CN214117483U - Steel pipe mobile positioning pile for building engineering cantilever beam scaffold erection - Google Patents

Steel pipe mobile positioning pile for building engineering cantilever beam scaffold erection Download PDF

Info

Publication number
CN214117483U
CN214117483U CN202023033368.8U CN202023033368U CN214117483U CN 214117483 U CN214117483 U CN 214117483U CN 202023033368 U CN202023033368 U CN 202023033368U CN 214117483 U CN214117483 U CN 214117483U
Authority
CN
China
Prior art keywords
steel
steel pipe
fixing part
fixed part
encorbelmenting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202023033368.8U
Other languages
Chinese (zh)
Inventor
万桥
唐成
姜新华
陈亚平
徐小红
黄烯望
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Dingcheng Weiye Building Materials Co ltd
Wuhan Research Institute of Materials Protection
Original Assignee
Wuhan Dingcheng Weiye Building Materials Co ltd
Wuhan Research Institute of Materials Protection
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Dingcheng Weiye Building Materials Co ltd, Wuhan Research Institute of Materials Protection filed Critical Wuhan Dingcheng Weiye Building Materials Co ltd
Priority to CN202023033368.8U priority Critical patent/CN214117483U/en
Application granted granted Critical
Publication of CN214117483U publication Critical patent/CN214117483U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a steel pipe mobile location stake of usefulness is set up to bearing beam scaffold frame of encorbelmenting of building engineering, including I-steel fixed part and steel pipe fixed part, steel pipe fixed part passes through I-steel fixed part to be fixed on the I-steel that is used for the installation scaffold frame of encorbelmenting, steel pipe fixed part top is equipped with the fixed hole of steel pipe that is used for the installation scaffold frame riser of encorbelmenting, and the fixed hole lateral part of steel pipe is equipped with the puller bolt that can contact scaffold frame riser of encorbelmenting, steel pipe fixed part is a steel tubular construction, and its bottom is equipped with the external screw thread, I-steel fixed part top is equipped with the screw that matches with this external screw thread. The I-steel connecting part is connected with the thread part of the steel pipe fixing part, fixes the I-steel connecting part sliding on the I-steel, and fixes the vertical pipe of the cantilever scaffold through the steel pipe fixing part. The steel pipe movable positioning pile has the advantages of stable stress, no shaking of the vertical pipe of the overhanging scaffold, convenient disassembly and repeated use and the like.

Description

Steel pipe mobile positioning pile for building engineering cantilever beam scaffold erection
Technical Field
The utility model belongs to the building engineering field relates to a scaffold frame of encorbelmenting, concretely relates to building engineering encorbelment steel pipe mobile location stake of outrigger scaffold frame set up usefulness.
Background
The method for building the overhanging outer scaffold on multiple layers or high layers mostly adopts a single-layer overhanging or multi-layer overhanging method. The common mode is that a short reinforcing steel bar head or a short circular tube is directly welded on an overhanging steel beam (profile steel) by adopting a standard method, and the welding position is the vertical rod fixing position of an outer scaffold. The upright stanchion of the outer scaffold steel pipe is seated on the short steel bar head or the short round pipe. When the cantilever beam is in turnover, the short reinforcing steel bar head or the short round tube type positioning device on the I-shaped steel is cut off. The construction speed of the cantilever layer of the outer frame on a construction site and the speed of a welding process are directly influenced, welding spots are formed on the surface of the repeatedly welded I-steel or metal defects are caused by overheating, the appearance is influenced, and the mechanical property of the cantilever beam I-steel is also adversely influenced.
Patent CN 111472535 a discloses a steel pipe movable positioning pile for building external scaffolds in construction engineering and a use method thereof. The method solves the problems that the positioning pile of the cantilever beam is not easy to disassemble and the mechanical property of the I-shaped steel of the cantilever beam is also influenced. The positioning pile is fixed on the I-shaped steel by utilizing the bolt on the connecting part, and the positioning pile can be detached only by detaching the bolt. However, the mobile spud has a problem in that it has a limited friction force to prevent the spud from sliding longitudinally by using a method of fixing the mobile spud using a bolt on a connecting member on one side so that the connecting member is in point contact with the i-beam when it is connected. In addition, the left structure and the right structure are inconsistent, so that the stress is unbalanced and the anti-loosening capability is poor. In addition, the connecting parts for fixing the steel pipes of the outer scaffold cannot be connected with the steel pipes of the outer scaffold in a seamless mode unless the steel pipes of the outer scaffold of each specification are provided with the proper connecting parts, and therefore a large amount of waste is caused.
Therefore, a positioning pile which is convenient to disassemble and does not have adverse effect on the mechanical property of the cantilever beam I-steel is needed, and a steel pipe movable positioning pile which is stable in stress and universal in specification is also needed.
SUMMERY OF THE UTILITY MODEL
The utility model discloses set up inconvenient, welded fastening to the outer scaffold frame of cantilever beam to current, the welded fastening has injury, welded positioning pile to the I-steel to lead to demolising the shortcoming that increases the difficulty when the outer scaffold frame of cantilever beam, provide a not only convenient to detach but also can not cause harmful effects's guide pile to the mechanical properties of cantilever beam I-steel, still need a atress stable, the general steel pipe of specification removes the guide pile.
In order to solve the technical problem, the utility model discloses a technical scheme as follows:
the utility model provides a steel pipe mobile positioning pile of usefulness is set up to constructional engineering outrigger girder scaffold, its characterized in that: including I-steel fixed part and steel pipe fixed part, the steel pipe fixed part passes through the I-steel fixed part to be fixed on the I-steel that is used for the installation scaffold frame of encorbelmenting, steel pipe fixed part top is equipped with the steel pipe fixing hole that is used for the installation scaffold frame riser of encorbelmenting, and the steel pipe fixing hole lateral part is equipped with the puller bolt that can contact scaffold frame riser of encorbelmenting.
Further, the steel pipe fixing part is of a steel pipe structure, external threads are arranged at the bottom of the steel pipe fixing part, and screw holes matched with the external threads are formed in the top of the I-shaped steel fixing part.
Furthermore, the middle part of the steel tube fixing part is provided with a polygonal column which is convenient for screwing the steel tube fixing part.
Further, the polygonal column is a hexagonal column.
Furthermore, 2-4 puller bolts are arranged on the periphery of the top of the steel pipe fixing part.
Further, the I-steel fixing part comprises base plates and inclined plates arranged on the lower sides of the two sides of the base plates and inclined towards the inner sides, a space for accommodating the I-steel wing plate is formed between each inclined plate and the corresponding end base plate, a screw hole of the I-steel fixing part is a threaded through hole formed in the middle of the base plate, and the steel pipe fixing part is screwed in the threaded through hole and plays a role in fixing the relative positions of the I-steel fixing part and the I-steel.
The utility model has the advantages that:
the utility model discloses a steel pipe movable positioning pile of special design structure for steel pipe fixed part thing three uses, and as the location fixing device who encorbelments the scaffold riser promptly, as the adapting unit with I-steel fixed part again, still I-steel fixed part is the location fixed part on the I-steel, the utility model discloses need not the welding, be about to encorbelment the stable installation on the I-steel of scaffold riser through screw-thread fit, provide stable safety guarantee for encorbelmenting putting up of scaffold, it is convenient to dismantle, greatly reduced the cost of putting up of the scaffold of encorbelmenting, reduced construction cycle, improved economic benefits.
The utility model discloses a top tight bolt structure makes the utility model discloses can deal with not unidimensional scaffold frame riser of encorbelmenting, the diameter that only needs the fixed hole of guarantee steel pipe is greater than the scaffold frame riser of encorbelmenting can.
Drawings
Fig. 1 is a schematic view of an installation structure of a steel pipe movable positioning pile of the present invention;
FIG. 2 is a schematic view of a steel pipe fixing member;
FIG. 3 is a schematic view of an I-beam attachment feature.
In the figure, 1-a cantilever scaffold vertical pipe, 2-a steel pipe fixing part, 3-an I-steel fixing part, 21-external threads, 22-an external hexagonal tightening part, 23-a puller bolt, 24-a steel pipe fixing inner hole, 31-a threaded through hole, 32-an I-steel fixing groove, 33-a base plate, 34-an inclined plate and 4-I-steel.
Detailed Description
The following describes embodiments of the present invention in further detail with reference to the accompanying drawings and examples. The following examples are intended to illustrate the invention, but are not intended to limit the scope of the invention.
Example 1
The utility model provides a steel pipe mobile location stake of usefulness is set up to bearing beam scaffold frame encorbelmented in building engineering, includes I-steel fixed part 3 and steel pipe fixed part 2, steel pipe fixed part 2 is fixed on the I-steel 4 that is used for the installation scaffold frame of encorbelmenting through I-steel fixed part 3, 2 tops of steel pipe fixed part are equipped with the steel pipe fixing hole 24 that is used for the installation scaffold frame riser 1 of encorbelmenting, and the steel pipe fixing hole 24 lateral part is equipped with the puller bolt 23 that can contact scaffold frame riser 1 of encorbelmenting.
In this embodiment, the steel pipe fixing part 2 is also made of a steel pipe, the inner diameter of the steel pipe is larger than the outer diameter of the overhanging scaffold stand pipe 1, the side surface of the top of the steel pipe is provided with a plurality of transverse and centripetal screw holes, and the screwed bolt is used as a tightening bolt 23 for fixing the overhanging scaffold stand pipe 1. And external threads 21 are turned at the bottom of the steel pipe and are used for connecting the I-shaped steel fixing part 3.
The I-steel fixing component 3 comprises base plates 33 and inclined plates 34 arranged below two sides of the base plates 33 and inclined towards the inner sides, a space for containing an I-steel wing plate is formed between each inclined plate 34 and the corresponding end base plate 33, I-steel fixing grooves 32 are formed between the two inclined plates 34 and the base plates 33, and the size of inner grooves of the I-steel fixing grooves 32 is completely matched with the size of the I-steel 4 to be installed. The screw hole of the I-shaped steel fixing part 3 is a threaded through hole 31 formed in the middle of the base plate 33, the steel pipe fixing part 2 is screwed down in the threaded through hole 31 and abuts against the top surface of the I-shaped steel 4, and the effect of fixing the relative position of the I-shaped steel fixing part 3 and the I-shaped steel 4 is achieved.
In order to facilitate screwing of the steel pipe fixing part 2, a hexagonal column is machined in the middle of the steel pipe by welding or turning, namely the outer hexagonal screwing part 22 is convenient for screwing by a wrench.
And 2-4 jacking bolts 23 are arranged around the top of the steel pipe fixing part 2.
When the cantilever scaffold is used, the I-steel fixing component 3 is sleeved from the end part of the I-steel 4, the I-steel fixing component 3 is moved to a proper position on the I-steel 4, then the steel pipe fixing component 2 is installed on the I-steel fixing component 3 in a thread fit mode, in the process of screwing the steel pipe fixing component 2, the steel pipe fixing component 2 and the I-steel fixing component 3 are fixed, meanwhile, the bottom of the I-steel fixing component 3 plays a role of a fastening bolt and props against the surface of the I-steel 4, the position of the I-steel fixing component 3 on the I-steel 4 is also fixed, finally, the cantilever scaffold vertical pipe 1 is placed into a steel pipe fixing inner hole 24 in the top of the steel pipe fixing component 2, the jacking bolt 23 is screwed, the cantilever scaffold vertical pipe 1 is fixed into the steel pipe fixing inner hole 24, and then the cantilever scaffold can be built.
The above embodiments are merely illustrative, and not restrictive, of the present invention. Although the present invention has been described in detail with reference to the embodiments, it should be understood by those skilled in the art that various combinations, modifications or equivalent substitutions may be made to the technical solution of the present invention without departing from the spirit and scope of the technical solution of the present invention, and all of the technical solutions should be covered by the scope of the claims of the present invention.

Claims (6)

1. The utility model provides a steel pipe mobile positioning pile of usefulness is set up to constructional engineering outrigger girder scaffold, its characterized in that: including I-steel fixed part and steel pipe fixed part, the steel pipe fixed part passes through the I-steel fixed part to be fixed on the I-steel that is used for the installation scaffold frame of encorbelmenting, steel pipe fixed part top is equipped with the steel pipe fixing hole that is used for the installation scaffold frame riser of encorbelmenting, and the steel pipe fixing hole lateral part is equipped with the puller bolt that can contact scaffold frame riser of encorbelmenting.
2. The steel pipe mobile spud of claim 1, wherein: the steel pipe fixing part is of a steel pipe structure, external threads are arranged at the bottom of the steel pipe fixing part, and screw holes matched with the external threads are formed in the top of the I-shaped steel fixing part.
3. The steel pipe mobile spud of claim 1, wherein: and a polygonal column convenient for screwing the steel tube fixing part is arranged in the middle of the steel tube fixing part.
4. The steel pipe mobile spud of claim 3, wherein: the polygonal column is a hexagonal column.
5. The steel pipe mobile spud of claim 1, wherein: and 2-4 jacking bolts are arranged around the top of the steel pipe fixing part.
6. The steel pipe mobile spud according to any one of claims 2 to 5, wherein: the I-steel fixing part comprises base plates and inclined plates arranged on the lower sides of the two sides of the base plates and inclined towards the inner sides, a space for accommodating an I-steel wing plate is formed between each inclined plate and the corresponding end base plate, a screw hole of the I-steel fixing part is a threaded through hole arranged in the middle of each base plate, and the steel pipe fixing part is screwed in the threaded through hole and plays a role in fixing the relative positions of the I-steel fixing part and the I-steel.
CN202023033368.8U 2020-12-16 2020-12-16 Steel pipe mobile positioning pile for building engineering cantilever beam scaffold erection Active CN214117483U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202023033368.8U CN214117483U (en) 2020-12-16 2020-12-16 Steel pipe mobile positioning pile for building engineering cantilever beam scaffold erection

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202023033368.8U CN214117483U (en) 2020-12-16 2020-12-16 Steel pipe mobile positioning pile for building engineering cantilever beam scaffold erection

Publications (1)

Publication Number Publication Date
CN214117483U true CN214117483U (en) 2021-09-03

Family

ID=77511659

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202023033368.8U Active CN214117483U (en) 2020-12-16 2020-12-16 Steel pipe mobile positioning pile for building engineering cantilever beam scaffold erection

Country Status (1)

Country Link
CN (1) CN214117483U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113719098A (en) * 2021-09-23 2021-11-30 河南省安装集团有限责任公司 Wall-through overhanging I-steel and use method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113719098A (en) * 2021-09-23 2021-11-30 河南省安装集团有限责任公司 Wall-through overhanging I-steel and use method thereof

Similar Documents

Publication Publication Date Title
WO2022062294A1 (en) Suspension connection node for large-span cantilever steel truss and construction method therefor
CN102425116B (en) Method for connecting trough-type base of steel trestle with embedded bolt in concrete bracket
CN214117483U (en) Steel pipe mobile positioning pile for building engineering cantilever beam scaffold erection
CN206245709U (en) A kind of outrigger wall-connecting piece
CN202000649U (en) Movable strengthening device for bottom of upright stenshion of construction cantilevered frame
CN109972734B (en) Steel construction beam column node
CN210163784U (en) A uninstallation device for pier stud bent cap construction
CN203462075U (en) Furnace-supporting platform frame of converter
CN202090616U (en) Protective device for stairs during construction
CN201620592U (en) Scaffold double-steel-pipe welding base
CN217947394U (en) Movable hanging bracket for wet joint bottom template of bridge box girder
CN219261713U (en) Combined pre-buried fixing piece of overhanging I-steel
CN104878734B (en) A kind of ship lift Nut column removes frock and method for dismounting thereof
CN219011498U (en) Connecting device of steel structure node
CN218149701U (en) Supporting structure of clamping type scaffold platform on universal H-shaped steel stand column
CN216077927U (en) Stainless steel fastener for building site
CN211597651U (en) Structure system of I-steel encorbelments
CN220318377U (en) Prefabricated pier stud embedded bar positioning jig frame of bearing platform splicing surface
CN217557626U (en) Bottom fixing device for upright rod of cantilever type steel pipe scaffold
CN218522335U (en) Temporary support system for chimney outer barrel
CN211714556U (en) Building scaffold wall connecting device
CN220184607U (en) Quick mounting and dismounting and turnover external scaffold wall connecting piece
CN217393688U (en) Anti-toppling device for injection pipe in ingot mold
CN217678618U (en) Curved stress surface converter of supporting structure
CN215368661U (en) Detachable high-turnover outer frame wall connecting piece

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant