CN214147837U - Boiler steam pipeline system - Google Patents

Boiler steam pipeline system Download PDF

Info

Publication number
CN214147837U
CN214147837U CN202021796137.XU CN202021796137U CN214147837U CN 214147837 U CN214147837 U CN 214147837U CN 202021796137 U CN202021796137 U CN 202021796137U CN 214147837 U CN214147837 U CN 214147837U
Authority
CN
China
Prior art keywords
steam
pipeline
boiler
gas
steam pipeline
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021796137.XU
Other languages
Chinese (zh)
Inventor
徐东耀
严明建
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhaoqing Enn Clean Energy Co ltd
Original Assignee
Zhaoqing Enn Clean Energy Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhaoqing Enn Clean Energy Co ltd filed Critical Zhaoqing Enn Clean Energy Co ltd
Priority to CN202021796137.XU priority Critical patent/CN214147837U/en
Application granted granted Critical
Publication of CN214147837U publication Critical patent/CN214147837U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Treatment Of Fiber Materials (AREA)

Abstract

The utility model discloses a boiler steam pipeline system, which comprises a softened water tank, a softened water pipeline, a buffer water tank, a water supply pipeline, a first gas boiler, a first steam pipeline, a second gas boiler, a second steam pipeline, a first steam manifold, a second steam manifold, a fifth steam pipeline, a stop valve, a pressure reducing valve, a third steam pipeline, a forming machine, a fourth steam pipeline and a dyeing and finishing workshop; the water outlet of the buffer water tank is connected with the first gas-fired boiler and the second gas-fired boiler through the water feeding pipeline; the first branch cylinder and the second branch cylinder are communicated through the fifth steam pipeline; the pressure reducing valve is arranged in the middle of the fifth steam pipeline, and the stop valves are arranged at two ends of the fifth steam pipeline; the second branch cylinder is connected with the forming machine through the third steam pipeline. The utility model discloses can reach resources are saved with vapor rational distribution, reduce enterprise manufacturing cost's purpose.

Description

Boiler steam pipeline system
Technical Field
The utility model relates to a boiler steam pipeline field, concretely relates to boiler steam piping system.
Background
The steam generated by a gas boiler in a textile mill is applied to a forming machine and a dyeing and finishing workshop, and because the steam quantity required by production is inconsistent due to the influence of a light and vigorous season of production, all the steam quantity requirements of production can be met only by starting one boiler in a light season of production. Therefore, it is necessary to develop a boiler steam pipeline system.
SUMMERY OF THE UTILITY MODEL
The utility model aims at designing a boiler steam pipeline system, making it realize the rational distribution of load.
In order to achieve the above object, the utility model provides a following technical scheme:
a boiler steam pipeline system comprises a softened water tank, a softened water pipeline, a buffer water tank, a water supply pipeline, a first gas boiler, a first steam pipeline, a second gas boiler, a second steam pipeline, a first steam branch cylinder, a second steam branch cylinder, a fifth steam pipeline, a stop valve, a pressure reducing valve, a third steam pipeline, a forming machine, a fourth steam pipeline and a dyeing and finishing workshop; the water outlet of the softened water tank is connected with the buffer water tank through the softened water pipeline; the buffer water tank is connected with the first gas-fired boiler and the second gas-fired boiler through the water feeding pipeline; the first gas-fired boiler and the second gas-fired boiler are respectively connected with the first steam branch cylinder and the second steam branch cylinder through the first steam pipeline and the second steam pipeline; the first branch cylinder and the second branch cylinder are communicated through the fifth steam pipeline; the pressure reducing valve is arranged in the middle of the fifth steam pipeline, and the stop valves are arranged at two ends of the fifth steam pipeline; the first steam distributing cylinder is connected with the dyeing and finishing workshop through the fourth steam pipeline; the second steam distributing cylinder is connected with the forming machine through the third steam pipeline, and the forming machine is connected with the buffer water tank through the water return pipeline.
Further, the softening water tank comprises a water outlet, a medicine feeding port, a stirring motor, a stirring shaft, a water inlet, stirring blades and a filter screen; the top of the softened water tank is provided with the medicine feeding port and the stirring motor, and the lower left side and the upper right side of the softened water tank are respectively provided with the water outlet and the water inlet; the softening water tank is internally provided with the stirring shaft, the stirring blade and the filter screen; the upper end of the stirring shaft is fixedly connected with the power output end of the stirring motor; the lower part of the stirring shaft is provided with the stirring blade; the filter screen is arranged between the lower end of the stirring shaft and the water outlet, so that the rapid dissolution after the dosing can be ensured, and impurities in the medicine can be filtered out.
Furthermore, the forming machines are provided with 4 forming machines which are respectively connected with the second branch cylinder through the third steam pipeline, and the power sum of the 4 forming machines is closest to the output power of the second gas-fired boiler, so that the power matching is ensured, and the resource waste is reduced.
Furthermore, an electromagnetic descaler is arranged on the outer surface of the water supply pipeline, so that the adhesion of water scale in the pipeline is reduced.
Furthermore, the first gas-fired boiler and the second gas-fired boiler are respectively 20t/h and 15t/h hot air type natural gas steam boilers, the first gas-fired boiler is a low-pressure boiler, the second gas-fired boiler is a medium-pressure boiler, and the matching of the medium-low pressure gas-fired boilers can completely meet the power requirement required by production in a busy season and can meet the power requirement by stopping the first gas-fired boiler when the production is in a slack season.
Furthermore, the fifth steam pipeline is made of seamless steel pipes and is additionally provided with a heat insulation layer. Ensuring that the steam does not leak and reducing the energy loss of the steam.
Compared with the prior art, the beneficial effects of the utility model are that: first steam cylinder and second steam cylinder intercommunication through fifth steam conduit, realized satisfying the power demand of dyeing and finishing workshop with the vapor distribution of second gas boiler to first steam cylinder when production slack season, can deactivate first gas boiler, enable the power of boiler to obtain rational distribution, and return water pipeline lets the water heating in the water supply tank of the water steam of doing work in entering into buffer tank, improve the utilization ratio of heat energy, resources are saved, reduction enterprise manufacturing cost.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without creative efforts.
FIG. 1 is a flow diagram of a steam piping system according to the present invention;
FIG. 2 is a schematic view of the structure of the softened water tank of the present invention;
the names of the components identified in the figures are as follows:
1. a water outlet; 2. a drug feeding port; 3. a stirring motor; 4. a stirring shaft; 5. a water inlet; 6. a stirring blade; 7. a filter screen;
Detailed Description
The technical solution of the present invention will be described clearly and completely with reference to the accompanying drawings, and obviously, only some embodiments, not all embodiments, of the present invention are described. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative efforts belong to the protection scope of the present invention.
Example (b):
a boiler steam pipeline system comprises a softened water tank, a softened water pipeline, a buffer water tank, a water supply pipeline, a first gas boiler, a first steam pipeline, a second gas boiler, a second steam pipeline, a first steam branch cylinder, a second steam branch cylinder, a fifth steam pipeline, a stop valve, a pressure reducing valve, a third steam pipeline, a forming machine, a fourth steam pipeline and a dyeing and finishing workshop; the water outlet 1 of the softened water tank is connected with the buffer water tank through a softened water pipeline; the buffer water tank is connected with the first gas-fired boiler and the second gas-fired boiler through a water feeding pipeline; the first gas-fired boiler and the second gas-fired boiler are respectively connected with the first steam cylinder and the second steam cylinder through a first steam pipeline and a second steam pipeline; the first steam distributing cylinder and the second steam distributing cylinder are communicated through a fifth steam pipeline; a pressure reducing valve is arranged in the middle of the fifth steam pipeline, and stop valves are arranged at two ends of the fifth steam pipeline; the first steam distributing cylinder is connected with a dyeing and finishing workshop through a fourth steam pipeline; the second steam distributing cylinder is connected with the forming machine through a third steam pipeline, and the forming machine is connected with the buffer water tank through a water return pipeline.
The softening water tank comprises a water outlet 1, a medicine feeding port 2, a stirring motor 3, a stirring shaft 4, a water inlet 5, stirring blades 6 and a filter screen 7; the top of the softened water tank is provided with a medicine feeding port 2 and a stirring motor 3, and the left lower part and the right upper part of the softened water tank are respectively provided with a water outlet 1 and a water inlet 5; a stirring shaft 4, a stirring blade 6 and a filter screen 7 are arranged in the softening water tank; the upper end of the stirring shaft 4 is fixedly connected with the power output end of the stirring motor 3; the lower part of the stirring shaft 3 is provided with a stirring blade 6; a filter screen 7 is arranged between the lower end of the stirring shaft 4 and the water outlet 5, so that the medicine can be quickly dissolved after being dosed, and impurities in the medicine can be filtered out.
The forming machine is provided with 4 forming machines which are respectively connected with the second steam distributing cylinder through a third steam pipeline, the power sum of the 4 forming machines is closest to the output power of the second gas boiler, the power matching is guaranteed, and the resource waste is reduced.
The outer surface of the water supply pipeline is provided with an electromagnetic cleaner, so that the adhesion of water scale in the pipeline is reduced.
The first gas-fired boiler and the second gas-fired boiler are respectively a 20t/h hot air type natural gas steam boiler and a 15t/h hot air type natural gas steam boiler, the first gas-fired boiler is a low-pressure boiler, the second gas-fired boiler is a medium-pressure boiler, the matching of the middle-low pressure gas-fired boiler can completely meet the power requirement required by production in a busy season, and the first gas-fired boiler can be stopped to be used in a slack season to meet the power requirement of production.
The fifth steam pipeline is made of seamless steel pipes and is additionally provided with a heat insulation layer. Ensuring that the steam does not leak and reducing the energy loss of the steam.
The working principle of the embodiment is as follows:
tap water and a treatment agent respectively enter a softened water tank from a water inlet 5 and a dosing port 2, are stirred, dissolved and filtered by a stirring shaft 4 to form softened water, then enter a buffer water tank through a softened water pipeline, the softened water enters a first gas boiler and a second gas boiler from the buffer water tank through a water supply pipeline, steam formed by heating the first gas boiler and the second gas boiler respectively enters a first steam distributing cylinder and a second steam distributing cylinder, the steam of the first steam distributing cylinder enters a dyeing and finishing workshop through a fourth steam pipeline for doing work, the steam of the second steam distributing cylinder is distributed into four forming machines through a third steam pipe, the steam passing through the forming machines enters the buffer water tank through a water return pipeline for heating the buffer water tank, so that the purpose of fully utilizing heat energy of water is achieved, the steam of the second steam distributing cylinder enters a fourth steam pipeline for doing work after being subjected to pressure reduction treatment through a fifth steam pipeline in slack season of production, and then enters the fourth steam pipeline for the dyeing and finishing workshop, and the first gas boiler can be stopped for standby.
The utility model has the advantages that: first steam cylinder and second steam cylinder intercommunication through fifth steam conduit, realized satisfying the power demand of dyeing and finishing workshop with the vapor distribution of second gas boiler to first steam cylinder when production slack season, can deactivate first gas boiler, enable the power of boiler to obtain rational distribution, and return water pipeline lets the water heating in the water supply tank of the water steam of doing work in entering into buffer tank, improve the utilization ratio of heat energy, resources are saved, reduction enterprise manufacturing cost.

Claims (6)

1. A boiler steam piping system, characterized by: the system comprises a softened water tank, a softened water pipeline, a buffer water tank, a water supply pipeline, a first gas boiler, a first steam pipeline, a second gas boiler, a second steam pipeline, a first steam cylinder, a second steam cylinder, a fifth steam pipeline, a stop valve, a pressure reducing valve, a third steam pipeline, a forming machine, a fourth steam pipeline and a dyeing and finishing workshop; the water outlet of the softened water tank is connected with the buffer water tank through the softened water pipeline; the buffer water tank is connected with the first gas-fired boiler and the second gas-fired boiler through the water feeding pipeline; the first gas-fired boiler and the second gas-fired boiler are respectively connected with the first steam branch cylinder and the second steam branch cylinder through the first steam pipeline and the second steam pipeline; the first branch cylinder and the second branch cylinder are communicated through the fifth steam pipeline; the pressure reducing valve is arranged in the middle of the fifth steam pipeline, and the stop valves are arranged at two ends of the fifth steam pipeline; the first steam distributing cylinder is connected with the dyeing and finishing workshop through the fourth steam pipeline; the second steam distributing cylinder is connected with the forming machine through the third steam pipeline, and the forming machine is connected with the buffer water tank through a water return pipeline.
2. The boiler steam piping system of claim 1, wherein: the softening water tank comprises a water outlet, a medicine feeding port, a stirring motor, a stirring shaft, a water inlet, stirring blades and a filter screen; the top of the softened water tank is provided with the medicine feeding port and the stirring motor, and the lower left side and the upper right side of the softened water tank are respectively provided with the water outlet and the water inlet; the softening water tank is internally provided with the stirring shaft, the stirring blade and the filter screen; the upper end of the stirring shaft is fixedly connected with the power output end of the stirring motor; the lower part of the stirring shaft is provided with the stirring blade; the filter screen is arranged between the lower end of the stirring shaft and the water outlet.
3. The boiler steam piping system of claim 1, wherein: the forming machine is provided with 4 forming machines which are respectively connected with the second steam distributing cylinder through the third steam pipeline.
4. The boiler steam piping system of claim 1, wherein: and an electromagnetic cleaner is arranged on the outer surface of the water supply pipeline.
5. The boiler steam piping system of claim 1, wherein: the first gas-fired boiler and the second gas-fired boiler are respectively 20t/h and 15t/h hot air type natural gas steam boilers, the first gas-fired boiler is a low-pressure boiler, and the second gas-fired boiler is a medium-pressure boiler.
6. The boiler steam piping system of claim 1, wherein: the fifth steam pipeline is made of seamless steel pipes and is additionally provided with a heat insulation layer.
CN202021796137.XU 2020-08-25 2020-08-25 Boiler steam pipeline system Active CN214147837U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021796137.XU CN214147837U (en) 2020-08-25 2020-08-25 Boiler steam pipeline system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021796137.XU CN214147837U (en) 2020-08-25 2020-08-25 Boiler steam pipeline system

Publications (1)

Publication Number Publication Date
CN214147837U true CN214147837U (en) 2021-09-07

Family

ID=77522325

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021796137.XU Active CN214147837U (en) 2020-08-25 2020-08-25 Boiler steam pipeline system

Country Status (1)

Country Link
CN (1) CN214147837U (en)

Similar Documents

Publication Publication Date Title
WO2011079613A1 (en) Feed water and drainage system for medium pressure heater in power plant
CN204552846U (en) A kind of back pressure steam turbines utilization system
CN214147837U (en) Boiler steam pipeline system
CN100577902C (en) Cascade flash process for polyster staple post processing
CN216638932U (en) Heating system for preparing ammonia through urea hydrolysis reaction
CN206347543U (en) A kind of vapour system
CN203404770U (en) Water supply backheating and drain system with medium pressure heater and drain pump
CN205532732U (en) Steam power plant's industry that is fit for variable working condition unit supplies heat energy -saving system
CN210772112U (en) Boiler waste heat recycling device
CN218993372U (en) Energy-saving transformation system for back pressure type turbine auxiliary machine of industrial self-contained power station
CN206176339U (en) A heat recovery system for high parameter secondary reheating unit
CN203395906U (en) Improved high-pressure heater drainage system
CN211012501U (en) Roasting flue gas waste heat utilization system
CN217209520U (en) Negative-pressure backwater warming unit for heat supply heat source
CN216385864U (en) Stainless steel integrated pipe behind gas table
CN202892936U (en) Comprehensive utilization device of neopentyl glycol steam afterheat and excessive pressure
CN113309586B (en) Back pressure machine system and equipment driven by coupled power balance power generation
CN217423217U (en) Corrugating machine comdenstion water retrieval and utilization device
CN202532442U (en) Heating condensed water return system of supercritical unit
CN212157112U (en) Temperature control circulating system
CN102168850B (en) Recycling system for condensed water used for paper manufacturing
CN217026494U (en) Crescent type paper machine heating system
CN213542441U (en) Steam condensation hot water closed recovery energy-saving system
CN212931068U (en) Heater for industrial sewage treatment
CN211372373U (en) Boiler blow-down water utilization system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant