CN214091169U - Temporary workshop for assembly type building construction - Google Patents

Temporary workshop for assembly type building construction Download PDF

Info

Publication number
CN214091169U
CN214091169U CN202022993307.XU CN202022993307U CN214091169U CN 214091169 U CN214091169 U CN 214091169U CN 202022993307 U CN202022993307 U CN 202022993307U CN 214091169 U CN214091169 U CN 214091169U
Authority
CN
China
Prior art keywords
roof
wall body
screw hole
threaded holes
sides
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022993307.XU
Other languages
Chinese (zh)
Inventor
庄峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202022993307.XU priority Critical patent/CN214091169U/en
Application granted granted Critical
Publication of CN214091169U publication Critical patent/CN214091169U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Roof Covering Using Slabs Or Stiff Sheets (AREA)

Abstract

Assembled construction constructs temporary worker room relates to simple and easy house technical field, specifically is an assembled construction constructs temporary worker room. Including four modular unit, four modular unit are by the roof, the side and baffle are constituteed, the equal fixedly connected with side in both sides of four roofs, eight sides and four roofs enclose into four mounting grooves, the middle part of four mounting groove inner walls is divided into eight wall body grooves through the baffle, eight wall body grooves respectively through first screw hole and first bolt respectively with the both sides at four wall body tops threaded connection in proper order, the top of four modular unit pass through second screw hole and second bolt respectively with four corner threaded connection of roof bottom. The utility model discloses realize quick installation and dismantlement, through the cooperation of second screw hole, play basin, water drainage tank and roof, can effectively prevent leaking of roof.

Description

Temporary workshop for assembly type building construction
Technical Field
The utility model relates to a simple and easy house technical field specifically is an interim worker's room of assembly type structure construction.
Background
The construction works of house buildings include factory buildings, theaters, hotels, shops, schools, hospitals, houses and the like, and new construction, reconstruction or extension of the house buildings can be realized only through construction activities. And need use assembled house as workman's living residence and office space in the building engineering trade and use, and current house is comparatively loaded down with trivial details at the in-process of installation with the dismantlement, can't adapt to the installation demand of the temporary housing on the building site, and current house installs the back usually, and the junction of roof and wall body, if sealed not well, leads to the roof to leak easily.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide an interim worker's room of assembly type structure construction to solve the installation and dismantle the problem that the process is loaded down with trivial details, roof and wall connection department leak easily.
The utility model provides an interim worker's room of assembly type structure construction, including four modular unit, four modular unit comprises roof, side and baffle, four the equal fixedly connected with side in both sides of roof, eight the side and four the roof encloses into four mounting grooves, four the middle part of mounting groove inner wall is divided into eight wall body grooves, eight through the baffle wall body groove respectively through first screw hole and first bolt respectively with the both sides at four wall body tops threaded connection in proper order, four modular unit's top through second screw hole and second bolt respectively with four corner threaded connection of roof bottom.
Furthermore, the number of the first threaded holes is thirty two, and the two ends of the two sides of the eight wall grooves are respectively arranged on the thirty two first threaded holes.
Furthermore, the number of the second threaded holes is twelve, and twelve second threaded holes are respectively arranged at the top ends of the four top plates in a group of every three second threaded holes.
Furthermore, every group the bottom of second screw hole has all seted up out the basin, and every two are adjacent go out the basin and respectively with the fixed intercommunication in both ends of a water drainage tank, just the water drainage tank is seted up in the inside of roof.
Furthermore, one side of one of the wall bodies is fixedly provided with a window through a ventilation opening, and one side of the other wall body is fixedly provided with a sealing door through an entrance and exit.
Compared with the prior art, the beneficial effects of the utility model are that:
1. through the matching of a wall body, a combined unit, a roof, a first bolt, a second threaded hole, a top plate, side edges, wall body grooves, a first threaded hole, a partition plate, a mounting groove and a second bolt, the combined unit is composed of the top plate, the side edges and the partition plate, the mounting groove is defined by the surrounding of the top plate and the side edges, the mounting groove is divided into two wall body grooves through the partition plate, the number of the combined units is four, the combined units are clamped with the two sides of four wall bodies through eight wall body grooves, then the wall bodies are fixed through the first bolt and the first threaded hole, meanwhile, the four top plates are connected with the roof through the second threaded hole and the second bolt, the assembly of a house is completed, and only the first bolt and the second bolt need to be removed during the disassembly, so that the rapid assembly and disassembly are realized;
2. through the cooperation of second screw hole, go out the basin, water drainage tank and roof, the second screw hole has been seted up on the top of roof, the basin has been seted up to the bottom of screw hole, water drainage tank has been seted up to the bottom of going out the basin, water drainage tank, go out basin and second screw hole intercommunication each other, and water drainage tank is the slope structure, it is lower to keep away from one side of wall body, thereby under the circumstances that the leakproofness of second screw hole became invalid, can help the second screw hole with water through going out the basin and water drainage tank outside the wall body, prevent leaking of roof.
Drawings
Fig. 1 is a schematic structural view of the present invention;
fig. 2 is a cross-sectional view of the combination unit of the present invention;
FIG. 3 is a bottom view of the connection relationship of the combination units of the present invention;
FIG. 4 is a top view of the connection relationship of the combination units of the present invention;
fig. 5 is a cross-sectional view of the top plate of the present invention.
In the figure: 1. a wall body; 2. a combination unit; 3. a roof; 4. a window; 5. a sealing door; 6. a first bolt; 7. a second threaded hole; 8. a water outlet groove; 9. a water discharge tank; 10. a top plate; 11. a side edge; 12. wall grooves; 13. a first threaded hole; 14. a partition plate; 15. mounting grooves; 16. and a second bolt.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Please refer to fig. 1-5, the utility model provides a temporary worker's room of assembly type structure construction, including four assembled unit 2, four assembled unit 2 are by roof 10, side 11 and baffle 14 are constituteed, the equal fixedly connected with side 11 in both sides of four roof 10, eight sides 11 and four roof 10 enclose into four mounting grooves 15, the middle part of 15 inner walls of four mounting grooves is divided into eight wall body grooves 12 through baffle 14, eight wall body grooves 12 are respectively through first screw hole 13 and first bolt 6 respectively with the both sides at four wall body 1 tops threaded connection in proper order, four assembled unit 2's top are through second screw hole 7 and second bolt 16 respectively with four corner threaded connection of roof 3 bottoms.
Preferably, the number of the first threaded holes 13 is thirty two, and the thirty two first threaded holes 13 are respectively formed at two ends of two sides of the eight wall grooves 12, and the wall 1 is fixed by the first threaded holes 13 and the first bolts 6;
preferably, the number of the second threaded holes 7 is twelve, and every three of the twelve second threaded holes 7 are respectively arranged at the top ends of the four top plates 10 in a group and used for fixing the roof 3 by the second threaded holes 7 and the second bolts 16 in a threaded manner;
preferably, the bottom end of each group of second threaded holes 7 is provided with a water outlet groove 8, every two adjacent water outlet grooves 8 are respectively and fixedly communicated with two ends of a water drainage groove 9, the water drainage grooves 9 are arranged in the top plate 10, and when the sealing property in the second threaded holes 7 fails, water infiltrated through the second threaded holes 7 is drained out of the wall body 1 through the water outlet grooves 8 and the water drainage grooves 9, so that the roof 3 is waterproof;
preferably, one side of one of the walls 1 is fixedly provided with a window 4 through a ventilation opening, and one side of the other wall 1 is fixedly provided with a sealing door 5 through an entrance.
When the prefabricated building construction temporary workshop is used in detail, the combined unit 2 comprises a top plate 10, side edges 11 and partition plates 14, a mounting groove 15 enclosed by the top plate 10 and the side edges 11 is divided into two wall grooves 12 through the partition plates 14, the number of the combined unit 2 is four, the combined unit is connected with two sides of four wall bodies 1 through eight wall grooves 12 in a clamping manner, then the wall bodies 1 are fixed through first bolts 6 and first threaded holes 13, meanwhile, the four top plates 10 are connected with a roof 3 through second threaded holes 7 and second bolts 16, so that the assembly of the house is completed, only the first bolts 6 and the second bolts 16 need to be removed during the disassembly, the rapid assembly and disassembly are realized, the second threaded holes 7 are formed in the top end of the top plate 10, the water outlet groove 8 is formed in the bottom end of the second threaded holes 7, the water outlet groove 9 is formed in the bottom end of the water outlet groove 8, the water outlet groove 9, the water outlet groove 8 and the second threaded holes 7 are communicated with each other, and the drainage channel 9 is an inclined structure, and the side far away from the wall body 1 is lower, so that under the condition that the sealing performance of the second threaded hole 7 is invalid, the second threaded hole 7 can be helped to discharge water out of the wall body 1 through the water outlet channel 8 and the drainage channel 9, and the water leakage of the roof 3 is prevented.
Although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments or portions thereof without departing from the spirit and scope of the invention.

Claims (5)

1. The utility model provides a temporary worker's room of assembly type structure construction, includes four assembled element (2), its characterized in that: four combination unit (2) comprise roof (10), side (11) and baffle (14), four the equal fixedly connected with side (11), eight in both sides of roof (10) side (11) and four roof (10) enclose into four mounting grooves (15), four the middle part of mounting groove (15) inner wall divide into eight wall body grooves (12), eight through baffle (14) wall body groove (12) respectively through first screw hole (13) and first bolt (6) respectively with the both sides at four wall body (1) tops threaded connection in proper order, four the top of combination unit (2) is passed through second screw hole (7) and second bolt (16) respectively with four corner threaded connection of roof (3) bottom.
2. The prefabricated construction temporary workshop of claim 1, wherein: the number of the first threaded holes (13) is thirty-two, and the thirty-two first threaded holes (13) are respectively arranged at two ends of two sides of the eight wall body grooves (12).
3. The prefabricated construction temporary workshop of claim 1, wherein: the number of the second threaded holes (7) is twelve, and twelve second threaded holes (7) are respectively arranged at the top ends of the four top plates (10) in a group of every three second threaded holes.
4. The prefabricated construction temporary workshop of claim 3, wherein: every group the bottom of second screw hole (7) has all seted up out basin (8), and every two are adjacent go out basin (8) and fix the intercommunication with the both ends of a water drainage tank (9) respectively, just water drainage tank (9) are seted up in the inside of roof (10).
5. The prefabricated construction temporary workshop of claim 1, wherein: one side of one of the wall bodies (1) is fixedly provided with a window (4) through a ventilation opening, and the other side of the wall body (1) is fixedly provided with a sealing door (5) through an entrance and exit.
CN202022993307.XU 2020-12-14 2020-12-14 Temporary workshop for assembly type building construction Active CN214091169U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022993307.XU CN214091169U (en) 2020-12-14 2020-12-14 Temporary workshop for assembly type building construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022993307.XU CN214091169U (en) 2020-12-14 2020-12-14 Temporary workshop for assembly type building construction

Publications (1)

Publication Number Publication Date
CN214091169U true CN214091169U (en) 2021-08-31

Family

ID=77427201

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022993307.XU Active CN214091169U (en) 2020-12-14 2020-12-14 Temporary workshop for assembly type building construction

Country Status (1)

Country Link
CN (1) CN214091169U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114278117A (en) * 2021-11-24 2022-04-05 无锡市中旭环保设备有限公司 Movable prefabricated house and construction method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114278117A (en) * 2021-11-24 2022-04-05 无锡市中旭环保设备有限公司 Movable prefabricated house and construction method thereof

Similar Documents

Publication Publication Date Title
US3927498A (en) Device for building construction
US5491934A (en) Two story building collapsed for shipping
US3862534A (en) Method of constructing a dwelling
CN214091169U (en) Temporary workshop for assembly type building construction
US4102091A (en) Prefabricated buildings
TR199801892T2 (en) The method of building a building structure, which gives the benefit of reinforcement framework and in-kind reinforcement framework for buildings.
US3629983A (en) Preconstructed multiple unit housing
KR101415321B1 (en) Curtain wall unit for outer wall of a building
WO2010018267A1 (en) Wet-area container module and private and general installations for residential, hotel and hospital buildings
JP2022553520A (en) Modular factory building
CN217175213U (en) House built by building structure module for building house
KR0171872B1 (en) Unit panel of curtain wall
JPS6019181Y2 (en) Shower room installation structure
JP2775143B2 (en) Waterproof pan for bathroom unit and method of manufacturing the same
JPS6019182Y2 (en) Waterproof pan installation structure in shower room
EP1196668A1 (en) Building system
CN220928253U (en) Waterproof connection node structure of prefabricated side fascia of assembled building
CN216142287U (en) Strenghthened type assembled building roofing divides parting joint waterproof construction
JPH11200533A (en) Room-forming panel member in which piping can be installed
CN211622743U (en) Combined integral bathroom structure
CN220203068U (en) Modularized building wallboard
CN217204797U (en) Unit type green energy-saving curtain wall system between inner waterproof layers
CN211313503U (en) Water-combined room and prefabricated structure
CN216380747U (en) Shower room convenient to install
CN215670696U (en) Assembled integral bathroom sealing frame structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant