CN214169128U - House foundation structure - Google Patents
House foundation structure Download PDFInfo
- Publication number
- CN214169128U CN214169128U CN202023087890.4U CN202023087890U CN214169128U CN 214169128 U CN214169128 U CN 214169128U CN 202023087890 U CN202023087890 U CN 202023087890U CN 214169128 U CN214169128 U CN 214169128U
- Authority
- CN
- China
- Prior art keywords
- pile
- fixedly connected
- thick bamboo
- house foundation
- infrastructure according
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 235000017166 Bambusa arundinacea Nutrition 0.000 claims abstract description 21
- 235000017491 Bambusa tulda Nutrition 0.000 claims abstract description 21
- 241001330002 Bambuseae Species 0.000 claims abstract description 21
- 235000015334 Phyllostachys viridis Nutrition 0.000 claims abstract description 21
- 239000011425 bamboo Substances 0.000 claims abstract description 21
- 239000002689 soil Substances 0.000 claims abstract description 18
- 239000007787 solid Substances 0.000 claims abstract description 5
- 238000009434 installation Methods 0.000 abstract description 5
- 239000002002 slurry Substances 0.000 description 4
- 238000003475 lamination Methods 0.000 description 3
- 239000011435 rock Substances 0.000 description 3
- 229910000831 Steel Inorganic materials 0.000 description 2
- 239000004568 cement Substances 0.000 description 2
- 230000002787 reinforcement Effects 0.000 description 2
- 239000010959 steel Substances 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 239000004576 sand Substances 0.000 description 1
- 239000004575 stone Substances 0.000 description 1
Images
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
The utility model discloses a house foundation structure, including artifical long-pending soil layer, a plurality of pile group holes have been seted up to the inside on artifical long-pending soil layer, the inside in pile hole is provided with a stake section of thick bamboo, the lower extreme fixedly connected with connecting plate of a stake section of thick bamboo, the lower extreme fixedly connected with baffle of connecting plate, the one end fixedly connected with connecting block of connecting plate, the one end fixedly connected with of connecting block keeps off the ring, the through-hole has been seted up to the lower extreme of a stake section of thick bamboo, four group's spouts, every group four group constant head tanks have all been seted up to one side of spout, four group the equal sliding connection in inside of spout has a slide bar, four group the surface sliding connection of slide bar has a solid fixed cylinder. The utility model discloses in, through the stake section of thick bamboo that sets up, pour into behind the stake section of thick bamboo installation mud after, through the baffle and the fender ring that set up, can make the contact between stake section of thick bamboo and the mud more inseparable to strengthen the steadiness of a stake section of thick bamboo.
Description
Technical Field
The utility model relates to a house foundation structure field especially relates to a house foundation structure.
Background
The foundation refers to the soil or rock mass of the supporting foundation under the building. Soil layers as building foundations are divided into rocks, crushed rock, sandy soil, silt, cohesive soil and artificial filling. The foundation includes natural foundation and artificial foundation. Natural foundations are layers of natural soil that do not require human reinforcement. The artificial foundation needs reinforcement treatment by people, and a stone chip cushion layer, a sand cushion layer, mixed lime-soil backfill, tamping and the like are common.
When the existing house foundation structure is used, the connection between the steel pipe and the cement is not tight enough, and the steel pipe and the cement are easy to deviate when in use.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the defects existing in the prior art and providing a house foundation structure.
In order to achieve the above purpose, the utility model adopts the following technical scheme: a house foundation structure comprises an artificial accumulated soil layer, wherein a plurality of pile assembling holes are formed in the artificial accumulated soil layer, pile cylinders are arranged in the pile holes, the lower ends of the pile cylinders are fixedly connected with connecting plates, the lower ends of the connecting plates are fixedly connected with baffle plates, one ends of the connecting plates are fixedly connected with connecting blocks, one ends of the connecting blocks are fixedly connected with baffle rings, and the lower ends of the pile cylinders are provided with through holes;
four groups of sliding grooves are formed in the pile tube, four groups of positioning grooves are formed in one side of each sliding groove, sliding rods are connected to the four groups of sliding grooves in a sliding mode, the outer surfaces of the sliding rods are connected with fixed tubes in a sliding mode, one ends of the fixed tubes are fixedly connected with positioning tubes, and springs are arranged in the fixed tubes.
As a further description of the above technical solution:
the inner thread of the pile barrel is connected with a threaded pipe, and the upper end of the threaded pipe is fixedly connected with an upper cover.
As a further description of the above technical solution:
the upper end fixedly connected with handle of upper cover, be provided with the rubber sleeve on hand.
As a further description of the above technical solution:
the lower extreme of artifical long-pending soil layer is provided with the flood lamination, the lower extreme of flood lamination is provided with the bottom.
As a further description of the above technical solution:
the connecting plates are provided with four groups, and the four groups of connecting plates are uniformly distributed at the lower end of the pile barrel.
As a further description of the above technical solution:
the baffle ring is positioned at the upper end of the baffle plate.
As a further description of the above technical solution:
the sliding grooves are communicated with the positioning grooves, and the four groups of positioning grooves are distributed on the inner surface of the pile barrel at equal intervals from top to bottom.
As a further description of the above technical solution:
the spring is located between the sliding rod and the positioning tube.
The utility model discloses following beneficial effect has:
1. the utility model discloses a pile section of thick bamboo that sets up pours into behind the installation of pile section of thick bamboo mud back, through the baffle and the fender ring that set up, can make the contact between a pile section of thick bamboo and the mud more inseparable to strengthen the steadiness of a pile section of thick bamboo.
2. The utility model discloses a spout and constant head tank that set up can be under the effect of spring with slide bar and solid fixed cylinder insert the constant head tank in, the location of the registration arm of can being convenient for, and the leading-in mud between registration arm and pile section of thick bamboo, can strengthen the intensity of a pile section of thick bamboo to strengthen the intensity of ground.
3. The utility model discloses a handle that sets up can be convenient for people and remove a stake section of thick bamboo, and through the rubber sleeve that sets up, can provide the protection to the staff.
4. The utility model discloses a threaded connection between screwed pipe and the stake section of thick bamboo, installation and dismantlement between upper cover and the stake section of thick bamboo of can being convenient for to the people's of being convenient for use.
Drawings
Fig. 1 is a front sectional view of a house foundation structure according to the present invention;
fig. 2 is a schematic perspective view of a pile tube of a foundation structure of a house foundation according to the present invention;
fig. 3 is a partial sectional view of a pile casing of a foundation structure of a house foundation according to the present invention;
fig. 4 is a top view of a house foundation structure provided by the present invention;
fig. 5 is an enlarged view of a point a in fig. 1.
Illustration of the drawings:
1. manually accumulating soil layers; 2. flood lamination layer; 3. a bottom layer; 4. positioning a groove; 5. a slide bar; 6. a positioning tube; 7. a fixed cylinder; 8. pile tube; 9. a threaded pipe; 10. a handle; 11. a rubber sleeve; 12. a spring; 13. an upper cover; 14. connecting blocks; 15. a connecting plate; 16. a baffle plate; 17. a baffle ring; 18. a through hole; 19. pile holes; 20. a chute.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and thus, should not be construed as limiting the present invention; the terms "first," "second," and "third" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance, and furthermore, unless otherwise explicitly stated or limited, the terms "mounted," "connected," and "connected" are to be construed broadly and may be, for example, fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
Referring to fig. 1-5, the present invention provides an embodiment: a house foundation structure comprises an artificial accumulated soil layer 1, wherein a flood layer 2 is arranged at the lower end of the artificial accumulated soil layer 1, a bottom layer 3 is arranged at the lower end of the flood layer 2, a plurality of pile assembling holes 19 are formed in the artificial accumulated soil layer 1, pile cylinders 8 can be conveniently placed, the pile cylinders 8 are arranged in the pile holes 19, connecting plates 15 are fixedly connected to the lower ends of the pile cylinders 8, four groups of connecting plates 15 are uniformly distributed at the lower ends of the pile cylinders 8, baffles 16 are fixedly connected to the lower ends of the connecting plates 15, connecting blocks 14 are fixedly connected to one ends of the connecting plates 15, retaining rings 17 are fixedly connected to one ends of the connecting blocks 14, the retaining rings 17 are located at the upper ends of the baffles 16, after slurry is poured into the pile cylinders 8 after installation, the connection between the pile cylinders 8 and the slurry can be more tight through the baffles 16 and the retaining rings 17, and therefore the stability of the pile cylinders 8 is enhanced, the lower end of the pile tube 8 is provided with a through hole 18, which is convenient for mud to flow to the bottommost end of the pile hole 19, thereby being convenient for fixing the baffle plate 16 and the baffle ring 17.
Four groups of sliding grooves 20 are formed in the pile tube 8, four groups of positioning grooves 4 are formed in one side of each group of sliding grooves 20, the sliding grooves 20 are communicated with the positioning grooves 4, the four groups of positioning grooves 4 are distributed on the inner surface of the pile tube 8 at equal intervals from top to bottom, sliding rods 5 are connected in the four groups of sliding grooves 20 in a sliding mode, fixed tubes 7 are connected on the outer surfaces of the four groups of sliding rods 5 in a sliding mode, one ends of the four groups of fixed tubes 7 are fixedly connected with positioning tubes 6, springs 12 are arranged in the fixed tubes 7, the springs 12 are located between the sliding rods 5 and the positioning tubes 6, the positioning tubes 6 are inserted into the pile tube 8, the fixed tubes 7 at the upper ends of the positioning tubes 6 and the sliding rods 5 slide in the sliding grooves 20, when the sliding rods 5 slide to one side of the positioning grooves 4, the positioning tubes 6 are rotated to enable the sliding rods 5 to rotate to enter the positioning grooves 4, at the moment, the springs 12 rebound, the sliding rods 5 extend to the deepest parts of the positioning grooves 4 to complete positioning tubes 6, the positioning of the positioning pipe 6 can be facilitated, and the strength of the pile tube 8 can be enhanced by the positioning pipe 6 and the introduced slurry between the pile tubes 8, so that the strength of the foundation is enhanced.
The inside threaded connection of stake section of thick bamboo 8 has screwed pipe 9, and the upper end fixedly connected with upper cover 13 of screwed pipe 9, through the threaded connection between screwed pipe 9 and the stake section of thick bamboo 8, can be convenient for the installation and the dismantlement between upper cover 13 and the stake section of thick bamboo 8 to the use of the people of being convenient for, the upper end fixedly connected with handle 10 of upper cover 13 can be convenient for people and remove stake section of thick bamboo 8, is provided with rubber sleeve 11 on the handle 10, can supply the protection to the people is portable.
The working principle is as follows: firstly, an operator places a pile barrel 8 into a pile hole 19 through a handle 10, then rotates an upper cover 13 to enable a threaded pipe 9 at the lower end of the upper cover 13 to rotate with the pile barrel 8, so that the upper cover 13 and the pile barrel 8 can be disassembled, then inserts a positioning pipe 6 into the pile barrel 8 to enable a fixed barrel 7 at the upper end of the positioning pipe 6 and a sliding rod 5 to slide in a sliding chute 20, rotates the positioning pipe 6 when the sliding rod 5 slides to one side of a positioning groove 4 to enable the sliding rod 5 to rotate and enter the positioning groove 4, at the moment, a spring 12 rebounds, the sliding rod 5 extends to be inserted into the deepest part of the positioning groove 4 to complete the positioning of the positioning pipe 6, then a mud layer is led into between the positioning pipe 6 and the pile barrel 8, mud flows to the bottom end of the pile hole 19 from a through hole 18 to complete the fixing of the pile barrel 8 and the positioning pipe 6, and simultaneously, a baffle 16 and a baffle ring 17 at the lower end of the pile barrel 8 can enable the connection between the pile barrel 8 and the mud layer to be tighter, thus, the stability of the pile tube 8 is enhanced, and finally, slurry is introduced into the positioning tube 6, so that the strength of the positioning tube 6 can be enhanced.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications and variations can be made in the embodiments or in part of the technical features of the embodiments without departing from the spirit and the scope of the invention.
Claims (8)
1. The utility model provides a house foundation structure, includes artifical long-pending soil layer (1), its characterized in that: a plurality of pile assembling holes (19) are formed in the artificial soil layer (1), a pile cylinder (8) is arranged in each pile hole (19), a connecting plate (15) is fixedly connected to the lower end of each pile cylinder (8), a baffle (16) is fixedly connected to the lower end of each connecting plate (15), a connecting block (14) is fixedly connected to one end of each connecting plate (15), a baffle ring (17) is fixedly connected to one end of each connecting block (14), and a through hole (18) is formed in the lower end of each pile cylinder (8);
four sets of spouts (20) have been seted up to the inside of stake section of thick bamboo (8), and every group four sets of constant head tanks (4) have all been seted up to one side of spout (20), four sets of equal sliding connection in the inside of spout (20) has slide bar (5), four sets of the surface sliding connection of slide bar (5) has solid fixed cylinder (7), four sets of one end fixedly connected with registration arm (6) of solid fixed cylinder (7), the inside of solid fixed cylinder (7) is provided with spring (12).
2. A house foundation infrastructure according to claim 1, wherein: the inner thread of the pile barrel (8) is connected with a threaded pipe (9), and the upper end of the threaded pipe (9) is fixedly connected with an upper cover (13).
3. A house foundation infrastructure according to claim 2, wherein: the upper end of the upper cover (13) is fixedly connected with a handle (10), and a rubber sleeve (11) is arranged on the handle (10).
4. A house foundation infrastructure according to claim 1, wherein: the artificial soil layer (1) is provided with a flood layer (2) at the lower end, and a bottom layer (3) is arranged at the lower end of the flood layer (2).
5. A house foundation infrastructure according to claim 1, wherein: four groups of connecting plates (15) are arranged, and the four groups of connecting plates (15) are uniformly distributed at the lower end of the pile cylinder (8).
6. A house foundation infrastructure according to claim 1, wherein: the baffle ring (17) is positioned at the upper end of the baffle plate (16).
7. A house foundation infrastructure according to claim 1, wherein: the sliding grooves (20) are communicated with the positioning grooves (4), and the four groups of positioning grooves (4) are distributed on the inner surface of the pile barrel (8) at equal intervals from top to bottom.
8. A house foundation infrastructure according to claim 1, wherein: the spring (12) is positioned between the sliding rod (5) and the positioning tube (6).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202023087890.4U CN214169128U (en) | 2020-12-18 | 2020-12-18 | House foundation structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202023087890.4U CN214169128U (en) | 2020-12-18 | 2020-12-18 | House foundation structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN214169128U true CN214169128U (en) | 2021-09-10 |
Family
ID=77608039
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202023087890.4U Expired - Fee Related CN214169128U (en) | 2020-12-18 | 2020-12-18 | House foundation structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN214169128U (en) |
-
2020
- 2020-12-18 CN CN202023087890.4U patent/CN214169128U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN214169128U (en) | House foundation structure | |
CN116084343A (en) | Large-scale prefabricated reinforced concrete ecological slope protection | |
CN215105233U (en) | Highway subgrade gravel pile | |
CN215252792U (en) | Foundation reinforcing device | |
CN209816862U (en) | Construction supporting device of town road drainage structures | |
CN211773858U (en) | Landscape gabion retaining wall | |
CN212692854U (en) | Settlement observation device | |
CN114319426A (en) | Consider novel assembled reinforced concrete barricade of planting technique wall | |
CN108330935B (en) | Mount is laid fast to hilly area irrigation's drainage channel | |
CN113638434A (en) | Gravel pile composite foundation and construction method thereof | |
CN208907218U (en) | A kind of empty van sea wall structure crossed over and protect underground utilities | |
CN112922003A (en) | Construction system and construction method for filtering pumping open caisson dry sealing bottom | |
CN207498974U (en) | Gravity type water jetting at high pressure percussion mechanism | |
CN111827305A (en) | Anti-damage reinforcing mechanism and method for geotechnical engineering | |
CN210352321U (en) | Greenbelt on two banks of river channel | |
CN217203575U (en) | Circumference marking tool for building earthwork construction | |
CN212582769U (en) | Novel land improvement is leveled device | |
CN210621677U (en) | Building concrete pipe pile | |
CN205975895U (en) | Three -dimensional filtration self -purification system of rainwater self -purification back leakage well | |
CN212561495U (en) | Foundation reinforcing pile | |
CN217053379U (en) | Foundation excavation collapse prevention supporting structure is built in room | |
CN215977206U (en) | Soft soil foundation reinforcing pipe | |
CN214401770U (en) | Positioning steel bar support device for anchor rod construction | |
CN217839963U (en) | Foundation reinforcing device | |
CN211922157U (en) | Municipal drainage road |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20210910 |
|
CF01 | Termination of patent right due to non-payment of annual fee |