CN214153771U - Quick-mounting distribution network hot-line work insulating operation rod upper comprehensive tool rack - Google Patents

Quick-mounting distribution network hot-line work insulating operation rod upper comprehensive tool rack Download PDF

Info

Publication number
CN214153771U
CN214153771U CN202022852783.XU CN202022852783U CN214153771U CN 214153771 U CN214153771 U CN 214153771U CN 202022852783 U CN202022852783 U CN 202022852783U CN 214153771 U CN214153771 U CN 214153771U
Authority
CN
China
Prior art keywords
tool
distribution network
support
fixing frame
pole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022852783.XU
Other languages
Chinese (zh)
Inventor
李吉祥
李长武
弓旭强
杨长旺
李正文
陈康
马大鹏
崔傲
杨润东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Transmission Branch Of Yunnan Power Grid Co ltd
Original Assignee
Live Operation Branch of Yunnan Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Live Operation Branch of Yunnan Power Grid Co Ltd filed Critical Live Operation Branch of Yunnan Power Grid Co Ltd
Priority to CN202022852783.XU priority Critical patent/CN214153771U/en
Application granted granted Critical
Publication of CN214153771U publication Critical patent/CN214153771U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Electric Cable Installation (AREA)

Abstract

The utility model relates to the technical field of distribution line live working, in particular to a comprehensive tool rack on a fast-assembly distribution network live working insulating operating rod, which comprises two tightening belts, wherein the tightening belts are arranged in parallel from top to bottom and wound on an electric pole, a fixing frame is arranged on the outer wall of one side of each tightening belt, a tool bag is arranged at the bottom of the fixing frame, a plurality of tool fixing sleeves are arranged on the outer wall of the tool bag, and a lifting rope mechanism is arranged at the top of the fixing frame; the mount includes the support, and the arc support is installed to one side outer wall of support, and a plurality of metal links are installed to the outer wall of support. During this distribution network live working insulating bar pole goes up comprehensive tool holder fast-assembling, adopt two tightening bands to stably be fixed in on the cement pole body, dismantle simple, simple to operate, tool holder edge establishes the metal link on the pole for hang pole type instrument, tool bag is established at the pole upper bracket middle part, can place the instrument head that the operation needs, makes things convenient for the operation personnel on the pole to change the instrument head on the pole.

Description

Quick-mounting distribution network hot-line work insulating operation rod upper comprehensive tool rack
Technical Field
The utility model relates to a distribution lines live working technical field, specifically speaking relates to a ready-package joins in marriage and synthesizes tool rest on net live working insulated operation pole.
Background
At present, insulating bar puts the problem that exists in carrying out the indirect live working of 10kV distribution lines: the required instrument of live working is more, because of there is not multiplexer utensil locating place on the pole, needs operation personnel and ground cooperation operation personnel to frequently transmit multiplexer utensil, causes the operating efficiency low, and the operation is long with time, increases the operation risk.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a synthesize instrument frame on ready-package distribution network live working insulated operating rod to solve the problem that proposes among the above-mentioned background art.
In order to achieve the purpose, the utility model provides a comprehensive tool rack on a quick-mounting distribution network hot-line work insulating operating rod, which comprises two tightening belts, wherein the tightening belts are arranged in parallel from top to bottom and wound on an electric pole, the outer wall of one side of each tightening belt is provided with a fixing frame, the bottom of each fixing frame is provided with a tool bag, the outer wall of each tool bag is provided with a plurality of tool fixing sleeves, and the top of each fixing frame is provided with a lifting rope mechanism; the fixing frame comprises a support, an upper arc-shaped support is arranged on the outer wall of one side of the support, a plurality of metal hanging rings are arranged on the outer wall of the support, a vertical rod is arranged at the bottom of one side of the support, a lower cross rod is arranged at the bottom end of the vertical rod, and a lower arc-shaped support is arranged on one side of the lower cross rod close to the electric pole; the lifting rope mechanism comprises a transmission lifting rope rod, a fixing bolt is installed at the bottom of one end, close to the fixing frame, of the transmission lifting rope rod, and an insulating pulley is installed at the bottom of one end, far away from the fixing frame, of the transmission lifting rope rod.
Preferably, both ends of the tightening belt are mounted on the fixing frame through tightening devices.
Preferably, the metal hanging rings are arranged at equal intervals.
Preferably, a preformed hole with a threaded structure is formed in the top surface of the support close to the lifting rope mechanism, and the bottom end of the fixing bolt is in threaded connection with the preformed hole.
Preferably, the upper arc-shaped support and the lower arc-shaped support are both arc-shaped structures on the sides close to the electric pole.
Preferably, the metal suspension ring is positioned right above the tool fixing sleeve.
Preferably, the tool bag is of a cuboid structure, and the top of the tool bag is tightly adhered to the outer edge of the fixing frame.
Compared with the prior art, the beneficial effects of the utility model are that:
during this distribution network live working insulating bar pole goes up comprehensive tool holder fast-assembling, adopt two tightening bands to stably be fixed in on the cement pole body, dismantle simple, simple to operate, tool holder edge establishes the metal link on the pole for hang pole type instrument, tool bag is established at the pole upper bracket middle part, can place the instrument head that the operation needs, makes things convenient for the operation personnel on the pole to change the instrument head on the pole.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a schematic structural view of the middle fixing frame of the present invention;
fig. 3 is a schematic structural view of the middle lifting rope mechanism of the present invention.
The various reference numbers in the figures mean:
1. an electric pole; 2. tightening the belt; 21. a tightening device; 3. a fixed mount; 31. a support; 311. a metal suspension loop; 32. an upper arc-shaped support; 33. a vertical rod; 34. a lower cross bar; 341. a lower arc-shaped support; 35. reserving a hole; 4. a tool bag; 41. a tool fixing sleeve; 5. a lifting rope mechanism; 51. a transfer hoist rope lever; 52. an insulating pulley; 53. and (5) fixing the bolt.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
In the description of the present invention, it is to be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", "clockwise", "counterclockwise", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and to simplify the description, but do not indicate or imply that the device or element referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore should not be construed as limiting the present invention.
The utility model provides a comprehensive tool rack on a fast-assembly distribution network hot-line work insulating operating rod, as shown in figures 1-3, comprising two tightening belts 2, wherein the tightening belts 2 are arranged in parallel from top to bottom and wound on an electric pole 1, a fixing frame 3 is arranged on the outer wall of one side of each tightening belt 2, a tool bag 4 is arranged at the bottom of the fixing frame 3 and used for placing tools, a plurality of tool fixing sleeves 41 are arranged on the outer wall of the tool bag 4, and a lifting rope mechanism 5 is arranged at the top of the fixing frame 3 and used for fixing a lifting rope; the fixing frame 3 comprises a support 31, an upper arc-shaped support 32 is installed on the outer wall of one side of the support 31, a plurality of metal hanging rings 311 are installed on the outer wall of the support 31, a vertical rod 33 is installed at the bottom of one side of the support 31, a lower cross rod 34 is installed at the bottom end of the vertical rod 33, and a lower arc-shaped support 341 is installed on one side of the lower cross rod 34 close to the electric pole 1 and used for being fixed on the outer wall of the electric pole 1; the lifting rope mechanism 5 comprises a transmission lifting rope rod 51, a fixing bolt 53 is installed at the bottom of one end, close to the fixed frame 3, of the transmission lifting rope rod 51, and an insulating pulley 52 is installed at the bottom of one end, far away from the fixed frame 3, of the transmission lifting rope rod 51, so that the rope can slide.
Specifically, the two ends of the tightening belt 2 are mounted on the fixing frame 3 through the tightening device 21, so that the tightening belt 2 can be tightened conveniently.
In this embodiment, the metal hanging rings 311 are arranged at equal intervals, so as to facilitate hanging the insulating rod.
Further, the top surface of the bracket 31 is provided with a preformed hole 35 with a threaded structure near the sling mechanism 5, and the bottom end of the fixing bolt 53 is in threaded connection with the preformed hole 35, so that the sling mechanism 5 can be conveniently installed.
Further, the upper arc-shaped support 32 and the lower arc-shaped support 341 close to the electric pole 1 are both arc-shaped structures, so as to be convenient for being attached to the outer wall of the electric pole 1.
Further, the metal hanging ring 311 is located right above the tool fixing sleeve 41.
Furthermore, the tool bag 4 is of a cuboid structure, and the top of the tool bag is tightly adhered to the outer edge of the fixing frame 3, so that the tool bag 4 can be conveniently fixed.
When the quick-mounting type integrated tool rest on the distribution network live working insulating operating rod is used, the integrated tool rest is quickly mounted and fixed on the body of a cement electric pole 1 through a tightening device 21 and a tightening belt 2, and meanwhile, the upper arc-shaped support 32 and the lower arc-shaped support 341 are ensured to be tightly contacted with the body of the electric pole 1, and the fixing frame 3 is firmly and reliably fixed; the tool bag 4 can be vertically arranged in the rectangular bracket 1 at the top end of the fixing frame 3 and is firmly fixed; the transmission rope hoisting point 51 is fixedly connected with the bracket 31 through a connecting and fixing bolt 53 on the transmission rope hoisting point and a preformed hole 35 on the bracket 31, and a transmission rope penetrates into the insulating pulley 52, so that the functions of up-down transmission tools can be realized; the insulating rod is hung in the metal hanging ring 311 on the bracket 31, so that the functions of hanging and placing the insulating operating rod on the electric pole 1 are realized; the tool bag 4 can be used for placing tool heads and materials; the tool fixing sleeve 41 can be used for fixing hand tools such as pliers, wrenches, screwdrivers, and the like.
The foregoing shows and describes the general principles, essential features, and advantages of the invention. It should be understood by those skilled in the art that the present invention is not limited by the above embodiments, and the description in the above embodiments and the description is only preferred examples of the present invention, and is not intended to limit the present invention, and that the present invention can have various changes and modifications without departing from the spirit and scope of the present invention, and these changes and modifications all fall into the scope of the claimed invention. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (7)

1. The utility model provides a synthesize tool rest on ready-package distribution network live working insulated operating rod, includes two tightening belt (2), its characterized in that: the tightening belt (2) is arranged in parallel from top to bottom and wound on the electric pole (1), a fixing frame (3) is mounted on the outer wall of one side of the tightening belt (2), a tool bag (4) is arranged at the bottom of the fixing frame (3), a plurality of tool fixing sleeves (41) are mounted on the outer wall of the tool bag (4), and a lifting rope mechanism (5) is mounted at the top of the fixing frame (3); the fixing frame (3) comprises a support (31), an upper arc-shaped support (32) is installed on the outer wall of one side of the support (31), a plurality of metal hanging rings (311) are installed on the outer wall of the support (31), a vertical rod (33) is installed at the bottom of one side of the support (31), a lower cross rod (34) is installed at the bottom end of the vertical rod (33), and a lower arc-shaped support (341) is installed on one side, close to the electric pole (1), of the lower cross rod (34); the lifting rope mechanism (5) comprises a transmission lifting rope rod (51), a fixing bolt (53) is installed at the bottom of one end, close to the fixing frame (3), of the transmission lifting rope rod (51), and an insulating pulley (52) is installed at the bottom of one end, far away from the fixing frame (3), of the transmission lifting rope rod (51).
2. The ready-package distribution network live working insulated operating rod upper comprehensive tool rack of claim 1, characterized in that: two ends of the tightening belt (2) are arranged on the fixed frame (3) through tightening devices (21).
3. The ready-package distribution network live working insulated operating rod upper comprehensive tool rack of claim 1, characterized in that: the metal hanging rings (311) are arranged at equal intervals.
4. The ready-package distribution network live working insulated operating rod upper comprehensive tool rack of claim 1, characterized in that: the top surface of support (31) is close to lifting rope mechanism (5) department and is seted up preformed hole (35) of helicitic texture, the bottom and the preformed hole (35) threaded connection of fixing bolt (53).
5. The ready-package distribution network live working insulated operating rod upper comprehensive tool rack of claim 1, characterized in that: and one sides of the upper arc-shaped support (32) and the lower arc-shaped support (341) close to the electric pole (1) are both arc-shaped structures.
6. The ready-package distribution network live working insulated operating rod upper comprehensive tool rack of claim 1, characterized in that: the metal hanging ring (311) is positioned right above the tool fixing sleeve (41).
7. The ready-package distribution network live working insulated operating rod upper comprehensive tool rack of claim 1, characterized in that: the tool bag (4) is of a cuboid structure, and the top of the tool bag is tightly adhered to the outer side edge of the fixing frame (3).
CN202022852783.XU 2020-12-02 2020-12-02 Quick-mounting distribution network hot-line work insulating operation rod upper comprehensive tool rack Active CN214153771U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022852783.XU CN214153771U (en) 2020-12-02 2020-12-02 Quick-mounting distribution network hot-line work insulating operation rod upper comprehensive tool rack

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022852783.XU CN214153771U (en) 2020-12-02 2020-12-02 Quick-mounting distribution network hot-line work insulating operation rod upper comprehensive tool rack

Publications (1)

Publication Number Publication Date
CN214153771U true CN214153771U (en) 2021-09-07

Family

ID=77583444

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022852783.XU Active CN214153771U (en) 2020-12-02 2020-12-02 Quick-mounting distribution network hot-line work insulating operation rod upper comprehensive tool rack

Country Status (1)

Country Link
CN (1) CN214153771U (en)

Similar Documents

Publication Publication Date Title
CN214153771U (en) Quick-mounting distribution network hot-line work insulating operation rod upper comprehensive tool rack
CN210710350U (en) Hoist is fixed to copper line drum
CN213802695U (en) Wallboard electric block upset hoist and mount is put
JP5913930B2 (en) Suspension jig for large concrete structures
CN211547221U (en) Lump material paving device
CN209815482U (en) Overhead hoist of aerated block
CN105591317A (en) Device for hanging cable hooks
CN215558412U (en) Tensioning type lifting appliance for inner wall of cylinder
CN218503265U (en) Chain dismounting device
CN210558877U (en) Simple and easy improvement device of hoist
CN211569854U (en) Vertical lifting appliance with cross arm
CN206023061U (en) The powered positor of suspension clamp gyroaxis
CN215160195U (en) Supporting beam device capable of being used in combination
CN210260849U (en) Copper coil pipe lifting device
CN210339194U (en) Aluminum round bar carrying device
CN208802753U (en) A kind of adjustable lifting appliance for square steel transport
CN216104124U (en) Holder for a bellows module
CN210326722U (en) Power cable safety hook
CN220283305U (en) Lifting appliance for lifting eccentric heliostat
CN217824169U (en) Cable suspension device
CN211056507U (en) Hoisting device of metal disc and lifting machine thereof
CN116715137B (en) Transmission line pole tower traction fixture and crane
CN216967704U (en) Rotary hanging rack for processing top surface of jack for coal mine
CN217126660U (en) Lifting appliance with fastening structure
CN211169536U (en) Universal hoisting clamping lifting appliance

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: No.1 yangxianpo, Wuhua District, Kunming, Yunnan 650033

Patentee after: Transmission branch of Yunnan Power Grid Co.,Ltd.

Address before: No. 201, Baita Road, Panlong District, Kunming, Yunnan 650011

Patentee before: YUNNAN POWER GRID Co.,Ltd. CHARGED OPERATION BRANCH