JP5913930B2 - Suspension jig for large concrete structures - Google Patents
Suspension jig for large concrete structures Download PDFInfo
- Publication number
- JP5913930B2 JP5913930B2 JP2011260223A JP2011260223A JP5913930B2 JP 5913930 B2 JP5913930 B2 JP 5913930B2 JP 2011260223 A JP2011260223 A JP 2011260223A JP 2011260223 A JP2011260223 A JP 2011260223A JP 5913930 B2 JP5913930 B2 JP 5913930B2
- Authority
- JP
- Japan
- Prior art keywords
- pin
- hole
- pin material
- large concrete
- support member
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 239000000725 suspension Substances 0.000 title claims description 39
- 239000000463 material Substances 0.000 claims description 132
- 230000037431 insertion Effects 0.000 claims description 10
- 238000003780 insertion Methods 0.000 claims description 10
- 230000005484 gravity Effects 0.000 claims description 4
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 description 6
- 230000006378 damage Effects 0.000 description 5
- 230000005540 biological transmission Effects 0.000 description 4
- 208000027418 Wounds and injury Diseases 0.000 description 3
- 208000014674 injury Diseases 0.000 description 3
- 230000002787 reinforcement Effects 0.000 description 3
- 239000002184 metal Substances 0.000 description 2
- 230000002093 peripheral effect Effects 0.000 description 2
- 230000000694 effects Effects 0.000 description 1
- 239000004615 ingredient Substances 0.000 description 1
- 230000001105 regulatory effect Effects 0.000 description 1
Images
Landscapes
- Load-Engaging Elements For Cranes (AREA)
Description
本発明は、吊筋が固設されたケーソンの如き大型コンクリート構造物をクレーンによって吊り上げ等を行う際、クレーン用ワイヤを安全且つ確実に吊筋に取り付けることができる大型コンクリート構造物用の吊り治具に関するものである。 The present invention provides a suspension treatment for a large concrete structure in which a crane wire can be safely and reliably attached to a suspension bar when a large concrete structure such as a caisson to which a suspension bar is fixed is lifted by a crane. It relates to ingredients.
クレーンにより大型コンクリート構造物を吊り上げ移動させる場合には、一般には予め大型コンクリート構造物に複数の吊筋を固設し、クレーンフックに玉掛けされたワイヤに取り付けられた吊り治具等を、これらの吊筋に取り付けて吊り上げている。 When a large concrete structure is lifted and moved by a crane, in general, a plurality of suspension bars are fixed to the large concrete structure in advance, and a lifting jig attached to a wire hooked on a crane hook is attached to these. It is lifted by attaching it to a suspension line.
このような吊り治具としては、構造が簡単で扱い易いシャックル型の吊り治具が使用されることがある。一般的なシャックルは、頂部の両端から並行に鉛直方向に向けて延設されたピン支持部材の中央の対向する位置にそれぞれピン材挿入用の貫通穴が形成されていて全体として逆U字状をなす本体部と、本体部の貫通穴に挿入されるピン材とから構成されている。またピン材としては円柱状をなしその先端部に抜け止め部材用の係止孔が形成されていて、このピン材を本体部の対向する両貫通穴を貫通させるように挿入した状態でピン材の係止孔に抜け止め部材を挿入してピン材の抜けを防止するものや、ピン材の先端部におねじ部が形成されていて、ピン材を一方の貫通穴から挿入して他方の貫通穴から突出させてナットで固定するタイプのものや、他方の貫通穴にめねじ部を形成させてピン材のおねじ部と螺合させるタイプのものがある(JIS B2801−1977参照。)。 As such a hanging jig, a shackle-type hanging jig having a simple structure and being easy to handle may be used. In general shackles, through holes for pin material insertion are formed at opposite positions in the center of pin support members extending in the vertical direction in parallel from both ends of the top portion, and are generally inverted U-shaped. And a pin member inserted into the through hole of the main body. In addition, the pin member has a cylindrical shape, and a locking hole for a retaining member is formed at the tip of the pin member, and the pin member is inserted in such a manner as to pass through both opposing through holes of the main body portion. A stopper member is inserted into the locking hole to prevent the pin material from coming off, or a threaded portion is formed at the tip of the pin material, and the pin material is inserted from one through hole to the other. There is a type that protrudes from a through hole and is fixed with a nut, and a type that forms a female thread part in the other through hole and is screwed with a male thread part of a pin material (see JIS B2801-1977). .
しかしながら、このような一般的なシャックル(JIS B2801−1977)を単に大型化しただけでは、大型コンクリート構造物用の吊り治具として使用することは難しい。 However, simply increasing the size of such a general shackle (JIS B2801-1977) is difficult to use as a hanging jig for a large concrete structure.
例えばピン材が円柱状をなし抜け止め部材を使用するタイプでは、大型コンクリート構造物用の吊り治具として使用する場合、重くて太いピン材を使用する必要があり、このようなピン材を貫通穴に挿入してピン材の係止孔に抜け止め部材を挿入しなければならないが、このようなピン材の貫通穴への抜き差しは人力によって行われるため、指を挟む等の怪我をし易く非常に危険である。特に風の影響や起重機船上等では波の影響によりクレーン用のフックが大きく揺れたりすることがしばしばあり、このフックに玉掛けされ大きく揺れることがある本体部の貫通穴にピン材を抜き差しすることは非常に困難な作業となる。 For example, in the type where the pin material has a cylindrical shape and uses a retaining member, when using it as a hanging jig for large concrete structures, it is necessary to use a heavy and thick pin material. The pin must be inserted into the hole and the retaining member must be inserted into the pin hole, but this pin material is inserted / removed manually into the through hole, so it is easy to get injured, such as pinching a finger. Very dangerous. In particular, the crane hook often shakes greatly due to the influence of the wind or on the hoist, etc. due to the influence of the waves. This is a very difficult task.
更にピン材の先端部におねじ部が形成されている態様では、ピン材の先端部のおねじ部を貫通穴のめねじ部に螺合させて固定した状態で大型コンクリート構造物を吊り下げると、めねじ部とおねじ部とに大きな荷重が加わり破損して取り外しができなくなるような場合があり、またナットを使用する場合であっても、本体部の貫通穴と当接する位置でナットをピン材の先端部のおねじ部と螺合させるため、ピン材のおねじ部の一部が本体部の貫通穴内に位置して大きな荷重が加わった際に破損等することがある。 Furthermore, in the aspect in which the screw portion is formed at the tip portion of the pin material, the large concrete structure is suspended in a state where the male screw portion of the tip portion of the pin material is screwed and fixed to the female screw portion of the through hole. In some cases, a large load is applied to the female thread part and the male thread part, resulting in damage that makes it impossible to remove the nut. Since it is screwed together with the male thread portion at the tip of the pin material, a part of the male thread portion of the pin material is located in the through hole of the main body portion and may be damaged when a large load is applied.
また重くて太いピン材を回転させて貫通穴に形成されためねじ部に螺合しなければならないため一段と困難な作業となり、またナットと螺合させる場合であっても、重くて太いピン材を人力によって貫通穴からしっかりと突出させた状態で、ピン材を動かないようにして大型のナットを螺合しなければならないため、作業が困難な場合もある。 In addition, a heavy and thick pin material is formed in the through hole by rotating it, so it must be screwed into the threaded portion, which makes the work more difficult, and even when screwing with a nut, a heavy and thick pin material is used. The work may be difficult because a large nut must be screwed in such a manner that the pin member does not move while being firmly projected from the through hole by human power.
このような従来のシャックル型の吊り治具を使用した場合の問題点に対して、コンクリート製品に設けた係止孔を貫通可能に形成されたピン材(支持ピン)と、ピン材(支持ピン)の基端部側に設けられ、クレーン等により吊り上げられるU字状の本体部(掛止体)と、ピン材(支持ピン)の先端部に対し支軸により回動可能に設けられた抜け止め部材(抜け止めピン)とを備え、抜け止め部材(抜け止めピン)は係止孔を通過した状態において、ピン材(支持ピン)の外周面から互いに反対方向に突出して、コンクリート製品の側壁面の二箇所に当接し得る位置に変位可能に構成されているコンクリート製品の吊下げ金具がある(例えば、特許文献1参照。)。 With respect to the problems in the case of using such a conventional shackle-type hanging jig, a pin material (support pin) formed so as to be able to penetrate a locking hole provided in a concrete product, and a pin material (support pin) ) Provided on the base end side, and a U-shaped main body (hanging body) that is lifted by a crane or the like, and a disengagement that is pivotable with respect to the tip of the pin material (support pin) A retaining member (retaining pin), and the retaining member (retaining pin) protrudes in the opposite direction from the outer peripheral surface of the pin material (support pin) in the state of passing through the locking hole, and is on the concrete product side. There is a hanging bracket for a concrete product configured to be displaceable at a position where it can come into contact with two locations on a wall surface (see, for example, Patent Document 1).
この吊下げ金具は、U字状の本体部(掛止体)の貫通穴に予めピン材(支持ピン)が挿入された状態で使用されるものであるため、ピン材(支持ピン)をU字状の本体部(掛止体)に挿入する際に手を挟むなどの問題が生じることがない。 Since this hanging metal fitting is used in a state in which a pin material (support pin) is inserted in advance in a through hole of a U-shaped main body (holding body), the pin material (support pin) is used as a U There is no problem such as pinching a hand when inserting into the character-shaped main body (hanging body).
しかしながらこの吊下げ金具は、長いピン材(支持ピン)を使用して、大きく突出させたピン材(支持ピン)の一部を、コンクリート製品に設けた係止孔に挿入して、ピン材(支持ピン)の先端の抜け止め部材(抜け止めピン)で固定するか、あるいはコイルスプリング等のような付勢手段を利用して(特許文献1 請求項2参照。)、抜け止め部材(抜け止めピン)とU字状の本体部(掛止体)とでコンクリート製品を挟持するだけであるため、大きな力が加わったり、大きな揺れ等を受けた場合にコイルスプリングが縮んで外れたり、抜け止め部材(抜け止めピン)が外れたりすることがあり、めねじとおねじで螺合させて固定した場合に比べて外れ易く大きな事故を起こす可能性がある。
However, this hanging metal fitting uses a long pin material (support pin), inserts a part of the pin material (support pin) that is greatly protruded into a locking hole provided in the concrete product, It is fixed with a retaining member (a retaining pin) at the tip of the support pin) or using a biasing means such as a coil spring (refer to
本発明は前記の問題に鑑み、予め大型コンクリート構造物に固設された吊筋に設けられた空間部に、吊り治具用のピン材を挿入する際に、非常に安全且つ容易に取り付け作業をすることができ、また挿入されたピン材は螺合されて確実且つ強固に固定することができ、更に大型コンクリート構造物を吊り上げる際に大きな荷重が加わっても、めねじ部やおねじ部が損傷等することがない大型コンクリート構造物用の吊り治具を提供することを課題とする。 In view of the above problems, the present invention is very safe and easy to attach when inserting a pin material for a hanging jig into a space provided in a hanging bar fixed in advance on a large concrete structure. The inserted pin material can be screwed and fixed securely and firmly, and even if a large load is applied when lifting a large concrete structure, the female screw part or male screw part It is an object of the present invention to provide a hanging jig for a large concrete structure that is not damaged.
本発明者らは前記課題を解決すべく鋭意検討を重ねた結果、逆U字状を成す本体部の頂部に形成されたワイヤ玉掛け部に、クレーンフック用ワイヤが玉掛けされた状態で使用される大型コンクリート構造物用の吊り治具において、大型コンクリート構造物用の吊り治具を、頂部と頂部の両端から並行に鉛直方向に向けて延設され中央の対向する位置にそれぞれピン材挿入用の貫通穴が形成されているピン支持部材とから成る本体部と、大型コンクリート構造物に固設された吊筋に設けられた空間部に挿入された状態で各ピン支持部材の貫通穴で支持されるピン材とから構成させれば、構造が簡単で取り扱い易く、
更にそのピン材を、大型コンクリート構造物に固設された吊筋に設けられた空間部に挿入され各ピン支持部材の貫通穴で支持される丸棒部と、この丸棒部の一端から連続して形成されていて最大径が丸棒部の径より小さいおねじ部とから構成させると共に、本体部の一方のピン支持部材の外面に、ピン材が貫通穴へ向けてスライド自在な中空穴と、この中空穴の一方のピン支持部材と反対側に形成されていてピン材のおねじ部と螺合するめねじ部とから成るピン案内部材を取り付ければ、シャックル型の吊り治具ではピン材の先端側に設けられているおねじ部を本体部のピン支持部材の貫通穴に形成されためねじ部に螺合させていたため、大きな荷重が掛かるとおねじ部やめねじ部が破損等をすることがあったが、本発明に係る吊り治具ではピン材の後端側に相当する位置におねじ部を形成させると共に、このおねじ部に螺合させるめねじ部が本体部のピン支持部材の貫通穴から離れた位置となるようにピン案内部材を別途設けることで、大きな荷重は本体部の貫通穴でピン材の先端側の丸棒部によって受け止めることによって、ピン材の後端側のおねじ部と本体部のピン支持部材の貫通穴から離れた位置に設けられたピン案内部材のめねじ部とは破損等することがなく、
またシャックル型の吊り治具では、ピン材の先端側に設けられたおねじ部は、ピン材を本体部のピン支持部材の貫通穴に挿入して最後に螺合させるが、本発明に係る吊り治具ではシャックル型の吊り治具とは反対側に位置するピン材の挿入口側に設けられていて、ピン材は本体部のピン支持部材の貫通穴に挿入して支持させる前から螺合した状態となるので、ピン材を回転させることによりピン材を本体部のピン支持部材の貫通穴へと真っ直ぐ且つ確実に挿入することができるから、従来の人力による本体部の貫通穴へのピン材の挿入とは異なり、指を挟む等の怪我をするようなこともなく、更にピン材のおねじ部の丸棒部と反対側の端部に回転力伝達部を設ければ、ピン材に大きな回転力を容易に加えることができるので、より迅速にピン材を抜き差しすることができ、本体部の他方のピン支持部材の外面にバランスウエイトを取り付けることによって、本体部の一方のピン支持部材に取り付けられたピン案内部材とバランスがとれ、本発明に係る吊り治具が傾いた状態となることを防止でき、大型コンクリート構造物に固設された吊筋に容易に取り付けることができることを究明して本発明を完成したのである。
As a result of intensive studies to solve the above-mentioned problems, the inventors of the present invention are used in a state where a wire for a crane hook is hung on a wire sling formed on the top of a main body having an inverted U shape. In the suspension jig for large concrete structures, the suspension jig for large concrete structures is extended in the vertical direction in parallel from the top and both ends of the top, and is inserted into the opposite positions in the center respectively. It is supported by the through hole of each pin support member in a state of being inserted into a main body part composed of a pin support member in which a through hole is formed and a space part provided in a hanging bar fixed to a large concrete structure. If it is made up of pin material, the structure is simple and easy to handle,
Furthermore, the pin material is inserted into the space provided in the suspension bar fixed to the large concrete structure and supported by the through hole of each pin support member, and continuous from one end of this round bar portion. A hollow hole that is formed of a male thread portion whose maximum diameter is smaller than the diameter of the round bar portion, and on the outer surface of one pin support member of the main body portion, the pin material is slidable toward the through hole And a pin guide member that is formed on the opposite side of the hollow hole from the one pin support member and includes a female threaded portion of the pin material and screwed thereto, the pin material can be used in a shackle-type hanging jig. Since the male screw part provided on the tip side is formed in the through hole of the pin support member of the main body part and screwed into the screw part, the male screw part and the female screw part may be damaged when a large load is applied. In the hanging jig according to the present invention, The screw guide is formed at a position corresponding to the rear end side of the lead material, and the female screw part screwed into the male screw part is positioned away from the through hole of the pin support member of the main body part. By providing a separate member, a large load is received by the round bar on the front end side of the pin material at the through hole of the main body portion, so that the male screw portion on the rear end side of the pin material and the through hole of the pin support member on the main body portion There is no damage etc. with the female thread part of the pin guide member provided at a position away from
Further, in the shackle type hanging jig, the male thread portion provided on the tip end side of the pin material is inserted into the through hole of the pin support member of the main body portion and finally screwed. The suspension jig is provided on the insertion side of the pin material located on the opposite side of the shackle-type suspension jig, and the pin material is screwed before being inserted and supported in the through hole of the pin support member of the main body. Since the pin material is rotated, the pin material can be straightly and surely inserted into the through hole of the pin support member of the main body portion by rotating the pin material. Unlike insertion of pin material, there is no injury such as pinching fingers, and if a rotational force transmission part is provided at the end opposite to the round bar of the male thread of the pin material, Since a large rotational force can be easily applied to the material, the pin can be pinned more quickly. By attaching a balance weight to the outer surface of the other pin support member of the main body part, the balance with the pin guide member attached to the one pin support member of the main body part is achieved, and the suspension according to the present invention The present invention has been completed by investigating that the jig can be prevented from being inclined and can be easily attached to a hanging bar fixed to a large concrete structure.
即ち本発明は、逆U字状を成す本体部の頂部に形成されたワイヤ玉掛け部に、クレーンフック用ワイヤが玉掛けされた状態で、予め大型コンクリート構造物に固設された吊筋に取り付けられて、大型コンクリート構造物をクレーンによって吊り上げるための大型コンクリート構造物用の吊り治具であって、
本体部は頂部とこの頂部の両端から並行に所定間隔aで鉛直方向に向けて延設された厚さがtで中央の対向する位置にそれぞれピン材挿入用の貫通穴が形成されているピン支持部材とから構成されていて、一方のピン支持部材の外面には、ピン材が貫通穴へ向けてスライド自在な中空穴と、この中空穴の一方のピン支持部材と反対側に形成されていてピン材のおねじ部と螺合するめねじ部とから成るピン案内部材が取り付けられており、他方のピン支持部材の外面にはピン材を各貫通穴に挿入して位置固定した際に吊り治具全体の重心を本体部のワイヤ玉掛け部の直下に位置させるバランスウエイトが取り付けられていて、
ピン材は、大型コンクリート構造物に固設された吊筋に設けられた空間部に挿入され各ピン支持部材の貫通穴で支持される丸棒部と、この丸棒部の一端から連続して形成されていて最大径が丸棒部の径より小さいおねじ部と、このおねじ部の丸棒部と反対側の端部に形成された回転力伝達部とから構成されており、
ピン材の丸棒部の長さXがX≧a+2tを、ピン材のおねじ部の有効ねじ部の長さYがY≧a+tを満たしていると共に、ピン案内部材の中空穴の長さZがZ≧a+tを満たしていることを特徴とする大型コンクリート構造物用の吊り治具である。
That is, the present invention is attached to a suspension bar fixed in advance on a large concrete structure in a state where a wire for a crane hook is slung on a wire sling formed on the top of a main body having an inverted U shape. A lifting jig for a large concrete structure for lifting a large concrete structure with a crane,
The main body portion is a pin extending in the vertical direction at a predetermined interval a in parallel from the top portion and both ends of the top portion, and has a thickness t and a pin material insertion through hole formed at each opposed position in the center. The pin member is formed on the outer surface of one pin support member, on the opposite side of the hollow hole from which the pin material can slide toward the through hole. A pin guide member made up of a female threaded portion of the pin material and a female threaded portion is attached, and the other pin support member is hung when the pin material is inserted into each through hole and fixed in position. A balance weight is attached to place the center of gravity of the entire jig directly below the wire sling portion of the main body,
The pin material is inserted into a space provided in a suspension bar fixed to a large concrete structure and supported by a through hole of each pin support member, and continuously from one end of this round bar portion. It is composed of a male thread part that is formed and has a maximum diameter smaller than the diameter of the round bar part, and a rotational force transmitting part that is formed at the end opposite to the round bar part of this male thread part,
The length X of the round bar portion of the pin material satisfies X ≧ a + 2t, the length Y of the effective screw portion of the male thread portion of the pin material satisfies Y ≧ a + t, and the length Z of the hollow hole of the pin guide member Is a hanging jig for large concrete structures characterized by satisfying Z ≧ a + t.
更にピン材の回転力伝達部がハンドルを取り付けるハンドル用嵌合部であれば、ハンドルを回転させることよって、人力によって容易にピン材を回転させてピン材の抜き差しをすることができて好ましく、またピン材の回転力伝達部が電動回転工具の回転部と嵌合される回転工具用嵌合部であれば、電動回転工具を使用することで、より迅速且つ簡便にピン材の抜き差しをすることができて好ましいのである。 Further, if the rotational force transmitting portion of the pin material is a handle fitting portion for attaching the handle, it is preferable that the pin material can be easily rotated by human power and the pin material can be inserted and removed, Moreover, if the rotational force transmission part of a pin material is a fitting part for rotary tools fitted with the rotary part of an electric rotary tool, the pin material can be inserted and removed more quickly and easily by using an electric rotary tool. This is preferable.
本発明に係る大型コンクリート構造物用の吊り治具は、逆U字状を成す本体部の頂部に形成されたワイヤ玉掛け部に、クレーンフック用ワイヤが玉掛けされた状態で、予め大型コンクリート構造物に固設された吊筋に取り付けられて、大型コンクリート構造物をクレーンによって吊り上げるための大型コンクリート構造物用の吊り治具であって、
本体部は頂部とこの頂部の両端から並行に所定間隔aで鉛直方向に向けて延設された厚さがtで中央の対向する位置にそれぞれピン材挿入用の貫通穴が形成されているピン支持部材とから構成されていて、一方のピン支持部材の外面には、ピン材が貫通穴へ向けてスライド自在な中空穴と、この中空穴の一方のピン支持部材と反対側に形成されていてピン材のおねじ部と螺合するめねじ部とから成るピン案内部材が取り付けられており、他方のピン支持部材の外面にはピン材を各貫通穴に挿入して位置固定した際に吊り治具全体の重心を本体部のワイヤ玉掛け部の直下に位置させるバランスウエイトが取り付けられていて、
ピン材は、大型コンクリート構造物に固設された吊筋に設けられた空間部に挿入され各ピン支持部材の貫通穴で支持される丸棒部と、この丸棒部の一端から連続して形成されていて最大径が丸棒部の径より小さいおねじ部と、このおねじ部の丸棒部と反対側の端部に形成された回転力伝達部とから構成されているから、
構造が簡単で取り扱い易く、シャックル型の吊り治具ではピン材の先端側に設けられているおねじ部を本体部のピン支持部材に形成されためねじ部に螺合させていたため、大きな荷重が掛かるとおねじ部やめねじ部が破損等をすることがあったが、ピン材の後端側に相当する位置におねじ部を形成させると共に、このおねじ部に螺合させるめねじ部が本体部のピン支持部材から離れた位置となるようにピン案内部材を別途設けられているから、大きな荷重は本体部のピン支持部材の貫通穴でピン材の先端側の丸棒部で受け止め、ピン材の後端側のおねじ部と本体部のピン支持部材から離れた位置に設けられたピン案内部材のめねじ部とは破損等することがなく、
またシャックル型の吊り治具ではピン材の先端側に設けられたおねじ部は、ピン材を本体部のピン支持部材の貫通穴に挿入して最後に螺合させるが、本発明に係る吊り治具ではシャックル型の吊り治具とは反対側に位置するピン材の挿入口側に設けられていて、ピン材は本体部のピン支持部材の貫通穴に挿入して支持させる前から螺合した状態となるので、ピン材を回転させることによりピン材を本体部のピン支持部材の貫通穴へと真っ直ぐ且つ確実に挿入することができるから、従来の人力によるピン材の挿入とは異なり、指を挟む等の怪我をするようなこともなく、
更にピン材のおねじ部の丸棒部と反対側の端部に回転力伝達部が設けられているから、ピン材に大きな回転力を容易に加えることができるので、より迅速にピン材を抜き差しすることができ、更に本体部の他方のピン支持部材の外面にバランスウエイトが取り付けられているから、本体部の一方のピン支持部材に取り付けられたピン案内部材とバランスがとれ、本発明に係る吊り治具が傾いた状態となることを防止でき、大型コンクリート構造物に固設された吊筋に容易に取り付けることができ、
更にピン材の丸棒部の長さXがX≧a+2tを満たしているので、所定間隔aで形成されそれぞれの厚さがtのピン材挿入用の貫通穴にピン材の丸棒部を確実に支持させることができ、
また前述のようにピン材はピン案内部材のめねじ部におねじ部が螺合されているのでピン材がピン案内部材のめねじ部にねじ込まれることによりピン支持部材の貫通穴に挿入されるので、ピン材はその有効ねじ部の長さYだけしか抜き差しすることができないが、その有効ねじ部の長さYがY≧a+tを満たしているから、ピン材の先端部をピン案内部材側のピン支持部材の貫通穴に引っ込んだ状態から、反対側のバランスウエイト側のピン支持部材の貫通穴に差し込まれた状態となるまでピン材を確実に抜き差しすることができ、
更にピン材を通す中空穴とめねじ部とから成るピン案内部材において、ピン案内部材の中空穴が短いと、ピン材を本体部のピン支持部材間からピン案内部材側のピン支持部材の貫通穴に引き入れることができないが、ピン案内部材の中空穴の長さZがZ≧a+tを満たすように中空穴の長さを十分に確保しているから、ピン材を本体部のピン支持部材間からピン案内部材側のピン支持部材の貫通穴に引き入れて、大型コンクリート構造物に固設された吊筋を本体部のピン支持部材間に確実に位置させることができるのである。
The hanging jig for a large concrete structure according to the present invention has a large concrete structure in advance in a state in which a wire for a crane hook is hung on a wire sling formed on the top of a main body having an inverted U shape. A hanging jig for a large concrete structure, which is attached to a suspension bar fixed to the large concrete structure for lifting the large concrete structure by a crane,
The main body portion is a pin extending in the vertical direction at a predetermined interval a in parallel from the top portion and both ends of the top portion, and has a thickness t and a pin material insertion through hole formed at each opposed position in the center. The pin member is formed on the outer surface of one pin support member, on the opposite side of the hollow hole from which the pin material can slide toward the through hole. A pin guide member made up of a female threaded portion of the pin material and a female threaded portion is attached, and the other pin support member is hung when the pin material is inserted into each through hole and fixed in position. A balance weight is attached to place the center of gravity of the entire jig directly below the wire sling portion of the main body,
The pin material is inserted into a space provided in a suspension bar fixed to a large concrete structure and supported by a through hole of each pin support member, and continuously from one end of this round bar portion. Since it is composed of a male thread part that is formed and has a maximum diameter smaller than the diameter of the round bar part, and a rotational force transmitting part formed at the end opposite to the round bar part of this male thread part,
The structure is simple and easy to handle, and in the shackle-type hanging jig, the male screw part provided on the tip side of the pin material is formed on the pin support member of the main body part and screwed into the screw part. When it is hooked, the external thread and internal thread may be damaged, but the thread is formed at a position corresponding to the rear end of the pin material, and the internal thread is screwed into the external thread. Since a pin guide member is separately provided so as to be positioned away from the pin support member of the part, a large load is received by the round bar part on the tip side of the pin material at the through hole of the pin support member of the main body part, and the pin The external thread side of the material and the female thread part of the pin guide member provided at a position away from the pin support member of the main body part are not damaged,
In addition, in the shackle type hanging jig, the male thread portion provided on the tip side of the pin material is inserted into the through hole of the pin support member of the main body portion and finally screwed. The jig is provided on the insertion side of the pin material located on the opposite side to the shackle-type hanging jig, and the pin material is screwed before being inserted into the through hole of the pin support member of the main body and supported. Since the pin material can be inserted straight and surely into the through hole of the pin support member of the main body part by rotating the pin material, unlike the conventional pin material insertion by human power, There is no injuries such as pinching fingers,
Furthermore, since a rotational force transmitting part is provided at the end opposite to the round bar of the male thread of the pin material, a large rotational force can be easily applied to the pin material, so that the pin material can be more quickly applied. Since the balance weight is attached to the outer surface of the other pin support member of the main body portion, the balance with the pin guide member attached to the one pin support member of the main body portion can be achieved. The hanging jig can be prevented from being tilted, and can be easily attached to a hanging bar fixed to a large concrete structure,
In addition, since the length X of the pin material round bar portion satisfies X ≧ a + 2t, the pin material round bar portion is securely formed in the through hole for inserting the pin material formed at a predetermined interval a and having a thickness t. Can be supported,
Further, as described above, since the pin material is screwed into the female thread portion of the pin guide member, the pin material is inserted into the through hole of the pin support member by being screwed into the female thread portion of the pin guide member. Therefore, the pin material can only be inserted / removed only by the length Y of the effective screw portion, but since the length Y of the effective screw portion satisfies Y ≧ a + t, the tip portion of the pin material is moved to the pin guide member. From the state of being retracted into the through hole of the pin support member on the side, the pin material can be reliably inserted and removed until it is inserted into the through hole of the pin support member on the opposite balance weight side,
Further, in the pin guide member composed of a hollow hole through which the pin material passes and a female thread portion, if the hollow hole of the pin guide member is short, the pin material is inserted between the pin support members of the main body portion through the through hole of the pin support member on the pin guide member side. However, since the length of the hollow hole is sufficiently secured so that the length Z of the hollow hole of the pin guide member satisfies Z ≧ a + t, the pin material is removed from between the pin support members of the main body portion. By pulling into the through hole of the pin support member on the pin guide member side, the suspension bars fixed to the large concrete structure can be reliably positioned between the pin support members of the main body.
更にピン材の回転力伝達部がハンドルを取り付けるハンドル用嵌合部である態様の場合には、ハンドルを回転させることよって、人力によって容易にピン材を回転させてピン材の抜き差しをすることができて好ましく、またピン材の回転力伝達部が電動回転工具の回転部と嵌合される回転工具用嵌合部である態様の場合には、電動回転工具を使用することで、より迅速且つ簡便にピン材の抜き差しをすることができて好ましいのである。 Further, in the case where the rotational force transmitting portion of the pin material is a handle fitting portion for attaching the handle, by rotating the handle, the pin material can be easily rotated by human power to insert and remove the pin material. In the case of a mode in which the rotational force transmitting portion of the pin material is a rotary tool fitting portion that is fitted to the rotary portion of the electric rotary tool, the use of the electric rotary tool allows more rapid and This is preferable because the pin material can be easily inserted and removed.
以下、図面を用いて本発明に係る大型コンクリート構造物用の吊り治具について詳細に説明する。 Hereinafter, the hanging jig for large concrete structures according to the present invention will be described in detail with reference to the drawings.
図面中、Lは予め大型コンクリート構造物に固設された吊筋であり、後述するピン材5が、この吊筋Lに設けられた空間部Laに挿入された状態で、クレーンによって大型コンクリート構造物が吊り上げられる。
In the drawing, L is a suspension bar fixed in advance on a large concrete structure, and a large concrete structure is formed by a crane in a state where a
1は頂部1aとこの頂部1aの両端から並行に所定間隔aで鉛直方向に向けて延設された厚さがtで中央の対向する位置にそれぞれピン材挿入用の貫通穴1baが形成されているピン支持部材1bとから構成されている本体部である。2は逆U字状を成す本体部1の頂部1aに形成されたワイヤ玉掛け部である。
3は後述するピン材5が貫通穴1baへ向けてスライド自在な中空穴3aと、この中空穴3aの一方のピン支持部材1bと反対側に形成されていて後述するピン材5のおねじ部5bと螺合するめねじ部3bとから成るピン案内部材であって、一方のピン支持部材1bの外面1bbに取り付けられている。このピン案内部材3の中空穴3aの長さZはZ≧a+tとなるように設けられている。
4は後述するピン材5を各貫通穴1baに挿入して位置固定した際に吊り治具全体の重心を本体部1のワイヤ玉掛け部2の直下に位置させるバランスウエイトであって、他方のピン支持部材1bの外面1bbに取り付けられている。
4 is a balance weight for positioning the center of gravity of the entire hanging jig immediately below the
5は大型コンクリート構造物に固設された吊筋Lに設けられた空間部Laに挿入され各ピン支持部材1bの貫通穴1baで支持される丸棒部5aと、この丸棒部5aの一端から連続して形成されていて最大径が丸棒部5aの径より小さいおねじ部5bと、おねじ部5bの丸棒部5aと反対側の端部に形成された回転力伝達部5cとから構成されているピン材である。
またピン材5の丸棒部5aの長さXはX≧a+2tを、ピン材5のおねじ部5bの有効ねじ部の長さYはY≧a+tを満たしている。ピン材5の丸棒部5aの長さXがa+2tより短いと、所定間隔aで形成されそれぞれの厚さがtのピン材挿入用の貫通穴1baに、ピン材5の丸棒部5aを確実に支持させることができないので、ピン材5の丸棒部5aの長さXはa+2t以上である必要がある。またピン材5はピン案内部材3のめねじ部3bにねじ込まれることにより貫通穴1baに挿入されるので、ピン材5の有効ねじ部の長さYだけしか抜き差しすることができないため、そのピン材5のおねじ部5bの有効ねじ部の長さYがa+tより短いとピン材5の抜き差しできる距離が短くなり、ピン材5の先端部をピン案内部材3側の貫通穴1baに引っ込んだ状態から、反対側のバランスウエイト4側の貫通穴1baに差し込まれた状態となるまでピン材5を確実に抜き差しすることができなくなるので、ピン材5の有効ねじ部の長さYはa+t以上であることが必要となる。
The length X of the
なおこれらの数値限定は、本発明を実施する上で必要となる必要最小限の長さを規定したものであり、上限については特段の限定はなく、本発明を実施する際にはこれらの最小値以上の長さを当業者が適宜決めることによって決定されるものである。即ちこれらの数値限定は、本発明を実施する上で必要となる最小限の長さを示したものであって、本発明の特殊な効果を奏する範囲を特定するための範囲を示すものではないので、限定の必要がない上限については特段に規定していない。また前述のピン案内部材3の中空穴3aの長さZの数値限定についても同様の理由により上限を規定していない。
These numerical limitations specify the minimum necessary length necessary for carrying out the present invention, and there is no particular limitation on the upper limit. It is determined by a person skilled in the art appropriately determining a length longer than the value. In other words, these numerical limits indicate the minimum length necessary for carrying out the present invention, and do not indicate a range for specifying a range that exhibits the special effects of the present invention. Therefore, the upper limit that does not need to be limited is not specifically defined. Moreover, the upper limit is not prescribed | regulated for the same reason also about numerical limitation of the length Z of the
またピン材5の回転力伝達部5cがハンドル6を取り付けるハンドル用嵌合部5caである場合には、人力によってハンドル6を回転させるだけでピン材5の抜き差しを容易にすることができて好ましく、またピン材5の回転力伝達部5cが電動回転工具7の回転部7aと嵌合される回転工具用嵌合部5cbである場合には、電動回転工具7を使用することで、より迅速且つ簡便にピン材5の抜き差しをすることができて好ましいのである。
Moreover, when the rotational force transmission part 5c of the
このような本発明に係る大型コンクリート構造物用の吊り治具を実際に使用するには、先ず図1の如き本発明に係る大型コンクリート構造物用の吊り治具のワイヤ玉掛け部2に、クレーンフック用ワイヤを玉掛けして、本発明に係る吊り治具をクレーンにより吊り下げた状態にする。そして本発明に係る吊り治具を、予め大型コンクリート構造物に固設された吊筋Lの上方から降ろして、ピン材5を吊筋Lに設けられた空間部Laに挿入可能な状態にする。なお風の影響や起重機船上等では波の影響により本発明に係る吊り治具が大きく揺れる場合があるから、このような場合には、例えば図8の如きピン案内部材3とバランスウエイト4のそれぞれ外周面の下側を支持する台座を準備して、図9のようにこの台座の中央部の空間に吊筋Lを通すようにして設置して、この台座に本発明に係る吊り治具を載置すれば、本発明に係る吊り治具が吊筋Lに対して大きく動くことがないので、より確実且つ安全に取り付け作業をすることもできる。
In order to actually use such a hanging jig for a large concrete structure according to the present invention, first, a
次に吊筋Lをピン支持部材1b間で挟むようにして設置された本発明に係る吊り治具は、おねじ部5bが従来のシャックル型とは反対側に位置するピン材5の挿入口側に設けられているから、ピン材5は本体部1のピン支持部材1bの貫通穴1baに挿入して支持させる前から螺合した状態となるので(例えば図7)、ピン材5を回転させることによりピン材5を本体部1のピン支持部材1bの貫通穴1baへと真っ直ぐ且つ確実に挿入することができる。そのため従来の人力によるピン材5の挿入とは異なり、指を挟む等の怪我をするようなこともなく、図9の如く、安全且つ確実にピン材5を本体部1のピン支持部材1bの貫通穴1baへと挿入することができるのである。
Next, in the hanging jig according to the present invention installed so as to sandwich the hanging bar L between the
その際に図9のように、ピン材5のハンドル用嵌合部5caにハンドル6が取り付けられている場合には、このハンドル6を人力により回転させるだけで、ピン材5をピン支持部材1bの貫通穴1baに容易に挿入することができる。この場合、ハンドル6にピン材5の差し込みすぎを防止するストッパーとしての役割をさせることもできる(図9)。また、ピン材5を引き抜く際には、ピン材5の丸棒部5aはおねじ部5bより径が大きいので、丸棒部5aはピン案内部材3のめねじ部3bを通過することができないので、丸棒部5aにピン材5の引き抜きすぎを防止するストッパーとしての役割をさせることもできるのである。
At this time, as shown in FIG. 9, when the
また図10のように、ピン材5に回転工具用嵌合部5cbが設けられている場合には、電動回転工具7の回転部7aを嵌合させることによって、より迅速且つ簡便にピン材5の抜き差しをすることもできる。
Further, as shown in FIG. 10, when the
そして図示していないが、大型コンクリート構造物には予め複数の吊筋Lが設けられていて、これらの吊筋Lに対して、それぞれ吊り治具を取り付けて吊り上げ、移動後にはそれらを取り外す必要があるが、本発明に係る吊り治具を使用すれば、このように多数回行う必要がある吊り治具の取り付け取り外し作業を安全且つ迅速に行うことができるのである。 Although not shown, the large concrete structure is provided with a plurality of suspension bars L in advance, each of which is attached with a lifting jig and lifted, and after moving, it is necessary to remove them. However, if the suspension jig according to the present invention is used, the attachment / detachment work of the suspension jig, which needs to be performed many times as described above, can be performed safely and quickly.
1 本体部
1a 頂部
1b ピン支持部材
1ba 貫通穴
1bb 外面
2 ワイヤ玉掛け部
3 ピン案内部材
3a 中空穴
3b めねじ部
4 バランスウエイト
5 ピン材
5a 丸棒部
5b おねじ部
5c 回転力伝達部
5ca ハンドル用嵌合部
5cb 回転工具用嵌合部
6 ハンドル
7 電動回転工具
7a 回転部
L 吊筋
La 空間部
X ピン材の丸棒部の長さ
Y ピン材のおねじ部の有効ねじ部の長さ
Z ピン案内部材の中空穴の長さ
a ピン支持部材間の所定間隔
t ピン支持部材の厚さ
1 Body
1a Top
1b Pin support member
1ba through hole
1bb
3a Hollow hole
5a Round bar
5b Male thread
5c Rotational force transmission part
5ca Fitting part for handle
5cb Fitting part for
7a Rotating part L Suspension
La Space X Length of the round bar of the pin material Y Length of the effective thread of the male thread of the pin material Z Length of the hollow hole of the pin guide member a Predetermined distance between the pin support members t thickness
Claims (3)
該本体部(1)は該頂部(1a)と該頂部(1a)の両端から並行に所定間隔aで鉛直方向に向けて延設された厚さがtで中央の対向する位置にそれぞれピン材挿入用の貫通穴(1ba)が形成されているピン支持部材(1b)とから構成され、一方のピン支持部材(1b)の外面(1bb)には、ピン材(5)が該貫通穴(1ba)へ向けてスライド自在な中空穴(3a)と、該中空穴(3a)の該一方のピン支持部材(1b)と反対側に形成されためねじ部(3b)とから成るピン案内部材(3)が取り付けられ、他方のピン支持部材(1b)の外面(1bb)には該ピン材(5)を各貫通穴(1ba)に挿入して位置固定した際に吊り治具全体の重心を該本体部(1)のワイヤ玉掛け部(2)の直下に位置させるバランスウエイト(4)が取り付けられ、
該ピン材(5)は、大型コンクリート構造物に固設された吊筋(L)に設けられた空間部(La)に挿入され各ピン支持部材(1b)の貫通穴(1ba)で支持される丸棒部(5a)と、該丸棒部(5a)の一端から連続して形成されていて最大径が該丸棒部(5a)の径より小さいおねじ部(5b)と、該おねじ部(5b)の該丸棒部(5a)と反対側の端部に形成された回転力伝達部(5c)とから構成されており、
該ピン材(5)の丸棒部(5a)の長さXがX≧a+2tを、該ピン材(5)のおねじ部(5b)の有効ねじ部の長さYがY≧a+tを満たしていると共に、該ピン案内部材(3)の中空穴(3a)の長さZがZ≧a+tを満たしており、
前記おねじ部(5b)は、前記ピン支持部(1b)と反対側に形成され、前記めねじ部(3b)は、前記ピン支持部(1b)と反対側に形成されており、前記おねじ部(5b)と前記めねじ部(3b)とは、前記ピン材(5)の丸棒部(5a)が前記ピン支持材(1b)の貫通穴(1ba)へ挿入される前に螺合された状態となることを特徴とする大型コンクリート構造物用の吊り治具。 Suspension fixed in advance to a large concrete structure with a wire for a crane hook hung on a wire sling portion (2) formed on a top portion (1a) of a main body portion (1) having an inverted U shape. A hanging jig for a large concrete structure attached to a line (L) for lifting a large concrete structure by a crane,
The body portion (1) is a pin member at a position where the thickness is t and the center is opposed to each other at a predetermined distance a in parallel from both ends of the top portion (1a) and the top portion (1a). is composed from the pin support member having a through hole for insertion (1ba) is formed (1b), on the outer surface (1bb) of one of the pin support member (1b), the pin member (5) is through hole a slidable hollow bore (3a) towards (1ba), the pin guide members consisting the the one of the pin support member (1b) threaded portion for being formed on the opposite side of the (3b) of the hollow hole (3a) (3) is attached , and the center of gravity of the entire lifting jig is fixed when the pin material (5) is inserted into each through hole (1ba) and fixed in position on the outer surface (1bb) of the other pin support member (1b). the balance weight (4) to be positioned directly below the wire slinging portion of the body portion (1) (2) is mounted et al is,
The pin member (5) is inserted into a space (La) provided in a suspension bar (L) fixed to a large concrete structure and supported by a through hole (1ba) of each pin support member (1b). A round bar part (5a), a male thread part (5b) formed continuously from one end of the round bar part (5a) and having a maximum diameter smaller than the diameter of the round bar part (5a), A rotating force transmitting portion (5c) formed at the opposite end of the round bar portion (5a) of the screw portion (5b);
The length X of the round bar portion (5a) of the pin material (5) satisfies X ≧ a + 2t, and the length Y of the effective screw portion of the male thread portion (5b) of the pin material (5) satisfies Y ≧ a + t. And the length Z of the hollow hole (3a) of the pin guide member (3) satisfies Z ≧ a + t ,
The male screw portion (5b) is formed on the opposite side to the pin support portion (1b), and the female screw portion (3b) is formed on the opposite side to the pin support portion (1b). The screw portion (5b) and the female screw portion (3b) are screwed before the round bar portion (5a) of the pin material (5) is inserted into the through hole (1ba) of the pin support material (1b). A hanging jig for a large concrete structure characterized by being in a combined state .
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2011260223A JP5913930B2 (en) | 2011-11-29 | 2011-11-29 | Suspension jig for large concrete structures |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2011260223A JP5913930B2 (en) | 2011-11-29 | 2011-11-29 | Suspension jig for large concrete structures |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2013112476A JP2013112476A (en) | 2013-06-10 |
JP5913930B2 true JP5913930B2 (en) | 2016-05-11 |
Family
ID=48708379
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2011260223A Active JP5913930B2 (en) | 2011-11-29 | 2011-11-29 | Suspension jig for large concrete structures |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP5913930B2 (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104359267B (en) * | 2014-11-25 | 2016-06-22 | 无锡市晶瑜冶金机械有限公司 | A kind of water-cooled but air drying system |
CN113104717B (en) * | 2020-06-23 | 2022-07-26 | 新疆苏中建设工程有限公司 | Special self-locking lifting appliance for steel structure |
CN114086786B (en) * | 2021-11-02 | 2023-02-03 | 安徽元昌建设工程有限公司 | Anti-falling device convenient to disassemble and having alarm function for building construction |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS4922693Y1 (en) * | 1970-04-23 | 1974-06-18 | ||
JPS528197Y2 (en) * | 1973-01-25 | 1977-02-21 | ||
JPH01169589U (en) * | 1988-05-20 | 1989-11-30 | ||
US5580113A (en) * | 1995-06-05 | 1996-12-03 | Magnum Construction Company, Inc. | Remote control crane/load safety shackle |
-
2011
- 2011-11-29 JP JP2011260223A patent/JP5913930B2/en active Active
Also Published As
Publication number | Publication date |
---|---|
JP2013112476A (en) | 2013-06-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP5913930B2 (en) | Suspension jig for large concrete structures | |
CN108368917A (en) | Rigging connector with combination suspension hook and shackle mount | |
JP2007131394A (en) | Hoisting accessory for container conveyance | |
EP1764337A1 (en) | Lifting assembly | |
JP4030022B1 (en) | Hanging jig | |
JP2008081305A (en) | Long material vertically hanging apparatus | |
JP2015086032A (en) | Palette hoisting auxiliary tool | |
JP4719301B1 (en) | Container connection bracket | |
US9964132B2 (en) | Quick hook | |
JP2008280814A (en) | Apparatus for opening and closing metal lid of manhole | |
JP3125406U (en) | Transportation hanger | |
US20170144865A1 (en) | Lifting Apparatus | |
JP6360945B2 (en) | Backhoe grip attachment mounting structure | |
JP4240334B2 (en) | Fishing rod support | |
CN210366658U (en) | Steel sheet hoisting accessory for construction | |
EP2712835A1 (en) | Handle for lifting hook | |
JP2018002396A (en) | Sling hand hook bar | |
JP3109069U (en) | Steel hanger | |
KR100864566B1 (en) | Propeller blade lifting device | |
JP3196921U (en) | Backhoe grip attachment mounting structure | |
CN217620555U (en) | Lockable sling storage rack | |
US10882722B2 (en) | Tool for lifting open floor grating and the like | |
JP2023107140A (en) | Screw-knotted rebar hanger | |
JP5732649B2 (en) | Vice | |
JPS6242837B2 (en) |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
RD03 | Notification of appointment of power of attorney |
Free format text: JAPANESE INTERMEDIATE CODE: A7423 Effective date: 20140812 |
|
RD03 | Notification of appointment of power of attorney |
Free format text: JAPANESE INTERMEDIATE CODE: A7423 Effective date: 20141121 |
|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20141126 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20150710 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20150721 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20150901 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20160315 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20160404 |
|
R150 | Certificate of patent or registration of utility model |
Ref document number: 5913930 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |