CN214186052U - Air cannon hanging gantry trolley for hanging air cannon in positioning bolt mounting process - Google Patents

Air cannon hanging gantry trolley for hanging air cannon in positioning bolt mounting process Download PDF

Info

Publication number
CN214186052U
CN214186052U CN202023003491.5U CN202023003491U CN214186052U CN 214186052 U CN214186052 U CN 214186052U CN 202023003491 U CN202023003491 U CN 202023003491U CN 214186052 U CN214186052 U CN 214186052U
Authority
CN
China
Prior art keywords
wheel
hanging
air cannon
positioning bolt
fixedly connected
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202023003491.5U
Other languages
Chinese (zh)
Inventor
葸建林
曹琰泉
牛国强
张栋国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongfu Lianzhong Jiuquan Composite Materials Co ltd
Original Assignee
Zhongfu Lianzhong Jiuquan Composite Materials Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongfu Lianzhong Jiuquan Composite Materials Co ltd filed Critical Zhongfu Lianzhong Jiuquan Composite Materials Co ltd
Priority to CN202023003491.5U priority Critical patent/CN214186052U/en
Application granted granted Critical
Publication of CN214186052U publication Critical patent/CN214186052U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Carriers, Traveling Bodies, And Overhead Traveling Cranes (AREA)

Abstract

The utility model discloses an installation positioning bolt in-process hangs wind big gun of wind big gun and hangs double-barreled trolley, including the horizon bar, horizon bar lower extreme both sides fixedly connected with connecting block, connecting block lower extreme intermediate position is equipped with a wheel, a wheel central point puts and pegs graft and has a screw rod No. one, a screw rod both ends are equipped with the nut No. one, a wheel is through a screw rod and a nut swing joint to connecting block, connecting block one side is equipped with the brake strip, one section of brake strip is pegged graft there is the screw, the brake strip passes through screw swing joint to the connecting block, horizon bar upper end intermediate position fixedly connected with pole setting, horizon bar upper end both sides fixedly connected with dead lever, the dead lever keeps away from the intermediate position of one side fixedly connected with pole setting of horizon bar, pole setting upper end one side fixedly connected with crossbeam, this kind of installation positioning bolt in-process hangs double-barreled trolley of wind big gun can reach installation positioning bolt laborsaving ann's portal trolley through setting up crossbeam and slide rail and wheel and make it can reach installation positioning bolt laborsaving ann's the intermediate position of wheel and put The purpose of improving the efficiency is achieved.

Description

Air cannon hanging gantry trolley for hanging air cannon in positioning bolt mounting process
Technical Field
The utility model relates to a hang longmen technical field, specifically be an installation positioning bolt in-process hangs wind big gun of wind big gun and hangs longmen dolly.
Background
The wind cannon is a pneumatic wrench, also called a ratchet wrench and electric tool assembly, and mainly is a tool for providing high torque output with minimum consumption, the embedded blade type root bolt sleeves are fixed by positioning bolts, a tool wind cannon is required to be used in the fixing process, the weight of the wind cannon is heavier, the blades are larger and larger, the positioning bolts are arranged by manpower, and therefore the wind cannon hanging gantry trolley for hanging the wind cannon in the positioning bolt installation process is very required in the positioning bolt installation process, but the existing wind cannon hanging method has some defects.
The prior art has the following defects or problems:
1. when the existing wind cannon hanging method is used, the existing wind cannon hanging method mostly needs to lift up the wind cannon manually to install the positioning bolt, and the method is characterized in that the wind cannon is heavier in weight and larger in blade, the positioning bolt is installed manually, so that the method is extremely laborious, the wind cannon cannot be installed continuously by manpower, and otherwise, the wind cannon is dangerous to hand and is inconvenient;
2. when the existing pneumatic hammer hanging method is used, the existing pneumatic hammer hanging method mostly needs to lift the pneumatic hammer manually to install the positioning bolt, and the method leads the manual work to bear the weight of the pneumatic hammer due to the fact that the weight of the pneumatic hammer is heavier, the pneumatic hammer needs to be lifted accurately to install the positioning bolt, so that the installation efficiency is reduced, the progress of a project is influenced, and the method is not practical.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to prior art's weak point, provide an installation positioning bolt in-process hangs the air cannon of wind big gun and hangs the gantry trolley, make an installation positioning bolt in-process hang the air cannon of wind big gun and hang the gantry trolley and can solve current air cannon method of hanging and need artifical the low problem that can not last operation and installation effectiveness are low of holding air cannon installation positioning bolt degree of safety when using.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides an installation positioning bolt in-process hangs wind big gun of wind big gun and hangs longmen dolly, includes the horizon bar, horizon bar lower extreme both sides fixedly connected with connecting block, connecting block lower extreme intermediate position is equipped with the wheel No. one, No. one the wheel central point puts and pegs graft there is the screw rod No. one, No. one the screw rod both ends are equipped with the nut No. one, No. one the wheel is through a screw rod and nut swing joint to connecting block, connecting block one side is equipped with the brake strip, one section peg graft of brake strip has the screw, the brake strip is through screw swing joint to connecting block, horizon bar upper end intermediate position fixedly connected with pole setting, horizon bar upper end both sides fixedly connected with dead lever, the dead lever keeps away from the interlude position of one side fixed connection to the pole setting of horizon bar, pole setting upper end one side.
As the utility model discloses a preferred technical scheme, one side fixed connection that the pole setting was kept away from to the crossbeam is to another pole setting relative with the pole setting, the pole setting is total two, the device that two pole settings are connected is whole the same, two pole settings connect into a whole through the crossbeam.
As the utility model discloses a preferred technical scheme, the crossbeam lower extreme is equipped with the slide rail, the equal fixedly connected with bearing diagonal pole in crossbeam lower extreme both sides, one side that the crossbeam was kept away from to the bearing diagonal pole all is connected to the pole setting.
As the utility model discloses a preferred technical scheme, slide rail upper end intermediate position is equipped with the four-wheel coaster, the inboard four corners position of four-wheel coaster lower extreme is equipped with four No. two wheels.
As the utility model discloses an optimized technical scheme, No. two wheel central points put and all peg graft and have No. two screw rods, No. two screw rods are pegged graft the position that four-wheel block is close to the lower extreme, No. two screw rods are equipped with the nut No. two with four-wheel block junction.
As the utility model discloses a preferred technical scheme, No. two wheels are inboard through No. two screw rods and No. two nut swing joint to four-wheel coaster, four-wheel coaster is through No. two wheel swing joint to slide rails.
As the utility model discloses a preferred technical scheme, the inboard lower extreme fixedly connected with fixed plate of four-wheel coaster, the fixed plate lower extreme is equipped with the jib, the jib lower extreme is equipped with two spring balancers, be equipped with the connecting rod between the spring balancer.
Compared with the prior art, the utility model provides an installation positioning bolt in-process hangs wind big gun of wind big gun and hangs longmen dolly possesses following beneficial effect:
1. according to the air cannon hanging gantry trolley for hanging the air cannon in the process of installing the positioning bolt, the air cannon can be installed on the four-wheel trolley through the hanger rod and the spring balancer 14 by arranging the slide rail and the four-wheel trolley, and then the four-wheel trolley moves on the slide rail, so that the positioning bolt is installed on the air cannon, the condition that the labor is wasted in manually lifting the air cannon installation positioning bolt is avoided, the operation safety degree is improved, and the operation is very convenient;
2. this installation positioning bolt in-process hangs wind big gun of wind big gun and hangs gantry trolley through setting up a wheel and connecting block for this installation positioning bolt in-process hangs wind big gun of wind big gun and hangs gantry trolley and move about through a wheel of connecting block lower extreme when using, thereby drive whole device activity, install the wind big gun and remove installation positioning bolt with carrying the wind big gun that can be more convenient after on the four-wheel block, promoted the installation effectiveness by a wide margin, it is very practical.
Drawings
FIG. 1 is a schematic perspective view of the present invention;
fig. 2 is a schematic view of the vertical structure of the present invention;
FIG. 3 is a schematic side view of the perspective structure of the present invention;
fig. 4 is a perspective structural schematic view of the slide rail of the present invention.
In the figure: 1. a first wheel; 2. a first nut; 3. connecting blocks; 4. a horizontal bar; 5. an oblique fixing rod; 6. a first screw rod; 7. a screw; 8. a brake bar; 9. erecting a rod; 10. an inclined support rod; 11. a slide rail; 12. a cross beam; 13. a connecting rod; 14. a spring balancer; 15. a second nut; 16. a second screw; 17. a second wheel; 18. a four-wheel tackle; 19. a boom; 20. and (7) fixing the plate.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, in this embodiment: the utility model provides an installation positioning bolt in-process hangs wind big gun of wind big gun and hangs gantry trolley, including the horizon bar 4, 4 lower extreme both sides fixedly connected with connecting blocks 3 of horizon bar, 3 lower extreme intermediate positions of connecting block are equipped with a wheel 1, 1 central point of a wheel puts and pegs graft and has a screw rod 6, 6 both ends of a screw rod are equipped with nut 2, a wheel 1 is through a screw rod 6 and 2 swing joint of nut 3 to connecting block 3, 3 one side of connecting block is equipped with brake strip 8, 8 one section pegs graft of brake strip has screw 7, brake strip 8 passes through screw 7 swing joint to connecting block 3, 4 upper end intermediate position fixedly connected with pole setting 9 of horizon bar, 4 upper end both sides fixedly connected with dead lever 5 of horizon bar, one side fixedly connected with pole setting 9's interlude position of dead lever 5 keeping away from horizon bar 4, pole setting 9 upper end one side fixedly connected with crossbeam 12.
In the embodiment, one side of the beam 12 far away from the vertical rod 9 is fixedly connected to another vertical rod 9 opposite to the vertical rod 9, the number of the vertical rods 9 is two, devices connected with the two vertical rods 9 are all the same, the two vertical rods 9 are connected into a whole through the beam 12, the whole device can be supported at a certain height through the devices connected with the two vertical rods 9 and can move, a positioning bolt and a wind cannon can be conveniently installed, a slide rail 11 is arranged at the lower end of the beam 12, oblique support rods 10 are fixedly connected to two sides of the lower end of the beam 12, one side of each oblique support rod 10 far away from the beam 12 is connected to the corresponding vertical rod 9, a four-wheel tackle 18 is arranged in the middle position of the upper end of the slide rail 11, the four-wheel tackle 18 can move on the slide rail 11 after the wind cannon is installed through the slide rail 11 and can move slightly when the positioning bolt is conveniently installed, four corners of the inner side of the lower end of the four-wheel tackle 18 are provided with four wheels 17, a second screw rod 16 is inserted in the center of the second wheel 17, the second screw rod 16 is inserted in the position of the four-wheel pulley 18 near the lower end, a second nut 15 is arranged at the joint of the second screw rod 16 and the four-wheel pulley 18, the second wheel 17 and the four-wheel pulley 18 form a movable whole through the second nut 15 and the second screw rod 16, the second wheel 17 is movably connected to the inner side of the four-wheel pulley 18 through the second screw rod 16 and the second nut 15, the four-wheel pulley 18 is movably connected to the slide rail 11 through the second wheel 17, the four-wheel pulley 18 can move on the slide rail 11 through the second wheel 17, the lower end of the inner side of the four-wheel pulley 18 is fixedly connected with a fixed plate 20, the lower end of the fixed plate 20 is provided with a suspender 19, the lower end of the suspender 19 is provided with two spring balancers 14, a connecting rod 13 is arranged between the spring balancers 14, and a wind cannon can be hung on the fixed plate 20 at the lower end of the inner side of the four-wheel pulley 18 through the suspender 19 and the spring balancers 14, the installation of the positioning bolt is convenient.
The utility model discloses a theory of operation and use flow: at first, the air cannon hanging gantry trolley for hanging the air cannon in the positioning bolt mounting process moves to the position of a positioning bolt to be mounted through a wheel 1, the braking is stopped stably through a brake strip 8, the air cannon is mounted to the lower end of a four-wheel pulley 18 through a suspender 19 and a spring balancer 14, the position of the air cannon can be adjusted through the movement of the four-wheel pulley 18 on a slide rail 11, the air cannon is enabled to be mounted with the positioning bolt, after the positioning bolt is mounted, the whole device can be moved to the next position through the wheel 1 at the lower end of a horizontal rod 4 to be mounted with the positioning bolt, the traditional mode that the air cannon is carried by a person to mount can be avoided through the device, the condition that the air cannon is pressed to one hand can not occur, the safety degree of mounting is improved, meanwhile, the efficiency of mounting is improved due to the movement, and the air cannon hanging gantry trolley is very practical.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments described in the foregoing embodiments, or equivalents may be substituted for elements thereof. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (7)

1. The utility model provides an installation positioning bolt in-process hangs wind big gun of wind big gun and hangs longmen dolly which characterized in that: including horizon bar (4), horizon bar (4) lower extreme both sides fixedly connected with connecting block (3), connecting block (3) lower extreme intermediate position is equipped with wheel (1) No. one, wheel (1) central point puts and pegs graft and has screw rod (6) No. one, screw rod (6) both ends are equipped with nut (2) No. one, wheel (1) through screw rod (6) and nut (2) swing joint to connecting block (3) No. one, connecting block (3) one side is equipped with brake strip (8), one section of brake strip (8) is pegged graft and is had screw (7), brake strip (8) are through screw (7) swing joint to connecting block (3), horizon bar (4) upper end intermediate position fixedly connected with pole setting (9), horizon bar (4) upper end both sides fixedly connected with dead lever (5) to one side, dead lever (5) keep away from the interlude of one side fixedly connected to pole setting (9) of horizon bar (4), dead lever (5) to one side And one side of the upper end of the vertical rod (9) is fixedly connected with a cross beam (12).
2. The air cannon hanging gantry trolley for hanging the air cannon in the process of installing the positioning bolt, which is characterized in that: one side of the cross beam (12) far away from the vertical rods (9) is fixedly connected to the other vertical rod (9) opposite to the vertical rods (9), the number of the vertical rods (9) is two, devices connected with the two vertical rods (9) are all the same, and the two vertical rods (9) are connected into a whole through the cross beam (12).
3. The air cannon hanging gantry trolley for hanging the air cannon in the process of installing the positioning bolt, which is characterized in that: crossbeam (12) lower extreme is equipped with slide rail (11), crossbeam (12) lower extreme both sides equal fixedly connected with bearing diagonal pole (10), one side that crossbeam (12) were kept away from in bearing diagonal pole (10) all is connected to pole setting (9).
4. The air cannon hanging gantry trolley for hanging the air cannon in the process of installing the positioning bolt, which is characterized in that: four-wheel pulley (18) are arranged in the middle of the upper end of the sliding rail (11), and four second wheels (17) are arranged at four corners of the inner side of the lower end of the four-wheel pulley (18).
5. The air cannon hanging gantry trolley for hanging the air cannon in the process of installing the positioning bolt, which is characterized in that: no. two wheels (17) central point puts and all pegs graft No. two screw rods (16), No. two screw rods (16) peg graft and are close to the position of lower extreme to four-wheel coaster (18), No. two screw rods (16) and four-wheel coaster (18) junction are equipped with No. two nuts (15).
6. The air cannon hanging gantry trolley for hanging the air cannon in the process of installing the positioning bolt, which is characterized in that: the second wheel (17) is movably connected to the inner side of the four-wheel tackle (18) through a second screw rod (16) and a second nut (15), and the four-wheel tackle (18) is movably connected to the sliding rail (11) through the second wheel (17).
7. The air cannon hanging gantry trolley for hanging the air cannon in the process of installing the positioning bolt, which is characterized in that: the lower extreme fixedly connected with fixed plate (20) of four-wheel pulley (18) inboard, fixed plate (20) lower extreme is equipped with jib (19), jib (19) lower extreme is equipped with two spring balancers (14), be equipped with connecting rod (13) between spring balancer (14).
CN202023003491.5U 2020-12-14 2020-12-14 Air cannon hanging gantry trolley for hanging air cannon in positioning bolt mounting process Active CN214186052U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202023003491.5U CN214186052U (en) 2020-12-14 2020-12-14 Air cannon hanging gantry trolley for hanging air cannon in positioning bolt mounting process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202023003491.5U CN214186052U (en) 2020-12-14 2020-12-14 Air cannon hanging gantry trolley for hanging air cannon in positioning bolt mounting process

Publications (1)

Publication Number Publication Date
CN214186052U true CN214186052U (en) 2021-09-14

Family

ID=77653347

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202023003491.5U Active CN214186052U (en) 2020-12-14 2020-12-14 Air cannon hanging gantry trolley for hanging air cannon in positioning bolt mounting process

Country Status (1)

Country Link
CN (1) CN214186052U (en)

Similar Documents

Publication Publication Date Title
CN208439287U (en) A kind of light rail construction feeding cart
CN109066467B (en) Insulating platform with all-round regulatory function
CN214186052U (en) Air cannon hanging gantry trolley for hanging air cannon in positioning bolt mounting process
CN111064101B (en) Be applied to portable gallows of door type of supplementary installation of high tension switchgear
CN207434910U (en) Combination cantilevered hoisting apparatus easy to assemble
CN205387447U (en) A device that equipment hoisted on was used for overhead power line pole and mounting tool thereof
CN208325261U (en) A kind of cover board transport installation vehicle
CN111409203A (en) Device for cutting off concrete pole of contact net
CN205662284U (en) Two poles become platform ground jack
CN205802755U (en) A kind of efficient lifting device for changing dust-removal cloth-bag
CN219287014U (en) Special frock of switch board dismouting
CN214570575U (en) A heavy object locomotive for ancient building construction site far away
CN209322326U (en) Ground power supply system guide groove Special-purpose hanger entrucking
CN213923926U (en) Self-hoisting and unloading balance car
CN214037705U (en) Building construction elevator fixing device
CN216141116U (en) Special lifting claw for bearing pedestal
CN220555612U (en) Lifting appliance for building construction
CN216190533U (en) Lifting appliance device for overhauling converter station
CN108892053A (en) The boom hoisting for hanging position can be adjusted
CN210973669U (en) Lift for civil engineering
CN209210237U (en) A kind of roots blower apparatus for examination and repair
CN209940350U (en) Part overhead hoist of usefulness is repaired to agricultural machinery
CN219197220U (en) Building construction ladder
CN220998972U (en) Simple track pulley device
CN219098507U (en) Lifting tool for assembling unit brake of harmonious locomotive