CN214100710U - Hanger structure for cable bridge - Google Patents

Hanger structure for cable bridge Download PDF

Info

Publication number
CN214100710U
CN214100710U CN202120129262.3U CN202120129262U CN214100710U CN 214100710 U CN214100710 U CN 214100710U CN 202120129262 U CN202120129262 U CN 202120129262U CN 214100710 U CN214100710 U CN 214100710U
Authority
CN
China
Prior art keywords
pin
horizontal
wire rope
horizontal die
bearing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120129262.3U
Other languages
Chinese (zh)
Inventor
张伟
郑君明
陆昌宏
孙国民
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Meilian Electric Power Technology Co ltd
Original Assignee
Jiangsu Yongxing Electric Energy Equipment Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Yongxing Electric Energy Equipment Technology Co ltd filed Critical Jiangsu Yongxing Electric Energy Equipment Technology Co ltd
Priority to CN202120129262.3U priority Critical patent/CN214100710U/en
Application granted granted Critical
Publication of CN214100710U publication Critical patent/CN214100710U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model provides a gallows structure that cable testing bridge was used, including mutually perpendicular's load montant and horizontal die-pin, be connected with wire rope between load montant and the horizontal die-pin, load montant bottom is provided with horizontal end mound, load montant top is provided with the installation ear, the one end that the load montant was kept away from to the horizontal die-pin is provided with the concatenation ear, horizontal die-pin inboard is provided with the layer board, the gallows structure that has solved cable testing bridge in the past usefulness is not good, the problem that the horizontal die-pin was buckled by the pressure easily, the utility model discloses rational in infrastructure, to horizontal die-pin evenly spread the atress, effectively improve the anti effect of buckling of horizontal die-pin.

Description

Hanger structure for cable bridge
Technical Field
The utility model relates to a gallows structure that cable testing bridge was used belongs to cable testing bridge technical field.
Background
The cable bridge is divided into structures of a groove type, a tray type, a ladder type, a grid type and the like, and comprises a support, a supporting arm, an installation accessory and the like. The inner bridge frame of the building can be independently erected and also can be laid on various buildings and pipe gallery supports, the characteristics of simple structure, attractive appearance, flexible configuration, convenient maintenance and the like are reflected, all parts need to be galvanized, and the inner bridge frame is arranged outside the building in the open air.
The hanger is used as a hoisting support of a cable bridge and used for protecting a cable and bearing the gravity of the cable, and generally comprises a force-bearing vertical rod and a horizontal supporting rod; the position that perpendicular vaulting pole was kept away from to horizontal die-pin in the past is because there is not strutting arrangement, receives the pressure effect of cable testing bridge to take place the bending easily, and then causes the hidden danger of buckling of horizontal bracket, and the gallows structure that a cable testing bridge was used is now urgently needed to solve the problem that above-mentioned appears.
SUMMERY OF THE UTILITY MODEL
Not enough to prior art exists, the utility model aims at providing a gallows structure that cable testing bridge was used to solve the problem that proposes in the above-mentioned background art, the utility model discloses rational in infrastructure, to horizontal die-pin flattening atress, effectively improve the anti effect of buckling of horizontal die-pin.
In order to achieve the above purpose, the present invention is realized by the following technical solution: the utility model provides a gallows structure that cable testing bridge was used, includes mutually perpendicular's load montant and horizontal die-pin, be connected with wire rope between load montant and the horizontal die-pin, load montant bottom is provided with horizontal end mound, load montant top is provided with the installation ear, the one end that the load montant was kept away from to the horizontal die-pin is provided with the concatenation ear, horizontal die-pin inboard is provided with the layer board.
And furthermore, two ends of the steel wire rope are provided with bearing screws, and the steel wire rope is in threaded fit connection with the force-bearing vertical rod and the horizontal supporting plate through the bearing screws.
Furthermore, the steel wire ropes are provided with a plurality of steel wire ropes, and each steel wire rope on one side of the force bearing vertical rod is parallel to each other.
Furthermore, threaded holes are formed in the edge portions of the mounting lugs and the splicing lugs in a penetrating mode.
Furthermore, the vertical bearing rods and the horizontal support rods are respectively provided with a front group and a rear group, and the distance between the two vertical bearing rods is the same as the distance between the two horizontal support rods.
Furthermore, the upper surface of the horizontal supporting plate and the upper surface of the bottom pier are on the same plane.
The utility model has the advantages that:
1. the two ends of the steel wire rope are provided with the bearing screws, and the steel wire rope is screwed with the force bearing vertical rods and the horizontal supporting plate threads through the bearing screws, so that the steel wire rope is convenient to mount and dismount; the steel wire ropes are arranged in a plurality of parallel, and each steel wire rope on one side of the force-bearing vertical rod is parallel to each other, so that each steel wire rope, the adjacent force-bearing vertical rods and the adjacent horizontal support rods form a triangular structure with the same shape and different sizes, and each part of the horizontal support rods is subjected to the same upward supporting component force and is uniformly transferred to the force-bearing vertical rods;
2. the edge parts of the mounting lug and the splicing lug of the utility model are all provided with threaded holes in a penetrating way, the mounting lug 2 is used for hoisting and mounting a force bearing vertical rod, and the splicing lug is used for horizontally splicing a plurality of hanging brackets;
3. the utility model discloses an interval between two sets of load montants is the same with the interval between two sets of horizontal die-pins, and horizontal layer board upper surface all is in the coplanar with the upper surface of bottom mound, makes things convenient for later stage cable testing bridge evenly unimpeded to pass through.
Drawings
Other features, objects and advantages of the invention will become more apparent upon reading of the detailed description of non-limiting embodiments with reference to the following drawings:
fig. 1 is a schematic structural view of a hanger structure for a cable tray according to the present invention;
fig. 2 is a top view of a hanger structure for a cable tray according to the present invention;
in the figure: the steel wire rope fixing device comprises a force bearing vertical rod 1, a mounting lug 2, a steel wire rope 3, a connecting screw 31, a horizontal supporting rod 4, a splicing lug 5, a bottom pier 6 and a supporting plate 7.
Detailed Description
In order to make the technical means, creation features, achievement purposes and functions of the present invention easy to understand, the present invention is further described below with reference to the following embodiments.
Referring to fig. 1-2, the present invention provides a technical solution: the utility model provides a gallows structure that cable testing bridge was used, including mutually perpendicular's load montant 1 and horizontal die-pin 4, be connected with wire rope 3 between load montant 1 and the horizontal die-pin 4, 1 bottom of load montant is provided with horizontal end mound 6, 1 top of load montant is provided with installation ear 2, the one end that load montant 1 was kept away from to horizontal die-pin 4 is provided with concatenation ear 5, 4 inboards of horizontal die-pin are provided with layer board 7, the gallows structure that has solved cable testing bridge in the past and used is not good, horizontal die-pin 4 receives the problem that the pressure buckled easily.
The utility model discloses a wire rope 3's both ends are provided with accepts screw 31, and wire rope 3 closes through accepting screw 31 and load montant 1 and 7 screw threads of horizontal support plate and is connected, the installation and the dismantlement of the wire rope 3 of being convenient for.
The utility model discloses a wire rope 3 is equipped with many, is parallel to each other between every wire rope 3 of 1 one side of load montant, and every wire rope 3 constitutes the triangle-shaped structure that the shape is the same, variation in size with adjacent load montant 1 and horizontal die-pin 4 like this, makes every part of horizontal die-pin 4 receive ascending support component the same, and even shift to on the load montant 1.
The utility model discloses an edge part of installation ear 2 and concatenation ear 5 all runs through set up threaded hole, and installation ear 2 is used for load montant 1's hoist and mount installation, and concatenation ear 5 is used for the concatenation of a plurality of gallows levels.
The utility model discloses a load montant 1 and horizontal die-pin 4 are two sets of around all being equipped with, and interval between two sets of load montants 1 is the same with the interval between two sets of horizontal die-pin 4, makes things convenient for later stage cable testing bridge evenly unimpededly to pass through.
The utility model discloses a 7 upper surfaces of horizontal support plate and the upper surface of bottom mound 6 all are in the coplanar for level and smooth bottom that supports the cable testing bridge.
As an embodiment of the present invention: firstly, splicing and connecting a steel wire rope 3 with bearing screws 31 at two ends with adjacent vertical bearing rods 1 and horizontal support rods 4 according to the length of the steel wire rope according to the pattern shown in figure 1, hoisting the vertical bearing rods 1 of a single hanger on a specified ceiling along mounting lugs 2, then horizontally splicing and connecting a plurality of hangers through splicing lugs 5, and finally placing a cable bridge on a support plate 7;
each steel wire rope 3, the adjacent vertical bearing rods 1 and the adjacent horizontal support rods 4 form a triangular structure with the same shape and different sizes, so that upward supporting component force borne by each part of each horizontal support rod 4 is the same and uniformly acts on the vertical bearing rods 1, and the hidden danger of bending and breaking caused by uneven stress of the horizontal support rods 4 is effectively prevented.
The basic principles and the main features of the invention and the advantages of the invention have been shown and described above, it will be evident to those skilled in the art that the invention is not limited to the details of the foregoing illustrative embodiments, but that the invention may be embodied in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Furthermore, it should be understood that although the present description refers to embodiments, not every embodiment may contain only a single embodiment, and such description is for clarity only, and those skilled in the art should integrate the description, and the embodiments may be combined as appropriate to form other embodiments understood by those skilled in the art.

Claims (6)

1. The utility model provides a gallows structure that cable testing bridge was used which characterized in that: including mutually perpendicular's load montant (1) and horizontal die-pin (4), be connected with wire rope (3) between load montant (1) and horizontal die-pin (4), load montant (1) bottom is provided with horizontal end mound (6), load montant (1) top is provided with installation ear (2), the one end that load montant (1) was kept away from in horizontal die-pin (4) is provided with concatenation ear (5), horizontal die-pin (4) inboard is provided with layer board (7).
2. The hanger structure for a cable tray of claim 1, wherein: and the two ends of the steel wire rope (3) are provided with bearing screws (31), and the steel wire rope (3) is in threaded screwing connection with the force-bearing vertical rod (1) and the horizontal supporting plate (7) through the bearing screws (31).
3. A hanger structure for a cable tray as claimed in claim 1 or 2, wherein: the steel wire ropes (3) are arranged in a plurality of rows, and each steel wire rope (3) on one side of the bearing vertical rod (1) is parallel to each other.
4. The hanger structure for a cable tray of claim 1, wherein: the edge parts of the mounting lugs (2) and the splicing lugs (5) are all provided with threaded holes in a penetrating mode.
5. The hanger structure for a cable tray of claim 1, wherein: the vertical bearing rods (1) and the horizontal supporting rods (4) are respectively provided with a front group and a rear group, and the distance between the two vertical bearing rods (1) is the same as the distance between the two horizontal supporting rods (4).
6. The hanger structure for a cable tray of claim 1, wherein: the upper surface of the horizontal supporting plate (7) and the upper surface of the bottom pier (6) are on the same plane.
CN202120129262.3U 2021-01-18 2021-01-18 Hanger structure for cable bridge Active CN214100710U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120129262.3U CN214100710U (en) 2021-01-18 2021-01-18 Hanger structure for cable bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120129262.3U CN214100710U (en) 2021-01-18 2021-01-18 Hanger structure for cable bridge

Publications (1)

Publication Number Publication Date
CN214100710U true CN214100710U (en) 2021-08-31

Family

ID=77439072

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120129262.3U Active CN214100710U (en) 2021-01-18 2021-01-18 Hanger structure for cable bridge

Country Status (1)

Country Link
CN (1) CN214100710U (en)

Similar Documents

Publication Publication Date Title
CN102444230B (en) Suspension type curtain wall and installation method thereof
CN212085705U (en) Can be with cable cellular-type crane span structure
EP2546430B2 (en) A suspended ceiling system and a method for suspending such a ceiling system
CN210297123U (en) Cable bridge convenient to cable installation
CN214100710U (en) Hanger structure for cable bridge
CN102518875B (en) The wire installation frame of a kind of dome or arc or slope use
CN110854759A (en) Cable bridge bracket
CN216113032U (en) Lifting support of monitoring sensor
CN202273338U (en) Hanging type curtain wall
CN210628982U (en) Fireproof plastic-sprayed cable bridge
CN210536242U (en) Support arm for cable bridge
CN210867090U (en) Shared hanger for pipeline and cable bridge
CN203852765U (en) Stage fireproof curtain provided with LED screen
CN211424184U (en) Workshop hanging type lamp rack
CN101775866A (en) Suspended ceiling
CN201635228U (en) Novel flash rack ceiling system
CN220673360U (en) Reinforcing and fixing device for direct-buried bridge
CN215870649U (en) Weak current intensification lays structure along wall
CN214885173U (en) Assembled molding column
CN212849691U (en) Wall-mounted cable bridge
CN214479256U (en) Power cable lays crane span structure
CN215119921U (en) Dual-purpose cable bridge bracket for side supporting and top hanging
CN221263231U (en) Layered assembled composite cable bridge
CN215672569U (en) Cable fixing device
CN216952813U (en) LED arc lamp box

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20240516

Address after: Room 804, Building 11, No. 3 Gangzhongxin Village, New District, Zhenjiang City, Jiangsu Province, 212000

Patentee after: He Fang

Country or region after: China

Address before: Line 3 / 2, Sanmao street, Yangzhong City, Zhenjiang City, Jiangsu Province (within Yongxing group)

Patentee before: JIANGSU YONGXING ELECTRIC ENERGY EQUIPMENT TECHNOLOGY Co.,Ltd.

Country or region before: China

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20240614

Address after: No. 1 Xinzhi Village, Xinba Town, Yangzhong City, Zhenjiang City, Jiangsu Province, 212200

Patentee after: Jiangsu Meilian Electric Power Technology Co.,Ltd.

Country or region after: China

Address before: Room 804, Building 11, No. 3 Gangzhongxin Village, New District, Zhenjiang City, Jiangsu Province, 212000

Patentee before: He Fang

Country or region before: China