CN214055147U - Building construction auxiliary device - Google Patents

Building construction auxiliary device Download PDF

Info

Publication number
CN214055147U
CN214055147U CN202022213943.6U CN202022213943U CN214055147U CN 214055147 U CN214055147 U CN 214055147U CN 202022213943 U CN202022213943 U CN 202022213943U CN 214055147 U CN214055147 U CN 214055147U
Authority
CN
China
Prior art keywords
fixedly connected
gun
sliding
drilling
positioning
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202022213943.6U
Other languages
Chinese (zh)
Inventor
蒋雪蕾
袁平春
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Oushuo Architectural Design Engineering Co ltd
Original Assignee
Shanghai Oushuo Architectural Design Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Oushuo Architectural Design Engineering Co ltd filed Critical Shanghai Oushuo Architectural Design Engineering Co ltd
Priority to CN202022213943.6U priority Critical patent/CN214055147U/en
Application granted granted Critical
Publication of CN214055147U publication Critical patent/CN214055147U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Processing Of Stones Or Stones Resemblance Materials (AREA)

Abstract

The utility model discloses a construction auxiliary device, including boring the rifle, be equipped with first folder and second folder outside the brill rifle respectively, be equipped with the center pin in the first folder, the one end fixedly connected with sliding seat that bores the rifle is kept away from to the center pin, sliding seat outside fixedly connected with slide bar, the slide bar is equipped with a plurality of, the sliding seat outside is equipped with the positioning seat, is equipped with the spout in the positioning seat, is equipped with the spring in the spout. When the utility model is used, the drilling gun is stabilized by the positioning frame before drilling, the drilling gun is ensured to vertically drill, the hole is prevented from being askew due to shaking hands or colliding the drilling gun by workers, and the drilling precision is improved; a heat dissipation fan is arranged in the drill gun to assist the drill gun in heat dissipation, so that overhigh temperature caused by long-time use of the drill gun is avoided, and the service life of the drill gun is prolonged; the light is installed at the drill gun top, makes things convenient for the staff to work in the environment that light is darker.

Description

Building construction auxiliary device
Technical Field
The utility model relates to a construction field specifically is a construction auxiliary device.
Background
The electric drill is a drilling machine using electricity as power. The electric tool is a conventional product in the electric tools and is also a product of the electric tools with the largest demand. The annual production and sale quantity accounts for 35 percent of the China electric tools. The main specifications of the electric drill are 4, 6, 8, 10, 13, 16, 19, 23, 32, 38, 49mm and the like, and the number refers to the maximum diameter of the drill bit for drilling on steel with the tensile strength of 390N/mm 2. The maximum drilling diameter of the drilling hole for materials such as nonferrous metals, plastics and the like can be 30-50% larger than the original specification.
However, current brill rifle does not have positioner, and the staff can shake or collide the brill rifle reason because of the hand and lead to punching and beat partially, influence the precision of punching. Therefore, the utility model provides a construction auxiliary device to solve the above-mentioned problem of proposing.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a construction auxiliary device to solve the problem that proposes among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme:
a building construction auxiliary device comprises a drilling gun, wherein a first clamping piece and a second clamping piece are respectively arranged outside the drilling gun, a central shaft is arranged in the first clamping piece, the first clamping piece and the second clamping piece are hinged through the central shaft, connecting pieces are fixedly connected to the bottoms of the first clamping piece and the second clamping piece respectively, a fastening piece is arranged in each connecting piece, one end, away from the drilling gun, of the central shaft is fixedly connected with a sliding seat, sliding rods are fixedly connected to the outer side of the sliding seat, a plurality of sliding rods are arranged, sliding blocks are fixedly connected to the tail ends of the sliding rods, positioning seats are arranged on the outer side of the sliding seat, sliding grooves are arranged in the positioning seats, a plurality of sliding grooves are arranged in each sliding seat, the sliding rods and the sliding blocks are both in sliding connection with the sliding grooves, and springs are arranged in the sliding grooves;
the bottom of the drill gun is fixedly connected with a handle, and a control switch is installed in the handle.
As a further proposal, the end of the positioning seat is provided with a screwed joint, and the outside of the positioning seat is connected with a positioning frame by screw thread.
As the utility model discloses scheme further still, locating rack outside fixedly connected with bracing piece, the inboard fixedly connected with locating lever of locating rack, bracing piece and locating lever all are equipped with a plurality of.
As the utility model discloses scheme further again, bore rifle bottom fixedly connected with auxiliary handle, auxiliary handle and handle all are equipped with the slipmat outward.
As the utility model discloses scheme further again, be equipped with the heat dissipation fan in the brill rifle, the heat dissipation fan is equipped with the protection network outward, protection network and brill rifle fixed connection.
As the utility model discloses further scheme again, bore rifle top fixedly connected with lamp stand, install the light in the lamp stand.
Compared with the prior art, the beneficial effects of the utility model are that:
1. through the utility model, the drill gun is stabilized by the positioning frame before drilling, so that the drill gun is ensured to vertically drill, the hole is prevented from being askew due to shaking hands or colliding the drill gun by workers, and the drilling precision is improved;
2. a heat dissipation fan is arranged in the drill gun to assist the drill gun in heat dissipation, so that overhigh temperature caused by long-time use of the drill gun is avoided, and the service life of the drill gun is prolonged; the light is installed at the drill gun top, makes things convenient for the staff to work in the environment that light is darker.
Drawings
Fig. 1 is a schematic structural view of a construction assisting apparatus.
Fig. 2 is a connection diagram of a positioning seat and a sliding seat in the auxiliary device for building construction.
Fig. 3 is a connection diagram of a heat dissipation fan and a drill gun in the building construction auxiliary device.
In the figure: 1. drilling a gun; 2. a first clamp member; 3. a second clamp; 4. a central shaft; 5. a sliding seat; 6. a slide bar; 7. a slider; 8. positioning seats; 9. a chute; 10. a spring; 11. a connecting frame; 12. a threaded joint; 13. a positioning frame; 14. a support bar; 15. positioning a rod; 16. a drill bit; 17. a connecting member; 18. a fastener; 19. a handle; 20. a non-slip mat; 21. an auxiliary handle; 22. a control switch; 23. a heat dissipation fan; 24. a protective net; 25. a lamp socket; 26. an illuminating lamp.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1 to 3, in an embodiment of the present invention, an auxiliary device for building construction includes a drill gun 1, a drill bit 16 is installed in the drill gun 1, a first clamping member 2 and a second clamping member 3 are respectively installed outside the drill gun 1, a central shaft 4 is installed in the first clamping member 2, the first clamping member 2 and the second clamping member 3 are hinged through the central shaft 4, a connecting member 17 is fixedly connected to the bottom of each of the first clamping member 2 and the second clamping member 3, a fastening member 18 is installed in the connecting member 17, a sliding seat 5 is fixedly connected to one end of the central shaft 4 away from the drill gun 1, a sliding rod 6 is fixedly connected to the outside of the sliding seat 5, a plurality of sliding rods 6 are installed on the sliding rod 6, a sliding block 7 is fixedly connected to the end of the sliding rod 6, a positioning seat 8 is installed on the outside of the sliding seat 5, a sliding chute 9 is installed in the positioning seat 8, a plurality of sliding chutes 9 are installed on the sliding rod 6 and the sliding block 7 are slidably connected to the sliding groove 9, a spring 10 is installed in the sliding chute 9, a connecting frame 11 is arranged in the positioning seat 8, a threaded joint 12 is arranged at the tail end of the positioning seat 8, a positioning frame 13 is in threaded connection with the outer side of the positioning seat 8, a supporting rod 14 is fixedly connected with the outer side of the positioning frame 13, a positioning rod 15 is fixedly connected with the inner side of the positioning frame 13, and a plurality of supporting rods 14 and positioning rods 15 are arranged;
the bottom of the drill gun 1 is fixedly connected with a handle 19, a control switch 22 is installed in the handle 19, an auxiliary handle 21 is fixedly connected with the bottom of the drill gun 1, anti-slip pads 20 are arranged on the outer sides of the auxiliary handle 21 and the handle 19, a heat dissipation fan 23 is arranged in the drill gun 1, a protective screen 24 is arranged outside the heat dissipation fan 23, the protective screen 24 is fixedly connected with the drill gun 1, a lamp holder 25 is fixedly connected with the top of the drill gun 1, and a lighting lamp 26 is installed in the lamp holder 25.
The utility model discloses a theory of operation is:
the drilling gun 1 is clamped by a first clamping piece 2 and a second clamping piece 3, a fastening piece 18 is fastened, the first clamping piece 2 and the second clamping piece 3 are driven by a connecting piece 17 to clamp the drilling gun 1, a positioning frame 13 is abutted to the wall surface during drilling, a positioning rod 15 surrounds a drilling position, the drilling gun 1 is started and pushes the drilling gun 1, the drilling gun 1 pushes a sliding seat 5 to move, the sliding seat 5 drives a sliding rod 6 and a sliding block 7 to move in a sliding groove 9, after a drill bit 16 is contacted with the wall surface and performs drilling, the drilling gun 1 is closed, the drill bit 16 is pulled out, and after the positioning frame 13 leaves the wall surface, a spring 10 rebounds to reset a positioning seat 8; the heat dissipation fan 23 is arranged in the drill gun 1 to assist the drill gun 1 in dissipating heat, so that overhigh temperature caused by long-time use of the drill gun 1 is avoided, and the service life of the drill gun 1 is prolonged; the top of the drilling gun 1 is provided with a lighting lamp 26, so that workers can work in a dark environment conveniently.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (6)

1. The building construction auxiliary device comprises a drilling gun (1) and is characterized in that a first clamping piece (2) and a second clamping piece (3) are respectively arranged outside the drilling gun (1), a central shaft (4) is arranged in the first clamping piece (2), the first clamping piece (2) and the second clamping piece (3) are hinged through the central shaft (4), connecting pieces (17) are fixedly connected to the bottoms of the first clamping piece (2) and the second clamping piece (3), fastening pieces (18) are arranged in the connecting pieces (17), a sliding seat (5) is fixedly connected to one end, far away from the drilling gun (1), of the central shaft (4), a plurality of sliding rods (6) are fixedly connected to the outer side of the sliding seat (5), a plurality of sliding rods (6) are arranged, a sliding block (7) is fixedly connected to the tail end of each sliding rod (6), a positioning seat (8) is arranged on the outer side of each sliding seat (5), a sliding chute (9) is arranged in each positioning seat (8), and a plurality of chutes (9) are arranged, the sliding rod (6) and the sliding block (7) are both connected with the sliding chute (9) in a sliding way, and a spring (10) is arranged in the sliding chute (9);
the bottom of the drilling gun (1) is fixedly connected with a handle (19), and a control switch (22) is installed in the handle (19).
2. The building construction auxiliary device is characterized in that a threaded joint (12) is arranged at the tail end of the positioning seat (8), and a positioning frame (13) is in threaded connection with the outer side of the positioning seat (8).
3. The building construction auxiliary device according to claim 2, characterized in that a support rod (14) is fixedly connected to the outer side of the positioning frame (13), a positioning rod (15) is fixedly connected to the inner side of the positioning frame (13), and a plurality of support rods (14) and positioning rods (15) are arranged.
4. The building construction auxiliary device according to claim 1, characterized in that an auxiliary handle (21) is fixedly connected to the bottom of the drill gun (1), and anti-slip pads (20) are arranged outside the auxiliary handle (21) and the handle (19).
5. The building construction auxiliary device according to claim 1, characterized in that a heat dissipation fan (23) is arranged in the drilling gun (1), a protective screen (24) is arranged outside the heat dissipation fan (23), and the protective screen (24) is fixedly connected with the drilling gun (1).
6. A construction aid according to claim 1, characterized in that a lamp holder (25) is fixedly connected to the top of the drill gun (1), and a lighting lamp (26) is arranged in the lamp holder (25).
CN202022213943.6U 2020-10-08 2020-10-08 Building construction auxiliary device Expired - Fee Related CN214055147U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022213943.6U CN214055147U (en) 2020-10-08 2020-10-08 Building construction auxiliary device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022213943.6U CN214055147U (en) 2020-10-08 2020-10-08 Building construction auxiliary device

Publications (1)

Publication Number Publication Date
CN214055147U true CN214055147U (en) 2021-08-27

Family

ID=77395400

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022213943.6U Expired - Fee Related CN214055147U (en) 2020-10-08 2020-10-08 Building construction auxiliary device

Country Status (1)

Country Link
CN (1) CN214055147U (en)

Similar Documents

Publication Publication Date Title
CN210450353U (en) Extrusion die frame for standard part
CN102764982A (en) Automatic screw fastening machine
CN102717261A (en) Automatic bolt screwing machine
CN214055147U (en) Building construction auxiliary device
CN214642005U (en) Hydraulic clamp for mine machining
CN202162411U (en) Portable hand bench drill
CN219598723U (en) Workpiece clamping device for automatic machine tool
CN107414153A (en) Cylindrical workpiece end face radial direction slotting attachment
CN205074840U (en) Tapping clamp
CN208826544U (en) A kind of trolley type breaker energy storage spring assembling/disassembling tool
CN216540669U (en) Steel bar sleeve connecting device
CN212946726U (en) Novel full-automatic numerical control lathe manipulator
CN213104611U (en) Boring machining clamp for bearing seat
CN213437959U (en) Manipulator with adjustment mechanism
CN210789650U (en) Robot ultrasonic welding device
CN219582264U (en) Radial drilling machine for machining steel members in different shapes
CN208800807U (en) It is a kind of for processing the drilling device of handware
CN2900045Y (en) Portable hand bench drill
CN221561343U (en) Electric manipulator capable of clamping objects with multiple specifications
CN216542114U (en) A processing platform for hardware fitting numerical control processing
CN212239285U (en) Drilling device for numerical control lathe
CN205765115U (en) A kind of fire hydrant key fixture and the horizontal machine tool with this fixture
CN219747133U (en) Direction is riser drilling frock
CN220547926U (en) CNC processing clamping fixture for multi-position simple part
CN220407183U (en) Drilling equipment for manufacturing steel structure fittings

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210827

CF01 Termination of patent right due to non-payment of annual fee