CN214169997U - Rail guard subassembly for building engineering - Google Patents

Rail guard subassembly for building engineering Download PDF

Info

Publication number
CN214169997U
CN214169997U CN202022852041.7U CN202022852041U CN214169997U CN 214169997 U CN214169997 U CN 214169997U CN 202022852041 U CN202022852041 U CN 202022852041U CN 214169997 U CN214169997 U CN 214169997U
Authority
CN
China
Prior art keywords
guardrail frame
face
pipe
guardrail
frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022852041.7U
Other languages
Chinese (zh)
Inventor
王和楚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangfeng Construction Group Co ltd
Original Assignee
Guangfeng Construction Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangfeng Construction Group Co ltd filed Critical Guangfeng Construction Group Co ltd
Priority to CN202022852041.7U priority Critical patent/CN214169997U/en
Application granted granted Critical
Publication of CN214169997U publication Critical patent/CN214169997U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model provides a rail guard subassembly for building engineering, including placing the base, place the up end fixed connection guardrail frame of base, many spliced poles of left end face fixed connection of guardrail frame, the joint annular has been seted up on the spliced pole, a plurality of spliced eyes have been seted up to the right-hand member face of guardrail frame, guardrail frame is through the inside of left end spliced pole plug-in connection to adjacent guardrail frame right-hand member spliced eye, the inserting groove has been seted up to the rear end face of guardrail frame, the inside grafting of grafting groove side has the fixed plate, a plurality of joint mouths have been seted up to the preceding terminal surface of fixed plate, the utility model discloses the dust that produces when being convenient for reduce the construction avoids causing air pollution, is convenient for in time dismantle and change damaged guardrail frame.

Description

Rail guard subassembly for building engineering
Technical Field
The utility model relates to a rail guard subassembly for building engineering belongs to the building engineering field.
Background
For building engineering, a building in construction often has a safety problem due to lack of guard rails, so that the guard rails are frequently used at the edge protection positions in the building engineering construction, and are mainly arranged at the positions with high-altitude falling danger hidden dangers such as foundation pit edges, floor edges, roof edges, stair edge edges and the like.
Generally, when construction is carried out on the side of a highway, construction places can be isolated from pedestrians and vehicles by using the protective guard, the protective guard can be composed of concrete and common isolation plates, the protective guard is detached after construction is completed and can be damaged frequently, the protective guard cannot be reused, great waste is caused, a large amount of dust can be generated in the construction places, air pollution is caused, and therefore a novel design is needed to solve the problem.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a not enough to prior art exists, the utility model aims at providing a rail guard subassembly for building engineering to propose in solving above-mentioned background art and dismantle the rail guard after the construction is accomplished, can damage it often, make and can not reuse, caused very big waste and can produce a large amount of dusts in construction department, cause air pollution's problem.
In order to achieve the above purpose, the present invention is realized by the following technical solution: a guard rail component for construction engineering comprises a placing base, wherein a guard rail frame is fixedly connected to the upper end face of the placing base, a plurality of inserting columns are fixedly connected to the left end face of the guard rail frame, clamping ring grooves are formed in the inserting columns, a plurality of inserting holes are formed in the right end face of the guard rail frame, the guard rail frame is inserted into the inserting holes in the right end of the adjacent guard rail frame through the inserting columns in the left end, inserting grooves are formed in the rear end face of the guard rail frame, a fixing plate is inserted into the inserting grooves in the side, a plurality of clamping ports are formed in the front end face of the fixing plate and clamped with the clamping ring grooves in the inserting columns in the guard rail frame, a mounting plate is fixedly connected to the upper end face of the guard rail frame, a plurality of connecting pipes are fixedly connected to the upper end face of the mounting plate, atomizing nozzles are fixedly connected to the upper end faces of the connecting pipes, and a water pump is mounted on the right end face of the mounting plate, the end of intaking of water pump is linked together with the inside water tank of lower extreme guardrail frame, the play water end of water pump has cup jointed the pump water pipe, the pump water pipe is linked together through the inside water pipe of mounting panel and connecting pipe and atomizer, the water pump passes through the wire and sets up the battery connection of electric lines in guardrail frame inside.
Further, the inside of guardrail frame installs many collector pipes and many communicating pipes, the up end fixed connection inlet tube of guardrail frame, place base rear end fixed connection outlet pipe.
Further, the inside of inlet tube link up mutually through the inside of communicating pipe with the collector pipe, the inside of outlet pipe link up mutually through the inside of communicating pipe with the collector pipe, and installs the valve on the outlet pipe.
Furthermore, a rectangular groove is formed in the front end face of the guardrail frame, fixing grooves are formed in four corners of the front end face of the rectangular groove, and propaganda materials are installed on the front end face of the guardrail frame through the rectangular groove and the fixing grooves.
Furthermore, both sides of the upper end and the lower end of the fixing plate are fixedly connected with connecting rods, and the rear end faces of the connecting rods are fixedly connected with square insertion rods.
Furthermore, a square fixing groove is formed in the right end of the rear end face of the guardrail frame and is located on two sides of the upper end and the lower end of the inserting groove, and the fixing plate is inserted into the square fixing groove through the square inserting rod and is fixed to the rear end face of the guardrail frame.
Further, the lower extreme fixed connection installation piece of water pump, and the installation piece is located the right-hand member of guardrail frame up end, the water tank is installed in the inside upper right corner of guardrail frame with the battery, and the water tank is located the left end of battery.
Furthermore, four corners of the upper end face of the placing base are provided with fixing ports, and the bottom of each fixing port is provided with a fixing hole.
The utility model has the advantages that: through the upper end fixed connection guardrail frame placing the base, and be provided with collector pipe and communicating pipe in guardrail frame's inside, be provided with the inlet tube through the up end at guardrail frame again, and at the rear end face fixed connection outlet pipe of placing the base, link up collector pipe and inlet tube and outlet pipe through communicating pipe for can be through the inlet tube toward the inside of collector pipe irrigate, with this gravity that can increase whole equipment, reach and place more firm effect.
Through many spliced columns of left end face fixed connection at guardrail frame, and the joint annular has been seted up on the spliced column, a plurality of spliced eyes have been seted up at guardrail frame's right-hand member face to the rethread, make can each rail guard of effectual connection, through the inside that guardrail frame was placed to the fixed plate through the spliced groove at guardrail frame's rear end face, and the joint mouth of seting up through the fixed plate rear end face and the joint annular groove looks joint on the spliced column, make can be in the same place two inseparable fixes of guardrail frame, reach the effect of being convenient for in time dismantle and changing the damaged guardrail frame with this.
Through the up end fixed connection mounting panel at the guardrail frame, and install a plurality of atomizer on the mounting panel, install the water pump through the right-hand member at the guardrail frame up end again, and be provided with the water tank in the inside upper right corner of guardrail frame for can spray department water smoke to the construction ground, with this dust that produces when can reducing the construction, reach the effect of avoiding causing air pollution.
Drawings
Other features, objects and advantages of the invention will become more apparent upon reading of the detailed description of non-limiting embodiments with reference to the following drawings:
fig. 1 is a schematic structural view of a guard rail assembly for construction engineering according to the present invention;
fig. 2 is a schematic view of a rear end surface of a guard rail frame in the guard rail assembly for construction engineering according to the present invention;
fig. 3 is a schematic view of a fixing plate in a guard rail assembly for construction engineering according to the present invention;
fig. 4 is a schematic view of the utility model of a base is placed in the guard rail assembly for building engineering.
In the figure: 1-placing a base, 2-fixing ports, 3-fixing holes, 4-inserting columns, 5-clamping ring grooves, 6-storage batteries, 7-mounting plates, 8-connecting pipes, 9-atomizing nozzles, 10-water inlet pipes, 11-water tanks, 12-inserting holes, 13-water collecting pipes, 14-communicating pipes, 15-rectangular grooves, 16-fixing grooves, 17-inserting grooves, 18-square fixing grooves, 19-water outlet pipes, 20-valves, 21-fixing plates, 22-clamping ports, 23-connecting rods, 24-square inserting rods, 25-pump water pipes, 26-water pumps, 27-mounting blocks and 28-guardrail frames.
Detailed Description
In order to make the technical means, creation features, achievement purposes and functions of the present invention easy to understand, the present invention is further described below with reference to the following embodiments.
Referring to fig. 1-4, the present invention provides a technical solution: the utility model provides a rail guard subassembly for building engineering, including placing base 1, place base 1's up end fixed connection guardrail frame 28, many spliced pole 4 of left end face fixed connection of guardrail frame 28, joint annular 5 has been seted up on spliced pole 4, a plurality of spliced holes 12 have been seted up to guardrail frame 28's right-hand member face, guardrail frame 28 pegs graft to the inside of adjacent guardrail frame 28 right-hand member spliced hole 12 through left end spliced pole 4, spliced groove 17 has been seted up to guardrail frame 28's rear end face, the inside grafting of spliced groove 17 side has fixed plate 21, a plurality of joint mouths 22 have been seted up to the preceding terminal surface of fixed plate 21, and 5 looks joints of joint ring groove on joint mouth 22 and the inside spliced pole 4 of guardrail frame 28, make can fix spliced pole 4.
Up end fixed connection mounting panel 7 of guardrail frame 28, a plurality of connecting pipes 8 of upper end fixed connection of mounting panel 7, up end fixed connection atomizer 9 of connecting pipe 8, water pump 26 is installed to the right-hand member face of mounting panel 7, water pump 26's the end of intaking is linked together with the inside water tank 11 of lower extreme guardrail frame 28, water pump 26's play water end has cup jointed pump water pipe 25, pump water pipe 25 is linked together through the inside water pipe of mounting panel 7 and connecting pipe 8 and atomizer 9, water pump 26 passes through the wire and sets up at the inside battery 6 connection of electric lines of guardrail frame 28, make and atomize and spray the operation.
The inside of guardrail frame 28 installs many collector pipes 13 and many communicating pipes 14, and the up end fixed connection inlet tube 10 of guardrail frame 28 places base 1 rear end fixed connection outlet pipe 19 for can discharge the inside water of collector pipe 13.
The inside of inlet tube 10 is linked up with the inside of collector pipe 13 through communicating pipe 14, and the inside of outlet pipe 19 is linked up with the inside of collector pipe 13 through communicating pipe 14, and installs valve 20 on the outlet pipe 19 for can store water inside collector pipe 13.
Rectangular channel 15 has been seted up to the preceding terminal surface of guardrail frame 28, and fixed slot 16 has been seted up to the four corners position of terminal surface before rectangular channel 15, and the preceding terminal surface of guardrail frame 28 is installed through rectangular channel 15 and fixed slot 16 and is announced the cloth for can play the effect of propaganda.
The two sides of the upper end and the lower end of the fixing plate 21 are fixedly connected with a connecting rod 23, and the rear end face of the connecting rod 23 is fixedly connected with a square insertion rod 24, so that the fixing plate 21 can be fixed.
Square fixed slot 18 has been seted up to the right end of guardrail frame 28 rear end face, and square fixed slot 18 is located the both sides of upper and lower extreme on inserting groove 17, and fixed plate 21 is pegged graft to the inside of square fixed slot 18 through square grafting pole 24 and is fixed at the rear end face of guardrail frame 28 for effectual will peg graft post 4 fixed.
The lower extreme fixed connection installation piece 27 of water pump 26, and installation piece 27 is located the right-hand member of guardrail frame 28 up end, and the water tank 11 is installed in the inside upper right corner of guardrail frame with battery 6, and the water tank 11 is located the left end of battery 6 for can atomize and spray the inside water of water tank 11.
The four corners position of placing base 1 up end has seted up fixed mouthful 2, and fixed orifices 3 have been seted up to the bottom of fixed mouthful 2 for can be with placing stable the fixing subaerial of base 1.
The specific implementation mode is as follows: when installing guardrail frame 28, at first move holistic facility to appointed position, through passing the fixed orifices 3 of placing base 1 four corners position afterwards, and squeeze into the underground through the hammer with the staple, make and to place stable the fixing of base 1 subaerial, valve 20 on outlet pipe 19 is closed afterwards, the inside of rethread past inlet tube 10 is watered, wait until collector pipe 13 and communicating pipe 14 inside water fill up the back, holistic equipment can be steadily placed subaerial this moment, with this gravity that can increase whole equipment, reach and place more firm effect.
When installing second guardrail frame 28 afterwards, the inside of inserting into preceding guardrail frame 28 right-hand member face inserting groove 17 is inserted to grafting post 4 through guardrail frame 28 left end face, the inside of guardrail frame 28 is placed to fixed plate 21 through inserting groove 17 at guardrail frame 28's rear end face afterwards again, and joint 22 that the rear end face was seted up through fixed plate 21 and the joint annular groove 5 looks joint on the grafting post 4, make can be in the same place two inseparable fixes of guardrail frame 28, reach the effect that the guardrail frame 28 has been damaged in time of being convenient for in this to dismantle and change.
Through at the up end fixed connection mounting panel 7 of guardrail frame 28, and install a plurality of atomizer 9 on mounting panel 7, the rethread is installed water pump 26 at the right-hand member of guardrail frame 28 up end, and is provided with water tank 11 in the inside upper right corner of guardrail frame 28 for can spray the water smoke to the construction ground, with this dust that produces when avoiding the construction is spread everywhere.
The basic principles and the main features of the invention and the advantages of the invention have been shown and described above, it will be evident to those skilled in the art that the invention is not limited to the details of the foregoing illustrative embodiments, but that the invention may be embodied in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Furthermore, it should be understood that although the present description refers to embodiments, not every embodiment may contain only a single embodiment, and such description is for clarity only, and those skilled in the art should integrate the description, and the embodiments may be combined as appropriate to form other embodiments understood by those skilled in the art.

Claims (8)

1. The utility model provides a rail guard subassembly for building engineering, is including placing base (1), its characterized in that: the guardrail comprises a base (1), a guardrail frame (28) fixedly connected with the upper end face of the base (1), a plurality of inserting columns (4) fixedly connected with the left end face of the guardrail frame (28), clamping ring grooves (5) formed in the inserting columns (4), a plurality of inserting holes (12) formed in the right end face of the guardrail frame (28), a fixing plate (21) inserted into the side inner portion of the inserting groove (17), a plurality of clamping ports (22) formed in the front end face of the fixing plate (21), clamping ports (22) clamped with the clamping ring grooves (5) formed in the inserting columns (4) in the guardrail frame (28), and a mounting plate (7) fixedly connected with the upper end face of the guardrail frame (28), a plurality of connecting pipes of upper end fixed connection (8) of mounting panel (7), up end fixed connection atomizer (9) of connecting pipe (8), water pump (26) are installed to the right-hand member face of mounting panel (7), the end of intaking of water pump (26) is linked together with inside water tank (11) of lower extreme guardrail frame (28), pump water pipe (25) have been cup jointed to the play water end of water pump (26), pump water pipe (25) are linked together through inside water pipe of mounting panel (7) and connecting pipe (8) and atomizer (9), water pump (26) are through wire and setting battery (6) the connection of electric lines inside guardrail frame (28).
2. A guard rail assembly for construction engineering according to claim 1, wherein: the utility model discloses a guardrail device, including guardrail frame (28), last up end fixed connection inlet tube (10), place base (1) rear end fixed connection outlet pipe (19), the internally mounted of guardrail frame (28) has many collector pipes (13) and many communicating pipes (14).
3. A guard rail assembly for construction engineering according to claim 2, wherein: the inside of inlet tube (10) is link up mutually through communicating pipe (14) and the inside of collector pipe (13), the inside of outlet pipe (19) is link up mutually through the inside of communicating pipe (14) with collector pipe (13), and installs valve (20) on outlet pipe (19).
4. A guard rail assembly for construction engineering according to claim 1, wherein: rectangular channel (15) have been seted up to the preceding terminal surface of guardrail frame (28), fixed slot (16) have been seted up to the four corners position of terminal surface before rectangular channel (15), the propaganda is installed through rectangular channel (15) and fixed slot (16) to the preceding terminal surface of guardrail frame (28).
5. A guard rail assembly for construction engineering according to claim 1, wherein: the two sides of the upper end and the lower end of the fixed plate (21) are fixedly connected with a connecting rod (23), and the rear end face of the connecting rod (23) is fixedly connected with a square insertion rod (24).
6. A guard rail assembly for construction engineering according to claim 5, wherein: the right end of the rear end face of the guardrail frame (28) is provided with a square fixing groove (18), the square fixing groove (18) is located on two sides of the upper end and the lower end of the inserting groove (17), and the fixing plate (21) is inserted into the square fixing groove (18) through a square inserting rod (24) and fixed on the rear end face of the guardrail frame (28).
7. A guard rail assembly for construction engineering according to claim 1, wherein: the lower extreme fixed connection installation piece (27) of water pump (26), and installation piece (27) are located the right-hand member of guardrail frame (28) up end, the upper right corner in guardrail frame inside is installed with battery (6) in water tank (11), and water tank (11) are located the left end of battery (6).
8. A guard rail assembly for construction engineering according to claim 1, wherein: four corners of the upper end face of the placing base (1) are provided with fixing ports (2), and the bottom of each fixing port (2) is provided with a fixing hole (3).
CN202022852041.7U 2020-12-02 2020-12-02 Rail guard subassembly for building engineering Active CN214169997U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022852041.7U CN214169997U (en) 2020-12-02 2020-12-02 Rail guard subassembly for building engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022852041.7U CN214169997U (en) 2020-12-02 2020-12-02 Rail guard subassembly for building engineering

Publications (1)

Publication Number Publication Date
CN214169997U true CN214169997U (en) 2021-09-10

Family

ID=77604121

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022852041.7U Active CN214169997U (en) 2020-12-02 2020-12-02 Rail guard subassembly for building engineering

Country Status (1)

Country Link
CN (1) CN214169997U (en)

Similar Documents

Publication Publication Date Title
CN214169997U (en) Rail guard subassembly for building engineering
CN214061409U (en) Municipal works urban road guardrail that can spray water smoke
CN215212255U (en) Suspension type frame combined high-altitude operation platform
CN210975430U (en) Sponge urban road rainwater collection and utilization system
CN210699300U (en) Dust collector for building site
CN111519977B (en) Prefabricated enclosure of assembled
CN213062188U (en) Municipal administration rainwater water storage device
CN214091351U (en) Construction enclosure with spraying device
CN209779550U (en) Modular flood prevention baffle plate
CN111894127A (en) Energy-conserving house of assembled timber structure
CN214145053U (en) Protector is kept apart with fast-assembling to municipal construction
CN219568958U (en) Anchor bolt assembled retaining wall
CN218991128U (en) Building site temporary enclosure
CN220954991U (en) Building protection device for building engineering management
CN213626962U (en) Modular foundation ditch protector for road construction
CN220539415U (en) Modular building construction encloses fender
CN218881830U (en) Envelope is used in construction of assembly type structure intelligence curtain
CN211776444U (en) Green ecological fender that encloses of assembled steel construction
CN220226187U (en) Protection structure of scaffold fixing assembly for municipal house building
CN219471712U (en) Large advertisement cloth fence for construction during operation
CN213214491U (en) Louver type wall vertical greening device
CN216920363U (en) Easy dismouting formula excavation supporting
CN211851236U (en) Building fence for constructional engineering
CN214532308U (en) Combined steel fence
CN219280813U (en) Assembled rainwater is collected and is utilized device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant