CN214035959U - Separation and combination type tool for segmented tower - Google Patents

Separation and combination type tool for segmented tower Download PDF

Info

Publication number
CN214035959U
CN214035959U CN202022748207.0U CN202022748207U CN214035959U CN 214035959 U CN214035959 U CN 214035959U CN 202022748207 U CN202022748207 U CN 202022748207U CN 214035959 U CN214035959 U CN 214035959U
Authority
CN
China
Prior art keywords
positioning
outer roller
board
positioning member
tower
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022748207.0U
Other languages
Chinese (zh)
Inventor
崔旭
刘波
周柳泉
刘红艳
栾公灿
王孝松
马子红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong CRRC Tongli Steel Structure Co Ltd
Original Assignee
Shandong CRRC Tongli Steel Structure Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong CRRC Tongli Steel Structure Co Ltd filed Critical Shandong CRRC Tongli Steel Structure Co Ltd
Priority to CN202022748207.0U priority Critical patent/CN214035959U/en
Application granted granted Critical
Publication of CN214035959U publication Critical patent/CN214035959U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/72Wind turbines with rotation axis in wind direction
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/728Onshore wind turbines

Landscapes

  • Wind Motors (AREA)

Abstract

The utility model relates to a separating and combining type tool for a sectional type tower, which comprises three positioning pieces, wherein the three positioning pieces are spliced to form a circular ring structure, and adjacent positioning pieces are detachably connected through connecting pieces; the setting element includes outer roller board and inner arc board, is connected through the support column between outer roller board and the inner arc board, and the central axis of support column passes ring column structure's center, and the cover is equipped with the slip layer board on the stand, is equipped with rectangular shape hole in the slip layer board, the connecting hole of rectangular shape hole adaptation in the pylon flange. The utility model discloses can realize the location of burst formula pylon when separation and equipment, can reduce the damage of pylon.

Description

Separation and combination type tool for segmented tower
Technical Field
The utility model belongs to the technical field of the tooling equipment, concretely relates to separation, combination formula frock are used to burst formula pylon.
Background
The statements herein merely provide background related to the present disclosure and may not necessarily constitute prior art.
With the technology of wind power generation becoming mature day by day and the development of wind resources for many years, most of wind fields of the plain class are developed and finished, and a grid-connected power generation mode is entered. The near phase begins to enter the development of high altitude, low wind speed areas. The tower height also gradually breaches 130 meters from 70 meters.
However, the increase of the height of the tower also corresponds to the sharp increase of the construction cost of the wind field in the mountainous area. The requirements for straightness and gradient of roads in the site are multiplied, and the expenses for road operation, post maintenance and the like in the site are increased along with the increase. And an increase in tower height, also corresponds to an increase in tower diameter. The main transportation mode of the existing tower is road transportation, the limit height of the existing road transportation is usually 5 meters, which means that the diameter of the tower exceeds 4.6 meters, a special transport vehicle is needed to meet the transportation requirement, and along with the increase of the diameter of the tower, the diameter required by the height of the existing tower must reach 6.7 meters to meet the use requirement and the safety performance, and if the traditional tower mode is utilized, the tower cannot reach a wind field. A novel segmented tower is generated, and the tower can be divided into three segments, so that the height of the tower in the transportation process can be reduced, and the transportation requirements can be met. And can be assembled in advance after arriving at the machine position and then hoisted.
The inventor understands that the emerging segmented tower can meet the requirement of on-site road transportation, but new requirements are put on the production of the tower, and the traditional production mode is required to be changed and upgraded. The process of separating the tower is required to be added, and because the tonnage of the tower is heavier, and the requirement of the tower on the flatness of the flange is within the range of 2mm, the flange is not damaged or deformed in the separation process, and the vertical flange in the cylinder is not damaged when the tower is placed after separation, so that the tower cannot collide with the flange. Most of the existing separated tower frame separation tools are fixed, corresponding protective measures cannot be taken during cutting and separation, and the separated tower frame needs to be manufactured with a tool again for supporting.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a separation, combination formula frock are used to burst formula pylon can solve one of above-mentioned technical problem at least.
In order to achieve the above object, one or more embodiments of the present invention provide a separating and assembling tool for a segmented tower, comprising three positioning elements, wherein the three positioning elements are spliced to form a circular structure, and adjacent positioning elements are detachably connected by a connecting element; the setting element includes outer roller board and inner arc board, is connected through the support column between outer roller board and the inner arc board, and the central axis of support column passes ring column structure's center, and the cover is equipped with the slip layer board on the stand, is equipped with rectangular shape hole in the slip layer board, the connecting hole of rectangular shape hole adaptation in the pylon flange.
As a further improvement, the positioning element is of an arc-shaped plate structure, the positioning element comprises a first positioning element, a second positioning element and a third positioning element which are sequentially arranged along the circumferential direction, the second positioning element and the third positioning element are vertically symmetrical, and supporting legs are respectively arranged below the second positioning element and the third positioning element.
As further improvement, the side face of each outer roller plate is provided with a concave-convex structure, and the concave-convex structures between the two outer roller plates which are spliced mutually can be mutually spliced to realize positioning.
The beneficial effects of one or more of the above technical solutions are as follows:
by adopting a sliding support plate structure, the strip-shaped holes in the sliding support plate can be fixedly connected with the bolt holes in the tower flange through bolts, so that the device can realize the clamping function during tower division through fixation with the flange on the end surface of the tower; after the tower is divided, the synchronous separation between the positioning piece and the tower can be realized by disassembling the connecting piece, and the probability of damage to the tower can be reduced without arranging additional tools in subsequent processes and installation.
The sliding support plate is connected with the upright column in a sliding mode, the sliding support plate slides along the upright column, the sliding support plate is convenient to adapt to towers with different diameters and sizes, and the application range of the device is widened.
The mode that the concave-convex structure is disassembled from each other is adopted, so that the positioning between a plurality of positioning pieces in the device and a plurality of tower fragments in the tower is realized in the process of re-installing the tower, and the speed of assembling the tower is improved.
Drawings
The accompanying drawings, which are incorporated in and constitute a part of this application, illustrate embodiments of the application and, together with the description, serve to explain the application and are not intended to limit the application.
Fig. 1 is a schematic view of the overall structure in the embodiment of the present invention;
fig. 2 is an exploded view of the overall structure in an embodiment of the invention;
fig. 3 is a schematic structural view of a first positioning member in an embodiment of the present invention;
FIG. 4 is a schematic view of the second positioning member and the third positioning member of the embodiment of the present invention;
fig. 5 is a schematic structural view of a second positioning member in an embodiment of the present invention;
FIG. 6 is a schematic structural view illustrating three positioning members spliced and fixed to each other according to an embodiment of the present invention;
FIG. 7 is an enlarged view of the structure of portion A of FIG. 6;
FIG. 8 is an enlarged view of the structure of portion B of FIG. 7;
figure 9 is a schematic view of an embodiment of the invention with the sliding pallet in the first position;
figure 10 is a schematic view of an embodiment of the present invention with the sliding pallet in the second position.
In the figure, 1, an outer roller plate; 2. a connecting member; 3. a pin shaft; 4. a strip-shaped hole; 5. an inner arc plate; 6. a sliding support plate; 7. a support pillar; 8. a support leg; 9. a first positioning member 10, a second positioning member; 11. a third positioning member; 201. a first positioning member; 202. a first bolt; 203. a second positioning member; 204. and a second bolt.
Detailed Description
It should be noted that the following detailed description is exemplary and is intended to provide further explanation of the disclosure. Unless defined otherwise, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this application belongs.
It is noted that the terminology used herein is for the purpose of describing particular embodiments only and is not intended to be limiting of example embodiments according to the present application. As used herein, the singular forms "a", "an" and "the" are intended to include the plural forms as well, and it should be understood that when the terms "comprises" and/or "comprising" are used in this specification, they specify the presence of stated features, steps, operations, devices, components, and/or combinations thereof, unless the context clearly indicates otherwise.
Aiming at the problems that the existing tool cannot be transferred to the next procedure along with the separation tower, cannot protect the separation process and cannot have the function of reassembling the tower, the embodiment provides a novel separation and assembly type tool which meets the requirements of a segmented tower.
In a typical embodiment of the present invention, as shown in fig. 1 to 10, the present embodiment provides a separating and assembling tool for a segmented tower, which includes three positioning elements, the three positioning elements are spliced to form a circular structure, and adjacent positioning elements are detachably connected by a connecting element 2; the setting element includes outer roller board 1 and inner arc board 5, is connected through support column 7 between outer roller board 1 and the inner arc board 5, and the central axis of support column 7 passes the center of circle annular structure, and the cover is equipped with slip layer board 6 on the stand, is equipped with rectangular shape hole 4 in the slip layer board 6, the connecting hole of rectangular shape hole 4 adaptation in the pylon flange.
In this embodiment, the positioning element is an arc-shaped plate-shaped structure, the positioning element includes a first positioning element 9, a second positioning element 10 and a third positioning element 11, which are sequentially arranged along a circumferential direction, the second positioning element 10 and the third positioning element 11 are vertically symmetrical, and the supporting legs 8 are respectively arranged below the second positioning element 10 and the third positioning element 11.
In this embodiment, the outer roller plate 1 and the inner arc plate 5 are both arc-shaped plate structures. The arc-shaped plate-shaped structure can reduce material occupation and processing difficulty under the condition of ensuring that the outer contour is arc; it is understood that in other embodiments, other structures such as a fan shape may be adopted as long as the outer contours of the plurality of outer roller plates 1 can be spliced into a complete circle.
In this embodiment, the sliding support plate 6 includes a sliding sleeve, the sliding strip is sleeved outside the upright post, side plates are respectively installed on two sides of the sliding sleeve, and the side plates are provided with the elongated holes 4. The side plates are arc-shaped plates. A plurality of first positioning holes are formed in the stand column along the axis direction of the stand column, a second positioning hole is formed in the sliding sleeve, and the first positioning holes and the second positioning holes are fixed through inserting pin shafts.
The connecting piece 2 comprises connecting plates and bolts, the connecting plates are respectively fixed at the side edges of the positioning piece, and two adjacent connecting plates are fixed through the bolts. The connecting plates are respectively arranged at the outer roller plate 1 and the inner arc plate 5.
In this embodiment, the connecting plate installed at the outer roller plate 1 is a first connecting plate 201, the connecting plate installed at the inner arc plate 5 is a second connecting plate 203, adjacent first connecting plates 201 are fixedly connected through a first bolt 202, and adjacent second connecting plates 203 are fixedly connected through a second bolt 204.
A plurality of through holes along the circumferential direction are formed in the outer roller plate 1. It can be understood that the through holes are used for facilitating the hoisting of the positioning element, or the connection of the second positioning element 10 and the third positioning element 11 with the supporting leg 8. The supporting legs 8 are fixedly connected with the second positioning part 10 and the second positioning part 10 through bolts respectively.
It can be understood that, in the present embodiment, a leg 8 (not shown in the drawings) is detachably connected to the first positioning member, and the connection manner of the first positioning member in the leg 8 may refer to the connection between the second positioning member and the leg and the connection manner of the third positioning member and the leg. In this embodiment, the side of outer roller board 1 department is equipped with concave-convex structure, and concave-convex structure between two outer roller boards 1 that splice mutually can peg graft each other to realize the location.
The working principle is as follows: when the device is used for clamping and positioning the tower before splitting:
the first step is as follows: and (3) assembling, namely assembling the tool after the tower frame finishes a circular seam process, fixing the tool by using the slotted hole and the flange hole on the sliding support plate 6 after the tower frame is integrated, fastening the tool on the flange surface by using bolts at least at 6 points, and needing one tool for each flange. And entering the second step.
Specifically, in the first step, the tool is firstly assembled, the components are tiled on the ground and assembled in advance, the tool can be divided into three pieces (namely three positioning pieces) and consistent with the slicing mode of the corresponding slicing tower, the three slicing tools are spliced into a complete circle, the three slicing tools are connected by using connecting plates and bolts, the connecting plates at the positions of the inner arc plates 5 are connected firstly, and the connecting plates of the outer roller plates 1 are connected after fastening.
After the initial assembly, the bolts are fastened to prevent loosening. And then the sliding support plate 6 is adjusted to a proper position, so that the tool positioning hole (namely the strip-shaped hole 4) on the sliding support plate 6 and the flange hole in the tower are positioned on the same circle of outer diameter. Currently, the outer diameter of a mounting flange hole is determined according to a drawing, and then adjustment is carried out according to scales on a main upright post. After the position is adjusted, the position is fixed by a pin shaft 3. Specifically, the pin shaft 3 penetrates through the side wall of the sliding sleeve and is tightly pressed on the outer wall of the upright post. The relative positions of the sliding bracket and the upright are positions when the first position and the second position are shown in fig. 9 and 10, respectively. Is suitable for towers with different diameter sizes.
The second step is that: and cutting, namely cutting the tower frame into the slicing and cutting process, and cutting the tower frame by using a cutting trolley according to a line drawn in advance, wherein the tower frame is not separated by itself after cutting because the tool is assembled into a whole, and the third step is carried out after all the tower frames are cut.
The third step: the first positioning member 9 is separated. And (3) installing a lifting ring in a round hole in the outer roller plate 1, decomposing the concave-convex structure and the outer roller plate 1, connecting the lifting ring by using a travelling crane, lifting the first positioning piece 9 to separate the tower frame to vertically lift, and entering the fourth step.
The fourth step: and (5) separating. And separating the rest two towers, utilizing the supporting legs 8 to ensure that the two towers are horizontally placed on the ground, and separating the concave-convex structure and the outer roller plate 1 to form two independent tools in a separated state. And then entering the fifth step.
The fifth step: can utilize frock direct contact ground for the continuation circulation of depositing or the subsequent handling of burst pylon, the going on of sanding spraying paint is carried out more easily to this kind of angle.
And a sixth step: and in combination, after the tower reaches a machine position after the tower is produced, the tower can be assembled by utilizing the tool on the segmented tower, and the concave-convex structure can be utilized to quickly position and combine, so that the size of the tower after integration is ensured.
The beneficial effect of this embodiment is: traditional frock is fixed, only uses when being used for the pylon separation, and the characteristics of this embodiment are exactly by the pylon separation, become the frock separation, and the frock after the separation can follow the pylon from production, separation, transportation, machine position equipment etc. whole processes, and cyclic use need not change the frock, causes the trouble of dismantling many times, avoids the in-process to take place the incident, or causes the damage to the pylon. And the production efficiency can be greatly improved.
Although the present invention has been described with reference to the accompanying drawings, it is not intended to limit the scope of the present invention, and those skilled in the art should understand that various modifications or variations that can be made by those skilled in the art without inventive work are still within the scope of the present invention.

Claims (10)

1. A separating and combining type tool for a segmented tower is characterized by comprising three positioning pieces, wherein the three positioning pieces are spliced to form a circular ring structure, and adjacent positioning pieces are detachably connected through connecting pieces;
the setting element includes outer roller board and inner arc board, is connected through the support column between outer roller board and the inner arc board, and the central axis of support column passes ring column structure's center, and the cover is equipped with the slip layer board on the stand, is equipped with rectangular shape hole in the slip layer board, the connecting hole of rectangular shape hole adaptation in the pylon flange.
2. The separating and combining tool for the segmented tower frame according to claim 1, wherein the positioning member is an arc-shaped plate-shaped structure, the positioning member comprises a first positioning member, a second positioning member and a third positioning member which are sequentially arranged along a circumferential direction, the second positioning member and the third positioning member are vertically symmetrical, and supporting legs are respectively arranged below the second positioning member and the third positioning member.
3. The split-type tower frame separating and assembling tool according to claim 1, wherein the outer roller plate and the inner arc plate are both arc-shaped plate structures.
4. The separating and assembling tool for the segmented tower frame according to claim 1, wherein the sliding support plate comprises a sliding sleeve, the sliding strip is sleeved outside the upright post, side plates are respectively installed on two sides of the sliding sleeve, and the elongated holes are formed in the side plates.
5. The split-type tower frame separating and combining tool according to claim 1, wherein the connecting piece comprises connecting plates and bolts, the connecting plates are respectively fixed at the side edges of the positioning piece, and two adjacent connecting plates are fixed through the bolts.
6. The split-type tower frame separation and combination tool according to claim 4, wherein the upright column is provided with a plurality of first positioning holes along the axis direction of the upright column, the sliding sleeve is provided with second positioning holes, and the first positioning holes and the second positioning holes are fixed through inserting pins.
7. The split-type tower frame separating and assembling tool according to claim 1, wherein a plurality of through holes are formed in the outer roller plate in the circumferential direction.
8. The split-type tower frame separation and combination tool according to claim 1, wherein the side surfaces of the outer roller plates are provided with concave-convex structures, and the concave-convex structures between the two spliced outer roller plates can be mutually spliced to realize positioning.
9. The split-type tower frame separation and combination tool according to claim 2, wherein the support legs are fixedly connected with the second positioning piece and the second positioning piece through bolts respectively.
10. The split-type tower separating and assembling tool according to claim 4, wherein the side plates are arc-shaped plates.
CN202022748207.0U 2020-11-24 2020-11-24 Separation and combination type tool for segmented tower Active CN214035959U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022748207.0U CN214035959U (en) 2020-11-24 2020-11-24 Separation and combination type tool for segmented tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022748207.0U CN214035959U (en) 2020-11-24 2020-11-24 Separation and combination type tool for segmented tower

Publications (1)

Publication Number Publication Date
CN214035959U true CN214035959U (en) 2021-08-24

Family

ID=77361796

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022748207.0U Active CN214035959U (en) 2020-11-24 2020-11-24 Separation and combination type tool for segmented tower

Country Status (1)

Country Link
CN (1) CN214035959U (en)

Similar Documents

Publication Publication Date Title
EP3730782B1 (en) Support assembly, splice tooling and splice method
CN113235948B (en) Spatial vertical rotation construction method for steel structure roof of large-scale venue
CN110497158B (en) Manufacturing process of segmented tower
CN101434325B (en) Vertical shaft wind power generator transportation method
CN214035959U (en) Separation and combination type tool for segmented tower
CN211141292U (en) Special bracket for integral hoisting of air pipe
CN211343226U (en) Integrated tool for transferring and deformation preventing of blades
CN109113938B (en) Segmented variable-pitch bearing reinforcing flange for wind turbine generator and air installation method of segmented variable-pitch bearing reinforcing flange
CN217198624U (en) Multi-functional six unmanned aerial vehicle that possess big load capacity
CN215804960U (en) Fan concrete shell ring concatenation construction operation platform
CN110748156A (en) Sliding positioning top supporting structure of large silo and construction method thereof
CN214366539U (en) Segment type tower drum annular platform, segment type tower drum and wind generating set
CN212421145U (en) Disassembling tool
CN110424811B (en) Construction method of steel structure indirect cooling tower expansion platform
CN111295491B (en) Method for producing segments of a multi-part tower segment
CN209494209U (en) A kind of building template environment-friendly type aluminum profile
CN210788901U (en) Clamp for connecting and fixing drawing die and drawing machine
CN113863739A (en) Rapid installation method and device for modular cold box
CN112879232A (en) Fan impeller assembling platform and construction method
CN218931433U (en) Offshore wind power bolt assembly hoisting tool
CN216633242U (en) Tool for H-shaped steel column
CN214885399U (en) Adjustable operation construction equipment of steel column
CN204235099U (en) Hydraulic turbine connecting shaft bolt disassembly platform frock
CN221341107U (en) Photoelectric load quick assembly disassembly hanging type installing support
CN112942798A (en) Adjustable construction operation device and installation method for super high-rise huge section steel column

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant