CN214121324U - Water level monitoring device for hydraulic engineering construction convenient to installation - Google Patents
Water level monitoring device for hydraulic engineering construction convenient to installation Download PDFInfo
- Publication number
- CN214121324U CN214121324U CN202120352048.4U CN202120352048U CN214121324U CN 214121324 U CN214121324 U CN 214121324U CN 202120352048 U CN202120352048 U CN 202120352048U CN 214121324 U CN214121324 U CN 214121324U
- Authority
- CN
- China
- Prior art keywords
- fixed
- block
- fixed mounting
- threaded rod
- installation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000009434 installation Methods 0.000 title claims abstract description 21
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 title claims abstract description 19
- 238000012806 monitoring device Methods 0.000 title claims abstract description 14
- 238000010276 construction Methods 0.000 title claims abstract description 13
- 230000000694 effects Effects 0.000 claims abstract description 16
- 230000001105 regulatory effect Effects 0.000 claims abstract description 14
- 230000004075 alteration Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 230000002262 irrigation Effects 0.000 description 1
- 238000003973 irrigation Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012544 monitoring process Methods 0.000 description 1
- 238000010248 power generation Methods 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Images
Landscapes
- Details Of Measuring And Other Instruments (AREA)
Abstract
The utility model discloses a water level monitoring devices is used in hydraulic engineering construction convenient to installation, which comprises a fixing plate and i, the outside fixed mounting of fixed plate has the connecting block, the inside movable mounting of connecting block has the movable block, the inside movable mounting of movable block has the regulating block, one side fixed mounting of regulating block has the threaded rod, the outside activity of threaded rod has cup jointed the nut piece, the both sides fixed mounting of nut piece has the connection piece, one side fixed mounting of connection piece has the promotion spring, the outside activity of threaded rod has cup jointed fixed box, fixed box's both sides fixed mounting has the locating piece, the locating hole has been seted up to the inside of locating piece. After the appointed position is filled in through with the spud, place fixed box behind suitable position, pass the locating hole through the nail and can fix fixed box position, the effect of pulling can be played to the three different directions of fixed plate to the threaded rod of three difference of rotatory installation to this can make equipment bottom play stable effect, so that equipment installs.
Description
Technical Field
The utility model belongs to the technical field of hydraulic engineering, concretely relates to water level monitoring device is used in hydraulic engineering construction convenient to installation.
Background
The engineering is built for eliminating water damage and developing and utilizing water resource. The service objects are divided into flood control engineering, farmland hydraulic engineering, hydroelectric power engineering, channel and harbor engineering, water supply and drainage engineering, environmental hydraulic engineering, coastal reclamation engineering and the like. The hydraulic engineering which can serve multiple targets such as flood control, water supply, irrigation, power generation and the like at the same time is called comprehensive utilization hydraulic engineering.
Traditional water level monitoring devices are when using:
1. because traditional water level monitoring autoalarm has mounting flange in its bottom welding mostly, then fixes it on appointed position, and the mounting means tradition is comparatively inconvenient, has leaded to wasting time and energy, has reduced the installation effectiveness, dismantles it in the later stage and overhauls or when changing, also has same problem, and performance is relatively poor.
SUMMERY OF THE UTILITY MODEL
Not enough to prior art exists, the utility model aims at providing a water level monitoring device for hydraulic engineering construction convenient to installation has solved and has wasted time and energy, has reduced the installation effectiveness, dismantles to it in the later stage and overhauls or when changing, also has same problem.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a water level monitoring device for hydraulic engineering construction convenient to installation, includes the fixed plate, the outside fixed mounting of fixed plate has the connecting block, the inside movable mounting of connecting block has the movable block, the inside movable mounting of movable block has the regulating block, one side fixed mounting of regulating block has the threaded rod, the screw block has been cup jointed in the outside activity of threaded rod, the both sides fixed mounting of screw block has the connection piece, one side fixed mounting of connection piece has the promotion spring, the outside activity of threaded rod has cup jointed fixed box, the both sides fixed mounting of fixed box has the locating piece, the locating hole has been seted up to the inside of locating piece.
Preferably, the top of fixed plate fixed mounting has the fixed column, the front fixed mounting of fixed column has the scale plate, the bottom fixed mounting of fixed plate has the spud.
Preferably, the connecting blocks are three and are circumferentially fixedly mounted outside the fixing plate, and two ends of the movable block penetrate through two sides of the connecting blocks and are mounted inside the connecting blocks.
Preferably, the one end that the regulating block was kept away from to the threaded rod runs through the movable block and extends to the outside, the one end fixed mounting that the regulating block was kept away from to the threaded rod has rotatory piece.
Preferably, the outer ring external thread matched with the specification and the size of the inner ring internal thread of the nut block is arranged outside the threaded rod, and the two limiting rods are symmetrically and fixedly arranged inside the fixing box.
Preferably, the number of the pushing springs is two, the two pushing springs are symmetrically movably sleeved outside the limiting rod, and one end, far away from the connecting sheet, of each pushing spring is in contact with one side of the inner wall of the fixed box.
Compared with the prior art, the beneficial effects of the utility model are that:
1. after the appointed position is filled in through with the spud, place fixed box behind suitable position, pass the locating hole through the nail and can fix fixed box position, the effect of pulling can be played to the three different directions of fixed plate to the threaded rod of three difference of rotatory installation to this can make equipment bottom play stable effect, so that equipment installs.
2. Can drive fixed box when rotatory through the threaded rod and promote to the fixed plate, the promotion spring of fixed box internally mounted can cushion and the suitable position the removal of nut piece to this can keep the power of drawing of fixed box, the installation that makes equipment can stabilize in appointed position, has improved the stability of equipment use greatly, so that equipment installs.
Drawings
Fig. 1 is a schematic view of the overall three-dimensional structure of the present invention;
fig. 2 is a schematic view of the three-dimensional structure of the fixing box of the present invention;
fig. 3 is a front sectional structural schematic view of the fixing box of the present invention.
In the figure: 1. a fixing plate; 2. fixing a column; 3. a scale plate; 4. connecting blocks; 5. a movable block; 6. an adjusting block; 7. a threaded rod; 8. rotating the block; 9. a nut block; 10. connecting sheets; 11. a push spring; 12. a fixing box; 13. a limiting rod; 14. positioning blocks; 15. positioning holes; 16. and (6) positioning the pile.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, the present invention provides a technical solution: the utility model provides a water level monitoring device for hydraulic engineering construction convenient to installation, which comprises a fixing plate 1, the outside fixed mounting of fixed plate 1 has connecting block 4, the inside movable mounting of connecting block 4 has movable block 5, the inside movable mounting of movable block 5 has regulating block 6, one side fixed mounting of regulating block 6 has threaded rod 7, nut piece 9 has been cup jointed in the outside activity of threaded rod 7, nut piece 9's both sides fixed mounting has connection piece 10, one side fixed mounting of connection piece 10 has push spring 11, fixed box 12 has been cup jointed in the outside activity of threaded rod 7, the both sides fixed mounting of fixed box 12 has locating piece 14, locating hole 15 has been seted up to the inside of locating piece 14.
In this embodiment scheme, through after stuffing the assigned position with spud 16, place fixed box 12 behind suitable position, it can fix fixed box 12 position to pass locating hole 15 through the ocean nail, the effect of pulling can be played to the three different directions of fixed plate 1 to the threaded rod 7 of three difference of rotatory installation, with this can make the equipment bottom play stable effect, so that equipment installs, can drive fixed box 12 and promote to fixed plate 1 when 7 rotatory through the threaded rod, fixed box 12 internally mounted's push spring 11 can cushion and the suitable position to the removal of nut piece 9, with this pulling force that can keep fixed box 12, make equipment can be firm install in assigned position, the stability of equipment use has been improved greatly, so that equipment installs.
Specifically, the top of fixed plate 1 is fixedly mounted with fixed column 2, and the front fixed mounting of fixed column 2 has scale plate 3, and the bottom fixed mounting of fixed plate 1 has spud 16.
In this embodiment, the top fixed mounting through fixed plate 1 has fixed column 2 and the positive fixed mounting of fixed column 2 has scale plate 3 to this staff of can being convenient for observes, and bottom fixed mounting through fixed plate 1 has spud 16, and so can be convenient for insert appointed position and fix.
Specifically, connecting block 4 has threely, and three connecting block 4 is circumference fixed mounting in the outside of fixed plate 1, and the inside at connecting block 4 is installed to the both sides of the both ends through connection piece 4 of movable block 5.
In this embodiment, be circumference fixed mounting through three connecting block 4 and install in the inside of connecting block 4 in the outside of fixed plate 1 and the both ends through connection 4's of movable block 5 both sides to this pulling structure that can stimulate three not equidirectional simultaneously.
Specifically, one end, far away from the adjusting block 6, of the threaded rod 7 penetrates through the movable block 5 and extends to the outside, and one end, far away from the adjusting block 6, of the threaded rod 7 is fixedly provided with a rotating block 8.
In this embodiment, the one end of keeping away from regulating block 6 through threaded rod 7 runs through movable block 5 and extends to outside and threaded rod 7 keep away from the one end fixed mounting of regulating block 6 has rotatory piece 8 to this rotatory piece 8 that can be convenient for the rotatory installation of staff drives threaded rod 7 and removes.
Specifically, the outer ring external thread matched with the specification and the size of the inner ring internal thread of the nut block 9 is arranged outside the threaded rod 7, and two limiting rods 13 are symmetrically and fixedly arranged inside the fixing box 12.
In this embodiment, the outer ring external thread matched with the specification and size of the inner ring internal thread of the nut block 9 is formed outside the threaded rod 7, so that the threaded rod 7 can rotate to drive the nut block 9 to move.
Specifically, two pushing springs 11 are provided, the two pushing springs 11 are symmetrically movably sleeved outside the limiting rod 13, and one end, far away from the connecting sheet 10, of each pushing spring 11 is in contact with one side of the inner wall of the fixing box 12.
In this embodiment, two pushing springs 11 are symmetrically movably sleeved outside the limiting rod 13, so that the pushing springs 11 apply force in a specific direction, and one end of each pushing spring 11 far away from the connecting sheet 10 is in contact with one side of the inner wall of the fixed box 12, so that the pushing springs 11 can generate acting force between one side of the connecting sheet 10 and the inner wall of the fixed box 12.
The utility model discloses a theory of operation and use flow: move this equipment to appointed place, through filling in appointed position back with spud 16, place fixed box 12 behind suitable position, it can fix fixed box 12 position to pass locating hole 15 through the nail, rotatory three different threaded rod 7 of installation can play the effect of pulling to the three different directions of fixed plate 1, with this can make the equipment bottom play stable effect, so that equipment installs, can drive fixed box 12 and promote to fixed plate 1 when 7 rotatory through the threaded rod, fixed box 12 internally mounted's push spring 11 can cushion and suitable position the removal of nut piece 9, with this pulling force that can keep fixed box 12, make installing that equipment can stabilize in appointed position, the stability of equipment use has been improved greatly, so that equipment installs.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (6)
1. The utility model provides a water level monitoring device for hydraulic engineering construction convenient to installation, includes fixed plate (1), its characterized in that: the utility model discloses a nut fixing device, including fixed plate (1), the outside fixed mounting of fixed plate (1) has connecting block (4), the inside movable mounting of connecting block (4) has movable block (5), the inside movable mounting of movable block (5) has regulating block (6), one side fixed mounting of regulating block (6) has threaded rod (7), nut piece (9) have been cup jointed in the outside activity of threaded rod (7), the both sides fixed mounting of nut piece (9) has connection piece (10), one side fixed mounting of connection piece (10) has push spring (11), fixed box (12) have been cup jointed in the outside activity of threaded rod (7), the both sides fixed mounting of fixed box (12) has locating piece (14), locating hole (15) have been seted up to the inside of locating piece (14).
2. The water level monitoring device convenient to installation for hydraulic engineering construction of claim 1, characterized in that: the top fixed mounting of fixed plate (1) has fixed column (2), the front fixed mounting of fixed column (2) has scale plate (3), the bottom fixed mounting of fixed plate (1) has spud (16).
3. The water level monitoring device convenient to installation for hydraulic engineering construction of claim 1, characterized in that: connecting block (4) have threely, three connecting block (4) are circumference fixed mounting in the outside of fixed plate (1), the inside at connecting block (4) is installed to the both sides that the both ends through connection block (4) of movable block (5).
4. The water level monitoring device convenient to installation for hydraulic engineering construction of claim 1, characterized in that: the one end that regulating block (6) were kept away from in threaded rod (7) runs through movable block (5) and extends to the outside, the one end fixed mounting that regulating block (6) were kept away from in threaded rod (7) has rotatory piece (8).
5. The water level monitoring device convenient to installation for hydraulic engineering construction of claim 1, characterized in that: the outer ring external thread matched with the inner ring internal thread specification and size of the nut block (9) is arranged on the outer portion of the threaded rod (7), and two limiting rods (13) are symmetrically and fixedly mounted inside the fixed box (12).
6. The water level monitoring device convenient to installation for hydraulic engineering construction of claim 1, characterized in that: the two pushing springs (11) are symmetrically movably sleeved outside the limiting rod (13), and one end, far away from the connecting sheet (10), of each pushing spring (11) is in contact with one side of the inner wall of the fixed box (12).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202120352048.4U CN214121324U (en) | 2021-02-07 | 2021-02-07 | Water level monitoring device for hydraulic engineering construction convenient to installation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202120352048.4U CN214121324U (en) | 2021-02-07 | 2021-02-07 | Water level monitoring device for hydraulic engineering construction convenient to installation |
Publications (1)
Publication Number | Publication Date |
---|---|
CN214121324U true CN214121324U (en) | 2021-09-03 |
Family
ID=77496868
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202120352048.4U Expired - Fee Related CN214121324U (en) | 2021-02-07 | 2021-02-07 | Water level monitoring device for hydraulic engineering construction convenient to installation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN214121324U (en) |
-
2021
- 2021-02-07 CN CN202120352048.4U patent/CN214121324U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201396237Y (en) | Twin-linkage marine current turbine | |
CN104763579A (en) | Array type ocean power generation device | |
CN214121324U (en) | Water level monitoring device for hydraulic engineering construction convenient to installation | |
CN207673482U (en) | A kind of no shutoff type hydroelectric installation | |
CN203596593U (en) | Sea cable sealing and fixing device | |
CN211621677U (en) | Underground pipe gallery formwork construction structure | |
CN108571006B (en) | Scour prevention device of offshore wind power pile foundation | |
CN204175507U (en) | Small-sized assembled hydroelectric installation | |
CA2948682A1 (en) | Vertical axis wind machine having controllable output power | |
CN105221329A (en) | Kinetic energy potential energy changes into mechanical energy mechanism | |
CN207526639U (en) | A kind of hydro-electric power generating equipment using wind and solar energy water-storage | |
CN204961148U (en) | Slope axle river power generation facility | |
TW201741549A (en) | Tidal power generation device characterized by using the change of tide to generate different flow speeds so as to adjust the force area of the water wheel module, thereby stabilizing the power generation efficiency of the power generator | |
CN217877659U (en) | Hydraulic structure deformation automatic monitoring device | |
CN203230522U (en) | Vertical ocean power generation device frame | |
CN216198685U (en) | Supporting device for offshore wind turbine | |
CN203977443U (en) | Pile foundation land wind-powered electricity generation tower foundation ring | |
CN217522412U (en) | Photovoltaic power plant switch board convenient to installation | |
CN219980729U (en) | Photovoltaic strutting arrangement on water | |
CN219221091U (en) | Adjustable coupling protection cover for wind generating set | |
CN219391213U (en) | Water conservancy and hydropower engineering dam piezometer tube protection device | |
CN213450695U (en) | Connecting bridge used in wind power rotating box | |
CN217406461U (en) | Environment-friendly power generation device for water conservancy and hydropower engineering | |
CN216161557U (en) | Detachable potential device is used to water conservancy water and electricity | |
CN217536896U (en) | Floater intercepting equipment for hydropower station |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20210903 |
|
CF01 | Termination of patent right due to non-payment of annual fee |