CN214117514U - Structural beam water and electricity pressure groove section bar for building - Google Patents

Structural beam water and electricity pressure groove section bar for building Download PDF

Info

Publication number
CN214117514U
CN214117514U CN202022817178.9U CN202022817178U CN214117514U CN 214117514 U CN214117514 U CN 214117514U CN 202022817178 U CN202022817178 U CN 202022817178U CN 214117514 U CN214117514 U CN 214117514U
Authority
CN
China
Prior art keywords
plate
flat board
building
structural beam
section bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022817178.9U
Other languages
Chinese (zh)
Inventor
姜淦清
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhaoqing Chuangfu New Materials Technology Co ltd
Original Assignee
Zhaoqing Chuangfu New Material Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhaoqing Chuangfu New Material Technology Co ltd filed Critical Zhaoqing Chuangfu New Material Technology Co ltd
Priority to CN202022817178.9U priority Critical patent/CN214117514U/en
Application granted granted Critical
Publication of CN214117514U publication Critical patent/CN214117514U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a structure roof beam water and electricity indent section bar for building relates to the building templates field, including last flat board, multiunit V type groove has been seted up at the top of going up the flat board, one side of going up dull and stereotyped bottom is provided with the swash plate, the swash plate is kept away from one side of going up the flat board and is provided with down the flat board, and goes up dull and stereotyped bottom and use the perpendicular bisector to be provided with two sets of connecting plates as the symmetry axis, and the quantity of every group connecting plate is two. The utility model discloses an upper flat plate, swash plate, lower flat plate and connecting plate that set up, after contacting with the wall template, because indent section bar protrusion in the medial surface of wall template, can make to form the recess that supplies to lay the water and electricity pipeline on the wall, do not need the secondary fluting or lay the PVC pipe, made things convenient for constructor's use, solved the problem that traditional water and electricity secondary structure construction wastes time and energy, indent section bar structure is whole one shot forming, the follow-up fluting at the wall that need not, the smart decoration efficiency of building has been improved greatly.

Description

Structural beam water and electricity pressure groove section bar for building
Technical Field
The utility model relates to a building templates field specifically is a structure roof beam water and electricity indent section bar for building.
Background
Modern building requires the quality in house more and more high, but the installation of traditional aluminum alloy template construction water and electricity pipeline is the secondary structure construction, treats that the major structure construction is accomplished the back, need leave the recess that the water and electricity pipeline was laid in the confession on the wall usually, perhaps directly places the PVC pipe in the wall in the major structure work progress, makes the water and electricity pipeline can install in the wall body through these modes.
But first kind fluting produces building rubbish easily, and the notch is pleasing to the eye, reduces the efficiency of construction, influences the house life-span, and the PVC pipe is then caused to install complicacy, construction to fall to imitate, overhaul the difficulty directly to place the second kind, and these two kinds of modes are the secondary structure construction, waste time and energy, and decoration efficiency is not high, also can't reach the requirement of building finish decoration simultaneously.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a: in order to solve the problem that the construction efficiency of a common water and electricity pipeline is not high, a structural beam water and electricity pressure groove section bar for buildings is provided.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a structure roof beam water electricity indent section bar for building, includes the upper flat plate, multiunit V type groove has been seted up at the top of upper flat plate, one side of upper flat plate bottom is provided with the swash plate, one side that the upper flat plate was kept away from to the swash plate is provided with down dull and stereotyped, and the bottom of upper flat plate uses the perpendicular bisector to be provided with two sets of connecting plates as the symmetry axis, and the quantity of every group connecting plate is two.
Preferably, the width of the lower flat plate is 250mm, the angle between the inclined plate and the lower flat plate is 68.2 degrees, and the width distance between the bottom of the inclined plate and the connecting plate is 50 mm.
Preferably, the depth of the V-shaped groove is 0.5mm, and the angle of the V-shaped groove is 90 degrees.
Preferably, the upper flat plate and the lower flat plate are connected through two groups of connecting plates, the inclined plate, the upper flat plate and the lower flat plate form a cavity structure, the distance between each group of connecting plates is 44mm, the distance between the two groups of connecting plates is 51.99mm, and the thickness of each connecting plate is 2.5 mm.
Preferably, a round chamfer is arranged at the joint of the upper flat plate and the inclined plate.
Preferably, the upper flat plate, the inclined plate and the lower flat plate are in an isosceles trapezoid structure.
Preferably, the upper flat plate, the inclined plate, the lower flat plate and the connecting plate are all integrally formed by 6061-T6 aluminum.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the utility model discloses an upper flat plate, swash plate, lower flat plate and the connecting plate that set up, after contacting with the wall template, because indent section bar protrusion in the medial surface of wall template, can make to form the recess that supplies to lay the water and electricity pipeline on the wall, solved traditional water and electricity and be the problem that secondary structure construction is wasted time and energy, indent section bar structure is whole one shot forming, and follow-up need not to slot at the wall, improves finish decoration efficiency.
Drawings
FIG. 1 is a cross-sectional view of the present invention;
fig. 2 is a top view of the present invention;
fig. 3 is a schematic perspective view of the present invention.
In the figure: 1. an upper flat plate; 2. a V-shaped groove; 3. a sloping plate; 4. a lower flat plate; 5. a connecting plate.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first," "second," and "third" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance. In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted", "connected" and "disposed" are to be construed broadly, and may be, for example, fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art. The following describes an embodiment of the present invention according to its overall structure.
Referring to fig. 1-3, a structural beam water and electricity indent section for building, includes an upper plate 1, a plurality of groups of V-shaped grooves 2 are provided at the top of the upper plate 1, an inclined plate 3 is provided at one side of the bottom of the upper plate 1, a lower plate 4 is provided at one side of the inclined plate 3 away from the upper plate 1, and two groups of connecting plates 5 are provided at the bottom of the upper plate 1 using a perpendicular bisector as a symmetry axis, and the number of each group of connecting plates 5 is two, after the upper plate 1, the inclined plate 3, the lower plate 4 and the connecting plates 5 are contacted with a wall form, since the indent section protrudes out of the inner side of the wall form, a groove for placing water and electricity pipelines can be formed on the wall surface, thereby solving the problem that the traditional water and electricity is time consuming and labor consuming in the construction of a secondary structure, the indent section structure is integrally formed at one time, and the subsequent grooving on the wall surface is not needed, and the finish decoration efficiency is improved.
Please refer to fig. 1, the width of the lower plate 4 is 250mm, the angle between the inclined plate 3 and the lower plate 4 is 68.2 °, and the width distance between the bottom of the inclined plate 3 and the connecting plate 5 is 50mm, so that the lower plate 4 is effectively prevented from being adhered to the concrete and being difficult to demould by the inclined plate 3.
Please refer to fig. 1, the depth of the V-shaped groove 2 is 0.5mm, and the angle of the V-shaped groove 2 is 90 °, so that the use effect of the groove pressing is effectively increased by the V-shaped groove 2.
Please refer to fig. 1, the upper plate 1 and the lower plate 4 are connected by two sets of connecting plates 5, the connecting plates 5 and the inclined plate 3, the upper plate 1 and the lower plate 4 form a cavity structure, the distance between each set of connecting plates 5 is 44mm, the distance between the two sets of connecting plates 5 is 51.99mm, the thickness of the connecting plates 5 is 2.5mm, and the strength of the upper plate 1 and the lower plate 4 is effectively increased by the connecting plates 5.
Please refer to fig. 1, a round chamfer is arranged at the joint of the upper flat plate 1 and the inclined plate 3, and the casting effect of the water and electricity pipeline road is effectively increased through the arranged round angle.
Please refer to fig. 1, the upper plate 1, the inclined plate 3 and the lower plate 4 are in an isosceles trapezoid structure, which facilitates the demolding of the compression mold after the molding operation is completed.
Please refer to fig. 1, the upper plate 1, the inclined plate 3, the lower plate 4 and the connecting plate 5 are all made of 6061-T6 aluminum material and are integrally formed, the aluminum profile has light weight and high strength, and the integral forming of the aluminum profile can stabilize the whole structure and has strong durability.
The working principle is as follows: on the medial surface of wall form is arranged in to dull and stereotyped 4 down, because indent section bar protrusion in wall form's medial surface can make to form the recess that supplies to lay the water and electricity pipeline on the wall, the swash plate 3 has effectually prevented that dull and stereotyped 4 and concrete adhesion down and be difficult to the drawing of patterns, and connecting plate 5 has effectually increased dull and stereotyped 1 and dull and stereotyped 4's intensity down, whole one shot forming, and follow-up need not to slot at the wall, improves the finish decoration efficiency.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.

Claims (7)

1. The utility model provides a structural beam water voltage groove section bar for building, includes last flat board (1), its characterized in that: go up flat board's (1) top and seted up multiunit V type groove (2), one side of going up flat board (1) bottom is provided with swash plate (3), one side that last flat board (1) was kept away from in swash plate (3) is provided with down dull and stereotyped (4), and the bottom of going up flat board (1) uses the perpendicular bisector to be provided with two sets of connecting plates (5) as the symmetry axis, and the quantity of every group connecting plate (5) is two.
2. A structural beam water voltage channel section for building according to claim 1, wherein: the width of lower flat board (4) is 250mm, the angle of swash plate (3) and lower flat board (4) is 68.2, and the width distance between swash plate (3) bottom and connecting plate (5) is 50 mm.
3. A structural beam water voltage channel section for building according to claim 1, wherein: the depth of the V-shaped groove (2) is 0.5mm, and the angle of the V-shaped groove (2) is 90 degrees.
4. A structural beam water voltage channel section for building according to claim 1, wherein: go up dull and stereotyped (1) and lower flat board (4) and be connected through two sets of connecting plates (5), and connecting plate (5) and swash plate (3), go up dull and stereotyped (1), dull and stereotyped (4) down form the cavity structure, and the distance between every group connecting plate (5) is 44mm, and the distance of two sets of connecting plates (5) is 51.99mm, and the thickness of connecting plate (5) is 2.5 mm.
5. A structural beam water voltage channel section for building according to claim 1, wherein: and a round chamfer is arranged at the joint of the upper flat plate (1) and the inclined plate (3).
6. A structural beam water voltage channel section for building according to claim 1, wherein: the upper flat plate (1), the inclined plate (3) and the lower flat plate (4) are of an isosceles trapezoid structure.
7. A structural beam water voltage channel section for building according to claim 1, wherein: the upper flat plate (1), the inclined plate (3), the lower flat plate (4) and the connecting plate (5) are all integrally formed by 6061-T6 aluminum materials.
CN202022817178.9U 2020-11-30 2020-11-30 Structural beam water and electricity pressure groove section bar for building Active CN214117514U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022817178.9U CN214117514U (en) 2020-11-30 2020-11-30 Structural beam water and electricity pressure groove section bar for building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022817178.9U CN214117514U (en) 2020-11-30 2020-11-30 Structural beam water and electricity pressure groove section bar for building

Publications (1)

Publication Number Publication Date
CN214117514U true CN214117514U (en) 2021-09-03

Family

ID=77507849

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022817178.9U Active CN214117514U (en) 2020-11-30 2020-11-30 Structural beam water and electricity pressure groove section bar for building

Country Status (1)

Country Link
CN (1) CN214117514U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113700297A (en) * 2021-09-26 2021-11-26 晟通科技集团有限公司 Formwork section bar and formwork frame

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113700297A (en) * 2021-09-26 2021-11-26 晟通科技集团有限公司 Formwork section bar and formwork frame

Similar Documents

Publication Publication Date Title
CN214117514U (en) Structural beam water and electricity pressure groove section bar for building
CN101787794B (en) Building template and building combined template suitable for quick assembly
CN2780874Y (en) Building energy-saving wall module for easy indoor decoration
CN209779560U (en) Steel formwork for irrigation and water conservancy concrete channel
CN201850754U (en) Precise building template system
CN201671322U (en) Building template and a building composition template suitable for rapidly assembling
CN209817409U (en) Building aluminum-plastic pressure trough plate convenient to assemble and disassemble
CN210459741U (en) Basic brick assembly body
CN217924662U (en) Plastering plate for splicing and plastering segmental prefabricated concrete tower tube pieces
CN217574315U (en) Anti effectual high strength PC board of buckling
CN206655426U (en) A kind of furring tile
CN214658195U (en) Splicable autoclaved aerated concrete block
CN218668295U (en) Cement board convenient to installation
CN213742078U (en) Connecting structure of straight building floor
CN212388865U (en) Prefabricated brick of recess of receiving is flooded to roofing parapet
CN213926733U (en) Assembled straight-section vertical splicing light and thin template
CN217896982U (en) Spliced autoclaved aerated concrete plate
CN219060858U (en) Basalt fiber composite building template
CN214220255U (en) Assembled combination wallboard
CN211369382U (en) Dry hanging system for assembled ceramic tiles
CN212689552U (en) Novel plastic formwork system and support system
CN214272629U (en) High-precision assembly type building block brick
CN217816962U (en) Floor heating construction node convenient to overhaul
CN213898995U (en) Novel transition section abnormal shape template of composite construction form
CN213683065U (en) High strength ageing resistance fitment apron

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 526200 No. 11, Huiyuan Avenue, Longfu Town, Sihui City, Zhaoqing City, Guangdong Province

Patentee after: Zhaoqing Chuangfu New Materials Technology Co.,Ltd.

Address before: 526200 customs supervision office building, No.11 Huiyuan Avenue, longfu Town, Sihui City, Zhaoqing City, Guangdong Province is only used as office space

Patentee before: Zhaoqing Chuangfu New Material Technology Co.,Ltd.