Prior art keywords
cable
bridge
ball
boss
cross slab
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020572675.4U
Other languages
Chinese (zh)
Inventor
边晓虎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shaanxi Xulin Environmental Protection Technology Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202020572675.4U priority Critical patent/CN212085705U/en
Application granted granted Critical
Publication of CN212085705U publication Critical patent/CN212085705U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a can be with cable cellular-type crane span structure, including the cable testing bridge, the middle part of cable testing bridge inner chamber is equipped with the cross slab, and the inside last chute that is located the cross slab top that is equipped with of cable testing bridge, the bottom of cable testing bridge inner chamber and the bottom of last chute all are equipped with the boss, and the one end that the boss is close to the cross slab is equipped with two first ball seats, and the movable sleeve is equipped with first ball on the first ball seat, forms the heat dissipation chamber between two adjacent bosses, and louvre and last louvre have been seted up down respectively to the bottom of cable testing bridge and the top of side. This can be with cable cellular-type crane span structure through setting up cross slab and last chute, can separate cable bridge upper and lower, through the boss of cable bridge inner chamber bottom and last chute bottom equidistance array, can separate between the cable of same layer to can improve cable wiring's regularity nature, twine each other when avoiding cable wiring, be favorable to the maintenance work of cable subsequent.

Description

Can be with cable cellular-type crane span structure
Technical Field
The utility model belongs to the technical field of the cable testing bridge, concretely relates to can be with cable cellular-type crane span structure.
Background
The cable bridge is divided into structures such as a groove type cable bridge, a tray type cable bridge, a ladder type cable bridge, a grid bridge and the like, and is composed of a support, a supporting arm, an installation accessory and the like. The steel plate can be independently erected and also can be laid on various buildings (structures) and pipe gallery supports, the characteristics of simple structure, attractive appearance, flexible configuration, convenience in maintenance and the like are reflected, all parts need to be galvanized and installed on an outdoor bridge outside the building, and if the steel plate is near the seaside or belongs to a corrosive area, the steel plate must have the physical characteristics of corrosion resistance, moisture resistance, good adhesive force and high impact strength.
However, the existing cable bridge structure is too simple, the cables cannot be effectively separated, and the cables are wound during cable wiring, so that the subsequent maintenance work of the cables is influenced.
SUMMERY OF THE UTILITY MODEL
For the technical problem who exists among the solution background art, the utility model provides a can possess the advantage that can separate, reduce cable wiring wearing and tearing when cable cellular-type crane span structure.
The utility model provides a technical scheme that its technical problem adopted is:
the utility model provides a can be with cable cellular-type crane span structure, includes the cable testing bridge, the middle part of cable testing bridge inner chamber is equipped with the cross slab, and the inside last chute that is located the cross slab top that is equipped with of cable testing bridge, the bottom of cable testing bridge inner chamber and the bottom of going up the chute all are equipped with the boss, the boss is close to the one end of cross slab and is equipped with two first ball seats, the movable sleeve is equipped with first ball on the first ball seat.
Preferably, a heat dissipation cavity is formed between every two adjacent bosses, and a lower heat dissipation hole and an upper heat dissipation hole are formed in the bottom of the cable bridge and the top of the side face of the cable bridge respectively.
Preferably, the top of the cable bridge is provided with a top cover, the bottom of the cable bridge is provided with a hanging bracket, and the hanging bracket is fixed on the wall top through a fixing bolt.
Preferably, the top and the bottom of the diaphragm plate are both provided with second ball seats in an equidistant array, the second ball seats are movably sleeved with second balls, and the diaphragm plate is provided with through holes.
Preferably, an annular groove for cable insertion is formed between the second ball and the two first balls.
Preferably, the two first ball seats on the boss are distributed in a V shape.
The above technical scheme of the utility model has following profitable technological effect:
1. this can be with cable cellular-type crane span structure through setting up cross slab and last chute, can separate cable bridge upper and lower, through the boss of cable bridge inner chamber bottom and last chute bottom equidistance array, can separate between the cable of same layer to can improve cable wiring's regularity nature, twine each other when avoiding cable wiring, be favorable to the maintenance work of cable subsequent.
2. This can be with cable cellular-type crane span structure, through setting up the second ball in cross slab top and bottom to and set up the first ball in cable bridge inner chamber bottom and last chute bottom, form the threading groove that is used for the cable to walk the line, utilize the characteristic that first ball and second ball can free rotation, can carry on spacingly and direction when laying cable, compare in prior art, can reduce when laying cable with division board, the wearing and tearing that the crane span structure contact friction produced, ensure the integrality and the security of cable.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a schematic view of the upper and lower heat dissipating holes of the present invention;
fig. 3 is a schematic view of a second ball structure according to the present invention.
Reference numerals:
1. a cable bridge; 2. a diaphragm plate; 21. a second ball seat; 22. a second ball bearing; 23. a through hole; 3. an upper wiring rack; 4. a boss; 5. a first ball seat; 6. a first ball bearing; 7. a heat dissipation cavity; 8. a lower heat dissipation hole; 9. an upper heat dissipation hole; 10. a top cover; 11. a hanger frame.
Detailed Description
In order to make the technical means, the creation features, the achievement purposes and the functions of the present invention easy to understand, the present invention will be further explained below with reference to the following embodiments and the accompanying drawings, but the following embodiments are only the preferred embodiments of the present invention, and not all embodiments are included. Based on the embodiments in the implementation, other embodiments obtained by those skilled in the art without any creative work belong to the protection scope of the present invention. Moreover, in the following description, descriptions of well-known structures and techniques are omitted so as to not unnecessarily obscure the concepts of the present invention.
Specific embodiments of the present invention will be described below with reference to the accompanying drawings.
Referring to fig. 1-2, the present invention provides a technical solution: a cable separation type bridge comprises a cable bridge 1, wherein a diaphragm plate 2 is arranged in the middle of an inner cavity of the cable bridge 1.
Through setting up the diaphragm plate 2, both can divide into two parts about cable testing bridge 1 is whole to form two wire casings that are used for the cable routing, avoid the cable stack from top to bottom and mutual interference or influence its problem of maintaining in subsequent order.
An upper wiring rack 3 positioned above the diaphragm plate 2 is arranged inside the cable bridge rack 1, and bosses 4 are arranged at the bottom of an inner cavity of the cable bridge rack 1 and the bottom of the upper wiring rack 3.
The bosses 4 arranged at the bottom of the inner cavity of the cable bridge 1 and the bottom of the upper chute 3 are utilized to lift the mounting position of the first ball seat 5, so that a heat dissipation cavity 7 is formed between the cable and the bottom of the inner cavity of the cable bridge 1 or the bottom of the upper chute 3 after cable wiring, the heat dissipation of the cable is ensured, and the abrasion caused by contact friction with the bottom of the inner cavity of the cable bridge 1 or the bottom of the upper chute 3 during cable wiring is avoided.
One end of the boss 4 close to the diaphragm plate 2 is provided with two first ball seats 5 distributed in a V shape, and the first ball seats 5 are movably sleeved with first balls 6.
Two first balls 6 and a second ball 22 that are V style of calligraphy and distribute form the three point location structure that is used for the cable to alternate, and utilize the characteristic that first ball 6 and second ball 22 can free rotation, can carry on spacingly and direction when laying cable routing, compare in prior art, can reduce the wearing and tearing that produce with division board, crane span structure contact friction during cable routing, ensure the integrality and the security of cable.
Referring to fig. 2, in the present embodiment, the bottom and the top of the side of the cable tray 1 are respectively provided with a lower heat dissipation hole 8 and an upper heat dissipation hole 9, and the diaphragm plate 2 is provided with a through hole 23.
The ventilation performance inside the cable bridge 1 is ensured by utilizing the lower radiating holes 8 arranged at the bottom of the cable bridge 1, the upper radiating holes 9 arranged at the top of the side surface of the cable bridge 1 and the through holes 23 arranged on the transverse partition plates 2, so that the heat radiation performance of the cable in the use process is ensured.
Referring to fig. 1, in the present embodiment, a top cover 10 is disposed on the top of the cable tray 1, and a hanger 11 is disposed on the bottom of the cable tray 1, wherein the hanger 11 is fixed on a wall top by a fixing bolt.
The top cover 10 arranged at the top of the cable bridge 1 is utilized to cover the top of the cable bridge 1, so that the dustproof effect is achieved, and the cable bridge 1 can be installed on the top surface of a wall through the hanging bracket 11, so that the purpose of hanging the cable bridge 1 is achieved.
Referring to fig. 3, in the present embodiment, the top and the bottom of the diaphragm plate 2 are provided with second ball seats 21 in an equidistant array, and the second ball seats 21 are movably sleeved with second balls 22.
Second ball 22 is located directly over between two adjacent bosss 4, is regular triangle with two first balls 6 and distributes, utilizes to form the ring channel that is used for the cable to alternate between second ball 22 and two first balls 6, will install the vertical partition of cable in cable testing bridge 1 inside, is favorable to cable wiring's regularity, aesthetic property, brings the facility for cable wiring work, also makes things convenient for the maintenance work of cable subsequence simultaneously.
The foregoing shows and describes the general principles, essential features, and advantages of the invention. It should be understood by those skilled in the art that the present invention is not limited by the above embodiments, and the description in the above embodiments and the description is only preferred examples of the present invention, and is not intended to limit the present invention, and that the present invention can have various changes and modifications without departing from the spirit and scope of the present invention, and these changes and modifications all fall into the scope of the claimed invention. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (6)

1. A cable split bridge comprising a cable bridge (1), characterized in that: the middle part of cable testing bridge (1) inner chamber is equipped with cross slab (2), and cable testing bridge (1) inside is equipped with last chute (3) that are located cross slab (2) top, the bottom of cable testing bridge (1) inner chamber and the bottom of going up chute (3) all are equipped with boss (4), the one end that boss (4) are close to cross slab (2) is equipped with two first ball seats (5), the movable sleeve is equipped with first ball (6) on first ball seat (5).
2. A cable split tray as defined in claim 1, wherein: a heat dissipation cavity (7) is formed between every two adjacent bosses (4), and a lower heat dissipation hole (8) and an upper heat dissipation hole (9) are respectively formed in the bottom of the cable bridge (1) and the top of the side face of the cable bridge.
3. A cable split tray as defined in claim 1, wherein: the top of the cable bridge (1) is provided with a top cover (10), the bottom of the cable bridge (1) is provided with a hanger (11), and the hanger (11) is fixed on the wall top through a fixing bolt.
4. A cable split tray as defined in claim 1, wherein: the top and the bottom of diaphragm (2) all are equipped with second ball seat (21) of equidistance array, movable sleeve is equipped with second ball (22) on second ball seat (21), through-hole (23) have been seted up on diaphragm (2).
5. A cable split tray as claimed in claim 4, wherein: the second ball (22) and the two first balls (6) form an annular groove for the cable to pass through.
6. A cable split tray as defined in claim 1, wherein: the two first ball seats (5) on the boss (4) are distributed in a V shape.
CN202020572675.4U 2020-04-17 2020-04-17 Can be with cable cellular-type crane span structure Expired - Fee Related CN212085705U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020572675.4U CN212085705U (en) 2020-04-17 2020-04-17 Can be with cable cellular-type crane span structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020572675.4U CN212085705U (en) 2020-04-17 2020-04-17 Can be with cable cellular-type crane span structure

Publications (1)

Publication Number Publication Date
CN212085705U true CN212085705U (en) 2020-12-04

Family

ID=73594663

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020572675.4U Expired - Fee Related CN212085705U (en) 2020-04-17 2020-04-17 Can be with cable cellular-type crane span structure

Country Status (1)

Country Link
CN (1) CN212085705U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113991564A (en) * 2021-12-01 2022-01-28 刘云辉 Cable bridge with wiring assembly
CN114825207A (en) * 2022-04-27 2022-07-29 江苏瑞仕达电气设备有限公司 Step type bridge for laying cables with different diameters
CN115832988A (en) * 2023-02-17 2023-03-21 江苏必拓电气有限公司 Cable bridge convenient for heat dissipation
CN116247581A (en) * 2022-12-15 2023-06-09 安徽瑞科电气有限公司 Breathable fire-resistant cable bridge

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113991564A (en) * 2021-12-01 2022-01-28 刘云辉 Cable bridge with wiring assembly
CN114825207A (en) * 2022-04-27 2022-07-29 江苏瑞仕达电气设备有限公司 Step type bridge for laying cables with different diameters
CN116247581A (en) * 2022-12-15 2023-06-09 安徽瑞科电气有限公司 Breathable fire-resistant cable bridge
CN116247581B (en) * 2022-12-15 2024-05-07 安徽瑞科电气有限公司 Breathable fire-resistant cable bridge
CN115832988A (en) * 2023-02-17 2023-03-21 江苏必拓电气有限公司 Cable bridge convenient for heat dissipation
CN115832988B (en) * 2023-02-17 2023-04-28 江苏必拓电气有限公司 Cable bridge convenient for heat dissipation

Similar Documents

Publication Publication Date Title
CN212085705U (en) Can be with cable cellular-type crane span structure
CN204715602U (en) A kind of duplex integrated ceiling
CN211151421U (en) Cable bridge easy to arrange wires and having heat dissipation function
CN214246270U (en) Curtain wall system with lamp groove
CN211018133U (en) Cable bridge convenient to installation is maintained
CN210380118U (en) Novel cable bridge for photovoltaic power generation
CN218149207U (en) Hot galvanizing steel structure for inclined roof ceiling
CN218990755U (en) Glass mounting structure for house inner wall
CN218161597U (en) Cable bridge for large span
CN214100710U (en) Hanger structure for cable bridge
CN216720819U (en) Adjustable bridge device of data center machine room
CN217630468U (en) Glass dome with deformed steel structure
CN211908239U (en) High-strength cable bridge
CN211377464U (en) Slot type crane span structure solidus component
CN215167068U (en) Ceiling expansion joint structure
CN211508482U (en) Electrical equipment wiring bridge
CN211480800U (en) Bridge convenient to ventilate and cross water
CN219158131U (en) Drop-level suspended ceiling reentrant corner connecting wire strip and drop-level suspended ceiling
CN215870649U (en) Weak current intensification lays structure along wall
CN216616412U (en) House glass partition wall installing the system
CN216312573U (en) Multilayer intercommunication type cable testing bridge
CN217427596U (en) Cable shaft mounting structure in wall
CN220914884U (en) Step type bridge frame assembly
CN204804136U (en) Mounting structure of inclined plane buckle and compound furred ceiling medium dip face
CN220306881U (en) Flat cable structure and cable bridge

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20211208

Address after: 710000 No. 11, Changxing village, Dazhao Street office, Chang'an District, Xi'an City, Shaanxi Province

Patentee after: Shaanxi Xulin Environmental Protection Technology Co.,Ltd.

Address before: 830037 No. 999, Shuixigou Town, Urumqi county, Urumqi City, Xinjiang Uygur Autonomous Region

Patentee before: Bian Xiaohu

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201204