embraced 7 bottoms and is located shovel piece 8 and has seted up slot 13 between.
In this embodiment, as shown in fig. 3, the slot 13 facilitates the insertion of the shovel block 8 of the first holding plate 6 and the second holding plate 7 into the slot 13 after the first holding plate 6 and the second holding plate 7 are clamped.
The two ends of the hanging plate 1 are respectively provided with a servo motor 15 through bolts, the driving end of each servo motor 15 is connected with the rotating shaft of the corresponding screw rod 4, and the first sliding groove 2 and the second sliding groove 3 are respectively connected with the two sides of the corresponding screw block 5 in a sliding manner.
In the embodiment, as shown in fig. 1, the screw rod 4 is driven to rotate by the servo motor 15.
It should be noted that, the utility model relates to a multi-pipe sling for galvanized pipe production line, when in use, a person assembles the suspension plate 1 with a hoisting mechanism (portal frame, electric hoist, etc.) of an operation site, when in use, the person falls the first holding plate 6 and the second holding plate 7 at the bottom of the suspension plate 1 to two sides of a pipe stack respectively, then pushes the shovel block 8 through the hydraulic push rod 10, so that the shovel block 8 can insert the bottom of two sides of the stacked pipe to clamp the pipe, after the pipe is shoveled at the top of the shovel block 8, the person drives the screw rod 4 to rotate through the servo motor 15, so that the wire block 5 on the screw rod 4 drives the first holding plate 6 and the second holding plate 7 to clamp oppositely, thereby clamping the pipe is realized, and the top of the clamped pipe is clamped by the limiting rod 11, so that the person can synchronously lift multiple groups of pipes, the handling is handled to the multiunit pipe fitting of treating the galvanization that helps personnel better, uses convenient flexibility, and during the jack-up handling, need not personnel and tie up in addition between to the pipe fitting and establish fixedly, the high efficiency of greatly increased operation has higher practicality.
The basic principles and the main features of the invention and the advantages of the invention have been shown and described above. It will be understood by those skilled in the art that the present invention is not limited to the above embodiments, and that the foregoing embodiments and descriptions are provided only to illustrate the principles of the present invention without departing from the spirit and scope of the present invention. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (4)

1. A multi-pipe lifting appliance for a galvanized pipe production line comprises a lifting plate (1), a first holding plate (6), a second holding plate (7), shovel blocks (8) and a limiting rod (11), and is characterized in that two ends of the bottom of the lifting plate (1) are respectively provided with a first sliding groove (2) and a second sliding groove (3), a lead screw (4) is rotatably installed in the first sliding groove (2) and the second sliding groove (3) through a bearing, corresponding wire blocks (5) are sleeved on the lead screw (4), the bottom of each wire block (5) of the first sliding groove (2) is welded with the first holding plate (6), the bottom of each wire block (5) of the second sliding groove (3) is welded with the second holding plate (7), the bottom of the inner side of each first holding plate (6) and the bottom of the inner side of each second holding plate (7) is provided with the shovel blocks (8), and mounting frames (9) corresponding to the shovel blocks (8) are distributed and welded on the outer sides of the first holding plate (6) and the second holding plates (7), mounting bracket (9) top all is equipped with hydraulic rod (10), hydraulic rod (10)'s output all runs through and connects with shovel piece (8) tip welding of correspondence.
2. The multi-pipe hanger for the galvanized pipe production line according to claim 1, characterized in that: first armful board (6) and second are embraced inboard top of board (7) and are all welded and be equipped with gag lever post (11), jack (12) have been seted up respectively at first armful board (6) and second armful board (7) top and lie in between gag lever post (11).
3. The multi-pipe hanger for the galvanized pipe production line according to claim 1, characterized in that: first embrace shovel piece (8) and gag lever post (11) of board (7) are embraced to board (6) and second and all crisscross the installation of arranging between, first embrace board (6) and second embrace board (7) bottom and be located shovel piece (8) and seted up slot (13).
4. The multi-pipe hanger for the galvanized pipe production line according to claim 1, characterized in that: the lifting plate is characterized in that servo motors (15) are respectively installed at two ends of the lifting plate (1) through bolts, the driving ends of the servo motors (15) are connected with the rotating shafts of the corresponding screw rods (4) in an installing mode, and the first sliding grooves (2) and the second sliding grooves (3) are respectively connected with two sides of the corresponding screw blocks (5) in a sliding mode.
CN202023117984.1U 2020-12-22 2020-12-22 Multi-pipe lifting appliance for galvanized pipe production line Active CN214192248U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202023117984.1U CN214192248U (en) 2020-12-22 2020-12-22 Multi-pipe lifting appliance for galvanized pipe production line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202023117984.1U CN214192248U (en) 2020-12-22 2020-12-22 Multi-pipe lifting appliance for galvanized pipe production line

Publications (1)

Publication Number Publication Date
CN214192248U true CN214192248U (en) 2021-09-14

Family

ID=77654818

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202023117984.1U Active CN214192248U (en) 2020-12-22 2020-12-22 Multi-pipe lifting appliance for galvanized pipe production line

Country Status (1)

Country Link
CN (1) CN214192248U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114538071A (en) * 2022-02-16 2022-05-27 安徽汇源镀锌有限公司 Multi-station feeding lifting appliance for hot galvanizing workshop

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114538071A (en) * 2022-02-16 2022-05-27 安徽汇源镀锌有限公司 Multi-station feeding lifting appliance for hot galvanizing workshop

Similar Documents

Publication Publication Date Title
CN202556023U (en) Pipeline prefabrication cantilever automatic welding machine
CN214192248U (en) Multi-pipe lifting appliance for galvanized pipe production line
CN212127258U (en) Hoisting accessory for construction
CN101424366A (en) Flywheel casing on-line rapid assembling device and method
CN214350589U (en) Circular tube welding fixture
CN211310410U (en) Winding clamping device
CN111362129A (en) Hoisting device for H-shaped steel
CN111438553A (en) Cross pipeline positioning and clamping device
CN218695417U (en) H steel group is to device
CN208825913U (en) A kind of penstock stiffening ring high efficiency assembly device
CN214770109U (en) Long-distance large-aperture pipeline aligning adjustment roller device
CN211277433U (en) Flange clamping device for valve machining
CN206278661U (en) Suspender joins position positioner
CN211680758U (en) Electric chuck for pipeline welding machine
CN219242805U (en) Hanger for pipeline installation for thermal pipeline laying
CN219546473U (en) Anode plate row and transportation device based on BEH type electrostatic dust collector
CN108115530A (en) A kind of rust removing device for steel tube for building
CN216471741U (en) Automatic picking device for insulation boards
CN215558285U (en) Electric lifting appliance for lifting rollers in encircling manner
CN221079763U (en) Transformer installation device that power engineering used
CN213011667U (en) C-shaped steel galvanizing lifting device
CN217570964U (en) Drill jig for machining pin holes of chain links
CN218904150U (en) High-productivity welding fixture with rotary air cylinder
CN211728125U (en) Automatic welding robot for flange plate and steel reinforcement framework
CN213969470U (en) Seam welder loading attachment is used in pole production

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant