CN214028723U - Handling device is used in hydraulic engineering pile foundation construction - Google Patents

Handling device is used in hydraulic engineering pile foundation construction Download PDF

Info

Publication number
CN214028723U
CN214028723U CN202022665742.XU CN202022665742U CN214028723U CN 214028723 U CN214028723 U CN 214028723U CN 202022665742 U CN202022665742 U CN 202022665742U CN 214028723 U CN214028723 U CN 214028723U
Authority
CN
China
Prior art keywords
transportation shell
pile foundation
shell
transportation
connecting piece
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022665742.XU
Other languages
Chinese (zh)
Inventor
梁玉山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangxi Chengan Construction Engineering Co ltd
Original Assignee
Jiangxi Chengan Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangxi Chengan Construction Engineering Co ltd filed Critical Jiangxi Chengan Construction Engineering Co ltd
Priority to CN202022665742.XU priority Critical patent/CN214028723U/en
Application granted granted Critical
Publication of CN214028723U publication Critical patent/CN214028723U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model relates to a transportation equipment technical field specifically is a handling device is used in hydraulic engineering pile foundation construction, and it includes first transportation shell, second transportation shell and third transportation shell, the bottom welding of first transportation shell has first connecting piece, the bottom one end welding of second transportation shell has the second connecting piece, first connecting piece and second connecting piece pass through bolt fixed connection, the one end welding of second connecting piece is kept away from to the bottom of second transportation shell has the third connecting piece, the bottom one end welding of third transportation shell has the fourth connecting piece, third connecting piece and fourth connecting piece pass through bolt fixed connection. The utility model has the advantages that: increase or reduce the second transportation shell according to the difference of pile foundation length, reach double buffering effect through shock pad and damping spring inside the transportation shell, can erect the pile foundation through the jack of first transportation shell and third transportation shell bottom.

Description

Handling device is used in hydraulic engineering pile foundation construction
Technical Field
The utility model relates to a transportation equipment technical field, especially a handling device is used in hydraulic engineering pile foundation construction.
Background
A deep foundation consisting of piles and pile caps connected to the piles or a single pile foundation consisting of piles and pile foundations connected to the piles, called a low cap pile foundation for short if the pile body is completely buried in the soil and the bottom surface of the cap is in contact with the soil, and called a high cap pile foundation if the upper part of the pile body is exposed above the ground and the bottom of the cap is above the ground.
At present, hydraulic engineering project is in the construction, often need utilize handling device to transport the pile foundation, and current handling device is at the in-process that uses, because the unable change in position that its fixed knot located, and then lead to this handling device can only transport the pile foundation of specific length, thereby its self range of application has been reduced, and current handling device though can realize fixing the pile foundation, but be unfavorable for lifting and put and get the pile foundation of hanging, thereby brought the inconvenience of working for operating personnel, consequently, need improve it.
The handling device for hydraulic engineering pile foundation construction disclosed in chinese patent CN210478766U has significant effect on the hydraulic pile foundation of different lengths in transportation, but also has the shortcoming of unsatisfactory damping and buffering effect when solving the problem.
SUMMERY OF THE UTILITY MODEL
The utility model aims to overcome the defects of the prior art, and provides a transporting device for hydraulic engineering pile foundation construction, which comprises a first transporting shell, a second transporting shell and a third transporting shell, wherein one end of the first transporting shell is welded with a first connecting piece, the bottom of the first transporting shell is fixedly provided with a first universal wheel, the inside of the first transporting shell is fixedly provided with a first shock pad, the bottom of the first shock pad is fixedly provided with a first shock absorption spring, the bottom of the first transporting shell is provided with a first groove, the inside of the first groove is fixedly provided with a first jack through a bolt, one end of the first jack is rotatably connected with a first lifting rod, the top of the first jack is welded with a first lifting tray, one end of the first transporting shell far away from the first connecting piece is welded with a first hand push rod, the outer wall of the first transporting shell is provided with a first square groove, and a first clamping block is welded on the lower surface of the first square groove.
Optionally, second connecting pieces are welded at two ends of the bottom of the second transportation shell and fixedly connected with the first connecting pieces through bolts.
Optionally, a second universal wheel is fixedly mounted at the bottom of the second transportation shell.
Optionally, a second damping pad is fixedly mounted inside the second transportation shell, and a second damping spring is fixedly mounted at the bottom of the second damping pad.
Optionally, a second square groove is formed in the outer wall of the second transportation shell, and a second clamping block is welded to the lower surface of the second square groove.
Optionally, a third connecting piece is welded at the bottom of the third transportation shell, a second hand push rod is welded at one end, far away from the third connecting piece, of the third transportation shell, and the third connecting piece is fixedly connected with the second connecting piece through a bolt.
Optionally, a third universal wheel is fixedly mounted at the bottom of the third transportation shell.
Optionally, a third damping pad is fixedly mounted inside the third transportation shell, and a third damping spring is fixedly mounted at the bottom of the third damping pad.
Optionally, a second groove is formed in the bottom of the third transport shell, a second jack is fixedly mounted inside the second groove through a bolt, one end of the second jack is rotatably connected with a second lifting rod, and a second lifting tray is welded to the top of the second jack.
Optionally, a third square groove is formed in the outer wall of the third transportation shell, and a third clamping block is welded to the lower surface of the third square groove.
The utility model has the advantages of it is following:
1. this handling device is used in hydraulic engineering pile foundation construction, through setting up the jack, shock pad and damping spring, when the pile foundation is in the transportation, shock pad and damping spring can implement dual buffering to the pile foundation, the shock attenuation is respond well, when the crane hoists the pile foundation, the jack at both ends can be in unsettled state by two constructors simultaneous operation to pile foundation frame, be convenient for hoist of crane, the artifical manual trouble of lifting the pile foundation out and hoisting has been removed from, the transport of pile foundation has been simplified, constructor's work efficiency has been improved
2. This handling device is used in hydraulic engineering pile foundation construction, through setting up first transportation shell, second transportation shell and third transportation shell, the transportation shell passes through the connecting piece with the transportation shell and is connected, the both ends of second transportation shell bottom all are provided with the connecting piece, according to the difference of site conditions, can reduce in proper order or increase second transportation shell, through first transportation shell, the demand that this equipment turned at the bend is accomplished to the universal wheel of second transportation shell and third transportation shell bottom, consequently, the practicality of this handling device under different circumstances has been increased.
Drawings
Fig. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic view of the structure of the connecting member of the present invention;
fig. 3 is a schematic structural view of a first transportation case of the present invention;
FIG. 4 is a schematic view of the shock pad of the present invention;
fig. 5 is a schematic structural view of the jack of the present invention.
In the figure: 1-a first transport shell, 2-a second transport shell, 3-a third transport shell, 4-a first connecting piece, 5-a first universal wheel, 6-a first shock-absorbing pad, 7-a first shock-absorbing spring, 8-a first groove, 9-a first jack, 10-a first lifting rod, 11-a first lifting tray, 12-a first hand-pushing rod, 13-a first square groove, 14-a first clamping block, 15-a second connecting piece, 16-a second universal wheel, 17-a second shock-absorbing pad, 18-a second shock-absorbing spring, 19-a second square groove, 20-a second clamping block, 21-a third connecting piece, 22-a second hand-pushing rod, 23-a third universal wheel, 24-a third shock-absorbing pad, 25-a third shock-absorbing spring, 26-a second groove, 27-a second jack, 28-a second lifting rod, 29-a second lifting tray, 30-a third square groove and 31-a third clamping block.
Detailed Description
The invention will be further described with reference to the accompanying drawings, but the scope of the invention is not limited to the following description.
As shown in fig. 1-5, a transporting device for hydraulic engineering pile foundation construction comprises a first transporting shell 1, a second transporting shell 2 and a third transporting shell 3, wherein a first connecting member 4 is welded at one end of the first transporting shell 1, a first universal wheel 5 is fixedly installed at the bottom of the first transporting shell 1, and the device can perform actions such as turning and the like in the transporting process through the arrangement of the first universal wheel 5, so that the operation of constructors is facilitated, a first damping pad 6 is fixedly installed inside the first transporting shell 1, a first damping spring 7 is fixedly installed at the bottom of the first damping pad 6, through the arrangement of the first damping spring 7, the vibration can be reduced in the transportation process on a bumpy road surface, the phenomenon that the pile foundation damages the internal structure of the pile foundation due to vibration in the transporting process is avoided, a first groove 8 is formed at the bottom of the first transporting shell 1, the utility model discloses a lifting device, including first recess 8, first jack 9, first lifting tray 9, first jack 9's one end is rotated and is connected with first lifter 10, the top welding of first jack 9 has first lift tray 11, through the setting of first jack 9, props up the pile foundation at the in-process that needs to lift by crane to the pile foundation, makes the pile foundation be in the suspended state and is convenient for lifting by crane, the one end welding that first connecting piece 4 was kept away from to first transportation shell 1 has first handspike 12, first square groove 13 has been seted up to the outer wall of first transportation shell 1, the lower surface welding of first square groove 13 has first fixture block 14, implants the rubber binding area through first square 13 groove, makes the rubber binding area tighten again and fixes to first fixture block 14 on, makes the pile foundation be difficult for breaking away from the device in the transportation.
As an optimal technical solution of the utility model: the two ends of the bottom of the second transportation shell 2 are welded with second connecting pieces 15, the second connecting pieces 15 are fixedly connected with the first connecting pieces 4 through bolts and are connected through bolts when in use, and fixing pieces such as bolts can be detached to separate the fixing pieces when the device is idle, so that the storage space can be saved.
As an optimal technical solution of the utility model: the bottom of the second transportation shell 2 is fixedly provided with a second universal wheel 16 which is matched with the first universal wheel 5 to run, so that the device can perform actions such as turning in the transportation process, and the operation of constructors is convenient.
As an optimal technical solution of the utility model: inside fixed mounting of second transportation shell 2 has second shock pad 17, the bottom fixed mounting of second shock pad 17 has second damping spring 18, through second damping spring 17's setting, can alleviate vibrations in the transportation on the road surface of jolting, avoids the pile foundation to destroy its inner structure because of vibrations in the transportation.
As an optimal technical solution of the utility model: the outer wall of the second transportation shell 2 is provided with a second square groove 19, the lower surface of the second square groove 19 is welded with a second clamping block 20, a rubber binding belt is implanted through the second square groove 19, the rubber binding belt is tightened and fixed on the second clamping block 20, and the pile foundation is not prone to being separated from the device in the transportation process.
As an optimal technical solution of the utility model: the bottom of the third transportation shell 3 is welded with a third connecting piece 21, one end, far away from the third connecting piece 21, of the third transportation shell 3 is welded with a second hand push rod 22, the third connecting piece 21 is fixedly connected with the second connecting piece 15 through a bolt and is connected with the third connecting piece through the bolt when in use, and when the device is not in use, fixing pieces such as the bolt and the like can be detached to separate the third connecting piece from the second connecting piece, so that the storage space can be saved.
As an optimal technical solution of the utility model: the bottom of the third transportation shell 3 is fixedly provided with a third universal wheel 23 which is matched with the first universal wheel 5 and the second universal wheel 16 to run, so that the device can perform actions such as turning in the transportation process, and the operation of constructors is convenient.
As an optimal technical solution of the utility model: the inside fixed mounting of third transportation shell 3 has third shock pad 24, the bottom fixed mounting of third shock pad 24 has third damping spring 25, through third damping spring 14's setting, can alleviate vibrations in the transportation on the road surface of jolting, avoids the pile foundation to destroy its inner structure because of vibrations in the transportation.
As an optimal technical solution of the utility model: second recess 26 has been seted up to the bottom of third transportation shell 3, there is second jack 27 second recess 26's inside through bolt fixed mounting, through the setting of second jack 27, props up the pile foundation at the in-process that needs lift by crane the pile foundation, makes the pile foundation be in the suspended state and is convenient for lifting by crane the one end of second jack 27 rotates and is connected with second lifter 28, second lifting tray 29 has been welded at the top of second jack 27. When the jack is used, an operator presses the lifting rod downwards to enable the hydraulic device in the jack to exert force upwards, at the moment, the hydraulic device in the jack supports the lifting tray upwards,
as an optimal technical solution of the utility model: the outer wall of the third transportation shell 3 is provided with a third square groove 30, the lower surface of the third square groove 30 is welded with a third clamping block 31, a rubber binding belt is implanted through the third square groove 30, the rubber binding belt is tightened and fixed on the third clamping block 31, and the pile foundation is not easy to break away from the device in the transportation process.
In summary, the following steps: the carrying device for hydraulic engineering pile foundation construction is provided with the jacks, the shock pad and the shock absorbing spring, when the pile foundation is transported, the shock pad and the shock absorbing spring can carry out double buffering on the pile foundation, the shock absorbing effect is good, when the pile foundation is lifted by a crane, the jacks at two ends can be simultaneously operated by two constructors to lift the pile foundation in a suspended state, the lifting of the crane is convenient, the trouble of manually lifting the pile foundation out and then lifting the pile foundation is avoided, the carrying of the pile foundation is simplified, the working efficiency of constructors is improved, the first transporting shell 1, the second transporting shell 2 and the third transporting shell 3 are arranged, the transporting shells are connected with the transporting shells through the connecting pieces, the connecting pieces are arranged at two ends of the bottom of the second transporting shell, the second transporting shell can be sequentially reduced or increased according to different field conditions, the requirement of turning of the equipment at a bend is met through the universal wheels at the bottoms of the first transporting shell 1, the second transporting shell 2 and the third transporting shell 3, thereby increasing the practicability of the carrying device under different conditions
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (10)

1. The utility model provides a handling device is used in hydraulic engineering pile foundation construction which characterized in that: it comprises a first transportation shell (1), a second transportation shell (2) and a third transportation shell (3), wherein a first connecting piece (4) is welded at one end of the first transportation shell (1), a first universal wheel (5) is fixedly installed at the bottom of the first transportation shell (1), a first shock pad (6) is fixedly installed inside the first transportation shell (1), a first shock absorption spring (7) is fixedly installed at the bottom of the first shock pad (6), a first groove (8) is formed in the bottom of the first transportation shell (1), a first jack (9) is fixedly installed inside the first groove (8) through a bolt, one end of the first jack (9) is rotatably connected with a first lifting rod (10), a first lifting tray (11) is welded at the top of the first jack (9), a first handspike (12) is welded at one end, far away from the first connecting piece (4), of the first transportation shell (1), first square groove (13) have been seted up to the outer wall of first transportation shell (1), the lower surface welding of first square groove (13) has first fixture block (14).
2. The carrying device for the construction of the hydraulic engineering pile foundation of claim 1, wherein: and second connecting pieces (15) are welded at two ends of the bottom of the second transportation shell (2), and the second connecting pieces (15) are fixedly connected with the first connecting pieces (4) through bolts.
3. The carrying device for the construction of the hydraulic engineering pile foundation of claim 1, wherein: and a second universal wheel (16) is fixedly arranged at the bottom of the second transportation shell (2).
4. The carrying device for the construction of the hydraulic engineering pile foundation of claim 1, wherein: the inside fixed mounting of second transportation shell (2) has second shock pad (17), the bottom fixed mounting of second shock pad (17) has second damping spring (18).
5. The carrying device for the construction of the hydraulic engineering pile foundation of claim 1, wherein: a second square groove (19) is formed in the outer wall of the second transportation shell (2), and a second clamping block (20) is welded to the lower surface of the second square groove (19).
6. The carrying device for the construction of the hydraulic engineering pile foundation of claim 1, wherein: the bottom welding of third transportation shell (3) has third connecting piece (21), the one end welding that third transportation shell (3) kept away from third connecting piece (21) has second hand push rod (22), third connecting piece (21) pass through bolt fixed connection second connecting piece (15).
7. The carrying device for the construction of the hydraulic engineering pile foundation of claim 1, wherein: and a third universal wheel (23) is fixedly arranged at the bottom of the third transportation shell (3).
8. The carrying device for the construction of the hydraulic engineering pile foundation of claim 1, wherein: the inside fixed mounting of third transportation shell (3) has third shock pad (24), the bottom fixed mounting of third shock pad (24) has third damping spring (25).
9. The carrying device for the construction of the hydraulic engineering pile foundation of claim 1, wherein: second recess (26) have been seted up to the bottom of third transportation shell (3), there is second jack (27) inside of second recess (26) through bolt fixed mounting, the one end of second jack (27) is rotated and is connected with second lifter (28), the top welding of second jack (27) has second lift tray (29).
10. The carrying device for the construction of the hydraulic engineering pile foundation of claim 1, wherein: the outer wall of the third transportation shell (3) is provided with a third square groove (30), and a third clamping block (31) is welded on the lower surface of the third square groove (30).
CN202022665742.XU 2020-11-18 2020-11-18 Handling device is used in hydraulic engineering pile foundation construction Active CN214028723U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022665742.XU CN214028723U (en) 2020-11-18 2020-11-18 Handling device is used in hydraulic engineering pile foundation construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022665742.XU CN214028723U (en) 2020-11-18 2020-11-18 Handling device is used in hydraulic engineering pile foundation construction

Publications (1)

Publication Number Publication Date
CN214028723U true CN214028723U (en) 2021-08-24

Family

ID=77360400

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022665742.XU Active CN214028723U (en) 2020-11-18 2020-11-18 Handling device is used in hydraulic engineering pile foundation construction

Country Status (1)

Country Link
CN (1) CN214028723U (en)

Similar Documents

Publication Publication Date Title
CN102126662A (en) Weight body of elevator counterweight
CN214028723U (en) Handling device is used in hydraulic engineering pile foundation construction
CN112623922A (en) Template overhead hoist is used in hydraulic engineering construction
CN202226572U (en) Miniature remote control crane
CN114505829A (en) Hydraulic cylinder stands up auxiliary device
CN212198159U (en) Box-type component turnover device
CN218141821U (en) A travelling car for transporting transformer
CN214614062U (en) Fuselage gyration fixing device suitable for piling machinery
CN212164379U (en) Carrier vehicle undercarriage structure of climate chamber container and climate chamber
JP2012117251A (en) Tubing device
CN106915708A (en) Vehicle raising adapter system
CN209455929U (en) A kind of hoisting auxiliary device and case change becoming lifting for case
CN104005412B (en) A kind of hydraulic static pile pressing machine being applicable to narrow building site
CN207566767U (en) A kind of water conservancy inserting plate balancing crane
CN206052675U (en) A kind of seat structure of vertical ship lift locking device hydraulic push rod
CN201362860Y (en) Building concrete pile detection device
CN218371208U (en) Hoisting sleeve bag
CN215107134U (en) Movable construction platform
CN219506742U (en) Socket-joint pile hammer strorage device
CN205220716U (en) Location is with hydraulic oil top removal handcart
CN219058470U (en) Portable installation and maintenance device for glass fiber reinforced plastic radar radome
CN210652852U (en) Large-scale sapling transportation fixing device
CN215558356U (en) Building engineering construction material lifts by crane fixing device
CN211688015U (en) Railway construction material handling device
KR102023760B1 (en) A gripper for transportation of reinforced block

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant