CN214033392U - A reinforcing bar mounting platform for high mound turns over mould construction - Google Patents

A reinforcing bar mounting platform for high mound turns over mould construction Download PDF

Info

Publication number
CN214033392U
CN214033392U CN202022496410.3U CN202022496410U CN214033392U CN 214033392 U CN214033392 U CN 214033392U CN 202022496410 U CN202022496410 U CN 202022496410U CN 214033392 U CN214033392 U CN 214033392U
Authority
CN
China
Prior art keywords
platform
connecting piece
reinforcing bar
mounting platform
construction according
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022496410.3U
Other languages
Chinese (zh)
Inventor
张�林
王展望
李永坤
霍温克
康学亮
杨一方
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinohydro Bureau 11 Co Ltd
PowerChina 11th Bureau Engineering Co Ltd
Original Assignee
Sinohydro Bureau 11 Co Ltd
PowerChina 11th Bureau Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinohydro Bureau 11 Co Ltd, PowerChina 11th Bureau Engineering Co Ltd filed Critical Sinohydro Bureau 11 Co Ltd
Priority to CN202022496410.3U priority Critical patent/CN214033392U/en
Application granted granted Critical
Publication of CN214033392U publication Critical patent/CN214033392U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Revetment (AREA)

Abstract

The utility model provides a reinforcing bar mounting platform for high mound turns over mould construction, it includes the pier stud, still includes mouthful style of calligraphy support body, mouthful style of calligraphy support body lower part pass through trapezoidal support frame setting and be in the exterior sheathing of pier stud on, trapezoidal support frame on transversely be provided with first connecting piece, mouthful style of calligraphy support body outside vertically be provided with the stand, stand bottom set up first connecting piece on, mouthful style of calligraphy support body on be provided with the multilayer platform. The utility model has the advantages that the lower trapezoidal support frame is connected with the template, thereby enhancing the stability and wind resistance of the mounting platform, ensuring the working environment of constructors and improving the working efficiency; the mounting platform is assembled and molded through the upright posts, so that the integral structure is simple and not heavy, and the mounting, debugging and construction operation are convenient; the mounting platform is multilayer structure, and the installation of the reinforcing bar on next pouring layer after the high pier stud turns over to rise of being convenient for has solved the system of reinforcing bar when turning over the high latitude operation of lift template and has installed the problem.

Description

A reinforcing bar mounting platform for high mound turns over mould construction
Technical Field
The utility model relates to a building installation field, especially a reinforcing bar mounting platform for high mound turns over mould construction.
Background
In the process of rapid development of the transportation industry, modern coastal urban highways are limited by urban construction, and conflict between highway city penetration and urban planning is avoided, so that the highways are planned and arranged along the periphery of a city in the line selection process and are provided with a plurality of high pier stud bridges.
At present, the high pier column construction method mainly comprises a sliding formwork, a creeping formwork and an overturning formwork construction process, and the following defects exist in the steel bar installation process by adopting the traditional overturning formwork construction: 1. scaffold erection platforms are adopted in the formwork turnover construction steel bar installation operation, and the construction is heavy and inconvenient; 2. the operation platform is not connected with the template, the overall stability and the wind resistance are poor, and the construction efficiency of constructors is reduced. Therefore, how to manufacture the steel bar installation platform for the high pier rollover construction, which can solve the problems in the prior art, is a technical problem to be solved.
SUMMERY OF THE UTILITY MODEL
The utility model discloses just based on above-mentioned technical problem, provided a reinforcing bar mounting platform for high mound turns over mould construction to solve the problem that exists among the above-mentioned background art.
In view of this, the utility model provides a reinforcing bar mounting platform for high mound turns over mould construction, it includes: the pier stud still includes mouthful style of calligraphy support body, mouthful style of calligraphy support body lower part pass through the trapezoidal support frame setting and be in the exterior sheathing of pier stud on, the trapezoidal support frame on transversely be provided with first connecting piece, mouthful style of calligraphy support body outside vertically be provided with the stand, stand bottom set up first connecting piece on, mouthful style of calligraphy support body on be provided with the multilayer platform.
In the above technical solution, preferably, the platforms of multiple layers are correspondingly provided with passing openings, and the platform further comprises ladder frames, wherein the ladder frames are arranged at the passing openings of the platforms of multiple layers.
In the above technical solution, preferably, the passage opening is detachably provided with a cover plate, and the cover plate is a foldable cover plate.
In the above technical solution, preferably, the bottom of the upright post is provided with a second connecting piece adapted to the first connecting piece, and the first connecting piece and the second connecting piece are detachably arranged through a U-shaped connecting fastener.
In the above technical solution, preferably, the second connecting member and the first connecting member are arranged in a lap joint manner, two positioning holes are respectively arranged at the lap joint of the second connecting member and the first connecting member, and the U-shaped connecting fastener passes through the trapezoidal support frame and is fixed on the positioning holes.
In the above technical solution, preferably, a diagonal member is disposed between the trapezoid supporting frame and the formwork.
In the above technical solution, preferably, a diagonal bracing member is disposed between the platform and the upright.
In the above technical solution, preferably, the platform is paved with a steel mesh sheet and a skirting board.
In the above technical solution, preferably, the platform outer ring is provided with a protective net.
In the above technical scheme, preferably, the square frame body is octagonal, and the octagonal portion of the square frame body is provided with the upright posts respectively.
The utility model provides a reinforcing bar mounting platform for high mound rollover construction, compared with the prior art, the utility model discloses a trapezoidal support frame is connected with the template, has strengthened mounting platform's stability and anti-wind ability, guarantees constructor's operation environment, has improved the operating efficiency; the mounting platform is assembled and molded through the upright posts, so that the integral structure is simple and not heavy, and the mounting, debugging and construction operation are convenient; the installation platform is of a multilayer structure, so that the installation of the steel bars of the next pouring layer after the high pier stud is turned over is facilitated, and the problem of steel bar manufacturing and installation during high-altitude operation of the turning-over and lifting template is solved; the utility model discloses hoist and mount construction convenience, dismouting are efficient, and the construction operation is smooth and easy, has improved the security and the travelling comfort of construction operation.
Drawings
Fig. 1 shows a schematic view of the overall structure of the present invention;
FIG. 2 is a schematic view showing the connection structure of the U-shaped connection fastener;
in the figure: the device comprises a template 1, a trapezoidal support frame 2, upright columns 3, a first connecting piece 4, a platform 5, diagonal bracing rod pieces 6, a ladder frame 7, a cover plate 8, a protective net 9, diagonal tension rod pieces 10, a U-shaped connecting fastener 11, a through opening 12, a second connecting piece 13 and a positioning hole 14.
Detailed Description
In order to make the aforementioned objects, features and advantages of the present invention more clearly understood, the present invention will be described in further detail with reference to the accompanying drawings and detailed description.
In the following description, numerous specific details are set forth in order to provide a thorough understanding of the present invention, however, the present invention may be practiced in other ways than those specifically described herein, and thus the scope of the present invention is not limited by the disclosure below.
The technical solution of the present invention is further explained with reference to fig. 1 and 2.
A first embodiment, as shown in fig. 1 and 2: the utility model provides a reinforcing bar mounting platform for high mound rollover construction, it includes: the pier column further comprises a square frame body, the lower part of the square frame body is arranged on an outer template 1 of the pier column through a trapezoid support frame 2, a first connecting piece 4 is transversely arranged on the trapezoid support frame 2, an upright column 3 is longitudinally arranged on the outer side of the square frame body, the bottom of the upright column 3 is arranged on the first connecting piece 4, and a plurality of layers of platforms 5 are arranged on the square frame body; the template 1 is a shaping steel template 1; the upright column 3 is a channel steel upright column 3; the protective net 9 is a plastic-coated safety protective net 9.
The platform 5 is correspondingly provided with a plurality of layers of passing openings 12, and the ladder rack 7 is arranged at the passing openings 12 of the platforms 5. A cover plate 8 is detachably arranged on the passing opening 12, the cover plate 8 is a foldable cover plate 8, the foldable cover plate 8 is a foldable reinforcing mesh cover plate, one end of the foldable cover plate is fixed by two nuts, and a single reinforcing steel bar at one end of the reinforcing mesh cover plate penetrates through the nuts to form a movable cover plate 8 hinged around one end;
the bottom of the upright post 3 is provided with a second connecting piece 13 matched with the first connecting piece 4, and the first connecting piece 4 and the second connecting piece 13 are detachably arranged through a U-shaped connecting fastener 11. The second connecting piece 13 and the first connecting piece 4 can be arranged in a lap joint mode, two positioning holes 14 are respectively formed in lap joints of the second connecting piece 13 and the first connecting piece 4, and the U-shaped connecting fastener 11 penetrates through the trapezoidal support frame 2 and is fixed on the positioning holes 14 through nuts.
An inclined pull rod piece 10 is arranged between the trapezoidal support frame 2 and the template 1. And an inclined strut rod 6 is arranged between the platform 5 and the upright post 3. And a steel mesh and a skirting board are paved on the platform 5. The platform 5 outer loop be provided with protection network 9, protection network 9 seal the protection for crossing plastic safety net filter screen. The square-shaped frame body is octagonal, and the octagonal position of the square-shaped frame body is provided with the upright posts 3 respectively.
In the use process: the overall dimension of the mounting platform is determined, the internal dimension does not influence the installation of the steel bars, and the whole mounting platform belongs to a single-upright-column multi-platform octagonal structure.
Pier stud structure is square, and the four corners is the fillet, and template 1 is in the unprocessed installing support of turning portion position, and the mounting platform four corners plane is connected for the oblique angle, connects and makes mounting platform under the current condition all around of not influencing, encorbelments the size reduction about the single face, makes mounting platform form the non-square structure's in plane stabilizer.
The operating platform 5 is provided with three layers of channels, the height of each layer of channel ensures that constructors can operate in a standing mode, only the outer side of one side of the operating platform is provided with a vertical supporting upright post 3, the operating platform 5 is supported by a trapezoidal supporting frame 2, a steel mesh is laid on the top of each layer of operating platform 5, and the mesh and a frame body are firmly welded; skirting boards are arranged at the feet of the operating platform 5, and a steel wire filter screen is integrally hung at the periphery of the operating platform.
Operation platform 5 is passed from top to bottom and is set up ladder frame 7, reserves logical mouth 12 at every layer of platform 5 passageway position, in order to avoid every layer of passageway to fall from logical mouth 12 in constructor operation process and cause the incident, sets up foldable apron 8 at logical mouth 12, and constructor in time covers apron 8 after passing.
The mounting platform is integrated through the upright post 3 and the first connecting piece 4, so that the integral stress on one side is ensured; the first connecting piece 4, the second connecting piece 13 and the trapezoidal support frame 2 are fixed through the U-shaped connecting fastener 11, so that the structure is stable, and the installation and the disassembly are convenient; the installation platform is fixed on the formwork 1 through the diagonal members 10 and the trapezoidal support frames 2, so that a stable truss structure is formed.
During the lifting period of the gate pier, the mounting platform is hoisted to the angle steel platform rod piece of the template 1 by adopting an automobile, assembled by the U-shaped connecting fastener and fixed with the diagonal member 10 by the trapezoidal support frame 2, so that the safety and stability of the construction process are ensured.
The utility model is used for the installation of reinforcing bar during the high pier stud construction of highway bridge, still can be applied to the construction of the independent high pier stud structure of other trades.
The above description is only for the purpose of illustrating the preferred embodiments of the present invention and is not to be construed as limiting the present invention, but is intended to cover various modifications and changes, which may be made by those skilled in the art. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (10)

1. The utility model provides a reinforcing bar mounting platform for high mound turns over mould construction, includes the pier stud, its characterized in that: still include mouthful style of calligraphy support body, mouthful style of calligraphy support body lower part pass through the trapezoidal support frame setting and be in the exterior sheathing of pier stud on, the trapezoidal support frame on transversely be provided with first connecting piece, mouthful style of calligraphy support body outside vertically be provided with the stand, stand bottom set up first connecting piece on, mouthful style of calligraphy support body on be provided with the multilayer platform.
2. The rebar installation platform for high pier rollover construction according to claim 1, wherein: the multilayer the platform on correspond and be provided with the mouth of passing through, still include the ladder frame, the ladder frame set up the multilayer the platform board pass mouth department.
3. The rebar installation platform for high pier rollover construction according to claim 2, wherein: the through opening is detachably provided with a cover plate, and the cover plate is a foldable cover plate.
4. A reinforcing bar mounting platform for high pier rollover construction according to claim 3, wherein: the bottom of the upright post is provided with a second connecting piece matched with the first connecting piece, and the first connecting piece and the second connecting piece are detachably arranged through a U-shaped connecting fastener.
5. A reinforcing bar mounting platform for high pier rollover construction according to claim 4, wherein: the second connecting piece and the first connecting piece can be arranged in a lap joint mode, two positioning holes are formed in the lap joint position of the second connecting piece and the first connecting piece respectively, and the U-shaped connecting fastener penetrates through the trapezoidal support frame to be fixed on the positioning holes.
6. A reinforcing bar mounting platform for high pier rollover construction according to claim 5, wherein: an inclined strut rod piece is arranged between the trapezoidal support frame and the template.
7. A reinforcing bar mounting platform for high pier rollover construction according to claim 6, wherein: and an inclined pull rod piece is arranged between the platform and the upright post.
8. A reinforcing bar mounting platform for high pier rollover construction according to claim 7, wherein: and a steel mesh and a skirting board are paved on the platform.
9. The rebar installation platform for high pier rollover construction according to claim 8, wherein: and a protective net is arranged on the outer ring of the platform.
10. A rebar installation platform for high pier rollover construction according to claim 1 or 9, wherein: the square-shaped frame body is octagonal, and the upright columns are arranged at the octagonal positions of the square-shaped frame body respectively.
CN202022496410.3U 2020-11-03 2020-11-03 A reinforcing bar mounting platform for high mound turns over mould construction Active CN214033392U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022496410.3U CN214033392U (en) 2020-11-03 2020-11-03 A reinforcing bar mounting platform for high mound turns over mould construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022496410.3U CN214033392U (en) 2020-11-03 2020-11-03 A reinforcing bar mounting platform for high mound turns over mould construction

Publications (1)

Publication Number Publication Date
CN214033392U true CN214033392U (en) 2021-08-24

Family

ID=77356242

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022496410.3U Active CN214033392U (en) 2020-11-03 2020-11-03 A reinforcing bar mounting platform for high mound turns over mould construction

Country Status (1)

Country Link
CN (1) CN214033392U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114086461A (en) * 2021-12-10 2022-02-25 中铁四局集团路桥工程有限公司 Rapid construction method for high pier combined assembly type steel bar inner support matched die overturning method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114086461A (en) * 2021-12-10 2022-02-25 中铁四局集团路桥工程有限公司 Rapid construction method for high pier combined assembly type steel bar inner support matched die overturning method
CN114086461B (en) * 2021-12-10 2023-12-19 中铁四局集团有限公司 Rapid construction method for high pier combined assembly type steel bar inner support by matching with turnover formwork method

Similar Documents

Publication Publication Date Title
CN111254796B (en) Single-side integral hoisting long-span overbridge for multiple railway business lines and construction method
CN105113388B (en) Formwork and bracket combining structure of vase pier of viaduct and application method
CN106760529B (en) Roof steel truss sliding assembly construction platform and installation method
JP5047680B2 (en) Construction method of continuous viaduct
CN214033392U (en) A reinforcing bar mounting platform for high mound turns over mould construction
CN206319610U (en) Roof system steel truss slipping and assembling construction platform structure
CN102767282B (en) Assembly-type high-formwork construction method for cantilever of oversized special-shaped conversion layer
CN113494051B (en) Construction method for block-by-block prefabricated installation of variable-section inclined tower steel reinforcement framework
CN206015531U (en) Quick assembled type ladder cage
CN210140771U (en) Construction work platform hoisting frame of high mound of bridge
CN111648229A (en) Assembled hoop platform for bent cap construction and mounting method thereof
CN109577206B (en) Hollow high pier formwork system and construction method
CN216194062U (en) Temporary support structure
CN213328707U (en) Thin-wall pier high-altitude operation combined platform
CN212714563U (en) Fast-assembling recyclable pier body template combined operation platform
CN212358023U (en) Integral type edge-facing protection device and structure for pier column, middle tie beam and bent cap construction
CN211815605U (en) Construction device for pile column type pier tie beam and capping beam
CN210127413U (en) Bridge cylindrical pier annular construction platform
CN209924407U (en) Combined working platform for steel structure high-altitude installation
CN112746563A (en) Totally-enclosed separated operating platform for ultrahigh hollow thin-wall pier and construction method thereof
CN111851978A (en) Assembled lifting scaffold and construction method thereof
CN109930497B (en) Workpiece for line crossing construction of formwork suspension casting combined system and construction process
CN218951997U (en) Construction device for pier body outer frame body capable of being constructed rapidly
JP2874576B2 (en) Moving scaffold for retaining wall construction
CN220434088U (en) Mobile stair steel platform

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant