CN214005436U - Pier hangs rail - Google Patents

Pier hangs rail Download PDF

Info

Publication number
CN214005436U
CN214005436U CN202022787283.2U CN202022787283U CN214005436U CN 214005436 U CN214005436 U CN 214005436U CN 202022787283 U CN202022787283 U CN 202022787283U CN 214005436 U CN214005436 U CN 214005436U
Authority
CN
China
Prior art keywords
pier
steel
basket platform
hanging
angle steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022787283.2U
Other languages
Chinese (zh)
Inventor
韦光
储著友
虞中明
李雷
江训济
晏伟
董景超
熊泳
黄靖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 24th Bureau Group Co Ltd
Original Assignee
China Railway 24th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 24th Bureau Group Co Ltd filed Critical China Railway 24th Bureau Group Co Ltd
Priority to CN202022787283.2U priority Critical patent/CN214005436U/en
Application granted granted Critical
Publication of CN214005436U publication Critical patent/CN214005436U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model relates to a pier hangs rail, including hanging flower basket platform, angle steel support, spiral stair and mound top rail, wherein the outer contour shape of hanging flower basket platform and spiral stair's enclosed region and pier, size identical adaptation, the hanging flower basket platform comprises horizontal angle steel and a plurality of L type's support combination, a plurality of supports are arranged along the length direction interval of horizontal angle steel, horizontal angle steel is installed in the horizontal part of support, link to each other and constitute wholly through the round steel between the vertical part of each support, horizontal angle steel upper berth is equipped with the steel lattice board; the spiral stair is arranged at the corner end part of the hanging basket platform and is used for communicating a working area on the hanging basket platform with a pier top working area in the pier top fence; the angle iron bracket is arranged at the bottom of the hanging basket platform to support the hanging basket platform, and can be connected and fixed with the bridge pier. The utility model has the advantages that: when quality is guaranteed, the installation efficacy is effectively improved, and damage in the later operation process is convenient to replace.

Description

Pier hangs rail
Technical Field
The utility model belongs to the technical field of the bridge construction technique and specifically relates to a pier hangs rail.
Background
With the development of science and technology, the safe construction of the bridge pier is very important. At present, a hanging fence is erected at the pier top position of a pier to facilitate construction or overhaul of the pier by maintainers. In the existing structure of the hanging fence, a plurality of components are processed and then welded and assembled on site.
At this time, such a suspension fence is not suitable for long-term use, and if a local damage occurs, only the whole of the component with the local damage can be cut off, and then a new component is replaced, and then welding is performed. Can so, because the pier hangs rail itself higher, the upper and lower transportation of extremely being unfavorable for the component, the construction degree of difficulty is great, is accomplishing the cutting back of damaged component moreover, hangs the risk that the breach causes the personal damage easily appears in the rail.
Disclosure of Invention
The utility model aims at providing a pier hangs rail according to the not enough of above-mentioned prior art, structural design and the protective measure between the structure that makes through the assembly under the prerequisite of guaranteeing pier and hanging rail security, effectively improve the efficiency of its installation and change.
The utility model discloses the purpose is realized accomplishing by following technical scheme:
a pier hangs rail which characterized in that: the hanging basket platform is formed by combining horizontal angle steel and a plurality of L-shaped supports, the plurality of supports are arranged at intervals along the length direction of the horizontal angle steel, the horizontal angle steel is installed at the horizontal parts of the supports, the vertical parts of the supports are connected through round steel to form a whole, and a steel lattice plate is laid on the horizontal angle steel; the spiral stair is arranged at the corner end part of the hanging basket platform and is used for communicating a working area on the hanging basket platform with a pier top working area in the pier top fence; the angle iron bracket is arranged at the bottom of the hanging basket platform to support the hanging basket platform, and can be connected and fixed with the bridge pier.
The horizontal angle steel and the bracket are fixedly connected through bolts.
The spiral stair and the hanging basket platform are fixedly connected through bolts.
The vertical part of the bracket is provided with a mounting hole matched with the round steel in a matching way, the round steel integrally penetrates through the mounting hole, and two ends of the round steel are fixed with the brackets positioned at two sides through galvanized screws.
Threads are arranged at two ends of the round steel; and a plastic retainer is arranged in the mounting hole.
The top of the spiral stair and the pier top of the pier are connected and fixed through implanting a chemical anchor bolt.
The end part of the hanging basket platform is aligned with the upright post of the beam support cushion stone on the pier top of the pier between the pier top fences.
When the distance between the steel lattice plate and the pier body of the pier is more than 20cm, the steel lattice plate and the pier body of the pier are sealed by arranging a hot-dip galvanized steel wire mesh, and the hot-dip galvanized steel wire mesh and the angle steel bracket are fixed through a U-shaped clamp.
The utility model has the advantages that: when the quality is guaranteed, the installation efficacy is effectively improved, the damage in the later-stage operation process is convenient to replace, the maintenance operation is more favorably realized by the maintenance personnel who directly reach the pier from the hanging basket platform to open and maintain, the safety risk of the labor operation is reduced, and the actual requirement for maintaining the bridge bearing by the maintenance part of the engineering is well met.
Drawings
Fig. 1 is a schematic plan view of the present invention;
fig. 2 is a schematic view of the vertical structure of the present invention;
FIG. 3 is a schematic structural view of a steel grating according to the present invention;
fig. 4 is a connecting structure diagram of the middle level angle steel and the bracket of the utility model.
Detailed Description
The features of the present invention and other related features are described in further detail below by way of example in conjunction with the accompanying drawings to facilitate understanding by those skilled in the art:
as shown in fig. 1-4, the labels 1-8 in the figures are respectively expressed as: hanging flower basket platform 1, support 2, horizontal angle steel 3, spiral stair 4, mound top rail 5, pier 6, angle steel support 7, steel lattice board 8, round steel 9.
Example (b): referring to fig. 1 and 2, the main body of the pier suspension fence in this embodiment includes a gondola 1, an angle bracket 7, a spiral staircase 4, and a pier top rail 5. The enclosed area of the hanging basket platform 1 and the spiral stair 4 is matched with the outer contour shape and size of the pier and is symmetrically arranged with the pier 6. The hanging basket platform 1 is formed by combining a horizontal angle steel 3 and a plurality of L-shaped supports 2, and the supports 2 are arranged at intervals along the length direction of the horizontal angle steel 3 to meet the requirement of supporting strength; the horizontal angle steel 3 is installed at the horizontal part of the bracket 2 and connected with the bracket through a bolt, so that the installation or replacement is convenient.
The vertical parts of the brackets 2 are connected through round steel 9 and form a whole, and the structural integrity and the stability of the brackets 2 are effectively improved on the premise of ensuring safety protection. In the specific implementation: the vertical part of the support 2 is provided with mounting holes matched with the round steel 9 in diameter, the round steel 9 integrally penetrates through the mounting holes formed in each support 2 at the single-side hanging basket platform 1, and the two ends of the round steel 9 are screwed and fixed with the supports 2 positioned on the two sides through galvanized screws.
As shown in fig. 4, a steel lattice plate 8 is laid on the horizontal angle steel 3 as a step for an operator to walk. At this time, since the outer side of the steel lattice plate 8 is surrounded by the vertical portion of the bracket 2 and the round steel 9, the personal safety of the operator walking on the steel lattice plate 8 can be ensured.
As shown in fig. 1 and 2, a pier top fence 5 is provided on the top of the pier 6, and the gondola 1 is provided below the pier top, and communication is established by providing spiral stairs 4 therebetween, so that an operator can move and switch between the working area of the gondola 1 and the pier top working area in the pier top fence 5 by the spiral stairs 4. Specifically, spiral stair 4 installs the corner tip at the hanging flower basket platform and its bottom is connected fixedly with hanging flower basket platform 1, and the top constitutes fixedly through implanting chemical anchor bolt with the pier top of pier 6. In the specific implementation: the spiral stairs 4 and the hanging basket platform 1 can be fixedly connected through bolts, so that the installation and the replacement are convenient. Similarly, the spiral stairs 4 and the pier top fence 5 can be connected and fixed through bolts.
As shown in fig. 2 and 4, the angle iron bracket 7 is arranged at the bottom of the nacelle platform 1 to support the nacelle platform, and the main body of the angle iron bracket 7 is in an oblique supporting body shape and can be connected and fixed with the pier 6 through a U-shaped clamp or an L-shaped clamp, so that the sufficient supporting force can be applied to the nacelle platform 1, and the stable structure is ensured.
In the embodiment, in specific implementation: the two ends of the round steel 9 are provided with threads, so that the connection strength between the round steel and the galvanized screw can be further ensured, and the safety is ensured. Be provided with the plastics protective shroud in the mounting hole that vertical portion of support 2 was seted up, this plastics protective shroud can be for turning over folding type plastics protective shroud, damages the hot dip galvanizing coat of support 2 when avoiding round steel 9 to install to effectively protect support 2.
The upright posts of the supporting base stones of the beams on the pier top of the pier 6 are aligned between the end part of the hanging basket platform 1 and the pier top fence 5, so that a closed structure is formed, the occupied position of the hanging fence body is reduced as much as possible, and the space is effectively avoided.
When a certain gap is formed between the steel lattice plate 8 and the pier body of the pier 6 and the gap is larger than 20cm, the steel lattice plate 8 and the pier 6 can be sealed by arranging a hot-dip galvanized steel wire mesh on the horizontal angle steel 2, and the hot-dip galvanized steel wire mesh is fixed to the angle steel bracket through a U-shaped clamp.
As shown in fig. 3, the steel lattice plate 8 is made in 1920 × 500mm size and manufactured according to G323/40/50SG standard, and can effectively reduce the number of components and facilitate installation while ensuring strength.
The pier top connecting part of the spiral stair 4 and the pier 6 can be realized by embedding bolts in the pier top, and if the bolts are not embedded, chemical anchor bolts can be planted behind. The exposed length of the bolt is not required to be too long, and the requirement for installing double nuts is met.
Although the conception and the embodiments of the present invention have been described in detail with reference to the drawings, those skilled in the art will recognize that various changes and modifications can be made therein without departing from the scope of the appended claims, and therefore, the description thereof is not repeated herein.

Claims (8)

1. A pier hangs rail which characterized in that: the hanging basket platform is formed by combining horizontal angle steel and a plurality of L-shaped supports, the plurality of supports are arranged at intervals along the length direction of the horizontal angle steel, the horizontal angle steel is installed at the horizontal parts of the supports, the vertical parts of the supports are connected through round steel to form a whole, and a steel lattice plate is laid on the horizontal angle steel; the spiral stair is arranged at the corner end part of the hanging basket platform and is used for communicating a working area on the hanging basket platform with a pier top working area in the pier top fence; the angle iron bracket is arranged at the bottom of the hanging basket platform to support the hanging basket platform, and can be connected and fixed with the bridge pier.
2. The pier hanging rail according to claim 1, wherein: the horizontal angle steel and the bracket are fixedly connected through bolts.
3. The pier hanging rail according to claim 1, wherein: the spiral stair and the hanging basket platform are fixedly connected through bolts.
4. The pier hanging rail according to claim 1, wherein: the vertical part of the bracket is provided with a mounting hole matched with the round steel in a matching way, the round steel integrally penetrates through the mounting hole, and two ends of the round steel are fixed with the brackets positioned at two sides through galvanized screws.
5. The pier hanging rail according to claim 4, wherein: threads are arranged at two ends of the round steel; and a plastic retainer is arranged in the mounting hole.
6. The pier hanging rail according to claim 1, wherein: the top of the spiral stair and the pier top of the pier are connected and fixed through implanting a chemical anchor bolt.
7. The pier hanging rail according to claim 1, wherein: the end part of the hanging basket platform is aligned with the upright post of the beam support cushion stone on the pier top of the pier between the pier top fences.
8. The pier hanging rail according to claim 1, wherein: when the distance between the steel lattice plate and the pier body of the pier is more than 20cm, the steel lattice plate and the pier body of the pier are sealed by arranging a hot-dip galvanized steel wire mesh, and the hot-dip galvanized steel wire mesh and the angle steel bracket are fixed through a U-shaped clamp.
CN202022787283.2U 2020-11-26 2020-11-26 Pier hangs rail Active CN214005436U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022787283.2U CN214005436U (en) 2020-11-26 2020-11-26 Pier hangs rail

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022787283.2U CN214005436U (en) 2020-11-26 2020-11-26 Pier hangs rail

Publications (1)

Publication Number Publication Date
CN214005436U true CN214005436U (en) 2021-08-20

Family

ID=77307472

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022787283.2U Active CN214005436U (en) 2020-11-26 2020-11-26 Pier hangs rail

Country Status (1)

Country Link
CN (1) CN214005436U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114703749A (en) * 2022-04-08 2022-07-05 中铁大桥局武汉桥梁特种技术有限公司 Method for steel truss inspection vehicle to pass through pier top without obstacle

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114703749A (en) * 2022-04-08 2022-07-05 中铁大桥局武汉桥梁特种技术有限公司 Method for steel truss inspection vehicle to pass through pier top without obstacle
CN114703749B (en) * 2022-04-08 2024-05-14 中铁大桥局武汉桥梁特种技术有限公司 Barrier-free pier top passing method for steel truss inspection vehicle

Similar Documents

Publication Publication Date Title
EP2071102B1 (en) A hanging structure supporting photovoltaic panels
JP6227316B2 (en) Flotage trap and its assembly method
CN103410670A (en) Trussed wind turbine tower and wind turbine unit with same
JP2014095281A (en) Frame for solar panel and installation method therefor
CN214005436U (en) Pier hangs rail
CN105932940A (en) Fish-bellied multi-cable photovoltaic support
CN112942847B (en) Construction method for mounting decorative plate outside old curtain wall by crossing bottom barrier
CN201794355U (en) Steel rod climbing-preventive screen structure
CN215057909U (en) Tower of vertical axis wind power generation system
JP3950800B2 (en) Suspension scaffold
CN209081302U (en) Tower crane attached assembly type operation maintenance platform
CN213572906U (en) Impeller assembling and hoisting platform for wind turbine generator in mountainous wind power plant
CN211949893U (en) Novel hot-galvanize railway protection network
KR200340325Y1 (en) Bridge inspection
CN207526644U (en) A kind of wind power generating set concrete tower internal structure
CN215632066U (en) Self-supporting high-speed rail crossing frame for power transmission line
CN110593139A (en) Light high-strength high-durability composite material safety platform and construction method thereof
CN219653537U (en) Assembled steel platform
RU2622975C1 (en) Method of installing a container power plant with relevant equipment in the field of its use and devices for realisation of the method
CN218406734U (en) Adjustable steel bar processing shed
CN219604133U (en) Steel bridge platform between deep foundation pit supporting beam and tower crane foundation
CN216141904U (en) Operation platform for beam prefabrication and cast-in-place combined construction in water area environment
CN209826058U (en) Adjustable prefabricated staircase show shelf
CN215169702U (en) A cat ladder that is used for cold tower cone segment between steel construction
CN215056003U (en) Novel safety protective guard for construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant