CN214144396U - Imitative chinese style post structure - Google Patents

Imitative chinese style post structure Download PDF

Info

Publication number
CN214144396U
CN214144396U CN202022809321.XU CN202022809321U CN214144396U CN 214144396 U CN214144396 U CN 214144396U CN 202022809321 U CN202022809321 U CN 202022809321U CN 214144396 U CN214144396 U CN 214144396U
Authority
CN
China
Prior art keywords
steel pipe
chinese style
wall
steel
post
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202022809321.XU
Other languages
Chinese (zh)
Inventor
黄磊
盛蓓蓓
潘寒琼
王迦约
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Tianyin Architectural Design Co ltd
Original Assignee
Zhejiang Tianyin Architectural Design Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Tianyin Architectural Design Co ltd filed Critical Zhejiang Tianyin Architectural Design Co ltd
Priority to CN202022809321.XU priority Critical patent/CN214144396U/en
Application granted granted Critical
Publication of CN214144396U publication Critical patent/CN214144396U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model belongs to the technical field of the technique of ancient building and specifically relates to an imitative chinese style post structure is related to, including aluminium post, steel pipe and the reinforcement component of setting in the aluminium post, aluminium post inner wall and the laminating of steel pipe outer wall, the reinforcement component includes the concrete column, the concrete column is pour in steel pipe inner wall. This application can strengthen imitative chinese style post structural strength, reduces the possibility that the aluminum pipe takes place deformation.

Description

Imitative chinese style post structure
Technical Field
The application relates to the technical field of ancient building, in particular to an imitated Chinese style wooden pillar structure.
Background
Ancient building post is easily affected damp and is corroded the damage, therefore selects the imitative wooden intraductal intussuseption of aluminum alloy to use for use at present often at the installation ancient building post and forms aluminum pipe core concrete post structure, but the aluminum alloy material is softer, easily receives the concrete impact when concreting and takes place deformation, influences pleasing to the eye, and whole imitative chinese style post structural strength is not enough.
SUMMERY OF THE UTILITY MODEL
In order to strengthen imitative chinese style post structural strength, reduce the possibility that the aluminum pipe takes place deformation, this application provides an imitative chinese style post structure.
The application provides an imitative chinese style post structure adopts following technical scheme: including aluminium post, setting steel pipe and the enhancement subassembly in the aluminium post, aluminium post inner wall and the laminating of steel pipe outer wall, it includes the concrete stand to strengthen the subassembly, the concrete stand sets up in steel pipe inner wall.
Through adopting above-mentioned technical scheme, when the imitative chinese style post is made at the scene, at first form the concrete stand with concrete placement in the steel pipe for imitative chinese style post structure further strengthens, and concrete placement in the steel pipe, and the aluminium column cover is located on the steel pipe, effectively avoids the aluminium column because of the material is softer, directly pours the concrete and receives concrete tension and take place deformation.
Preferably, the steel pipe includes four unit pieces, every the unit piece all includes two steel sheets, every two steel sheets in the unit piece are all connected perpendicularly, per two the steel sheet link sets up respectively in four extreme angle departments of aluminium post inner wall, every the steel sheet all supports tightly with aluminium post inner wall, the inside fixed subassembly that is used for fixed four unit pieces that is provided with of steel pipe.
By adopting the technical scheme, when the steel pipe is installed, the steel pipe is split into the four unit pieces which are respectively placed at the four end angles in the aluminum column, and then the four unit pieces are tightly abutted to the inner wall of the aluminum column by adopting the fixing assembly, so that the steel pipe installation step is effectively and simply carried out, and the steel pipe is tightly abutted to the aluminum column.
Preferably, each unit piece still includes the shielding plate, every shielding plate one end terminal surface all keeps away from aluminum column inner wall one side with a steel sheet in the corresponding unit piece and is connected, and every shielding plate salient corresponds steel sheet one end and all supports tightly with adjacent steel sheet.
Through adopting above-mentioned technical scheme, place the single component in the aluminium post, the fixed subassembly of rethread supports steel sheet and aluminium post inner wall tightly, for convenient single component installation to the aluminium post in, adjacent single component can have the clearance between supporting tightly in the installation, therefore set up the shielding plate between adjacent steel sheet and cover the clearance, effectively prevent when concreting that partial concrete offsets with the aluminium post from the clearance and leads to the aluminium post to warp.
Preferably, the fixed subassembly includes two mountings that set up from top to bottom, every the mounting all includes connecting rod, connecting block and supports tight pole, two connecting rod one end is connected with two adjacent shielding plates respectively, every the connecting rod other end all with correspond connecting block one end and be connected, every the connecting block is kept away from and is corresponded connecting rod one end terminal surface and all seted up the thread groove, every support the equal spiro union of tight pole one end in corresponding the thread groove, every support the tight pole other end and all support tightly with a shielding plate of relative one side.
Through adopting above-mentioned technical scheme, place back in the aluminium post as the single component, rotate the tight pole that supports for the tight pole toward keeping away from to correspond connecting rod one end and remove, support tightly until with relative one side shielding plate, thereby make steel sheet and aluminium post inner wall support tightly, make aluminium post and steel pipe installation more simple and convenient.
Preferably, each unit piece still includes two arcs, two a steel sheet is connected respectively to arc one end, two another end interconnect of arc.
Through adopting above-mentioned technical scheme, set up two arcs between two steel sheets, increase the area of contact of steel pipe and concrete, effectively reduce the possibility that steel pipe four corners formed the space when concreting.
Preferably, the reinforcing assembly further comprises four rib plates, one end of each rib plate is connected with the joint of two adjacent arc-shaped plates, and the other end of each rib plate is in clearance fit with the fixed assembly.
Through adopting above-mentioned technical scheme, set up multichannel stiffening rib at aluminium post inner wall, when carrying out concrete placement, can increase the area of contact of concrete and aluminium post inside to reinforcing strength.
Preferably, four rib plates are arranged at intervals along the length direction of the steel pipe.
Through adopting above-mentioned technical scheme, with the setting of four blocks of floor interval straggling from top to bottom, when concreting forms the concrete stand, can judge the filled concrete content through observing submerged floor quantity, pour the steel pipe bottom, the hollow setting of upper segment can practice thrift concrete material, and the hypomere after concreting, aluminium post hypomere weight is greater than the upper segment for aluminium post can be more stable vertical setting subaerial.
Preferably, the two fixing pieces are arranged at intervals up and down, the two connecting blocks are arranged at intervals in the projection of the horizontal plane, and the two fixing pieces are arranged at the upper end of the inner wall of the steel pipe.
Through adopting above-mentioned technical scheme, set up two connecting blocks projection intervals on the horizontal plane for two mountings are direct contactless and can not mutual interference, and two mountings set up in steel pipe inner wall upper end, make things convenient for in workman's operation.
To sum up, the application comprises the following beneficial technical effects:
when the imitated Chinese wooden column is manufactured on site, firstly, concrete is poured into the steel pipe to form a concrete upright column, so that the imitated Chinese wooden column structure is further reinforced, the concrete is poured into the steel pipe, and the aluminum column is sleeved on the steel pipe, so that the aluminum column is effectively prevented from being deformed due to concrete tension when the aluminum column is directly poured into the concrete due to soft materials;
when the steel pipe is installed, the steel pipe is split into four unit pieces which are respectively placed at four end angles in the aluminum column, and then the four unit pieces are abutted against the inner wall of the aluminum column by adopting the fixing assembly, so that the steel pipe installation step is effectively and simply carried out, the steel pipe is abutted against the aluminum column, and two arc-shaped plates are installed between the two steel plates, so that the contact area of the steel pipe and concrete is increased, and the possibility that gaps are formed at four corners of the steel pipe when the concrete is poured to form the concrete column is effectively reduced;
after the single element is placed in the aluminum column, the abutting rod is rotated, so that the abutting rod moves towards the end far away from the corresponding connecting rod until the end is abutted against the baffle plate on the opposite side, the steel plate is abutted against the inner wall of the aluminum column, and the aluminum column and the steel pipe are more convenient to install.
Drawings
FIG. 1 is a schematic diagram of the overall structure of an embodiment of the present application;
fig. 2 is a schematic view of an explosive structure inside a steel pipe in the embodiment of the present application.
Reference numerals: 1. an aluminum column; 2. a steel pipe; 21. a unit element; 211. a steel plate; 212. a shielding plate; 213. an arc-shaped plate; 3. a reinforcement assembly; 31. a rib plate; 4. a fixing assembly; 41. a fixing member; 411. a connecting rod; 412. connecting blocks; 4121. a thread groove; 413. and a support rod.
Detailed Description
The present application is described in further detail below with reference to figures 1-2.
The embodiment of the application discloses imitative chinese style post structure. As shown in fig. 1 and 2, the aluminum column comprises an aluminum column 1, a steel pipe 2 installed in the aluminum column 1, and a reinforcing assembly 3. The steel pipe 2 includes four unit pieces 21, every unit piece 21 all includes two steel pipes 2, a shielding plate 212 and two arcs 213, every arc 213 is quarter circular plate, two arcs 213 one end homogeneous interconnect in every unit piece 21, the other end of two arcs 213 in every unit piece 21 is equallyd divide and is connected with the one end of a steel sheet 211 respectively, two steel sheet 211 one sides in every unit piece 21 all support tightly with the laminating of 1 inner wall of aluminium post, four end angle departments at 1 inner wall of aluminium post are installed respectively to four unit pieces 21, and steel pipe 2 internally mounted has the fixed subassembly 4 that is used for fixed four unit pieces 21.
The reinforcing component 3 comprises a concrete upright (not shown in the figure) and four rib plates 31, one end of each rib plate 31 is connected with the joint of the two adjacent arc plates 213, the other end of each rib plate 31 is in clearance fit with the fixing component 4, and the concrete upright is arranged inside the steel pipe 2. The reinforcing ribs can increase the contact area of the concrete with the inside of the aluminum column 1, thereby enhancing the strength.
When the imitated Chinese style wooden column is manufactured on site, concrete is poured into the steel pipe 2 to form a concrete upright column, so that the imitated Chinese style wooden column structure is further reinforced, the concrete is poured into the steel pipe 2, the aluminum column 1 is sleeved on the steel pipe 2, and finally the aluminum column 1 is decorated outside the aluminum column 1, so that the imitated Chinese style wooden column effect is visually formed, and the strength of the imitated Chinese style wooden column structure is effectively enhanced.
When installing steel pipe 2, with four unit spare 21 of steel pipe 2 split, place four extreme angle departments in aluminium post 1 respectively, adopt fixed subassembly 4 again to support four unit spare 21 and 1 inner walls of aluminium post tightly, effective simple and convenient steel pipe 2 installation step realizes that steel pipe 2 supports tightly with aluminium post 1, and installs two arcs 213 between two steel sheets 211, has increased the area of contact of steel pipe 2 with the concrete stand, has effectively reduced the possibility that steel pipe 2 four corners formed the space behind the formation concrete stand of pouring.
One end of a steel plate 211 in each unit piece 21, which is far away from the arc-shaped plate 213, is connected with a baffle plate 212, each baffle plate 212 is installed on one side, which is far away from the aluminum column 1, of the corresponding steel plate 211, each baffle plate 212 protrudes out and is close to one end of the corresponding steel plate 211, the unit pieces 21 are placed in the aluminum column 1, the steel plates 211 and the inner wall of the aluminum column 1 are close to each other through the fixing assembly 4, the unit pieces 21 are installed in the aluminum column 1 conveniently, gaps can exist between the adjacent unit pieces 21 after installation and close to each other, therefore, the baffle plate 212 is arranged between the adjacent steel plates 211 to cover the gaps, and partial concrete is effectively prevented from being offset from the gaps and being deformed by the aluminum column 1 when the concrete is poured.
Four floor 31 are arranged along 2 length direction intervals of steel pipe, and when concreting, can judge the filled concrete content through observing submerged floor 31 quantity, pour 2 bottoms of steel pipe, and the concrete material can be practiced thrift to the hollow setting of upper segment, and the hypomere is pour and is formed concrete stand, and 1 hypomere weight of aluminium post is greater than the upper segment for aluminium post 1 can be more stably vertical setting subaerial.
Fixed subassembly 4 includes two mounting 41 that set up from top to bottom, every mounting 41 all includes connecting rod 411, connecting block 412 and support tight pole 413, two connecting rod 411 one end are connected with two adjacent shielding plate 212 respectively, every connecting rod 411 other end all with correspond connecting block 412 one end and be connected, every connecting block 412 is kept away from and is corresponded connecting rod 411 one end terminal surface and has all seted up thread groove 4121, every supports in tight pole 413 one end all the spiro union in corresponding thread groove 4121, every supports the tight pole 413 other end and all supports tightly with a shielding plate 212 of one side relatively. The two fixing pieces 41 are arranged at intervals up and down, the projections of the two connecting blocks 412 on the horizontal plane are arranged at intervals, and the two fixing pieces 41 are arranged at the upper end of the inner wall of the steel pipe 2.
After placing single component 21 in aluminum column 1, manually rotate tightening rod 413 for tightening rod 413 is toward keeping away from corresponding connecting rod 411 one end and is removed, until supporting tightly with relative one side shielding plate 212, thereby make steel sheet 211 support tightly with aluminum column 1 inner wall, make aluminum column 1 and steel pipe 2 installation simpler and more convenient. And the projections of the two connecting blocks 412 on the horizontal plane are arranged at intervals, so that the two fixing pieces 41 are not directly contacted and cannot interfere with each other, and the two fixing pieces 41 are arranged at the upper end of the inner wall of the steel pipe 2, thereby being convenient for workers to operate.
The implementation principle of imitative chinese style post structure of this application embodiment does:
when imitative chinese style post structure is installed at the job site, at first place four unit spare 21 in the inside four extreme angle departments of aluminium post 1, rotate two respectively in proper order and support tight pole 413 for support tight pole 413 is kept away from and is supported tightly with relative one side shielding plate 212 corresponding connecting block 412 one end, later toward the inside concreting of steel pipe 2 and form the concrete stand, controls the volume of concreting according to observing the inside floor 31 that submerges of steel pipe 2, thereby realizes the installation of post.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (8)

1. The utility model provides an imitative chinese style post structure which characterized in that: including aluminium post (1), steel pipe (2) and reinforcement assembly (3) of setting in aluminium post (1), aluminium post (1) inner wall and steel pipe (2) outer wall laminating, reinforcement assembly (3) include the concrete column, the concrete column is pour in steel pipe (2) inner wall.
2. The imitated Chinese style wood column structure of claim 1, wherein: steel pipe (2) are including four unit spare (21), every unit spare (21) all include two steel pipe (2), every two steel sheet (211) in unit spare (21) are all connected perpendicularly, per two steel sheet (211) link sets up respectively in four extreme angle departments of aluminium post (1) inner wall, every steel sheet (211) all support tightly with aluminium post (1) inner wall, steel pipe (2) inside is provided with fixed subassembly (4) that are used for fixed four unit spare (21).
3. The imitated Chinese style wood column structure of claim 2, wherein: each unit piece (21) further comprises a shielding plate (212), one end face of each shielding plate (212) is connected with one side, away from the inner wall of the aluminum column (1), of one steel plate (211) in the corresponding unit piece (21), and each shielding plate (212) protrudes to be tightly abutted against one end of the corresponding steel plate (211) and the adjacent steel plate (211).
4. The imitated Chinese style wood column structure of claim 2, wherein: fixed subassembly (4) include mounting (41) that two set up from top to bottom, every mounting (41) all include connecting rod (411), connecting block (412) and support tight pole (413), two connecting rod (411) one end is connected with two adjacent shielding plate (212) respectively, every connecting rod (411) other end all is connected with corresponding connecting block (412) one end, every connecting block (412) are kept away from and are corresponded connecting rod (411) one end terminal surface and all have been seted up thread groove (4121), every support tight pole (413) one end all spiro union in corresponding thread groove (4121), every support tight pole (413) other end all supports tightly with a shielding plate (212).
5. The imitated Chinese style wood column structure of claim 2, wherein: every unit spare (21) still includes two arcs (213), two a steel sheet (211) is connected respectively to arc (213) one end, two arc (213) other end interconnect.
6. The imitated Chinese style wood column structure of claim 5, wherein: the reinforcing component (3) further comprises four rib plates (31), one end of each rib plate (31) is connected with the joint of two adjacent arc plates (213), and the other end of each rib plate (31) is in clearance fit with the fixed component (4).
7. The imitated Chinese style wood column structure of claim 6, wherein: the four rib plates (31) are arranged at intervals along the length direction of the steel pipe (2).
8. The imitated Chinese style wood column structure of claim 4, wherein: the two fixing pieces (41) are arranged at intervals up and down, the two connecting blocks (412) are arranged at intervals in the projection on the horizontal plane, and the two fixing pieces (41) are arranged at the upper end of the inner wall of the steel pipe (2).
CN202022809321.XU 2020-11-28 2020-11-28 Imitative chinese style post structure Expired - Fee Related CN214144396U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022809321.XU CN214144396U (en) 2020-11-28 2020-11-28 Imitative chinese style post structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022809321.XU CN214144396U (en) 2020-11-28 2020-11-28 Imitative chinese style post structure

Publications (1)

Publication Number Publication Date
CN214144396U true CN214144396U (en) 2021-09-07

Family

ID=77567434

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022809321.XU Expired - Fee Related CN214144396U (en) 2020-11-28 2020-11-28 Imitative chinese style post structure

Country Status (1)

Country Link
CN (1) CN214144396U (en)

Similar Documents

Publication Publication Date Title
CN214144396U (en) Imitative chinese style post structure
CN213868440U (en) Assembly quality of side fascia for assembly type structure
CN210918296U (en) Square steel pipe sleeve fixing device
CN209568564U (en) A kind of civil engineering anti-seismic structure
CN217105790U (en) Heat-insulating energy-saving wall structure
CN209653365U (en) Tool-type wall-connecting piece
CN210797987U (en) Horizontal aluminum plate line structure
KR101182751B1 (en) A smart box unit for connecting between slurry wall and steel beam and a construction method thereof
CN206815596U (en) A kind of wallboard installation node with door opening
CN218758686U (en) Sizing template upper opening anti-overflow device
JP6865007B2 (en) Precast concrete foundation and its manufacturing method
CN214994626U (en) Assembled steel construction building structure of convenient operation
CN210946843U (en) Arch ring support piece for grouted arch slope protection
CN210976332U (en) High stability steel construction box post
CN205330172U (en) A formwork support device that is used for wall body corner position to be under construction
CN217298815U (en) Reinforced concrete anti-corrosion device used in building construction
CN215330689U (en) Prefabricated wall panel for underground structure
JPH0215952Y2 (en)
JPH0115774Y2 (en)
CN208122104U (en) A kind of crane Xiang cylinder and building
CN219365374U (en) Tool for reinforcing front support arm of hanging basket
CN213448970U (en) A consolidate wall body for house construction
CN220814384U (en) Refractory brick masonry structure for partition wall
CN111719773B (en) Floor type support for roof and construction method thereof
JP7370642B1 (en) Construction method of waist wall

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210907

CF01 Termination of patent right due to non-payment of annual fee